A02_Binded_SOW_Tech_Specs.pdf
PDF 190 KB Posted
- Attached to
- Dallas MEPS Graphics Federal contract opportunity
- Solicitation number
- W91236-15-T-0030
About this file
Statement of Work Technical Specs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0003_10September2015.pdf | ||
| Dallas_MEPS-R15_-_Floor_Plan_-_(MAIN_FLOOR_PLAN)6_19_15.pdf | ||
| A19_Amendment_0001_Questions_Answers.pdf | ||
| A19_Bid_Schedule.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DALLAS MEPS GRAPHICS PROCUREMENT AND INSTALLATION
STATEMENT OF WORK AND REQUEST FOR QUOTE (RFQ) PROCESS
STATEMENT OF WORK
1.0 PRODUCTS AND SERVICES
As a result of a renovation for the Military Entrance Processing Station (MEPS) located in Dallas, Texas, a graphic package is required to outfit the facility. This procurement serves to provide graphics for the facility. The requirement for this procurement is to provide and install graphics as specified below at the new installation location identified below as the new location.
List of products, quantities, and technical requirements are included in this contract package and will be considered as part of the awarded order. The awardee contractor is responsible for adhering to the list of products, quantities, and technical requirements detailed in this contract.
2.0 LOCATIONS
Installation location:
Military Entrance Processing Station (MEPS) Dallas 207 South Houston Street, #400 Dallas, Texas 75202
The facility is a multi story building located in the downtown urban environment with controlled access into the building. The MEPS is located on the fourth floor.
3.0 POINTS OF CONTACT
U.S. Army Corps of Engineers – Contracting Officer’s Representative (COR), Project Manager (COE PM) and Interior Designer (COE ID) Ms. Jennifer D. Wainwright 803 Front Street Norfolk, Virginia 23510-1096 Email: jennifer.d.wainwright@usace.army.mil Phone: 757-201-7142
Military Entrance Processing Station Dallas – (MEPS POC) LTC Jeffrey Olesko Email: Jeffrey.w.olesko.mil@mail.mil Phone: (214) 655-3200 x 225
4.0 HOURS OF OPERATION
Delivery of materials and Installation on new graphics shall take place during normal working hours of 0700 - 1600.
mailto:jennifer.d.wainwright@usace.army.mil
5.0 SCHEDULE OF COMPLETION
Timeframe for installation shall be accomplished in the shortest number of consecutive weekdays.
Delivery of materials and installation schedule shall not start without prior Government approval. Items that are manufactured earlier than other items shall be held off site at the Contractor’s expense until all contract items are ready for installation.
6.0 PRE PROPOSAL SITE VISIT
Prior to contract award, the Contractor has the opportunity to perform a scheduled site visit of the existing facility to verify existing conditions. The site visit will be held on Thursday 20 August 2015 starting at 1:00PM and ending at 3:00PM. This is a secured facility. During the he site visit, all attendees must be escorted. The site visit will begin promptly at 1:00PM. Late attendees will not be able to be escorted separately. All attendees must be present in the lobby on or before 1:00PM on Thursday 20 August at:
Military Entrance Processing Station (MEPS) Dallas 207 South Houston Street, #400 Dallas, Texas 75202 POC: Mr. Daniel Lewis
The Pre-Proposal site visit is encouraged, but not mandatory. This pre-proposal site visit is for informational purposes only. Photos may be taken only if approved by MEPS and no applicants are captured in the photos. Measurements and detailed drawings which are gathered shall not deviate from the scheduled time frame of the walk through designated for each area. The contract permits the awardee a post award site visit to gather more specific information.
This is a secured federal facility. All attendees are required to present a Government issued photo ID to enter the facility. All attendees must sign the attendance roster to include their name, company name, email address and phone number , including the MEPS escort and representatives present. The process of the walk through will be present by the MEPS escort. The Offerors will be escorted, as a group, through each area of the existing MEPS to view the existing facility. The group will also be escort to the locations available to access freight elevators, egress points and loading ramps/location
Conversations, discussions, deviations from the contract, betterments, and questions are not to be discussed during the site visit. Statements or representations made during the pre-proposal site visit are not legally binding. Changes resulting from the pre-proposal site visit are made official ONLY if issued through an amendment to the solicitation.
Offerors shall submit ALL questions in writing ONLY via email to Stormie.B.Wicks@USACE.Army.Mil .
Questions will not be accepted after 4:00 PM EST on Thursday, 27 August 2015. USACE Norfolk District shall post all questions and answers via Amendment to GSA Ebuy by 9:00 AM EST on 1 September 2015.
mailto:Stormie.B.Wicks@USACE.Army.Mil
7.0 POST AWARD EFFORTS
7.1 SITE VISIT
After contract award, the Contractor shall perform a site visit to the facility to verify existing conditions.
Discrepancies between contract requirements and existing conditions shall be noted and adjustments to the graphic package shall be made as necessary to fit the actual spaces.
7.2 COORDINATION EFFORTS
Within two weeks post award, awardee will be required to submit a photo/graphic depiction for each proposed item that meet the salient characteristics of each ID TAG line item in the RFQ. Each item shall be clearly marked with the appropriate ID TAG to identify which line item the information represents. If product literature/cut sheets are provided, specific items must be clearly marked or highlighted and labeled with the appropriate ID TAG. Warranty information and care and maintenance shall also be provided for each item. Two copies of this information are required.
Conference calls between the Government and Contractor will be conducted on a weekly basis to schedule site visit, review project status, and coordinate efforts prior, during, and after installation.
7.3 DESIGN SUBMITTAL
Contractor shall prepare a floor plan and design package based on the contract requirements and post award site visit. The floor plan and design package shall be submitted to the Government for review and approval prior to the ordering of materials. Once the package is approved by the Government, the contractor may order materials. Although orders shall not be placed without Government approval, the contractor is responsible for ensuring that all products ordered under this contract meet all contract requirements and specifications. Government approval to order graphics does not alleviate the contractor’s responsibility to meet contract requirements.
7.4 INSTALLATION
The Contractor shall provide all necessary materials, equipment, labor, supervision, and management to coordinate deliveries, unload materials, assemble items as required, and properly dispose of all associated packaging/crating materials.
7.5 DELIVERY
All deliveries shall be coordinated and scheduled by the prime contractor through the Contracting Officer’s Representative (COR). Materials shall not be shipped without confirmation from the Government. Any temporary storage of items prior to the installation shall be the responsibility of the Contractor at no additional cost to the Government. Deliveries will not be accepted prior to the scheduled and approved delivery date.
The Contractor shall comply with all site security regulations and shall initiate procedures to minimize the impact to on-site personnel. Check-in at the front desk is mandatory upon delivery truck arrival.
Driver shall have valid driver’s license, vehicle registration, proof of insurance, shipping manifest and the name and telephone number of the receiving point of contact personnel. Driver’s license must be kept on the person at all times.
7.6 RECEIVE AND UNLOAD
The Contractor shall unload, inspect, assemble and install contract items during the working hours identified in the contract and in accordance with the approved delivery dates. Working outside of the working hours identified in this contract requires prior approval from the Contracting Officer’s Representative. The contractor shall maintain a complete file of all damaged items, overages, shortages, etc. and shall ensure such matters are raised to the attention of the Government (COR). All damaged items, overages, and shortages shall be noted on the final punch list and resolved within 30 days of final walk through acceptance.
7.7 ASSEMBLE, PLACE AND INSTALL
Contract items shall be installed in accordance with manufacturer’s instructions and graphic items shall be installed in accordance with the approved design package. If no installation location is provided, graphics shall be placed as directed by the COR. Contractor shall remove all stickers, labels, etc. and ensure that no adhesive residue remains on surfaces. Contractor shall ensure items are level, plumb, square and in proper alignment . If required, graphics shall be securely attached to building. Contractor shall clean items installed under this contract and ensure that items are free from surface dirt and defects. The Contractor shall be responsible for notifying the COR of any discrepancies between the actual placement of graphic items against the approved design package.
7.8 PROTECTION OF PROPERTY
Prior to the start of installation, the Contractor shall perform an inspection of the building, grounds, and installation locations to identify any pre-existing damage to the building or its contents. The Contractor shall document any existing damage and submit a report to the Government. The Contractor will not be held liable for pre-existing damage provided that it is documented in the inspection report.
The Contractor shall protect contract items from damage during the installation period and shall take measures to prevent damage to the building and its contents. Any damage caused by the Contractor shall be repaired or replaced at the Contractor’s expense with like materials. Material-handling equipment shall have rubber wheels.
Prior to contract completion and transfer of contracted items to the Government, the Contractor shall be responsible for securing the area where work is being performed. If keys were provided to the Contractor for access, the Contractor shall maintain accountability and control of keys, and shall return all keys upon completion of work.
7.9 PRODUCT DOCUMENTATION
The Contractor shall provide all warranty information, assembly instructions, maintenance and care instructions to the Government (COR) upon completion of the graphic installation.
The Contractor shall turn over any special assembly tools, security hardware wrenches, and spare parts to the Government (COR) upon completion.
7.10 CLEAN-UP AND DISPOSAL OF EXISITNG GRAPHICS
The Contractor is responsible for the removal and disposal of all trash associated with the uncrating and assembling of contract items. Packing materials generated by the Contractor shall not be stored within the building.
The Contractor is responsible for providing their own trash and recyclable receptacles on site as necessary and is responsible for routing trash and receptacles off site on a regular basis and at the completion of the contract.
II REQUEST FOR QUOTE SELECTION PROCESS
1.0 OVERVIEW
This is a Request for Quote (RFQ). The Government intends to award a firm fixed price contract to the lowest price, responsible contractor whose quote conforms to all the terms and conditions of the RFQ.
1.1 BASIS OF AWARD
The Contracting Officer will award a firm fixed price contract to the lowest price, responsible contractor whose quote conforms to the RFQ and is determined fair and reasonable. The intent of this RFQ is to obtain the lowest priced quote. Accordingly, award shall be made on the basis of the lowest price.
Quotes which do not contain pricing for all items identified on the bid schedule shall be excluded from consideration for award.
The Government reserves the right to reject all quotes. The Government will not award a contract to a contractor whose quote contains a deviation, as described below. The Government shall not award a contract to a contractor whose quote does not contain pricing for all items contained on the bid schedule or whose quote changes or deviates from any bid items.
1.2 GENERAL INSTRUCTIONS
Contractors are reminded to include their lowest prices in their initial quotes and to automatically assume that they will NOT have an opportunity to participate in discussions or be asked to submit a revised quote. The Government intends to make award without discussions, if deemed to be within the best interest of the Government.
By submitting a quote, contractors are agreeing to provide items that meet all contract requirements as set forth in the request for quote and contract.
2.0 RFQ SUBMITTAL REQUIREMENTS
A responsive quote must contain a completed bid schedule.
Submit a completed Bid Schedule with all pricing, installation, project management, freight and delivery, and any other associated fees. Associated fees need to be clearly defined and included as part of the Total Bid Amount.
Bid Schedules that include a complete listing of all ID TAG line items with correct quantities as stated in the RFQ and individual unit costs and total costs will be considered for award. Quotes that do not include a complete listing of all required “ID TAG” line items, quotes which do not provide incorrect quantities from those stated in the RFQ, or quotes which do not provide individual and total costs for each “ID TAG” line item will be considered non-responsive and will NOT be considered for award.
3.0 DEVIATION
A deviation is defined as when a quote implies or specifically offers a difference from the specified criteria. A deviation is a deficiency. The contract shall NOT be awarded to a quote containing a deviation.
DALLAS GRAPHIC PACKAGE‐ TECHNICAL SPECIFICATIONS
***Dimensions provided are estimates. Contractor responsible for field measuring site.
*** For bidding purposes, assume existing wall surfaces are vinyl wall covering throughout facility.
*** Except where indicated as glass etched appearance, all vinyl shall be a translucent vinyl film to allow light to pass through and images to appear backlit.
***All acrylic shall be non- glare and edges shall be polished smooth.
TAG ID
DESCRIPTION
TECHNICAL SPECS QUANTITY
21 BOOT PRINTS IN MALE ORTHO ROOM Provide and install twenty one (21) vinyl image/appliqués of a set of boot prints. Each vinyl image/appliqué shall simulate a set of boot prints. 8" high image shall coordinated in color with the interior finishes. Material shall be applicable for foot traffic and be slip resistant.
21 BOOT PRINTS IN FEMALE ORTHO Provide and install twenty one (21) vinyl image/appliqués. Each vinyl image/appliqué shall simulate a set of boot prints. 8" high image shall coordinated in color with the interior finishes. Material shall be applicable for foot traffic and be slip resistant. 21
DALLAS LOGO FOR WALL IN COMMAND CONF ROOM FOR VTC Provide a three dimensional plastic/fiberglass MEPCOM logo installed on the existing wall. Provide capital lettering to read “DALLAS". Lettering shall be 1/4" thick, 8” high three dimensional letters with a brushed satin aluminum or flat black finish.
Install on existing wall/soffit.
MEPCOM LOGO IN ETCHED GLASS STICKER TO BE INSTALLED
UNDERNEATH GLASS ON CONFERENCE TABLE IN COMMAND
CONFERENCE ROOM ‐ EXISTING IS 20" DIAMETER.
provide a vinyl or appliqués with an etched glass appearances of a 20" diameter MEPCOM logo. Vinyl or appliqués shall be UV retardant. Vinyl or appliqué shall be installed on the underside of the existing glass top of the conference table.
NAVY LOGO AT ENTRANCE ‐ 3 GLASS 36" EACH provide three (3) custom window stickers which are installed on the inside of the window and viewed from the outside. Image shall be of military branch logos and an action photo on each. Window stickers shall be designed to be installed on existing window side lights which may be curved glass walls. Height is approximately 8' and glass windows are approximately 36" wide each.
CG LOGO AT ENTRANCE ‐ 2 GLASS 24" EACH provide two (2) custom window stickers which are installed on the inside of the window and viewed from the outside. Image shall be of military branch logos and an action photo on each. Window stickers shall be designed to be installed on existing window side lights which may be curved glass walls. Height is approximately 8' and glass windows are approximately 24" wide each.
MEDICAL LOGO ON GLASS DOOR OR SOFFIT ABOVE SINGLE
DOOR
Provide and install a 20" diameter vinyl appliqué, with an etched glass appearance or with full color applied directly to the face of the door or soffit above. Logo shall be the medical shield with 4" high lettering to read "MEDICAL" 1
MEDICAL LOGO ON GLASS DOOR OR SOFFIT ABOVE DOUBLE
DOOR
Provide and install a 20" diameter vinyl appliqué, with an etched glass appearance or with full color applied directly to the face of the door or soffit above. Logo shall be the medical shield with 4" high lettering to read "MEDICAL" 1
9TH BATTALION LOGO STICKER OF ETCHED GLASS AT TRANSOM
INTO COMMAND SUITE
Provide and install a 20" diameter vinyl appliqué, with an etched glass appearance applied directly to the face of the transom into the Command Suite. Logo shall be of the 9th Battalion logo. 1
DALLAS LOGO STICKER ETCHED GLASS ON GLASS DOOR INTO
COMMAND SUITE
Provide and install a 20" diameter vinyl appliqué, with an etched glass appearance applied directly to the face of the glass door into the Command Suite. Logo shall be of the Dallas MEPS logo. 1
10 FRAMED PRINTS 24X36 IN TEST ROOM Provide and install ten (10) acrylic panels measuring 24” wide by 36” high by 1/8” thick. Panel shall have a digital graphic image fused onto the panel surface and shall be mounted to the wall using four (4) satin aluminum standoff hardware brackets. 10
PROCESSING LOGO/ MOUNTED TO SOFFIT ABOVE DOOR/ON
GLASS DOOR
Provide and install a 20" diameter vinyl appliqué, with an etched glass appearance or with full color applied directly to the face of the door or soffit above. Logo shall be the processing shield with 4" high lettering to read "PROCESSING". 1
PROCESSING LOGO/SIGN TO BE MOUNTED AND HUNG FROM
CEILING AT ENTRANCE TO PROCESSING
Provide and install a total of one (1) overhead identity signs; ceiling mounted hanging from SAPC ceiling in corridors; aluminum and wood laminate finishes to match building finishes; 8"‐9" raised metal lettering in capitals to read "PROCESSING", double sided; securely attached to ceiling with typical installation method; approximate overall dimensions of 10" high x 36" wide x 1/2" thick
MEDICAL LOGO/SIGN TO BE MOUNTED AND HUNG FROM
CEILING AT ENTRANCE TO PROCESSING
Provide and install a total of one (1) overhead identity signs; ceiling mounted hanging from SAPC ceiling in corridors; aluminum and wood laminate finishes to match building finishes; 8"‐9" raised metal lettering in capitals to read "MEDICAL", double sided;
securely attached to ceiling with typical installation method; approximate overall dimensions of 10" high x 36" wide x 1/2" thick 1
TESTING LOGO/SIGN TO BE MOUNTED AND HUNG FROM
CEILING AT ENTRANCE TO PROCESSING
Provide and install a total of one (1) overhead identity signs; ceiling mounted hanging from SAPC ceiling in corridors; aluminum and wood laminate finishes to match building finishes; 8"‐9" raised metal lettering in capitals to read "TESTING", double sided;
securely attached to ceiling with typical installation method; approximate overall dimensions of 10" high x 36" wide x 1/2" thick 1
MARINE LOGO AT ENTRANCE ‐ 3 GLASS 36" EACH provide three (3) custom window stickers which are installed on the inside of the window and viewed from the outside. Image shall be of military branch logos and an action photo on each. Window stickers shall be designed to be installed on existing window side lights which may be curved glass walls. Height is approximately 8' and glass windows are approximately 36" wide each.
ARMY LOGO AT ENTRANCE ‐ ON CURVED GLASS AT ENTRANCE provide one (1) custom window stickers which are installed on the inside of the window and viewed from the outside. Image shall be of military branch logos and an action photo on each. Window stickers shall be designed to be installed on existing window side lights which may be curved glass walls. Height is approximately 8' and glass windows are approximately 36" wide each.
NATIONAL GUARD LOGO AT ENTRANCE ‐ ON CURVED GLASS AT
ENTRANCE
provide one (1) custom window stickers which are installed on the inside of the window and viewed from the outside. Image shall be of military branch logos and an action photo on each. Window stickers shall be designed to be installed on existing window side lights which may be curved glass walls. Height is approximately 8' and glass windows are approximately 36" wide each.
EXTRA LARGE MEPCOM/DALLAS LOGO AT ELEVATOR ENTRANCE
ON GLASS WINDOWS ‐ 3 GLASS 36" EACH ‐ ETCHED GLASS
FINISH
Provide and install a quantity of two (2) 30" diameter vinyl appliqué, glass etched appearance applied directly to the windows.
MEPCOM Logo and Dallas MEPS Logo 2
20A CHAIN OF COMMAND ‐ 31 LETTERS AND 14 FRAMES A. Provide and install 8" high three‐dimensional, 1/4" thick, upper case letters with a brushed stainless steel finish. Font shall be Arial Bold. Letters shall be all capitals. 31 Letters total. Install, flush mount, over existing wall finish. 31
20B
B. Provide and install fourteen (14) 11"x16" acrylic "sandwich " frames installed on to existing wall with brushed stainless off‐ sets/chrome edge grips. Photos (8"X10") of Chain of Command members will be provided by User prior to install. Placement will be provided after award. Frame construction must allow for multiple change outs per year without reducing the quality of the product or apparatus connection points.
20C
C. Provide and install fourteen (14) Chain of Command engraved plaques/name placeholders for inserts/inserts of name area approximately (5" wide x 3" tall) with name, rank and position. Color of plaque shall coordinate with interior finishes. Personnel information to be provided by Users after award. Install into inside of "sandwiched" frames of chain of Command, below photo, in a removable manner (double stick tape, Velcro, slides, etc.).
AF LOGO AT ENTRANCE ‐ 2 GLASS 24" EACH provide two (2) custom window stickers which are installed on the inside of the window and viewed from the outside. Image shall be of military branch logos and an action photo on each. Window stickers shall be designed to be installed on existing window side lights which may be curved glass walls. Height is approximately 8' and glass windows are approximately 24" wide each.
MARINE LOGO AT ENTRANCE ‐ 3 GLASS 36" EACH provide three (3) custom window stickers which are installed on the inside of the window and viewed from the outside. Image shall be of military branch logos and an action photo on each. Window stickers shall be designed to be installed on existing window side lights which may be curved glass walls. Height is approximately 8' and glass windows are approximately 36" wide each.
FULL LENGTH CUSTOM PRINT WALL COVERING ON CORNER
BESIDE MARINE ENTRANCE ‐ INNER CORNER ‐ WALLS 2'5" AND
7'7"
Provide and install a custom designed, digital printed wall covering which consists of two panels (approximately 2'5" x 9'0" and 7'7"x 9'0"); Wall covering shall completely cover wall from corner to corner or stop at an acceptable breaking location. Wall covering shall run from top of wall base to ceiling grid. Walls shall be prepped and primed to accept wall covering. Final wall graphic shall be protected with a sealed coating applied over the wall covering. Coating shall be a water based polyurethane applied in two coats using a back rolling method with a mohair roller.
CUSTOM WALL COVERING 11'0 " WIDE TO HAVE EACH OF THE
MILITARY LOGOS INSTALLED ON WALL BESIDE THE APP
WAITING CHECK IN DESK
Provide and install a custom designed, digital printed wall covering (approximately 11'0" x 9'0"); Wall covering shall completely cover wall from corner to corner or stop at an acceptable breaking location. Wall covering shall run from top of wall base to ceiling grid. Walls shall be prepped and primed to accept wall covering. Final wall graphic shall be protected with a sealed coating applied over the wall covering. Coating shall be a water based polyurethane applied in two coats using a back rolling method with a mohair roller.
CUSTOM WALL COVERING INSTALLED BEHIND APPLICANT
WAITING CHECK‐IN DESK TO HAVE
WELCOME/DALLAS/MEPCOM ‐ 4'6", 3'0", 7'0" (WALL IN THREE
SECTIONS)
Provide and install a custom designed, digital printed wall covering which consists of three panels (approximately 4'6" x 9'0";
3'0"x 9'0", and 7'0"x 9'0"); Wall covering shall completely cover wall from corner to corner or stop at an acceptable breaking location. Wall covering shall run from top of wall base to ceiling grid. Walls shall be prepped and primed to accept wall covering. Final wall graphic shall be protected with a sealed coating applied over the wall covering. Coating shall be a water based polyurethane applied in two coats using a back rolling method with a mohair roller.
GLASS BLOCK IS 102" HIGH ON BACK OF CEREMONY ROOM ‐
APPLY VINYL LOGO OF DALLAS AND SERVICE LOG WHICH
SHOULD BE ABLE TO BE SEEN FROM ELEVATOR
Provide and install a 60‐80" diameter vinyl appliqué, with full color applied directly to the face of the curved glass block. Logo shall be the Dallas MEPS logo and the service logo. 1
ON CORRIDOR LEADING INTO THE CEREMONY ROOM (ADJ TO
THE TEST ROOM ) INSTALL CUSTOM WALL COVERING THE
LENGTH OF THE WALL WITH PHOTOS REPRESENTING ALL THE
BRANCHES OF THE MILITARY AND THE AMERICAN FLAG.
Provide and install a custom designed, digital printed wall covering (approximately 22'0"x 9'0"); Wall covering shall completely cover wall from corner to corner or stop at an acceptable breaking location. Wall covering shall run from top of wall base to ceiling grid. Walls shall be prepped and primed to accept wall covering. Final wall graphic shall be protected with a sealed coating applied over the wall covering. Coating shall be a water based polyurethane applied in two coats using a back rolling method with a mohair roller.
TEST LOGO ON DOOR OR SOFFIT ABOVE SINGLE DOOR Provide and install a 20" diameter vinyl appliqué, with an etched glass appearance or with full color applied directly to the face of the door or soffit above. Logo shall be the test shield with 4" high lettering to read "TESTING" 1
CEREMONY DEDICATION PLAQUE TO CHIEF KEIL‐BIO AND STORY
AWARDS
Provide a framed shadow box with Chief Keil's biography and story awards; frame shall have a clear acrylic/glass/ wood finish stained to match/ complement the wood stain and species through the facility; Photo and written biography shall be provided by installers; awards provided by MEPS shall be incorporated in the collage which may have different depths for interest; frame shall be approximately 4' x 3'; security apparatus shall be used to ensure frame is not removable by applicants 1
IN 6" RAISED CHROME LETTERS "WELCOME TO THE DALLAS
MEPS" AT COMMAND SUITE ENTRANCE.
Provide and install 10” high, 1/4" thick, three‐dimensional, upper case, letters with a brushed stainless steel finish. Font shall be Arial Bold. Letters shall be all capitals and read “WELCOME TO THE DALLAS MEPS”. Install, flush mount, over existing wall finish.
FRAMES FOR OATHS IN MEDICAL BRIEFING ROOM Provide and install a total of two (2) poster holders each with 2 layers of 1/4" thick clear acrylic and hardware; Image to be provided by User prior to installation; Contractor to print image and provide in final poster holder; poster holders shall be installed on to existing wall with brushed stainless off‐sets/chrome edge grips; Panel approximately 48" high x 36" wide x 1/2" thick
FRAMES FOR OATHS IN COMMAND BRIEFING ROOM Provide and install a total of two (2) poster holders each with 2 layers of 1/4" thick clear acrylic and hardware; Image to be provided by User prior to installation; Contractor to print image and provide in final poster holder; poster holders shall be installed on to existing wall with brushed stainless off‐sets/chrome edge grips; Panel approximately 48" high x 36" wide x 1/2" thick