Amendment 0014

View the file

Other files

File Type Posted
W91236-15-R-0008-0015_-_Cancellation.pdf PDF
Technical_Bidder_Inquiries_for_Radford-Atch_27.pdf PDF
Piping_List-Atch_26.pdf PDF
Revised_Bid_Schedule_2_Nov_2015-_Atch_25.pdf PDF
W91236-15-R-0008-0013.pdf PDF
W91236-15-R-0008-0012_-_Proposal_Due_Date_Extension.pdf PDF
A.07.24_W91236-15-R-0008-0011_--_22_20_ _01_10_00__Revision _Redacted_Air_Permit.pdf PDF
A.07.24_W91236-15-R-0008-0011_-Atch_24-_Air_Permit_Application_Redacted_14_May_2014.pdf PDF
A.07.24_W91236-15-R-0008-0011_-Atch_23-_Bid_Schedule.pdf PDF
60334911_P_N_0501.dwg DWG drawing
60334911_C_108.dwg DWG drawing
60334911_C_101.dwg DWG drawing
60334911_CeXSP02.dwg DWG drawing
60334911_E_N_0602.dwg DWG drawing
60334911_C_102.dwg DWG drawing
60334911_G_NXBRDR.dwg DWG drawing
60334911_C_107.dwg DWG drawing
60334911_M610.dwg DWG drawing
60334911_VeXSP01.dwg DWG drawing
60334911_IC701.dwg DWG drawing
60334911_G_N_0002_RFP.dwg DWG drawing
NCS_RNK_Full.ctb —
60334911_C_001.dwg DWG drawing
60334911_G_N_0001_RFP.dwg DWG drawing
60334911_G_N_0002.dwg DWG drawing
60334911_G_N_0003.dwg DWG drawing
W91236-5-R-0008-0010_-_Updated_CAD_Drawings_and_22_20_Revision.pdf PDF
60334911_CdXSP00.dwg DWG drawing
60334911_A_NXFP02.dwg DWG drawing
60334911_CUnXSP00.dwg DWG drawing
60334911_C_105.dwg DWG drawing
60334911_CGnXSP00.dwg DWG drawing
60334911_G_NXATTR.dwg DWG drawing
60334911_E_N_0601.dwg DWG drawing
60334911_CUnXSP01.dwg DWG drawing
60334911_C_103.dwg DWG drawing
60334911_CeXSP01.dwg DWG drawing
TSAEC_MLN.shx —
60334911_M612.dwg DWG drawing
60334911_M001.dwg DWG drawing
60334911_E_N_0603.dwg DWG drawing
Tsaec.shx —
60334911_C_104.dwg DWG drawing
60334911_C_106.dwg DWG drawing
60334911_V_NXBRDR.dwg DWG drawing
60334911_VeXSP00.dwg DWG drawing
60334911_CSnXSP00.dwg DWG drawing
60334911_A_NXFP01.dwg DWG drawing
60334911_CLnXSP00.dwg DWG drawing
Border_ANSI_D_USACE.rfa —
Show 40 more

Latest 50 of 84 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorporate the follow ing into the solicitation:

(1) revised Bid Schedule as Attachment 25 to the solicitation, (2) Piping Tie-In List as Attachment 26 to the solicitation,

(3) revised Section 00 22 20; (4) technical questions and answ ers from ProjNet as Attachment 27 to the solicitation; and (5) revisions to the specif ications as identif ied on the continuation page.

The proposal due date remains 20 November 2015.

POC: Sandra Kharan

1. CONTRACT ID CODE PAGE OF PAGES

J 1 34

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Nov-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91236-15-R-0008

X 9B. DATED (SEE ITEM 11)

13-Feb-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Nov-2015

CODE

USA ENGINEER DISTRICT, NORFOLK

803 FRONT STREET

NORFOLK VA 23510-1096

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91236-15-R-0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 10 Site Visit Photo 2 39 29-JUL-2015

Attachment 11 Site Visit Photos 3 14 29-JUL-2015

Attachment 12 CAD Drawing 001

Attachment 13 CAD Drawing 102

Attachment 14 CAD Drawing 103

Attachment 15 CAD Drawing 104

Attachment 16 Geotechnical Report 210 24-AUG-2015

Attachment 17 Appendix CC SEGD

Amended Drawings

Attachment 18 Appendix DD Amended

Drawings

Attachment 19 VPDES Permit

VA0000248

76 10-JUN-2015

Attachment 20 Permit Fact Sheet 61

Attachment 21 Permit Attachments 120

Attachment 22 CAD Drawings

Attachment 23 Revised Bid Schedule 2 12-SEP-2015

Attachment 24 Redacted Air Permit 36 14-MAY-2014

Attachment 4 Bid Schedule 2 02-JUL-2015

Attachment 5 Specs Vol I 711 17-JUN-2015

Attachment 6 Specs Vol II 1110 17-JUN-2015

Attachment 7 Drawings 30 17-JUN-2015

Attachment 8 Appendicies AA-FF 252

Attachment 9 Site Visit Photos 1 50 29-JUL-2015 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 10 Site Visit Photo 2 39 29-JUL-2015

Attachment 11 Site Visit Photos 3 14 29-JUL-2015

Attachment 12 CAD Drawing 001

Attachment 13 CAD Drawing 102

Attachment 14 CAD Drawing 103

Attachment 15 CAD Drawing 104

Attachment 16 Geotechnical Report 210 24-AUG-2015

Attachment 17 Appendix CC SEGD

Amended Drawings

Attachment 18 Appendix DD Amended

Drawings

Attachment 19 VPDES Permit

VA0000248

76 10-JUN-2015

Attachment 20 Permit Fact Sheet 61

Attachment 21 Permit Attachments 120

Attachment 22 CAD Drawings

Attachment 23 Revised Bid Schedule 2 12-SEP-2015

Attachment 24 Redacted Air Permit 36 14-MAY-2014

Attachment 25 Revised Bid Schedule 2 29-OCT-2015

Attachment 26 Piping List 1

Attachment 27 Technical Questions &

Answers

Attachment 4 Bid Schedule 2 02-JUL-2015

Attachment 5 Specs Vol I 711 17-JUN-2015

Attachment 6 Specs Vol II 1110 17-JUN-2015

Attachment 7 Drawings 30 17-JUN-2015

Attachment 8 Appendicies AA-FF 252

Attachment 9 Site Visit Photos 1 50 29-JUL-2015

The following have been added by full text:

SF 30 BLOCK 14 CONT. PAGE

1. CHANGES TO THE SOLICITATION. Attached hereto are new and revised pages to the specifications.

Revised pages replace like‐numbered pages.

a. REVISED PARAGRAPHS. The following revised paragraphs replace like‐numbered paragraphs.

Changes to the paragraph are indicated in “bold”.

Delete Table of Contents reference 3.11.3.7 in its entirety and replace with the following new citation in

Section 01 10 00:

3.11.3.7 Inlet Air Chilling System, Chillers, Chilled Water and Condenser Water Pumps, and

Cooling Tower……………………………………………………………………………...76

Delete Paragraph 3.11.1. in its entirety and replace with the following new paragraphs in Section 01 10 00:

3.11.1. CHPP System Performance Design Criteria

The design criteria for CHPP performance are as follows:

• Winter: –6ºF outside air / 50ºF CHPP minimum indoor temperature

• Summer: 92.1ºF dry bulb (DB) with coincident 73ºF wet bulb (WB) / 102ºF CHPP maximum indoor

• Plant elevation: 1,855 feet

• Filtered makeup water (see Appendix FF): 45ºF to 85ºF

These criteria apply only to the combustion turbine, and chiller performance calculations.

See Paragraph 6.9.3 for indoor air quality and HVAC design.

Delete Paragraph 3.11.2. in its entirety and replace with the following new paragraphs in Section 01 10 00:

3.11.2 CHPP Noise Limits

Except as specified elsewhere in the RFP individual mechanical and power generating equipment, including but not limited to boilers, fans, HRSG, CTG, pumps, air compressors and filter dryers located within the Boilers/STG/CTG/HRSG, Feedwater Chemical, Storage Pump, Chillers, and

Mechanical Rooms shall have an equivalent "A" weighted sound level, measured at 3'-0" above floor level and 3'-0" horizontally from the base of the equipment shall not exceed 85dbA and the requirements of applicable UFC criteria whichever is most restrictive. The contractor shall perform an acoustical analysis of the cumulative total contributions of equipment in each space and make recommendations to the Government for hearing protection in accordance with OSHA standards.

In the electrical rooms, noise levels shall be limited to 75 dBA. See Appendix CC, Room Data Sheets, which contain STC and NC requirements and criteria.

Delete Paragraph 3.11.3.3.(f) in its entirety and replace with the following new paragraph in Section 01 10

00:

3.11.3.3.(f). Two (2) chillers for providing chilled water to the chilling system

Delete Paragraph 3.11.3.7 in its entirety and replace with the following new paragraphs in Section 01 10

3.11.3.7 Inlet Air Chilling System, Chillers, Chilled Water and Condenser Water Pumps, and Cooling

Tower

(a) The Contractor shall select and size an inlet air chilling system for each CTG based on a mechanical refrigeration machine or an absorption chiller fired with less than or equal to 40 psig steam at the discharge temperature of the selected BPSTG but capable of accepting steam at the temperature of the pressure-reducing station. Units shall meet or exceed the requirements as stated in ASHRAE 189.1

(b) The chillers shall be sized based on the required inlet air chilling capacity and use of 40 percent propylene glycol solution. The space in which the chiller is located shall be conditioned

(if required) to limit the relative humidity to 85 percent.

(c) The chillers shall be provided with a programmable logic control (PLC) system that operates the chiller and associated condenser water (if required) and chilled water pumps. The system shall be programmed to alternate chiller operation with appropriate valving for automatic switching as desired. The chillers shall be provided with a programmable logic control (PLC) system complete with a color HMI for local operator interface that operates the chiller and associated condenser water and chilled water pumps.

(d) Pumps shall be provided with NEMA premium efficiency motors.

(e) A two-cell, counter-flow cooling tower (if required) shall be provided to reject heat from the chiller process. Cooling tower fans shall be equipped with variable frequency drives (VFDs) to maintain a constant cold well temperature at an operator-selected setpoint. The cooling tower shall be all stainless steel or fiberglass construction. The Contractor shall provide an electric resistance heating system for freeze protection.

(f) The Contractor shall provide continuous condition monitoring of the condenser water (if required) for conductivity, pH, and oxidation-reduction potential . The condenser water shall be automatically blown down to control the conductivity to an operator-selected setpoint.

(g) As prescribed by the RFAAP water treatment contractor (GE Water & Process Technologies), the Contractor shall provide equipment that automatically introduces chemicals into the condenser water system (if required) for control of pH, scale/sludge, and bacteria.

Delete Paragraph 3.11.3.33 in Section 01 10 00 its entirety.

Delete Paragraph 3.11.5.3.(q) in its entirety and replace with the following new paragraph in Section 01 10

3.11.5.3.(q) CTGs shall be tested, to the greatest practical extent, at the manufacturer’s facility prior to delivery to demonstrate CTG system functionality and that the heat rate, power output, and emissions will be met; however, acceptance of the CTGs will be based solely on a site acceptance test that demonstrates attainment of all Performance Guarantees associated with the CTG while operating without any reportable exceedance of any emission limit in the project’s Air Permit.

Delete Paragraph 3.13.4.2.3.3. in its entirety and replace with the following new paragraph in Section 01

10 00:

3.13.4.2.3.3. Chiller / Chiller Cooling Tower

Delete Paragraph 5.2.6. in its entirety and replace with the following new paragraph in Section 01 10 00:

5.2.6. Permits

The Contractor shall be responsible for obtaining all permits (local, State, and Federal) required for design and construction of all site features and utilities. With respect to the Air Permit, the

Contractor shall be responsible for providing all additional information required by the Virginia

DEQ for the Radford Arsenal to obtain any required minor modifications (The Air Permit is provided in Appendix GG).

Delete Paragraph 5.10.7.15 (h) in its entirety and replace with the following new paragraphs in Section 01

10 00:

5.10.7.15 (h). Audible appliances shall have a minimum sound output of at least 15 dB above average ambient sound levels or 5 dB above maximum ambient sound level (which ever is greater).

Not to exceed 110 dBA. Levels shall be measured at 10 feet 0 inches from the device.

Delete Paragraph 6.9.3. in its entirety and replace with the following new paragraph in Section 01 10 00:

6.9.3. Climatic Conditions

(a) Location: Radford, VA – 1,855 feet above mean sea level

(b) Conditions: Actual conditions from ASHRAE Fundamentals 2013 corrected for specific project requirements:

(1) Virginia Tech Airport, VA (closest available data)

(2) Heating design @ 99.6% = 10.4ºF DB

(3) Cooling design @ 0.4% = 89.8 DB @ 72.6 mean coincident wet bulb (MCWB)

(4) Evaporation WB/mean coincident dry bulb (MCDB) @ 0.4% = 75.6 WB @ 83.5

MCDB

(5) Winter: 50-year extreme = –6ºF DB

These design criteria do not apply to combustion turbine and chiller performance calculations.

Delete Paragraph 6.9.3.7.3. in its entirety and replace with the following new paragraph in Section 01 10

6.9.3.7.3. Primary Cooling

Primary cooling shall be provided by a source that is dedicated to comfort cooling.

The selection of the primary cooling system shall be supported by an LCCA that takes into consideration the capital cost and the cost of maintenance, energy, and water. The inlet air chilling system shall not be used for space cooling.

Delete Paragraph 6.12.1.3. in its entirety and replace with the following new paragraph in Section 01 10

6.12.1.3. Air Quality

The design for the new RFAAP CHPP shall comply with all applicable Federal and Commonwealth of Virginia air quality rules. The Contractor's design shall allow the project to proceed in accordance with the Air Permit application dated 14 May 2014, including supplemental information dated 25 June 2014, 31 July 2014, and 3 September 2014, and the VDEQ final permit to construct and operate dated 8 October 2014 with no modifications or only minor modifications in accordance with 9 VAC 5-80-1280. Copies of the Air Permit, application, associated correspondence, and supporting documentation are included in Appendix GG. The Contactor shall identify any required permit modifications, the reasons for the modifications, and the anticipated impacts on the project schedule. The Contractor shall be responsible for the technical preparation of any modification request to the Air Permit. The contractor shall coordinate submission of the modification request with the contracting officer for approval.

Delete Paragraph 3.5.1.3.(e)(3)(i) in their entirety and replace with the following new paragraphs in

Section 01 33 16:

3.5.1.3.(e)(3)(i) Chillers.

Delete Paragraph 1.3.3. in its entirety and replace with the following new paragraph in Section 01 91

00.80:

1.3.3. Performance and Load Testing

The Contractor’s responsibility includes start-up, initial operations, emissions, performance and load testing of the Facility and all of its components. The Contractor shall provide all preliminary, initial and final check-out, perform all calibration of controls and equipment, and perform all required performance testing. The Contractor shall provide technical representatives as required from all sub-contractors and suppliers, to assist during start-up, initial operations and performance testing. The Contractor shall perform, and perform again if necessary, the Performance Tests to demonstrate the attainment of each and every Power Generation Systems Performance Guarantee while concurrently meeting the emissions limits as defined by calculation and stack tests required by the Air Permit. The Commissioning Specialist (CxC) shall witness testing, preliminary, initial, final check-out, calibration, and performance testing, and shall prepare and assemble reports.

SECTION 00 22 20 - PHASE 2 DESIGN-BUILD SELECTION PROCEDURES AND BASIS OF AWARD

The following have been modified:

BASIS OF AWARD

SECTION 00 22 20

PHASE 2 DESIGN-BUILD SELECTION PROCEDURES AND BASIS OF AWARD

1.0 OVERVIEW

2.0 BASIS OF AWARD

3.0 NOT USED

4.0 PHASE 2 PROPOSAL CONTENTS AND RELATED EVALUATION FACTORS

5.0 VOLUME 1 – DESIGN - TECHNICAL

5.1 GENERAL

5.2 TAB A – FACTOR 1 – OUTPUT PERFORMANCE, EFFICIENCY, and ENVIRONMENTAL

COMPLIANCE GUARANTEES

5.2.1 SUBMISSION REQUIREMENTS

5.2.2 EVALUATION CRITERIA

5.3 TAB B – FACTOR 2 – PROPOSED CONTRACT DURATION and PRELIMINARY SUMMARY

SCHEDULE

5.3.1. SUBMISSION REQUIREMENTS

5.3.2. EVALUATION CRITERIA

5.4 TAB C – FACTOR 3 – DESIGN CONCEPTS and QUALITY of MATERIALS

5.4.1. SUBMISSION REQUIREMENTS

5.4.2. EVALUATION CRITERIA

6.0 VOLUME 2 - REMAINING PERFORMANCE CAPABILITY AND SMALL BUSINESS

PARTICIPATION

6.1 TAB B – FACTOR 4 – KEY SUBCONTRACTORS’ EXPERIENCE

6.1.1. SUBMISSION REQUIREMENTS

6.1.2. EVALUATION CRITERIA

6.2 TAB C – FACTOR 5 – SMALL BUSINESS PARTICIPATION PLAN

6.2.1. SUBMISSION REQUIREMENTS

6.2.2. EVALUATION CRITERIA

7.0 VOLUME 3 – COST/PRICE AND PRO FORMA INFORMATION

7.1 GENERAL

7.2 TAB A – FACTOR 6 - COST / PRICE (STANDARD FORM 1442 AND CONTRACT LINE ITEM

SCHEDULE)

7.2.1 SUBMISSION REQUIREMENTS

7.2.2 EVALUATION CRITERIA

7.3 TAB B – BID GUARANTEE

7.3.1 SUBMISSION REQUIREMENTS

7.3.2 EVALUATION CRITERIA

8.0 EVALUATION PROCEDURES

8.1 GENERAL

8.2 DISCUSSIONS (IF NECESSARY)

PHASE TWO – SECTION 00 22 20 ATTACHMENTS

1 – POWER PERFORMANCE and EFFICIENCY and ENVIRONMENTAL COMPLIANCE

GUARANTEES SUBMITTAL FORM

2 - TABLE OF SPACES FORM

3 – LETTER OF COMMITMENT OF KEY SUBCONTRACTOR FORM

4 – COMPANY SPECIALIZED EXPERIENCE – KEY SUBCONTRACTOR

5 – SMALL BUSINESS PARTICIPATION PROPOSAL FORMAT

1.0 OVERVIEW

Those Offerors short-listed in Phase 1 are invited to submit a Phase 2 proposal, as indicated below. The

Government will evaluate the proposals in accordance with the evaluation criteria described herein, utilizing the definitions, evaluation and rating system described in paragraphs 8.3 and 8.4 of Section 00 22 10, Phase 1 Design-

Build selection procedures. Cost/Price information will be evaluated for fairness, reasonableness, and for material unbalancing, as described herein. The Phase 2 evaluation will be conducted in accordance with FAR Part 15.

2.0 BASIS OF AWARD

2.1 The Contracting Officer will award a firm fixed-price contract to that responsible Phase 2 Offeror whose proposal the Source Selection Authority determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, considering the non-price factors described herein, and cost/price. All evaluation factors, other than cost/price, when combined, are considered more important than the cost/price.

After the Government individually evaluates and rates each proposal, the Contracting Officer/Source Selection

Authority will compare proposals to determine which proposal represents the best value. The Government reserves the right to accept other than the lowest priced offer or to reject all offers. The Government will not award a contract to an Offeror whose proposal contains a deficiency, as defined in FAR 15.001.

2.2 As part of the evaluation, the Government will evaluate betterments in proposals relative to the minimum standards in the RFP to determine if they offer additional value to the Government. In addition, innovations in proposals will be evaluated to determine if creative ideas of the Offeror are a better value to the Government compared to the minimum criteria. Innovations will be evaluated as betterments. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proposals received will be considered proprietary information and shall be clearly marked as such by the Offeror. All proposals must meet the minimum criteria.

3.0 NOT USED

4.0 PHASE 2 PROPOSAL CONTENTS AND RELATED EVALUATION FACTORS

(VOLUME 1 – DESIGN - TECHNICAL)

Location Factor Description Relative Importance

TAB A FACTOR 1

Output Performance, Efficiency, and

Environmental Compliance Guarantees 1st (Most Important Factor)

TAB B FACTOR 2 Proposed Contract Duration and Preliminary

Summary Schedule 2nd (Slightly less important than Factor 1)

TAB C FACTOR 3

Design Concepts and Quality of Materials

3rd (Slightly less important than Factor 2)

(VOLUME 2 – REMAINING PERFORMANCE CAPABILITY AND SMALL BUSINESS

PARTICIPATION)

Location Factor Description Relative Importance

Location Factor Description Relative Importance

TAB A FACTOR 4 Key Subcontractors’ Experience 4th (Slightly less important than Factor 3)

TAB B FACTOR 5 Small Business Participation Plan 5th (Slightly less important than Factor 4)

(VOLUME 3 – PRICE AND PRO FORMA INFORMATION)

Location Factor Description Relative Importance

TAB A FACTOR 6

Cost/Price (Standard Form 1442 and

Proposal Bid Schedules)

6th (Less important than Factors 1 through

5, combined)

TAB B N/A Bid Guarantee Not Rated

5.0 VOLUME 1 – DESIGN - TECHNICAL

5.1 GENERAL: The intent during the Phase 2 proposal submission and review process is not to require a detailed design effort or to perform a detailed design engineering review, respectively. The submission of fully developed drawings, details, or specifications for Government evaluation is not required or desired. The use of BIM to prepare or submit proposals is NOT required. The Government is not asking for design analyses in the proposal and will not be performing a detailed engineering analysis or design review at the proposal stage. Acceptance by the

Government of the successful Offeror’s technical proposal will not relieve the successful Offeror’s responsibilities as the Designer of Record for the resulting contract. If the Government evaluators have actual knowledge or strong suspicion that a proposed technical solution is inappropriately sized, being used in the wrong application or otherwise does not meet the contract requirements; the Government will inform the Offeror in the event that discussions are conducted with the firm. However, the Government in its review does not assume responsibility to identify issues or errors in the proposed technical solution. After award, in the event of conflict between the contractor’s accepted proposal and the requirements in the final amended RFP, the order of precedence will be followed as indicated in clause 52.236-5000, DESIGN/BUILD CONTRACT – ORDER OF PRECEDENCE. The

Offeror shall identify what it considers to be Betterments (See paragraph 5.4.1.4 of this section; and for evaluation see paragraph 5.4.2.4 of this section). Note that the Government will not evaluate any information that exceeds the page limits, where indicated below. The final design must comply with the RFP requirements except that accepted betterments become the new contract minimum requirements.

5.2 VOLUME 1 – TAB A – FACTOR 1 – OUTPUT PERFORMANCE, EFFICIENCY, and

ENVIRONMENTAL COMPLIANCE GUARANTEES

5.2.1 Submission Requirements:

Offerors shall provide the output performance, efficiency, and environmental compliance guarantees with respect to the submitted technical solution. Offerors shall refer to the definitions included at Section 5.2.3 below. In the event an Offeror is unable to provide any of the unqualified and unconditional guarantees required herein, it shall submit a narrative not exceeding two pages (in bullet form) clearly and concisely describing any condition or qualification that otherwise precludes the guarantee. An explanation of how the Government will evaluate this narrative is provided in paragraph 5.2.2 below.

Output Performance Guarantees:

5.2.1.1 Guaranteed Gross Electric Outputs:

(a) Guaranteed Gross Electric Output - Combustion Gas Turbine: The Offeror shall provide the gross electric output of each of the two (2) combustion gas turbines (referred to as either combustion gas turbines or combustion turbines herein) when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability

Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical

Systems, and 01 91 00.80 Commissioning. This information shall be provided in the Output Performance, Efficiency, and Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

(b) Guaranteed Gross Electric Output – Back Pressure Steam Turbine: The Offeror shall provide the gross electric output of the back pressure steam turbine operating with an exhaust steam pressure of not less than 40 psig when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability Centered Acceptance for

Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80

Commissioning. This information shall be provided in the Output Performance, Efficiency, and Environmental

Compliance Guarantees Table, Attachment 1 at the end of this section.

(c) Normal Degraded Output: The Offeror shall provide a statement substantiating that the sum of 96% of the

Guaranteed Gross Electric Outputs of the two (2) combustion gas turbines provided in 5.2.1.1 (a), plus 98% of the

Guaranteed Gross Electric Output of the back pressure steam turbine generator provided in 5.2.1.1 (b) is no less than

16 MW. This statement shall be provided in the Output Performance, Efficiency, and Environmental Compliance

Guarantees Table, Attachment 1 at the end of this section.

5.2.1.2 Guaranteed Packaged Water Tube Boiler Capacity: The Offeror shall provide a statement containing an unqualified and unconditional guarantee that each of the three (3) packaged water tube boilers will have the capacity to produce, when firing either natural gas or fuel oil, no less than 115,000 lbs/hr of 275 psig steam at 550 degrees F when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability Centered

Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01

91 00.80 Commissioning. This statement shall be provided in the Output Performance, Efficiency, and

Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

5.2.1.3 Guaranteed Fired Heat Recovery Steam Generator (HRSG) Output (Duct Fired and Fresh Air Fired): The

Offeror shall provide a statement containing an unqualified and unconditional guarantee that each of the two (2)

HRSGs will have the capacity to produce, when operating in both duct fired and fresh air fired modes (Guaranteed

Duct Fired HRSG Steam Output, and Guaranteed Fresh Air Fired Steam Output, respectively) will produce, no less than 115,000 lbs/hr of 275 psig steam at 550 degrees F when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability

Centered Acceptance for Electrical Systems, and 01 91 00.80 Commissioning. This statement shall be provided in the Output Performance, Efficiency, and Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

5.2.1.4 Guaranteed Unfired HRSG Output: The Offeror shall provide the guaranteed unfired capacity for each of the two (2) HRSGs and tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability

Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical

Systems, and 01 91 00.80 Commissioning. The capacity shall be expressed in pounds of steam per hour, specifying pressure and temperature. The unfired capacity shall be provided in the Output Performance, Efficiency, and

Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

Efficiency Guarantees:

5.2.1.5 Guaranteed Heat Rate (Combustion Gas Turbine): The Offeror shall provide the guaranteed heat rate for each of the two (2) combustion turbine generators when operating at their guaranteed gross electric output as submitted in paragraph 5.2.1.1 (a) above, and tested in accordance with Section 01 10 00 Statement of Work, 01 86

12.07 40 Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80 Commissioning. The heat rate shall be expressed in BTU (LHV) per kW-

Hr, and provided in the Output Performance, Efficiency, and Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

5.2.1.6 Guaranteed Steam Rate (Back Pressure Steam Turbine): The Offeror shall provide the guaranteed steam rate for the back pressure steam turbine generator when operating at its guaranteed gross electric output as submitted in paragraph 5.2.1.1 (b) above, and tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40

Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for

Electrical Systems, and 01 91 00.80 Commissioning. The steam rate shall be expressed in pounds of steam per kW-

Hr, and provided in the Output Performance, Efficiency, and Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

5.2.1.7 Guaranteed HRSG Duct Firing Rate: The Offeror shall provide the guaranteed duct firing rate for each of the two (2) HRSGs when operating at a capacity of no less than 115,000 lbs/hr of 275 psig steam at 550 degrees F as stated in paragraph 5.2.1.3 above. The duct firing rate shall be expressed in BTU (LHV) per hour, and provided in the Output Performance, Efficiency, and Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

5.2.1.8 Guaranteed Packaged Water Tube Boiler Fuel Consumption in the Natural Gas Fired Mode: The Offeror shall provide the guaranteed fuel consumption for each of the three (3) packaged water tube boilers in the natural gas fired mode when operating at the guaranteed capacity of no less than 115,000 lbs/hr of 275 psig steam at 550 degrees F as stated in paragraph 5.2.1.2 above. The fuel consumption shall be expressed in BTU (LHV) per hour, and provided in the Output Performance, Efficiency, and Environmental Compliance Guarantees Table, Attachment

1 at the end of this section.

5.2.1.9 Guaranteed Packaged Water Tube Boiler Fuel Consumption in the Fuel Oil Fired Mode: The Offeror shall provide the guaranteed fuel consumption for each of the three (3) packaged water tube boilers in the fuel oil fired mode when operating at the guaranteed capacity of no less than 115,000 lbs/hr of 275 psig steam at 550 degrees F as stated in paragraph 5.2.1.2 above. The fuel consumption shall be expressed in BTU (LHV) per hour, and provided in the Output Performance, Efficiency, and Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

5.2.1.10 Guaranteed Parasitic Power Load: The Offeror shall provide the parasitic power load for the CHPP operating at the normal degraded gross electric output of 16 megawatts while concurrently producing no less than

460,000 lbs/hr of steam at 275 psig and 550 degrees F. The parasitic power load shall be expressed in kW, and provided in the Output Performance, Efficiency, and Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

Environmental Compliance Guarantees:

5.2.1.11 Environmental Testing Compliance (Air Permit): The Offeror shall provide a statement containing an unqualified and unconditional guarantee that the proposed CHPP design and operating condition will meet all emission requirements of the Commonwealth of Virginia Stationary Source Permit to Construct and Operate, Registration Number 20656, dated October 8, 2014. Any non-emission requirements found in the air permit, or associated application information, which indicates or is based on a specific make and model of equipment is not subject to this guarantee. Only testing methods identified in the air permit will be used to validate the achievement of this guarantee. This statement shall be provided in the Output Performance, Efficiency, and Environmental

Compliance Guarantees Table, Attachment 1 at the end of this section.

5.2.2 Evaluation Criteria In the event an Offeror is unable to provide any of the unqualified and unconditional guarantees required herein, it shall submit a narrative not exceeding two pages (in bullet form) clearly and concisely describing any condition or qualification that otherwise precludes the guarantee. The Government will assess the nature and extent of the Offeror's potential conditions or qualifications where none or less are considered a better value to the Government. Offerors are cautioned that a conditional or qualified guarantee with respect to environmental compliance will be highly disfavored by the Government and may result in a significant weakness during the evaluation process. The successful Offeror will be responsible for preparing any information required by the Virginia DEQ in the event that an air permit modification is required.

Output Performance Guarantees:

5.2.2.1 Guaranteed Gross Electric Outputs: The Government will determine if the Offeror provided the following:

(1) the gross electric output for each of the two (2) combustion turbine generators; (2) the gross electric output for the back pressure steam turbine generator; and (3) an unqualified and unconditional statement to demonstrate that the normal degraded output of the CHPP is equal to or greater than 16 MW. The total normal degraded gross electric output of the two (2) combustion turbine generators and the back pressure steam turbine generator shall be no less than 16 megawatts.

5.2.2.2 Guaranteed Packaged Water Tube Boiler Capacity: The Government will determine if the Offeror provided a statement containing an unqualified and unconditional guarantee that each of the three (3) packaged water tube boilers will have the capacity to produce, when firing either natural gas or fuel oil, no less than 115,000 lbs/hr of 275 psig steam at 550 degrees F as required in paragraph 5.2.1.2 above.

5.2.2.3 Guaranteed Fired HRSG Output (Duct Fired and Fresh Air Fired): The Government will determine if the

Offeror provided a statement containing an unqualified and unconditional guarantee that each of the two (2) HRSGs will have the capacity to produce, when operating in both duct fired and fresh air fired modes (Guaranteed Duct

Fired HRSG Steam Output and Guaranteed Fresh Air Fired Steam Output, respectively), no less than 115,000 lbs/hr of 275 psig steam at 550 degrees F as required in paragraph 5.2.1.3 above.

5.2.2.4 Guaranteed Unfired HRSG Output: The Government will determine if the Offeror provided the unfired capacity for each of the two (2) HRSGs, when operating in Turbine Exhaust Mode, as required in paragraph 5.2.1.4 above.

Efficiency Guarantees:

5.2.2.5 Guaranteed Heat Rate (Combustion Gas Turbine): The Government considers efficient, or relatively low, guaranteed heat rates for the two (2) combustion turbine generators (CTGs) a significant advantage that will yield a lower lifecycle fuel cost for the project. The Government will assess the proposed guaranteed CTG heat rates as required in paragraph 5.2.1.5 above in relation to the rates proposed by other Phase 2 Offerors. The Government will give more favorable consideration to a proposal that provides a relatively lower guaranteed heat rate.

5.2.2.6 Guaranteed Steam Rate (Back Pressure Steam Turbine): The Government considers an efficient, or relatively low, guaranteed steam rate for the back pressure steam turbine generator (STG) a significant advantage that will yield a lower lifecycle fuel cost for the project. The Government will assess the proposed guaranteed STG steam rate as required in paragraph 5.2.1.6 above in relation to the rates proposed by other Phase 2 Offerors. The

Government will give more favorable consideration to a proposal that provides a relatively lower guaranteed steam rate.

5.2.2.7 Guaranteed HRSG Duct Firing Rate: The Government considers efficient, or relatively low, guaranteed duct firing rates for the two (2) HRSGs a significant advantage that will yield a lower lifecycle fuel cost for the project. The Government will assess the proposed guaranteed HRSG duct firing rates as required in paragraph

5.2.1.7 above in relation to the rates proposed by other Phase 2 Offerors. The Government will give more favorable consideration to a proposal that provides a relatively lower guaranteed duct firing rate.

5.2.2.8 Guaranteed Packaged Water Tube Boiler Fuel Consumption in the Natural Gas Fired Mode: The

Government considers efficient, or relatively low, guaranteed boiler fuel consumption rates for the three (3) packaged water tube boilers a significant advantage that will yield a lower lifecycle fuel cost for the project. The

Government will assess the proposed guaranteed boiler fuel consumption rates (in natural gas fired mode) as required in paragraph 5.2.1.8 above in relation to the rates proposed by other Phase 2 Offerors. The Government will give more favorable consideration to a proposal that provides a relatively lower guaranteed boiler fuel consumption rate.

5.2.2.9 Guaranteed Packaged Water Tube Boiler Fuel Consumption in the Fuel Oil Fired Mode: The Government considers efficient, or relatively low, guaranteed boiler fuel consumption rates for the three (3) packaged water tube boilers a significant advantage that will yield a lower lifecycle fuel cost for the project. The Government will assess the proposed guaranteed boiler fuel consumption rates (in fuel oil fired mode) as required in paragraph 5.2.1.9 above in relation to the rates proposed by other Phase 2 Offerors. The Government will give more favorable consideration to a proposal that provides a relatively lower guaranteed boiler fuel consumption rate.

5.2.2.10 Guaranteed Parasitic Power Load: The Government considers an efficient, or relatively low, guaranteed parasitic power load rate a significant advantage that will yield a lower lifecycle fuel cost for the project. The

Government will assess the proposed guaranteed parasitic power load as required in paragraph 5.2.1.10 above in relation to the rates proposed by other Phase 2 Offerors. The Government will give more favorable consideration to a proposal that provides a relatively lower guaranteed parasitic power load rate.

5.2.2.11 Relative Importance of Efficiency Guarantees: As noted above, the Government will assess each required Efficiency Guarantee, relative to the other proposals competing in Phase 2. With respect to relative importance of the required Efficiency Guarantees, the Government has determined the following order: the

Government will place greatest weight on the incremental benefit represented by the more efficient proposed guaranteed heat rate. The Government will place significantly less weight, relative to the heat rate, on the incremental benefit represented by the more efficient guaranteed parasitic power load. The Government will place less weight, relative to the parasitic power load, on the incremental benefit represented by the more efficient guaranteed HRSG duct firing rates and boiler fuel consumption rates (in natural gas fired mode). The Government will place less weight, relative to the duct firing rate and boiler fuel consumption (natural gas mode), on the incremental benefit represented by the more efficient guaranteed STG steam rate. The Government will place less weight, relative to the STG steam rate, on the incremental benefit represented by the more efficient guaranteed boiler fuel consumption rate (in fuel oil fired mode).

Environmental Compliance Guarantee:

5.2.2.12 Environmental Test Compliance (Air Permit): The Government will determine if the Offeror provided a statement containing an unqualified and unconditional guarantee that all emission requirements of the

Commonwealth of Virginia Stationary Source Permit to Construct and Operate, Registration Number 20656, dated

October 8, 2014 will be met as required in paragraph 5.2.1.11. Offers that meet the emissions requirements of the air permit but use emitting equipment different from those stated in the air permit will be evaluated non-punitively with respect to the need to modify the air permit for that equipment.

5.2.3 DEFINITIONS:

(a) Electric Output (Combustion Gas Turbine or Back Pressure Steam Turbine): Electric energy generated as measured at the terminals of the generator when tested under specific site conditions. (Each turbine must be measured individually.)

(b) Guaranteed Gross Electric Output – Combustion Gas Turbine: The Gross Electric Output to be submitted in the Output Performance Guarantees provided above which the Combustion Turbine Generator will produce while operating in compliance with all regulatory requirements when tested in accordance with Section 01 10 00

Statement of Work, 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40

Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80 Commissioning.

(c) Guaranteed Electric Output – Back Pressure Steam Turbine: The Gross Electric Output to be submitted in the

Output Performance Guarantees provided above which the Back Pressure Steam Turbine will produce while operating at an inlet condition of 275 psig and 550 degrees F and an exhaust condition of 40 psig in compliance with all regulatory requirements when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40

Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for

Electrical Systems, and 01 91 00.80 Commissioning.

(d) Normal Degraded Output: The expected outputs of i) the two Combustion Gas Turbines, when operating at the full load condition, during the time period between new installation and total overhaul of the Cold and Hot Gas

Sections of the Combustion Gas Turbine, or between total overhauls of the Cold and Hot Gas Sections of the

Combustion Gas Turbine when all of manufacturer’s recommended services are performed in accordance with the manufacturer’s requirements; and ii) a Back Pressure Steam Turbine Generator allowing for normal wear and tear provided that all of manufacturer’s recommended services are performed in accordance with the manufacturer’s recommendations. For the purposes of this proposal, the Offeror shall assume that Normal Degraded Output for (1) each of the Combustion Gas Turbines is 96% of the Guaranteed Gross Electric Output – Combustion Turbine

Generator; and (2) the Back Pressure Steam Turbine is 98% of the Guaranteed Gross Electric Output - Back

Pressure Steam Turbine Generator.

(e) Heat Rate – (Combustion Gas Turbines): The Lower Heating Value (LHV) of the fuel consumed by the

Combustion Gas Turbines divided by the Gross Electric Output produced by the Combustion Gas Turbines.

(f) Guaranteed Heat Rate (Combustion Gas Turbines): The Heat Rate of the Combustion Turbine Generator shall be no greater than that submitted in the Efficiency Guarantees provided above when the Combustion Gas Turbine

Generator is operating at the Guaranteed Gross Electric Output and in compliance with all regulatory requirements when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability Centered

Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01

91 00.80 Commissioning.

(g) Steam Rate (Back Pressure Steam Turbine): The mass flow of steam, at the design point for steam pressures and temperatures at the inlet and exhaust of the steam Back Pressure Steam Turbine divided by the Gross Electric

Output generated by the Back Pressure Steam Turbine.

(h) Guaranteed Steam Rate (Back Pressure Steam Turbine): A value for the Gross Heat Rate to be submitted in the

Efficiency Guarantees provided above which will be the maximum Gross Steam Rate required for the Back Pressure

Steam Turbine to produce its Guaranteed Gross Electric Output while operating in compliance with all regulatory requirements when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability

Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical

Systems, and 01 91 00.80 Commissioning.

(i) Unfired HRSG Steam Output: The steam produced by each HRSG at 275 psig and 550 degrees F, solely from the exhaust gases from a Combustion Turbine Generator.

(j) Duct Fired HRSG Steam Output: Steam produced by each HRSG at 275 psig and 550 degrees F from a combination of exhaust gases from the Combustion Turbine Generator (CTG) with additional thermal energy input from the combustion of natural gas using the excess oxygen in the CTG exhaust.

(k) Fresh Air Firing of HRSG: The utilization of an HRSG to produce steam, without the coincident operation of its combustion turbine generator, by supply of combustion air with an independent fan.

(l) Guaranteed Unfired HRSG Output: The steam rate to be submitted in the Output Performance Guarantees provided below produced by each HRSG at, 275 psig and 550 degrees F, solely from the exhaust gases from the

Combustion Turbine Generator while the CTG is operating at its Guaranteed Gross Electric Power Output when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability Centered Acceptance for

Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80

Commissioning.

(m) Guaranteed Fired HRSG Output (Duct Fired and Fresh Air Fired): Each HRSG shall be guaranteed to produce

115,000 lbs/hr of steam at 275 psig and 550 degrees F, to be submitted in the Output Performance Guarantees provided above, while in compliance with all regulatory requirements when tested in accordance with Section 01 10

00 Statement of Work, 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40

(n) Guaranteed HRSG Duct Firing Rate: The maximum gas consumption ( BTUs - Higher Heating Value (HHV)) to be submitted in the Efficiency Guarantees provided above which needs to be burned in the duct burner while operating the Combustion Turbine at the Guaranteed Gross Electric Output and meeting the Guaranteed Heat Rate for the CTG, to produce 115,000 lbs/hr of steam at 275 psig – 550 degrees F while in compliance with all regulatory requirements when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability

Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical

Systems, and 01 91 00.80 Commissioning.

(o) Guaranteed Packaged Water Tube Boiler Capacity: Each Boiler shall be guaranteed to produce, when firing either natural gas or fuel oil, no less than 115,000 lbs/hr of 275 psig – 550 degrees F steam while in compliance with all regulatory requirements when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40

Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for

(p) Guaranteed Packaged Water Tube Boiler Fuel Consumption – Natural Gas Fuel: The fuel consumption HHV to be submitted in the Efficiency Guarantees provided above required to achieve the Guaranteed Boiler Capacity when operating on natural gas when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40

Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for

(q) Guaranteed Packaged Water Tube Boiler Fuel Consumption – No. 2 Fuel Oil: The fuel consumption HHV to be submitted in the Efficiency Guarantees provided above required to achieve the Guaranteed Boiler Capacity when operating on No. 2 Fuel Oil when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40

Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for

(r) Parasitic Power: The electric power required to produce the power and steam at the CHPP plus the electric power losses up to the 69 kV terminals of the generator step up transformer.

(s) Guaranteed Parasitic Power: The maximum Parasitic Power to be submitted in the Efficiency Guarantees provided above required to produce 16 MW of Gross Electric Output at the combustion gas turbine generator outputs and back pressure steam turbine generator output as determined to represent Normal Degraded Output and

460,000 Lbs/Hour of steam at 275 psig and 550 degrees F when tested in accordance with Section 01 10 00

Statement of Work, 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40

5.3 VOLUME 1 – TAB A – FACTOR 2 – PROPOSED CONTRACT DURATION and PRELIMINARY

SUMMARY SCHEDULE

5.3.1 Submission Requirements:

5.3.1.1 Proposed Contract Duration: The Offeror shall indicate its proposed total contract duration, expressed in calendar days not to exceed the maximum allowable contract duration so specified, in the appropriate Contract Line

Item Number (CLIN) in the Proposed Bid Schedule in Tab A of Volume 3. The Offeror also shall include its proposed contract duration within the header to its Preliminary Summary Schedule required in paragraph 5.3.1.2.

For purposes of this submission, the total contract duration shall begin with the issuance of the Notice to Proceed following award and shall conclude when all output performance, efficiency, and environmental compliance guarantees and training requirements are met as defined by terms of this solicitation and confirmed by the contracting officer. The total contract duration shall be equal to the total number of days reflected in the Preliminary

Summary Schedule required.

5.3.1.2 Preliminary Summary Schedule: Submit a summary level schedule for integrated design and construction. Schedules or diagrams may be provided separately in a size that is easily read, but shall be bound and clearly labeled as VOLUME 2 – TAB A. This summary schedule will, after contract award, be replaced with the

Project Schedule, as required by Section 01 32 01.00 10: Project Schedule. The summary schedule shall be task oriented, indicating the number of calendar days, after notice to proceed, by which milestones are to be achieved.

Offeror may use a critical path or other method of his choice; however, schedules shall be graphically represented.

The proposed project schedule shall reflect the proposed…