Amendment_0001_W91236-17-B-0012_DLA_Boilers.pdf
PDF 56 KB Posted
- Attached to
- Replace Boilers/Install New Natural Gas Line Project Federal contract opportunity
- Solicitation number
- W91236-17-B-0012
About this file
Amendment 0001 - RFI
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DRAWINGS_RTA_DSCR_GAS_LINES_NOV_2016_SIGNED.pdf | ||
| W91236-17-B-0012_DLA_Boilers_IFB.pdf | ||
| DRAWINGS_RTA_DSCR_BOILERS_NOV_2016_SIGNED.pdf | ||
| SPECIFICATIONS_-_DLA_Boilers-Nat_Gas_Dated_10-18-16.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W91236-17-B-0012, Natural Gas Mains and New Boilers, Chesterf ield, Virginia
The purpose of this amendment is to incorporate the ProjNet Inquiry Report.
Contracting POC: Jaime Scott How ard, Jaime.C.Scott@usace.army.mil, 757-201-7158.
Nothing Follow s
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Aug-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123617B0012
X 9B. DATED (SEE ITEM 11)
02-Aug-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Aug-2017
CODE
USA ENGINEER DISTRICT, NORFOLK
803 FRONT STREET
NORFOLK VA 23510-1096
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123617B0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 21 00 - INSTRUCTIONS
The following have been added by full text:
RFI
Bid Inquiry Contracting Officers Report Closed
Inquiries Project: DLA - Natural Gas Mains and New Boilers Review: W91236-17-B- 0012 (00002) (sorted by CommentID ) Displaying 6 inquiries.
Id Discipline Sheet Detail Spec 7098773 Energy Mon & Controls Section 01 11 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
What is the total number of boilers to be replaced
1-0
1-1 Government Response. There are two boilers per building with a total of six new boilers required.
Reference notes on drawings M-101, M-102, and M-103.
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7098786 Energy Mon & Controls 01 11 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
What is the total number of boilers to be replaced
1-1 Government Response. There are two boilers per building with a total of six new boilers required.
Reference notes on drawings M-101, M-102, and M-103.
sensitive.
7102531 Energy Mon & Controls 01 11 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please specify the capacity of each boiler Hot water boiler capacity and the steam boiler capacity.
1-1 Government Response. Sizes are specified in the notes on the Mechanical sheets M-101 for 31 'K' Bay, M-102 for Bldg. 34 and M-103 Bldg. 79.
Information for this report is procurement sensitive.
7125978 Construction Management 3.2.1 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is a separate CQC System manager required to be onsite fulltime throughout construction, with no other duties?
1-1 Government Response. Per Section 01 45 00.00 50 Para 3.4.2, " This CQC System Manager must be on the site at all times during construction and be employed by the prime Contractor. The CQC System Manager must be assigned no other duties."
7125984 Construction Management Section 014500, p.4, para.3.4.3 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Ref. spec. section 014500,p.4,para.3.4.3 "CQC Personnel". There are ten(10) CQC specialists listed for this project. Please confirm which of these individuals is required to be onsite fulltime.
1-1 Government Response. Per Section 01 45 00.00 50 Para 3.4.3, " provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: mechanical, civil."
7125994 Safety 1.5.1.1 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is a separate SSHO (Site Safety Health Officer)required to be onsite fulltime throughout construction, with no other duties?
1-1 Government Response. Per Section 01 35 26, " The SSHO or an equally-qualified Designated Representative/alternate shall be at the work site at all times to implement and administer the Contractor's safety program and government accepted Accident Prevention Plan." SSHO can have other duties, however, the SSHO cannot be the CQC System Manager.
sensitive.
Report Complete
(End of Summary of Changes)
| 1-0 |
| Information for this report is procurement sensitive. |
| 1-0 |
| Information for this report is procurement sensitive. |
| 1-0 |
| Information for this report is procurement sensitive. |
| 0 |
| Information for this report is procurement sensitive. |
| 1-0 |
| Information for this report is procurement sensitive. |
| Information for this report is procurement sensitive. |
File details come from the government source that posted it. Updated .