About this file

Solicitation Amendment 0013

View the file

Other files

File Type Posted
W91236-15-R-0008-0015_-_Cancellation.pdf PDF
Technical_Bidder_Inquiries_for_Radford-Atch_27.pdf PDF
W91236-15-R-0008-0014.pdf PDF
Piping_List-Atch_26.pdf PDF
Revised_Bid_Schedule_2_Nov_2015-_Atch_25.pdf PDF
W91236-15-R-0008-0012_-_Proposal_Due_Date_Extension.pdf PDF
A.07.24_W91236-15-R-0008-0011_--_22_20_ _01_10_00__Revision _Redacted_Air_Permit.pdf PDF
A.07.24_W91236-15-R-0008-0011_-Atch_24-_Air_Permit_Application_Redacted_14_May_2014.pdf PDF
A.07.24_W91236-15-R-0008-0011_-Atch_23-_Bid_Schedule.pdf PDF
60334911_P_N_0501.dwg DWG drawing
60334911_C_108.dwg DWG drawing
60334911_C_101.dwg DWG drawing
60334911_CeXSP02.dwg DWG drawing
60334911_E_N_0602.dwg DWG drawing
60334911_C_102.dwg DWG drawing
60334911_G_NXBRDR.dwg DWG drawing
60334911_C_107.dwg DWG drawing
60334911_M610.dwg DWG drawing
60334911_VeXSP01.dwg DWG drawing
60334911_IC701.dwg DWG drawing
60334911_G_N_0002_RFP.dwg DWG drawing
NCS_RNK_Full.ctb —
60334911_C_001.dwg DWG drawing
60334911_G_N_0001_RFP.dwg DWG drawing
60334911_G_N_0002.dwg DWG drawing
60334911_G_N_0003.dwg DWG drawing
W91236-5-R-0008-0010_-_Updated_CAD_Drawings_and_22_20_Revision.pdf PDF
60334911_CdXSP00.dwg DWG drawing
60334911_A_NXFP02.dwg DWG drawing
60334911_CUnXSP00.dwg DWG drawing
60334911_C_105.dwg DWG drawing
60334911_CGnXSP00.dwg DWG drawing
60334911_G_NXATTR.dwg DWG drawing
60334911_E_N_0601.dwg DWG drawing
60334911_CUnXSP01.dwg DWG drawing
60334911_C_103.dwg DWG drawing
60334911_CeXSP01.dwg DWG drawing
TSAEC_MLN.shx —
60334911_M612.dwg DWG drawing
60334911_M001.dwg DWG drawing
60334911_E_N_0603.dwg DWG drawing
Tsaec.shx —
60334911_C_104.dwg DWG drawing
60334911_C_106.dwg DWG drawing
60334911_V_NXBRDR.dwg DWG drawing
60334911_VeXSP00.dwg DWG drawing
60334911_CSnXSP00.dwg DWG drawing
60334911_A_NXFP01.dwg DWG drawing
60334911_CLnXSP00.dwg DWG drawing
Border_ANSI_D_USACE.rfa —
Show 40 more

Latest 50 of 84 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to define the term Pro Forma, correct Section 00 22 20 paragraph 7.3.1 and extend the proposal due date to 20 Nov 2015 for the follow ing reason:

The Government has received information that the solicitation may unnecessarily restrict competition among the emitting equipment manufacturers. The Government is conducting additional investigation to ensure the solicitation provides for full and open competition. The Government intends to conclude its review by no later than 30 Oct 2015, if an additional amendment concerning this issue is required it w ill be posted by 02 Nov 2015.

POC: Sandra Kharan, 757-201-7643

1. CONTRACT ID CODE PAGE OF PAGES

J 1 30

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Oct-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91236-15-R-0008

X 9B. DATED (SEE ITEM 11)

13-Feb-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Oct-2015

CODE

USA ENGINEER DISTRICT, NORFOLK

803 FRONT STREET

NORFOLK VA 23510-1096

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91236-15-R-0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE

SUMMARY OF CHANGES

SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE

The required response date/time has changed from 29-Oct-2015 03:00 PM to 20-Nov-2015 03:00 PM.

SECTION 00 22 20 - PHASE 2 DESIGN-BUILD SELECTION PROCEDURES AND BASIS OF AWARD

The following have been modified:

BASIS OF AWARD

SECTION 00 22 20

PHASE 2 DESIGN-BUILD SELECTION PROCEDURES AND BASIS OF AWARD

1.0 OVERVIEW

2.0 BASIS OF AWARD

3.0 NOT USED

4.0 PHASE 2 PROPOSAL CONTENTS AND RELATED EVALUATION FACTORS

5.0 VOLUME 1 – DESIGN - TECHNICAL

5.1 GENERAL

5.2 TAB A – FACTOR 1 – OUTPUT PERFORMANCE, EFFICIENCY, and ENVIRONMENTAL

COMPLIANCE GUARANTEES

5.2.1 SUBMISSION REQUIREMENTS

5.2.2 EVALUATION CRITERIA

5.3 TAB B – FACTOR 2 – PROPOSED CONTRACT DURATION and PRELIMINARY SUMMARY

SCHEDULE

5.3.1. SUBMISSION REQUIREMENTS

5.3.2. EVALUATION CRITERIA

5.4 TAB C – FACTOR 3 – DESIGN CONCEPTS and QUALITY of MATERIALS

5.4.1. SUBMISSION REQUIREMENTS

5.4.2. EVALUATION CRITERIA

6.0 VOLUME 2 - REMAINING PERFORMANCE CAPABILITY AND SMALL BUSINESS

PARTICIPATION

6.1 TAB B – FACTOR 4 – KEY SUBCONTRACTORS’ EXPERIENCE

6.1.1. SUBMISSION REQUIREMENTS

6.1.2. EVALUATION CRITERIA

6.2 TAB C – FACTOR 5 – SMALL BUSINESS PARTICIPATION PLAN

6.2.1. SUBMISSION REQUIREMENTS

6.2.2. EVALUATION CRITERIA

7.0 VOLUME 3 – COST/PRICE AND PRO FORMA INFORMATION

7.1 GENERAL

7.2 TAB A – FACTOR 6 - COST / PRICE (STANDARD FORM 1442 AND CONTRACT LINE ITEM

SCHEDULE)

7.2.1 SUBMISSION REQUIREMENTS

7.2.2 EVALUATION CRITERIA

7.3 TAB B – BID GUARANTEE

7.3.1 SUBMISSION REQUIREMENTS

7.3.2 EVALUATION CRITERIA

8.0 EVALUATION PROCEDURES

8.1 GENERAL

8.2 DISCUSSIONS (IF NECESSARY)

PHASE TWO – SECTION 00 22 20 ATTACHMENTS

1 – POWER PERFORMANCE and EFFICIENCY and ENVIRONMENTAL COMPLIANCE

GUARANTEES SUBMITTAL FORM

2 - TABLE OF SPACES FORM

3 – LETTER OF COMMITMENT OF KEY SUBCONTRACTOR FORM

4 – COMPANY SPECIALIZED EXPERIENCE – KEY SUBCONTRACTOR

5 – SMALL BUSINESS PARTICIPATION PROPOSAL FORMAT

1.0 OVERVIEW

Those Offerors short-listed in Phase 1 are invited to submit a Phase 2 proposal, as indicated below. The Government will evaluate the proposals in accordance with the evaluation criteria described herein, utilizing the definitions, evaluation and rating system described in paragraphs 8.3 and 8.4 of Section 00 22 10, Phase 1 Design- Build selection procedures. Cost/Price information will be evaluated for fairness, reasonableness, and for material unbalancing, as described herein. The Phase 2 evaluation will be conducted in accordance with FAR Part 15.

2.0 BASIS OF AWARD

2.1 The Contracting Officer will award a firm fixed-price contract to that responsible Phase 2 Offeror whose proposal the Source Selection Authority determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, considering the non-price factors described herein, and cost/price. All evaluation factors, other than cost/price, when combined, are considered more important than the cost/price.

After the Government individually evaluates and rates each proposal, the Contracting Officer/Source Selection Authority will compare proposals to determine which proposal represents the best value. The Government reserves the right to accept other than the lowest priced offer or to reject all offers. The Government will not award a contract to an Offeror whose proposal contains a deficiency, as defined in FAR 15.001.

2.2 As part of the evaluation, the Government will evaluate betterments in proposals relative to the minimum standards in the RFP to determine if they offer additional value to the Government. In addition, innovations in proposals will be evaluated to determine if creative ideas of the Offeror are a better value to the Government compared to the minimum criteria. Innovations will be evaluated as betterments. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proposals received will be considered proprietary information and shall be clearly marked as such by the offeror. All proposal must meet the minimum criteria.

3.0 NOT USED

4.0 PHASE 2 PROPOSAL CONTENTS AND RELATED EVALUATION FACTORS

(VOLUME 1 – DESIGN - TECHNICAL)

Location Factor Description Relative Importance

TAB A FACTOR 1

Output Performance, Efficiency, and Environmental Compliance Guarantees

1st (Most Important Factor)

TAB B FACTOR 2 Proposed Contract Duration and Preliminary Summary Schedule

2nd (Slightly less important than Factor 1)

TAB C FACTOR 3

Design Concepts and Quality of Materials

3rd (Slightly less important than Factor 2)

(VOLUME 2 – REMAINING PERFORMANCE CAPABILITY AND SMALL BUSINESS

PARTICIPATION)

Location Factor Description Relative Importance

Location Factor Description Relative Importance

TAB B FACTOR 4 Key Subcontractors’ Experience 4th (Slightly less important than Factor 3)

TAB A FACTOR 5 Small Business Participation Plan 5th (Slightly less important than Factor 4)

(VOLUME 3 – PRICE AND PRO FORMA INFORMATION)

Location Factor Description Relative Importance

TAB A FACTOR 6

Cost/Price (Standard Form 1442 and Proposal Bid Schedules)

6th (Less important than Factors 1 through 5, combined)

TAB B N/A Bid Guarantee Not Rated

5.0 VOLUME 1 – DESIGN - TECHNICAL

5.1 GENERAL: The intent during the Phase 2 proposal submission and review process is not to require a detailed design effort or to perform a detailed design engineering review, respectively. The submission of fully developed drawings, details, or specifications for Government evaluation is not required or desired. The use of BIM to prepare or submit proposals is NOT required. The Government is not asking for design analyses in the proposal and will not be performing a detailed engineering analysis or design review at the proposal stage. Acceptance by the Government of the successful Offeror’s technical proposal will not relieve the successful Offeror’s responsibilities as the Designer of Record for the resulting contract. If the Government evaluators have actual knowledge or strong suspicion that a proposed technical solution is inappropriately sized, being used in the wrong application or otherwise does not meet the contract requirements; the Government will inform the Offeror in the event that discussions are conducted with the firm. However, the Government in its review does not assume responsibility to identify issues or errors in the proposed technical solution. After award, in the event of conflict between the contractor’s accepted proposal and the requirements in the final amended RFP, the order of precedence will be followed as indicated in clause 52.236-5000, DESIGN/BUILD CONTRACT – ORDER OF PRECEDENCE. The Offeror shall identify what it considers to be Betterments (See paragraph 5.4.1.4 of this section; and for evaluation see paragraph 5.4.2.4 of this section). Note that the Government will not evaluate any information that exceeds the page limits, where indicated below. The final design must comply with the RFP requirements except that accepted betterments become the new contract minimum requirements.

5.2 VOLUME 1 – TAB A – FACTOR 1 – OUTPUT PERFORMANCE, EFFICIENCY, and

ENVIRONMENTAL COMPLIANCE GUARANTEES

5.2.1 Submission Requirements:

Offerors shall provide the output performance, efficiency, and environmental compliance guarantees with respect to the submitted technical solution. Offerors shall refer to the definitions included at Section 5.2.3 below.

Output Performance Guarantees:

5.2.1.1 Guaranteed Gross Electric Outputs:

(a) Guaranteed Gross Electric Output - Combustion Gas Turbine: The Offeror shall provide the gross electric output of each of the two (2) combustion gas turbines (referred to as either combustion gas turbines or combustion turbines herein) when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability

Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80 Commissioning. This information shall be provided in the Output Performance, Efficiency, and Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

(b) Guaranteed Gross Electric Output – Back Pressure Steam Turbine: The Offeror shall provide the gross electric output of the back pressure steam turbine operating with an exhaust steam pressure of not less than 40 psig when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80 Commissioning. This information shall be provided in the Output Performance, Efficiency, and Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

(c) Normal Degraded Output: The Offeror shall provide a statement substantiating that the sum of 96% of the Guaranteed Gross Electric Outputs of the two (2) combustion gas turbines provided in 5.2.1.1 (a), plus 98% of the Guaranteed Gross Electric Output of the back pressure steam turbine generator provided in 5.2.1.1 (b) is no less than 16 MW. This statement shall be provided in the Output Performance, Efficiency, and Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

5.2.1.2 Guaranteed Packaged Water Tube Boiler Capacity: The Offeror shall provide a statement containing an unqualified and unconditional guarantee that each of the three (3) packaged water tube boilers will have the capacity to produce, when firing either natural gas or fuel oil, no less than 115,000 lbs/hr of 275 psig steam at 550 degrees F when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80 Commissioning. This statement shall be provided in the Output Performance, Efficiency, and Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

5.2.1.3 Guaranteed Fired Heat Recovery Steam Generator (HRSG) Output (Duct Fired and Fresh Air Fired): The Offeror shall provide a statement containing an unqualified and unconditional guarantee that each of the two (2) HRSGs will have the capacity to produce, when operating in both duct fired and fresh air fired modes (Guaranteed Duct Fired HRSG Steam Output, and Guaranteed Fresh Air Fired Steam Output, respectively) will produce, no less than 115,000 lbs/hr of 275 psig steam at 550 degrees F when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80 Commissioning. This statement shall be provided in the Output Performance, Efficiency, and Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

5.2.1.4 Guaranteed Unfired HRSG Output: The Offeror shall provide the guaranteed unfired capacity for each of the two (2) HRSGs and tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80 Commissioning. The capacity shall be expressed in pounds of steam per hour, specifying pressure and temperature. The unfired capacity shall be provided in the Output Performance, Efficiency, and Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

Efficiency Guarantees:

5.2.1.5 Guaranteed Heat Rate (Combustion Gas Turbine): The Offeror shall provide the guaranteed heat rate for each of the two (2) combustion turbine generators when operating at their guaranteed gross electric output as submitted in paragraph 5.2.1.1 (a) above, and tested in accordance with Section 01 10 00 Statement of Work, 01 86

12.07 40 Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80 Commissioning. The heat rate shall be expressed in BTU (LHV) per kW- Hr, and provided in the Output Performance, Efficiency, and Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

5.2.1.6 Guaranteed Steam Rate (Back Pressure Steam Turbine): The Offeror shall provide the guaranteed steam rate for the back pressure steam turbine generator when operating at its guaranteed gross electric output as submitted in paragraph 5.2.1.1 (b) above, and tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80 Commissioning. The steam rate shall be expressed in pounds of steam per kW- Hr, and provided in the Output Performance, Efficiency, and Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

5.2.1.7 Guaranteed HRSG Duct Firing Rate: The Offeror shall provide the guaranteed duct firing rate for each of the two (2) HRSGs when operating at a capacity of no less than 115,000 lbs/hr of 275 psig steam at 550 degrees F as stated in paragraph 5.2.1.3 above. The duct firing rate shall be expressed in BTU (LHV) per hour, and provided in the Output Performance, Efficiency, and Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

5.2.1.8 Guaranteed Packaged Water Tube Boiler Fuel Consumption in the Natural Gas Fired Mode: The Offeror shall provide the guaranteed fuel consumption for each of the three (3) packaged water tube boilers in the natural gas fired mode when operating at the guaranteed capacity of no less than 115,000 lbs/hr of 275 psig steam at 550 degrees F as stated in paragraph 5.2.1.2 above. The fuel consumption shall be expressed in BTU (LHV) per hour, and provided in the Output Performance, Efficiency, and Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

5.2.1.9 Guaranteed Packaged Water Tube Boiler Fuel Consumption in the Fuel Oil Fired Mode: The Offeror shall provide the guaranteed fuel consumption for each of the three (3) packaged water tube boilers in the fuel oil fired mode when operating at the guaranteed capacity of no less than 115,000 lbs/hr of 275 psig steam at 550 degrees F as stated in paragraph 5.2.1.2 above. The fuel consumption shall be expressed in BTU (LHV) per hour, and provided in the Output Performance, Efficiency, and Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

5.2.1.10 Guaranteed Parasitic Power Load: The Offeror shall provide the parasitic power load for the CHPP operating at the normal degraded gross electric output of 16 megawatts while concurrently producing no less than 460,000 lbs/hr of steam at 275 psig and 550 degrees F. The parasitic power load shall be expressed in kW, and provided in the Output Performance, Efficiency, and Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

Environmental Compliance Guarantees:

5.2.1.11 Environmental Testing Compliance (Air Permit): The Offeror shall provide a statement containing an unqualified and unconditional guarantee that the proposed CHPP design and operating condition will meet all requirements of the Commonwealth of Virginia Stationary Source Permit to Construct and Operate, Registration Number 20656, dated October 8, 2014. Environmental compliance will be determined when the CHPP is operated at any level within the design parameters in the RFP. This statement shall be provided in the Output Performance, Efficiency, and Environmental Compliance Guarantees Table, Attachment 1 at the end of this section.

5.2.2 Evaluation Criteria

Output Performance Guarantees: Offerors are cautioned that a failure to provide any of the Output Performance Guarantees required under paragraph 5.2.1 will render the proposal ineligible for award.

5.2.2.1 Guaranteed Gross Electric Outputs: The Government will determine if the Offeror provided the following:

(1) the gross electric output for each of the two (2) combustion turbine generators; (2) the gross electric output for the back pressure steam turbine generator; and (3) an unqualified and unconditional statement to demonstrate that the normal degraded output of the CHPP is equal to or greater than 16 MW. The total normal degraded gross electric output of the two (2) combustion turbine generators and the back pressure steam turbine generator shall be no less than 16 megawatts.

5.2.2.2 Guaranteed Packaged Water Tube Boiler Capacity: The Government will determine if the Offeror provided a statement containing an unqualified and unconditional guarantee that each of the three (3) packaged water tube boilers will have the capacity to produce, when firing either natural gas or fuel oil, no less than 115,000 lbs/hr of 275 psig steam at 550 degrees F as required in paragraph 5.2.1.2 above.

5.2.2.3 Guaranteed Fired HRSG Output (Duct Fired and Fresh Air Fired): The Government will determine if the Offeror provided a statement containing an unqualified and unconditional guarantee that each of the two (2) HRSGs will have the capacity to produce, when operating in both duct fired and fresh air fired modes (Guaranteed Duct Fired HRSG Steam Output and Guaranteed Fresh Air Fired Steam Output, respectively), no less than 115,000 lbs/hr of 275 psig steam at 550 degrees F as required in paragraph 5.2.1.3 above.

5.2.2.4 Guaranteed Unfired HRSG Output: The Government will determine if the Offeror provided the unfired capacity for each of the two (2) HRSGs, when operating in Turbine Exhaust Mode, as required in paragraph 5.2.1.4 above.

Efficiency Guarantees: Offerors are cautioned that a failure to provide any of the Efficiency Guarantees required under paragraph 5.2.1 will render the proposal ineligible for award.

5.2.2.5 Guaranteed Heat Rate (Combustion Gas Turbine): The Government considers efficient, or relatively low, guaranteed heat rates for the two (2) combustion turbine generators (CTGs) a significant advantage that will yield a lower lifecycle fuel cost for the project. The Government will assess the proposed guaranteed CTG heat rates as required in paragraph 5.2.1.5 above in relation to the rates proposed by other Phase 2 Offerors. The Government will give more favorable consideration to a proposal that provides a relatively lower guaranteed heat rate.

5.2.2.6 Guaranteed Steam Rate (Back Pressure Steam Turbine): The Government considers an efficient, or relatively low, guaranteed steam rate for the back pressure steam turbine generator (STG) a significant advantage that will yield a lower lifecycle fuel cost for the project. The Government will assess the proposed guaranteed STG steam rate as required in paragraph 5.2.1.6 above in relation to the rates proposed by other Phase 2 Offerors. The Government will give more favorable consideration to a proposal that provides a relatively lower guaranteed steam rate.

5.2.2.7 Guaranteed HRSG Duct Firing Rate: The Government considers efficient, or relatively low, guaranteed duct firing rates for the two (2) HRSGs a significant advantage that will yield a lower lifecycle fuel cost for the project. The Government will assess the proposed guaranteed HRSG duct firing rates as required in paragraph

5.2.1.7 above in relation to the rates proposed by other Phase 2 Offerors. The Government will give more favorable consideration to a proposal that provides a relatively lower guaranteed duct firing rate.

5.2.2.8 Guaranteed Packaged Water Tube Boiler Fuel Consumption in the Natural Gas Fired Mode: The Government considers efficient, or relatively low, guaranteed boiler fuel consumption rates for the three (3) packaged water tube boilers a significant advantage that will yield a lower lifecycle fuel cost for the project. The Government will assess the proposed guaranteed boiler fuel consumption rates (in natural gas fired mode) as required in paragraph 5.2.1.8 above in relation to the rates proposed by other Phase 2 Offerors. The Government will give more favorable consideration to a proposal that provides a relatively lower guaranteed boiler fuel consumption rate.

5.2.2.9 Guaranteed Packaged Water Tube Boiler Fuel Consumption in the Fuel Oil Fired Mode: The Government considers efficient, or relatively low, guaranteed boiler fuel consumption rates for the three (3) packaged water tube boilers a significant advantage that will yield a lower lifecycle fuel cost for the project. The Government will assess the proposed guaranteed boiler fuel consumption rates (in fuel oil fired mode) as required in paragraph 5.2.1.9 above in relation to the rates proposed by other Phase 2 Offerors. The Government will give more favorable consideration to a proposal that provides a relatively lower guaranteed boiler fuel consumption rate.

5.2.2.10 Guaranteed Parasitic Power Load: The Government considers an efficient, or relatively low, guaranteed parasitic power load rate a significant advantage that will yield a lower lifecycle fuel cost for the project. The

Government will assess the proposed guaranteed parasitic power load as required in paragraph 5.2.1.10 above in relation to the rates proposed by other Phase 2 Offerors. The Government will give more favorable consideration to a proposal that provides a relatively lower guaranteed parasitic power load rate.

5.2.2.11 Relative Importance of Efficiency Guarantees: As noted above, the Government will assess each required Efficiency Guarantee, relative to the other proposals competing in Phase 2. With respect to relative importance of the required Efficiency Guarantees, the Government has determined the following order: the Government will place greatest weight on the incremental benefit represented by the more efficient proposed guaranteed heat rate. The Government will place significantly less weight, relative to the heat rate, on the incremental benefit represented by the more efficient guaranteed parasitic power load. The Government will place less weight, relative to the parasitic power load, on the incremental benefit represented by the more efficient guaranteed HRSG duct firing rates and boiler fuel consumption rates (in natural gas fired mode). The Government will place less weight, relative to the duct firing rate and boiler fuel consumption (natural gas mode), on the incremental benefit represented by the more efficient guaranteed STG steam rate. The Government will place less weight, relative to the STG steam rate, on the incremental benefit represented by the more efficient guaranteed boiler fuel consumption rate (in fuel oil fired mode).

Environmental Compliance Guarantee: Offerors are cautioned that a failure to provide the guarantee of environmental test compliance will render the proposal ineligible for award.

5.2.2.12 Environmental Test Compliance (Air Permit): The Government will determine if the Offeror provided a statement containing an unqualified and unconditional guarantee that all requirements of the Commonwealth of Virginia Stationary Source Permit to Construct and Operate, Registration Number 20656, dated October 8, 2014 will be met as required in paragraph 5.2.1.11.

5.2.3 DEFINITIONS:

(a) Electric Output (Combustion Gas Turbine or Back Pressure Steam Turbine): Electric energy generated as measured at the terminals of the generator when tested under specific site conditions. (Each turbine must be measured individually.)

(b) Guaranteed Gross Electric Output – Combustion Gas Turbine: The Gross Electric Output to be submitted in the Output Performance Guarantees provided above which the Combustion Turbine Generator will produce while operating in compliance with all regulatory requirements when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80 Commissioning.

(c) Guaranteed Electric Output – Back Pressure Steam Turbine: The Gross Electric Output to be submitted in the Output Performance Guarantees provided above which the Back Pressure Steam Turbine will produce while operating at an inlet condition of 275 psig and 550 degrees F and an exhaust condition of 40 psig in compliance with all regulatory requirements when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80 Commissioning.

(d) Normal Degraded Output: The expected outputs of i) the two Combustion Gas Turbines, when operating at the full load condition, during the time period between new installation and total overhaul of the Cold and Hot Gas Sections of the Combustion Gas Turbine, or between total overhauls of the Cold and Hot Gas Sections of the Combustion Gas Turbine when all of manufacturer’s recommended services are performed in accordance with the manufacturer’s requirements; and ii) a Back Pressure Steam Turbine Generator allowing for normal wear and tear provided that all of manufacturer’s recommended services are performed in accordance with the manufacturer’s recommendations. For the purposes of this proposal, the Offeror shall assume that Normal Degraded Output for (1) each of the Combustion Gas Turbines is 96% of the Guaranteed Gross Electric Output – Combustion Turbine Generator; and (2) the Back Pressure Steam Turbine is 98% of the Guaranteed Gross Electric Output - Back Pressure Steam Turbine Generator.

(e) Heat Rate – (Combustion Gas Turbines): The Lower Heating Value (LHV) of the fuel consumed by the Combustion Gas Turbines divided by the Gross Electric Output produced by the Combustion Gas Turbines.

(f) Guaranteed Heat Rate (Combustion Gas Turbines): The Heat Rate of the Combustion Turbine Generator shall be no greater than that submitted in the Efficiency Guarantees provided above when the Combustion Gas Turbine Generator is operating at the Guaranteed Gross Electric Output and in compliance with all regulatory requirements when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80 Commissioning.

(g) Steam Rate (Back Pressure Steam Turbine): The mass flow of steam, at the design point for steam pressures and temperatures at the inlet and exhaust of the steam Back Pressure Steam Turbine divided by the Gross Electric Output generated by the Back Pressure Steam Turbine.

(h) Guaranteed Steam Rate (Back Pressure Steam Turbine): A value for the Gross Heat Rate to be submitted in the Efficiency Guarantees provided above which will be the maximum Gross Steam Rate required for the Back Pressure Steam Turbine to produce its Guaranteed Gross Electric Output while operating in compliance with all regulatory requirements when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80 Commissioning.

(i) Unfired HRSG Steam Output: The steam produced by each HRSG at 275 psig and 550 degrees F, solely from the exhaust gases from a Combustion Turbine Generator.

(j) Duct Fired HRSG Steam Output: Steam produced by each HRSG at 275 psig and 550 degrees F from a combination of exhaust gases from the Combustion Turbine Generator (CTG) with additional thermal energy input from the combustion of natural gas using the excess oxygen in the CTG exhaust.

(k) Fresh Air Firing of HRSG: The utilization of an HRSG to produce steam, without the coincident operation of its combustion turbine generator, by supply of combustion air with an independent fan.

(l) Guaranteed Unfired HRSG Output: The steam rate to be submitted in the Output Performance Guarantees provided below produced by each HRSG at, 275 psig and 550 degrees F, solely from the exhaust gases from the Combustion Turbine Generator while the CTG is operating at its Guaranteed Gross Electric Power Output when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80 Commissioning.

(m) Guaranteed Fired HRSG Output (Duct Fired and Fresh Air Fired): Each HRSG shall be guaranteed to produce 115,000 lbs/hr of steam at 275 psig and 550 degrees F, to be submitted in the Output Performance Guarantees provided above, while in compliance with all regulatory requirements when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80 Commissioning.

(n) Guaranteed HRSG Duct Firing Rate: The maximum gas consumption ( BTUs - Higher Heating Value (HHV)) to be submitted in the Efficiency Guarantees provided above which needs to be burned in the duct burner while operating the Combustion Turbine at the Guaranteed Gross Electric Output and meeting the Guaranteed Heat Rate for the CTG, to produce 115,000 lbs/hr of steam at 275 psig – 550 degrees F while in compliance with all regulatory requirements when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80 Commissioning.

(o) Guaranteed Packaged Water Tube Boiler Capacity: Each Boiler shall be guaranteed to produce, when firing either natural gas or fuel oil, no less than 115,000 lbs/hr of 275 psig – 550 degrees F steam while in compliance with all regulatory requirements when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40

Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80 Commissioning.

(p) Guaranteed Packaged Water Tube Boiler Fuel Consumption – Natural Gas Fuel: The fuel consumption HHV to be submitted in the Efficiency Guarantees provided above required to achieve the Guaranteed Boiler Capacity when operating on natural gas when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80 Commissioning.

(q) Guaranteed Packaged Water Tube Boiler Fuel Consumption – No. 2 Fuel Oil: The fuel consumption HHV to be submitted in the Efficiency Guarantees provided above required to achieve the Guaranteed Boiler Capacity when operating on No. 2 Fuel Oil when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80 Commissioning.

(r) Parasitic Power: The electric power required to produce the power and steam at the CHPP plus the electric power losses up to the 69 kV terminals of the generator step up transformer.

(s) Guaranteed Parasitic Power: The maximum Parasitic Power to be submitted in the Efficiency Guarantees provided above required to produce 16 MW of Gross Electric Output at the combustion gas turbine generator outputs and back pressure steam turbine generator output as determined to represent Normal Degraded Output and 460,000 Lbs/Hour of steam at 275 psig and 550 degrees F when tested in accordance with Section 01 10 00 Statement of Work, 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems, 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems, and 01 91 00.80 Commissioning.

5.3 VOLUME 1 – TAB A – FACTOR 2 – PROPOSED CONTRACT DURATION and PRELIMINARY

SUMMARY SCHEDULE

5.3.1 Submission Requirements:

5.3.1.1 Proposed Contract Duration: The Offeror shall indicate its proposed total contract duration, expressed in calendar days not to exceed the maximum allowable contract duration so specified, in the appropriate Contract Line Item Number (CLIN) in the Proposed Bid Schedule in Tab A of Volume 3. The Offeror also shall include its proposed contract duration within the header to its Preliminary Summary Schedule required in paragraph 5.3.1.2.

For purposes of this submission, the total contract duration shall begin with the issuance of the Notice to Proceed following award and shall conclude when all output performance, efficiency, and environmental compliance guarantees and training requirements are met as defined by terms of this solicitation and confirmed by the contracting officer. The total contract duration shall be equal to the total number of days reflected in the Preliminary Summary Schedule required.

5.3.1.2 Preliminary Summary Schedule: Submit a summary level schedule for integrated design and construction. Schedules or diagrams may be provided separately in a size that is easily read, but shall be bound and clearly labeled as VOLUME 2 – TAB A. This summary schedule will, after contract award, be replaced with the Project Schedule, as required by Section 01 32 01.00 10: Project Schedule. The summary schedule shall be task oriented, indicating the number of calendar days, after notice to proceed, by which milestones are to be achieved.

Offeror may use a critical path or other method of his choice; however, schedules shall be graphically represented.

The proposed project schedule shall reflect the proposed contract durations for individual tasks and cumulatively.

Offerors are instructed to address the following features:

(a) Provide a narrative, describing the design packaging plan for separate design packages, based on the Offeror’s plan for fast tracking. Describe all design and construction to be “fast-tracked” (See Section 01 33 16: Design After Award). If long lead item equipment must be ordered prior to completion of a design phase, describe the requirement in the narrative and show the required ordering task in the schedule.

(b) Show the design phase, including events associated with coordinating the interim and final design submittals for each package and the proper handling of the review comments for each design package (See Section 01 33 16:

Design After Award).

(c) Show the overall construction phase for the facility, site work, and utilities (Offerors are not expected to depict detailed breakdown of construction (e.g., by trades)). Show fast track starts for design packages.

(d) Show turnover of the facility. The time to complete the facility and turnover to the Government must consider the requirement for the Contractor’s CQC completion inspection, commissioning, and the subsequent joint Contractor-Government turnover inspection.

(e) Show as-built submissions (See Section 01 78 02.00 10: Project Closeout).

(f) Constraints: Identify any constraints on the schedules presented (e.g., labor or material availability, permits, weather, etc.) and describe how the Offeror intends to address these constraints. Offeror must demonstrate the capability and flexibility to plan and schedule the complete project to meet the proposed contract completion period.

(g) Indicate the anticipated overall critical path on the schedule.

5.3.2 Evaluation Criteria:

5.3.2.1 Proposed Contract Duration: The total contract duration submitted in response to paragraph 5.3.1.1 shall become the contractually binding completion period in the event of award. The Government will evaluate the reasonableness of the proposed contract duration by assessing how well the proposed summary schedule supports it taking into account the logic and sequencing of activities, typical design and construction durations, and constraints.

To be eligible for a rating of “acceptable” or better for this factor, the proposed contract duration may not exceed the maximum allowed contract duration, unless the Preliminary Summary Schedule submitted in response to 5.3.1.2 clearly identifies a constraint(s) and describes with particularity why the constraint(s) will preclude the Offeror from achieving the maximum allowed contract duration.

The Government may consider a proposed contract duration which is shorter than the maximum allowed duration an advantage. Provided that the Government deems the Preliminary Summary Schedule realistic and reasonably achievable, the Government will evaluate the extent to which the proposed duration may provide for a shorter duration. To be considered an advantage to the Government, a difference of at least three weeks (twenty-one (21) calendar days) between the proposed contract duration and the maximum allowable contract duration will be deemed a material benefit to the Government, with greater differences evaluated accordingly. Similarly, in the comparative analysis of competing proposals, the Government will consider a difference of at least three weeks (twenty-one (21) calendar days) to be material in terms of a comparative advantage, with greater differences evaluated accordingly. Offerors are cautioned that the Government will rate adversely (to include finding a weakness, significant weakness, or deficiency) an unreasonably condensed contract duration which may place additional cost or schedule risk on the Government or which may create a risk of contract or performance failure.

5.3.2.2 Preliminary Summary Schedule: The Government will evaluate the Preliminary Summary Schedule to assess the degree of the Offeror’s understanding of the project scope. The Government will assess the extent to which it identifies constraints which must be considered in the schedule (e.g., permitting (see Section 01 10 00), long lead items, etc.) and the extent to which the Offeror describes innovative approaches to mitigate the constraints.

The Government will evaluate the degree of understanding of events associated with coordinating design submittals, reviews, and incorporating review comments. The Government will assess the Offeror’s capability to schedule the complete project within the proposed contract duration, and the realism of the schedule. The Government will evaluate the design packaging plan for logic and reasonableness, how well it facilitates meeting the proposed contract duration, how well it facilitates the Government’s ability to timely perform its design reviews, how well it minimizes risk for tear-out and demonstrates ability to provide for coordinated reviews.

5.4 VOLUME 1 – TAB A – FACTOR 3 – DESIGN CONCEPTS AND QUALITY OF MATERIALS

5.4.1 Submission Requirements:

Factor 3 – Design Concepts and Quality of Materials consists of four (4) parts: Technical Approach Narrative, Presentation Drawings, Maintenance and Reliability Approach Narrative, and a List of Betterments (Or Quality Improvements).

5.4.1.1 Technical Approach Narrative:

Provide a technical approach narrative demonstrating the Offeror’s proposed solution to requirements of the solicitation in accordance with the specific requirements discussed below. The narrative must include both a qualitative and quantitative analysis of the process. The narrative shall not exceed fifteen (15) type written pages.

Not included in the page limit; the Offeror may additionally provide simple sketches and/or drawings, on folded 11” by 17” sheets, to help illustrate design basis concepts and rationale of the proposal. (Reference Appendix B Existing Record Drawings in the RFP as needed.)

At a minimum, provide a system description of the Combined Heat and Power Plant addressing the following items:

5.4.1.1.1 Equipment Selection: Provide a complete equipment description for all major components including:

Combustion Turbine Generator, Back Pressure Steam Turbine Generator, HRSG, Packaged Water Tube Boilers, plant control system, air emissions control equipment, cooling system, major pumps, water treatment system, and fuel storage facilities.

For the Combustion Turbine Generator, Steam Turbine Generator, HRSGs, and Packaged Water Tube Boilers to be procured:

Provide an un-priced copy of the proposed vendor’s detailed quotation, List the manufacturer lead time, Provide the terms and expiration of warranties/guarantees.

Describe how the power generation systems, configurations, utilities, and systems selected provide for a highly efficient design. Discuss how these selections provide value to the Government and how they address the minimum requirements of the solicitation. Narrative should focus on maintenance considerations and suitability of the proposed systems for the expected usage. Include information regarding interconnection and utility coordination with public utility providers where applicable. Describe the electric and thermal systems supplying electric and thermal energy to the host facility and the impacts the CHPP facility will have on their operations (e.g., energy consumption and production, emissions, etc.). Describe how the proposed CHPP system may allow the shutdown of any major operating equipment (e.g., heating, cooling, or electric power) without adversely affecting the host facility.

5.4.1.1.2 Equipment Configuration: Describe the technologies and configurations being proposed, e.g. Gas Turbine(s), Heat Recovery Steam Generators, Packaged Water Tube Boilers, Duct Firing Units, Steam Turbines, Absorptions Chillers, Cooling Towers, steam pressure reducing station with desuperheater, etc.

5.4.1.1.3 Combustion Inlet Air Cooling: Describe the type of combustion inlet air cooling.

5.4.1.1.4 Air Emissions: Describe all air emission control systems, e.g., low NOx burners, steam or water injection systems, catalytic combustors, catalytic oxidizers, selective catalytic reduction systems. Describe how the project will meet Best Available Control Technology Standards and Environmental Emissions Standards. At a minimum, the proposed CHPP design and operating condition must meet all requirements of the Commonwealth of Virginia Stationary Source Permit to Construct and Operate, Registration Number 20656, dated October 8, 2014.

5.4.1.1.5 Interoperability: Describe how the power control, SCADA, and BAS systems are integrated into the performance of the facility.

5.4.1.1.6 Site Planning: Describe the proposed site addressing building and exterior equipment placement considerations. Address vehicle access and utility tie-in points.

5.4.1.1.7 Commissioning: Describe the commissioning plan and schedule; coordinated with project schedule submission requirement in Factor 2. Describe commissioning throughout design and construction.

5.4.1.1.8 Risk and Risk Mitigation Plan: Identify the major risks for project execution and associated contingency and/or mitigation plans.

5.4.1.2 Presentation Drawings:

Provide the following preliminary design information used as the basis for the facility design and associated performance guarantees:

5.4.1.2.1 Schematic Site Plan:

Provide Schematic Site Plans showing site improvements for buildings, substation, exterior mechanical and electrical equipment, exterior tanks, paving, parking lots, and walkways. Indicate all building and exterior equipment setbacks and separations including setbacks and separations that meet antiterrorism design requirements.

Delineate exterior equipment, utility corridor(s), vehicle circulation and pedestrian access to allow evaluation of the integration of this new development into the existing surrounding infrastructure within and outside of the existing limited area at the Radford Army Ammunition Plant. Select the format of the drawings provided to best illustrate compliance with the requirements of the Statement of Work.

5.4.1.2.2 Major Equipment Arrangement Including Maintenance Access/Egress Paths and Support Spaces:

The Government will provide a Building Functional Relationships Diagram and room data sheets in Section 01 10 00, Statement of Work, for functional reference. The Offeror shall provide schematic floor plans showing the proposed layout the equipment illustrating the manufacturer’s recommended service clearances, five (5) point turning radius of major equipment and largest service component, equipment service aisles, and ingress and egress for each building level including building floors and service mezzanines, and equipment control, service, and environmental compliance platforms. Major equipment includes, but is not limited to, combustion gas turbine, back pressure steam turbine, heat recovery steam generator, packaged water tube boiler, water softening system, deaerator, boiler feedwater pumps, steam pressure reducing station, mechanical HVAC equipment, panelboards, transformer, motor control centers, and switchgear. The Offeror shall indicate the sight-lines to each power generation component (gas turbine, heat recovery steam generator, and boiler) observable from the plant control room.

5.4.1.2.3 Combined Heat and Power Plant Process Flow Diagram:

The Combined Heat and Power Plant Process Flow Diagram shall show inlet/outlet flow rates of all steam, natural gas, water, and exhaust (pressures, temperatures, enthalpy flows) for the major equipment and supporting systems.

5.4.1.2.3.1 Steam: Describe where steam enters (or exits) the power facility steam cycle (HRSG, steam turbine extraction, etc.).

5.4.1.2.3.2 Backup: Describe the system(s) that will back up thermal energy delivery during a power facility curtailment or outage.

5.4.1.2.4 Electrical Single-Line Diagram:

Provide an Electrical Single-Line Diagram which shows the substation transformers, connections to the existing 69kV power distribution loop, turbine generators, 4160kV paralleling switchgear, 480V switchboards, configuration of the black start generator and uninterruptible power supplies, automatic transfer switches, switchboards, main and tie circuit breakers, load shedding capabilities, pad mounted transformers, motor control centers, and grounding.

Highlight any design features which provide enhanced contingency operation such as N+1 capabilities and ring bus layouts.

5.4.1.3 Maintenance And Reliability Approach Narrative:

Provide Maintenance and Reliability Approach Narratives, both qualitative…