W91236-13-B-0001-0001.pdf
PDF 2 MB Posted
- Attached to
- Renovation of Building 24, DLA Richmond, VA.
- Solicitation number
- W91236-13-B-0001
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Abstract_W91236-13-B-0001.pdf | ||
| Bldg24_DLA_Site_Visit_Attendance_Sign_In_(29Jan2013).pdf | ||
| Background_Check_Form_2012_(2).xls | XLS spreadsheet | |
| W91236-13-B-0001.pdf | ||
| DLA_Building_24.pdf | ||
| RTA_Spec.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W26GLG22983047
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W91236-13-B-0001, Renovate Building 24, DLA Richmond, VA is amended as follow s:
1. Clause: FAR 52.229-3, Federal, State, and Local Taxes is hereby incorporated into the solicitation.
2. General Decision Number: VA130103 dated 01/11/2013 is hereby deleted and replaced w ith VA130103 dated 01/18/2013.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Feb-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91236-13-B-0001
X 9B. DATED (SEE ITEM 11)
17-Jan-2012
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Feb-2013
CODE
USA ENGINEER DISTRICT, NORFOLK
CONTRACTING OFFICE
803 FRONT STREET
NORFOLK VA 23510-1096
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91236-13-B-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SECTION 00 11 00 - SOLICITATION, OFFER & AWARD
General Decision Number: VA130103 01/18/2013 VA103
Superseded General Decision Number: VA20120103
State: Virginia
Construction Type: Building
Counties: Chesterfield and Colonial Heights* Counties in Virginia.
*INDEPENDENT CITY
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date 0 01/04/2013 1 01/11/2013 2 01/18/2013
BOIL0045-004 10/01/2012
Rates Fringes
BOILERMAKER......................$ 31.21 25.52
CARP0613-008 05/01/2010
Rates Fringes
CARPENTER........................$ 21.51 7.27+2%
ELEC0666-012 03/01/2011
Rates Fringes
ELECTRICIAN......................$ 28.45 36.00%
ELEV0051-005 01/01/2012
Rates Fringes
ELEVATOR MECHANIC................$ 35.94 23.535+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving and Christmas Day.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ENGI0147-023 05/01/2012
Rates Fringes
Power equipment operators:
Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100
ft. above ground............$ 27.98 8.69%+7.80 Cranes under 90 tons........$ 27.06 8.69%+7.80
* IRON0028-011 01/01/2013
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 24.36 13.02
PAIN0051-031 06/01/2012
Rates Fringes
PAINTER (Brush & Roller).........$ 17.25 8.91
PLUM0010-015 09/01/2012
Rates Fringes
PIPEFITTER (Including HVAC Pipe & System Installation)......$ 27.40 15.02
SHEE0100-037 07/01/2010
Rates Fringes
SHEET METAL WORKER (Excluding HVAC Duct Installation)..........$ 25.62 11.72
SUVA2010-096 09/20/2010
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 23.29 10.09
BRICKLAYER.......................$ 22.88 5.81
CEMENT MASON/CONCRETE FINISHER...$ 13.29 0.62
IRONWORKER, ORNAMENTAL...........$ 16.45 2.28
LABORER: Common or General......$ 10.28 0.00
LABORER: Landscape..............$ 10.64 0.00
LABORER: Mason Tender - Brick...$ 10.90 2.35
LABORER: Mason Tender - Cement/Concrete..................$ 12.96 3.12
LABORER: Pipelayer..............$ 14.44 2.35
OPERATOR: Backhoe...............$ 17.67 3.16
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 15.62 2.40
OPERATOR: Bulldozer.............$ 21.50 4.80
OPERATOR: Excavator.............$ 18.38 4.17
OPERATOR: Forklift..............$ 17.93 7.28
OPERATOR: Loader................$ 20.63 4.80
OPERATOR: Mechanic..............$ 18.23 1.59
OPERATOR: Roller................$ 21.50 4.80
PAINTER: Spray..................$ 21.01 6.91
PLUMBER..........................$ 16.78 6.13
ROOFER...........................$ 21.55 7.01
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 17.97 5.28
SPRINKLER FITTER (Fire Sprinklers)......................$ 16.25 4.37
TILE FINISHER....................$ 17.32 6.72
TILE SETTER......................$ 21.12 7.68
TRUCK DRIVER: Dump Truck........$ 13.25 1.80
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
AMENDMENT:
The solicitation is amended as follows:
The following items represent changes to the contract scope. These changes apply across the entire solicitation.
SPECIFICATIONS
Section 01 50 00 Temporary Construction Facilities and Controls, Section 3.5
DELETE section 3.5, Government Field Office, in its entirety. Subsections 3.5.1 and 3.5.2 shall be deleted accordingly. No government field office is required.
Section 08 91 00 Metal Wall and Door Louvers DELETE in its entirety.
Section 27 10 00 paragraph 2.3.3.1:
Modify paragraph to read as follows: “Provide work area copper cable in accordance with TIA- 568-C.2, with a blue, thermoplastic jacket. Provide a minimum of one each seven feet workstation cable complete for every wall outlet. Provide a minimum of one each seven foot patch cord for every port in all patch panels.”
DRAWINGS
SD101: First Flr & Low Roof Framing Plan - Demolition
REPLACE sheet in its entirety with revised sheet.
SD301: Sections - Demolition
REPLACE sheet in its entirety with revised sheet.
SE101: Foundation and First Floor Plan – New Work
SE301: Sections – New Work
AD101: First Floor Plan - Demolition
AD301: Building Sections – Demolition
REPLACE sheet in its entirety with revised sheet.
AE501: Keynote #9
REVISE Sheet Keynote #9 to read: 4” thick closed cell spray polyurethane continuous on underside of existing deck and around existing roof joists, substrate shall be clean of dirt and dry (15% moisture content) or as recommended by mfg., install primer on substrate as recommended by mfg.”
M201: D4: Enlarged Mechanical Room Plan
ADD SKM-201-1, which modifies floor plan showing the addition of a buffer tank to the hot water system
M501: Boiler Schedule
ADD SKM-501-1, which modifies BOILER SCHEDULE NOTES to show the addition of a buffer tank and boiler recirculation pump to the hot water system.
M602: C1: Heating Water Piping Schematic ADD SKM-602-1, which modifies HEATING WATER PIPING SCHEMATIC to show the addition of a buffer tank and boiler recirculation pump to the hot water system.
M801: General Notes ADD SKM-801-1, which modifies GENERAL NOTE 1 for clarification.
M804: Hydronic Pumping Control Schematic ADD SKM-804-1, which modifies HYDRONIC PUMPING CONTROL SCHEMATIC to show the addition of a buffer tank and boiler recirculation pump to the hot water system
ET502: Termination Rack typical Detail
REVISE rack detail as follows: "Provide a 72 port FODP at the top of rack, provide five each 2 RU 48 port CAT 6 PP, provide five each 2RU horizontal wire management, per rack / cabinet."
ET601: Premises Wiring Distribution System (PWDS) Diagram REVISE notation flagged to existing telecom MH to read, " Connect to existing fiber optic OSP cable and existing Copper OSP cable in existing telecommunications manhole adjacent the building and extend into new telecommunications room, in conduit as indicated on drawing
ES101."
ET601: PWDS Diagram: Modify cabling note to read as follows: “(2) 4 PAIR CAT 6 UTP VIA CONDUIT /
CABLE TRAY TO TELECOMMUNICATION RACKS/CROSS CONNECTS. (1) 4 PAIR TO
VOICE, (1) 4 PAIR TO DATA RACKS. TYPICAL.”
ET601: PWDS Diagram: Modify BEP notation to read as follows: “BEP (75 PAIR).”
HYDRONIC PUMPING CONTROL SCHEMATIC
| pd26 |
| Amendments 1-3 |
| Amendment 1 |
| Binder2 |
| 1205 SKM-201-1 |
| 1205 SKM-501-1 |
| 1205 SKM-602-1 |
| 1205 SKM-801-1 |
| 1205 SKM-804-1 |
File details come from the government source that posted it. Updated .