W13B0006-0001.pdf

PDF 35 KB Posted

Attached to
Maintenance Dredging, James River, Virginia Federal contract opportunity
Solicitation number
W91236-13-B-0006
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Maintenance Dredging, James River, Virginia, newest first.
File Type Posted
W13B0006_Bid_Abstract.pdf PDF
W13B0006-0002.pdf PDF
W13B0006-0001_Specs_5-15-2013.pdf PDF
W13B0006.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Subject for Maintenance Dredging, James River, Virginia is amended as follow s:

See SCHEDULE on Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-May-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91236-13-B-0006

X 9B. DATED (SEE ITEM 11)

11-May-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-May-2013

CODE

USA ENGINEER DISTRICT, NORFOLK

CONTRACTING OFFICE

803 FRONT STREET

NORFOLK VA 23510-1096

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91236-13-B-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SCHEDULE

1. The question cutoff date through Projnet is 10:00AM on May 31, 2013.

2. The target range for the task order during base year is between $500,000 to $3,000,000.

3. DELETE Summary of Work Task Order During Base Year and Bid Schedule (Item 0001, 0002, 0003, 0007, 0008 and 0010) and REPLACE with Summary of Work, Task Order During Base Year and Bid Schedule For Task Order During Base Year dated, 20 May 2013.

4. Refer to Section 00800 – Special Contract Requirements, Clause 252.236-7001 Contract Drawings and specifications (Aug 2000), Paragraph (e), DELETE “James River IDIQ 2013, JRIDIQ2013, 395 Pages” and REPLACE with “James River IDIQ 2013 dated May 15, 2013, JRIDIQ2013, 396 Pages.”

5. Refer to Specifications, Division 35 – Waterway and Marine Construction, ADD Section 35 20 40 Historic Bank Height Information from Previous James River Task Order.

6. The Contracting Office Point-of-Contact is:

Veronica McGuire, Phone: 757-201-7366, Fax 757-201-7183, Email:

mailto:veronica.a.mcguire@usace.army.mil veronica.a.mcguire@usace.army.mil

20 May 2013

SUMMARY OF WORK

TASK ORDER DURING BASE YEAR

Task Order 0001

The work to be performed under this IDIQ contract Task Order will be on the Middle and Lower James River Shoals of Dancing Point-Swann Point Shoal Channel, and Tribell Shoal Channel, The work to be performed are the items defined in the base year contract line item schedule as Item No. 0001, 0002, 0003, 0007, 0008, 0010, and all associated work as defined in this Summary of Work. Plan Drawings will not be issued for this contract. The latest survey of each shoal may be obtained from the Norfolk District Web site at http://rci.nao.usace.army.mil/esds/SurveysIndex.aspx. A Before Dredging Survey of each dredging area will be performed upon receipt of the Contractor’s advance notice for dredging, as stipulated in Section 01 14 00, paragraph 1.5.3.

All work specified in this contract shall be performed in accordance with the contract documents and specifications applicable to the respective payment Items indicated and as stated in this Summary of Work. The Contractor shall begin work as soon as the Notice to Proceed (NTP) is given from the Contracting Officer. The Contractor shall begin performance within 10 calendar days and complete all work within 75 calendar days after receiving notice-to-proceed.

Portions of the following Channels on the James River Federal Navigation Project are to be dredged in the order indicated below to an elevation of -26 feet Mean Lower Low Water. One foot of overdepth will be allowed. Actual dredging areas, dredging widths, and associated dredging volume will be determined based on results of the Before Dredging (BD) Surveys for each channel indicated. Up to two 2) Acceptance Sections will be allowed for each channel segment indicated for completion of the scheduled work. The Contractor's Dredging and Dredged Material Placement Plan and Progress Schedule shall be coordinated with this requirement for completing the scheduled work in suitable sections for timely acceptance by the Government

1. Dancing Point – Swann Point Shoal Channel (Stations -20+00 – 379+33.9 (Up to Full Channel Width)).

2. Tribell Shoal Channel (Stations 0+00 – 261+75.7 (Up to Full Channel Width)).

Work is to be performed within 10 days from receiving the Notice to Proceed by the Contracting Officer or Contracting Officer Representative. Prior to commencement of work a Before Dredging (BD) Survey will be performed for each acceptance section to be dredged. For each acceptance section surveyed, the Government shall provide the Contractor in a timely manner, BD drawings indicating the required dredging locations, required and allowable dredging depths, and available pay volume.

20 May 2013

BID SCHEDULE FOR TASK ORDER DURING BASE YEAR

Task Order 0001

ESTIMATED

ITEM DESCRIPTION QUANTITY UNIT U/P AMOUNT

0001 Mobilization and Demobilization. 1 JOB XXX $___________

0002 Mobilization and Demobilization of Additional Pipeline. 1 JOB XXX $___________

0003 Dredging – Lower and Middle James

River Shoals 600,000 CY $_______ $___________

0007 Transportation of Plant and Equipment from Designated Mobilization Point to First Dredging Area and Subsequent RIVER Areas 100 MILES $_______ $___________

0008 Installation and Removal of

Additional Pipeline 12,000 LF $_______ $___________

0010 Dredging – Lower James River Shoals at Pipeline Lengths exceeding 10,000 linear feet. 140,000 CY $________ $___________

TOTAL ESTIMATED AMOUNT $______________

File details come from the government source that posted it. Updated .