AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Subject order for construction of Phase 1B site environmental remediation for Dense Non-aqueous Phase Liquid (DNAPL) Soil Stabilization at the Atlantic Wood Industries Superfund Site located in Portsmouth, Virginia is amended as follows:

1. The proposal due date is changed to 20 APRIL 2012, 2:00pm. All proposals should be delivered to ATTN: Veronica McGuire, 803 Front Street, Norfolk, VA 23510. All are required to submit a Standard Form (SF) 33 acknowledging all amendments.

2. Sign In sheet is hereby attached.

3. Refer to Section 00100, Instruction to Bidders: Factors for Evaluation is hereby incorporated and is attached.

4. The Contracting Office Point-of-Contact is:

Veronica McGuire, Phone: 757-201-7366, Fax 757-201-7183, Email: veronica.a.mcguire@usace.army.mil

1. CONTRACT ID CODE PAGE OF PAGES

1 22

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Mar-2012

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91236-12-R-0022

X 9B. DATED (SEE ITEM 11)

09-Mar-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Mar-2012

CODE

USA ENGINEER DISTRICT, NORFOLK

CONTRACTING OFFICE

803 FRONT STREET

NORFOLK VA 23510-1096

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91236-12-R-0022

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

SECTION IV

FACTORS FOR EVALUATION

SECTION 00 22 11

PROPOSAL SUBMISSION REQUIREMENTS EVALUATION CRITERIA AND BASIS OF AWARD -

ONE STEP - -LOWEST PRICE TECHNICALLY ACCEPTABLE, DESIGN-BID-BUILD

(SINGLE AWARD)

1.0 OVERVIEW

2.0 GENERAL INSTRUCTIONS

3.0 PROPOSAL INFORMATION AND RELATED EVALUATION FACTORS, SUBFACTORS AND

ELEMENTS

3.1 VOLUME 1 – PERFORMANCE CAPABILITY

3.2 VOLUME 2 – PRICE AND PRO-FORMA INFORMATION

4.0 VOLUME 1 –FACTOR 1 - PERFORMANCE CAPABILITY

4.1 TAB A –SUBFACTOR 1 – SPECIALIZED EXPERIENCE

4.2 TAB B –SUBFACTOR 2 – PAST PERFORMANCE

4.3 TAB C –SUBFACTOR 3 – KEY PERSONNEL CAPABILITIES AND EXPERIENCE

5.0 VOLUME 2 – PRICE AND PRO FORMA INFORMATION

5.1 TAB A – FACTOR 2 – PRICE (STANDARD FORM 1442, PROPOSAL DATA SHEET AND

CONTRACT LINE ITEM SCHEDULE)

5.2 TAB B - BID GUARANTEE, EVIDENCE OF BONDABILITY

5.3 TAB C – REQUIRED PRE-AWARD INFORMATION

6.0 EVALUATION PROCEDURES

6.1 SOURCE SELECTION EVALUATION BOARD (SSEB)

6.2 EVALUATION

6.3 EVALUATION RATING SYSTEM

ATTACHMENTS

1 - COMPANY SPECIALIZED EXPERIENCE PRIME CONTRACTOR

2 - COMPANY SPECIALIZED EXPERIENCE KEY SUBCONTRACTOR

3 - PAST PERFORMANCE EVALUATION QUESTIONNAIRE

4 - KEY PERSONNEL RESUME

5 - LETTER OF COMMITMENT FOR KEY PERSONNEL (PRIME CONTRACTOR)

6 - LETTER OF COMMITMENT FOR KEY PERSONNEL (KEY SUBCONTRACTOR)

7 - PROPOSAL DATA SHEETS

1. OVERVIEW

The Government is looking for ways to streamline construction, manage labor and other resource constraints in an effort to reduce costs and achieve a 12-month schedule for project execution at lower cost, while taking advantage of industry standards, means and methods. In this selection procedure, interested firms or joint venture entities (referred to as “Offerors”) submit certain specified performance capability proposals, demonstrating their capability to successfully execute the construction under the contract resulting from this solicitation. The Government will evaluate the qualifications in accordance with the criteria described herein and will award a single contract to the Lowest Price Technically Acceptable Offeror. The total evaluated price will include the base and all optional items.

2. GENERAL INSTRUCTIONS

2.1. Proposals should be submitted initially on the most favorable terms from a price and capability standpoint.

Do not assume that Offerors will be contacted or afforded an opportunity to clarify, discuss or revise their proposals.

2.2. Firms formally organized as construction contractors that have associated specifically for this project, consortia of firms or any other interested parties may submit proposals. Associations may be as joint ventures or as key team subcontractors. Any legally organized Offeror may submit a proposal.

2.3. Submit the proposal in a tabbed, three-ring binder. Note that the Government will not evaluate any material that exceeds the page limits, where indicated below.

2.4. Proposal Format

2.4.1. Written materials: 8 ½” x 11” format, using 10 point or larger font size, in bound volumes, using 3-ring binders (except that Pro Forma material and price proposal shall be submitted in a closed manila envelope).

Each bound volume will contain a Title Sheet on the cover for ready identification of the proposal and a full table of contents, separated by Tabs, as prescribed herein.

2.4.2. The prime, consortium, or joint venture’s name, address, a signature of the official that can bind the firm and a telephone number shall appear in the lower left corner of the title page of any document/volume to be evaluated.

2.4.3. Volume number, section and date submitted shall appear in the bottom right corner of each page (along with the revision number for the amended page, if necessary).

2.4.4. Number of pages: The proposal shall be limited to a maximum of 250 typewritten pages. Each side of a double sided page shall constitute one page.

2.5. Joint Venture Proposal Requirements

When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HubZone joint venture, the Offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.

3. PROPOSAL AND RELATED EVALUATION FACTORS, SUBFACTORS AND ELEMENTS

3.1. VOLUME 1 – PERFORMANCE CAPABILITY

Factor/Sub Factor

Location Description

FACTOR 1 PERFORMANCE CAPABILITY

Subfactor 1 Vol. 1 TAB A Specialized Experience

Subfactor 2 Vol. 1 TAB B Past Performance

Subfactor 3 Vol. 1 TAB C Key Personnel Capabilities and Experience

NOTE: The rating will be either “Acceptable” or “Unacceptable” against criteria/measurement contained in the RFP. All ratings, whether “Acceptable” or “Unacceptable,” will be documented fully to include the rationale for the rating and a reference to the specific portion of the Offeror’s proposal that the evaluator(s) used to determine that rating.

3.2. VOLUME 2 – PRICE AND PRO FORMA INFORMATION

Factor/Sub Factor

Location Description

FACTOR 2 Vol. 2 TAB A Price (Standard Form 1442, Proposal Data Sheet And Contract Line Item Schedule)

N/A Vol. 2 TAB B Bid Guarantee

N/A Vol. 2 TAB C Required Pre-Award Information

NOTE: 8(a) Joint Venture Offeror or Offeror submitting Proposal as HubZone Joint Venture shall submit evidence from Offerors SBA Servicing Agency that the Offeror has notified and discussed the proposed joint venture for this specific project with the appropriate SBA Representative or Business Opportunity Specialist.

4. VOLUME 1 – FACTOR 1 – PERFORMANCE CAPABILITY

4.1. TAB A – SUBFACTOR 1 - SPECIALIZED EXPERIENCE

4.1.1. SUBMISSION REQUIREMENTS

4.1.1.1. Offerors must demonstrate recent, relevant experience as a prime contractor on one (1), two (2), or three (3) similar projects, using the Company Specialized Experience Prime Contractor form (Attachment 1). The page limitation is two (2) pages per similar project, for a maximum of six (6) pages for similar projects as a prime contractor. If the major component of the construction (i.e., in-situ stabilization/solidification of DNAPL) is to be performed by the Offeror’s key subcontractor(s), then the Offeror must also provide specialized experience information of the subcontractor(s) by submitting key subcontractor(s)’ specialized experience information for one (1), two (2), or three (3) similar projects using Company Specialized Experience (Key Subcontractor) form (Attachment 2).

The page limitation is two (2) pages per similar project for subcontractor(s), for a maximum of six (6) pages for the key subcontractor(s), if applicable.

4.1.1.2. A project will be considered similar if it includes any of the following criteria. While any one (1) project does not need to meet all of the criteria below to be considered similar, projects described per

4.1.1.1 above must collectively show experience that meets ALL of the following criteria:

(a) Remediation of a minimum of 5,000 cubic yards of contaminated soil containing Dense Non-aqueous Phase Liquid (DNAPL) and Polynuclear Aromatic Hydrocarbons (PAHs), via in-situ soil stabilization/solidification.

(b) In-situ soil stabilization/solidification of contaminated soil at a HTRW site at least $2,500,000.00 in value.

(c) Demonstrate in-situ soil stabilization/solidification at depths of 25 feet or greater from the ground surface.

4.1.1.3 Submit projects that are currently well underway (fully designed and at least 50% construction progress completed) or construction completed no longer than five (5) years preceding the date of this solicitation.

4.1.1.4 Offerors may identify state and local government and private projects that are similar to the Government’s requirements.

4.1.1.5. If the Offeror is a joint venture, each individual entity must demonstrate recent, relevant experience and meet the criteria for similar projects stated in 4.1.1.1 and 4.1.1.2.

4.1.1.6 If any firm has multiple functions or divisions, limit the project examples to those preformed by the division or unit submitting the offer or by the team member.

4.1.2. EVALUATION CRITERIA:

4.1.2.1. The Government will evaluate the required information to determine whether the Offeror meets the minimum specialized experience requirements.

4.1.2.2. An Offeror will receive an “Acceptable” rating if the Offeror demonstrates specialized experience on similar projects as described above. The Offeror will receive an “Acceptable” rating for specialized experience if all three (3) components under 4.1.1.2 are demonstrated in one (1), two (2), or three (3) projects.

4.1.2.3. An Offeror will receive an “Unacceptable” rating if the Offeror fails to demonstrate specialized experience on similar projects as described above. The Offeror will receive an “Unacceptable” rating for specialized experience if all three (3) components under 4.1.1.2 are not demonstrated in one (1), two (2), or (3) projects

4.1.2.4. The Government reserves the right to verify recent, relevant, and similar project experience in submitted projects by interviewing the customers or point of contact(s). The Government may check any or all cited references to verify supplied information. Offerors must provide all requested information on Attachment 1 or Attachment 2 as applicable, including the point of contact for reference and the current telephone number of the reference point of contact.

4.2. TAB B – SUBFACTOR 2 - PAST PERFORMANCE

4.2.1. Past performance refers to the quality of recent project experience from the owner’s perspective

4.2.2. SUBMISSION REQUIREMENTS:

4.2.1.1 The Offeror must provide customer references using the Past Performance Evaluation Questionnaire (Attachment 3). Customer References must be associated with project(s) submitted under TAB A- Subfactor 1 - Specialized Experience.

4.2.1.2 The Offeror must provide a Point Of Contact and phone number under TAB B for projects submitted under TAB A – Subfactor 1 - Specialized Experience.

4.2.1.3 Each Past Performance Evaluation Questionnaire must be completed and submitted directly by the customer reference, not the Offeror, before the proposal due date. The customer reference shall either email the completed Attachment 3 directly to (Veronica.A.McGuire@usace.army.mil) or fax to 757-201- 7183 with Attn: Veronica McGuire Re: Solicitation Number W91236-12-R-0022 before the proposal due date. Any Past Performance Evaluation Questionnaires submitted directly by the Offeror will not be considered.

4.2.1.4 Responses must be provided for all questions on Attachment 3 along with the customer reference name(s), company affiliation and current phone numbers.

4.2.1.5 If any firm has multiple functions or divisions, limit the customer references to those who are customers of the division, unit or team member submitting the offer.

4.2.1.6 The Government may contact and interview the points of contact of the customer reference and reserves the right to interview other individuals acting for the listed reference, if the listed reference is not available.

Furthermore, the Government reserves the right to interview other individuals if the point of contact is not available.

4.2.1.7 TAB B, Subfactor 2 will have a ten (10) page limitation. Offerors must include points of contact and phone numbers for points of contacts associated with project(s) submitted under Subfactor 1, Specialized Experience. Offerors should also include any additional past performance information including commendations, awards, etc. under TAB B. The Government will not evaluate individual customer reference material that exceeds the ten (10) page limitation. Double-sided pages will count as two pages.

Use ten (10) point or larger font size. There are no requirements for margins or spacing.

4.2.3. EVALUATION CRITERIA:

4.2.3.1. The Government will evaluate the required information to determine whether the Offeror has demonstrated satisfactory past performance through customer references for project(s) submitted under Subfactor 1, Specialized Experience.

4.2.3.2. The Government reserves the right to verify past performance by reviewing the Corps of Engineers Construction Contractor Appraisal Support System (CCASS), other DOD or Government appraisal systems or to interview commercial owners or references. The Government may also check any or all cited references to verify supplied information.

4.2.3.3. Offeror will receive an “Acceptable” rating if the Offeror demonstrates satisfactory past performance on customer references for project(s) submitted under Subfactor 1, Specialized Experience.

4.2.3.4. The Offeror will receive an “Unacceptable” rating if the Offeror does not demonstrate satisfactory past performance through customer references for project(s) submitted under Subfactor 1, Specialized Experience. Failure to receive Past Performance Evaluation Questionnaires from customer references, provide points of contact and phone numbers for project(s) submitted under Subfactor 1, or any additional past performance information under TAB B will automatically result in an “Unacceptable” rating.

4.2.3.5. The Offeror will receive an “Unacceptable” rating if the CCASS or other DoD or Government appraisal systems contain an overall or interim rating of less than satisfactory for any similar project identified in Subfactor 1, Specialized Experience.

4.2.3.6. An Offeror may not establish past performance based on the past performance of its proposed key personnel, apart from that of the Offeror.

4.2.3.7. If any firm has multiple functions or divisions, the Government will only evaluate past performance of the division or unit submitting the offer.

4.2.3.8. The Government will not release the Past Performance Evaluation Questionnaires to the Offeror at any time, in order for the Government to solicit candid, unbiased interview comments.

4.3. TAB C – SUBFACTOR 3 - KEY PERSONNEL CAPABILITIES AND EXPERIENCE

4.3.1. SUBMISSION REQUIREMENTS

4.3.2. Provide a consolidated list of key personnel (as described below) with name, position title and description of project responsibility for each.

4.3.3. Indicate whether key personnel had a significant role in any of the similar project submissions included under Subfactor 1, Specialized Experience.

4.3.4. Offeror must also provide resumes for key personnel using the Key Personnel Resume form (Attachment 4). The Key Personnel Resume form should be no more than two (2) pages in length per resume.

4.3.5. The Offeror shall provide a Letter of Commitment from all proposed key personnel not currently employed by the team members. Key personnel to be employed by the prime contractor should use the Letter of Commitment for Key Personnel (Prime Contractor) (Attachment 5). Key personnel to be employed by a key subcontractor should use the Letter of Commitment for Key Personnel (Key Subcontractor)

(Attachment 6). Key personnel must include a project manager and project superintendent along with the other team’s key personnel.

4.3.6. Key Personnel shall include all of the following:

4.3.6.1. Prime Contractor’s Project Manager Responsible for Construction. The minimum experience requirements for the Project Manager are at least three (3) years project management experience in a similar project (as described under Subfactor 1, Specialized Experience, paragraph 4.1.1.2) or other projects that demonstrate experience with in-situ soil stabilization/solidification of contaminated soil.

4.3.6.2. Project Superintendent. The minimum experience requirements for the Project Superintendent are at least three (3) years construction management experience in a similar project (as described under Subfactor 1, Specialized Experience, paragraph 4.1.1.2) or other projects that demonstrate experience with in-situ soil stabilization/solidification of contaminated soil.

4.3.7. EVALUATION CRITERIA

4.3.7.1. The Government will evaluate the required information to determine whether the Offeror meets or exceeds the minimum key personnel capabilities and experience qualifications.

4.3.7.2. An Offeror will receive an “Acceptable” rating if the Offeror demonstrates that key personnel meet or exceed minimum experience requirements.

4.3.7.3. An Offeror will receive an “Unacceptable” rating if the Offeror does not demonstrate that key personnel meet the minimum experience requirements.

4.3.7.4. An Offeror will be automatically rated “Unacceptable” if the Offeror does not submit information for all key personnel listed above.

5. VOLUME 2 – PRICE AND PRO FORMA INFORMATION

Submit the Pro Forma information in a separate envelope labeled: “Volume 2 - Pro Forma Requirements.”

5.1. TAB A - FACTOR 2 – PRICE (STANDARD FORM 1442, PROPOSAL DATA SHEET AND

CONTRACT LINE ITEM SCHEDULE)

5.1.1. Submission Requirements:

5.1.1.1. Submit the properly filled out and executed SF 1442 and Proposal Data Sheet (Attachment 7), along with the CLIN Schedule, containing proposed line item and total pricing, as well as the proposed contract duration.

5.1.1.2. Supplemental Price Breakdown. The Government will require a price breakdown of the Contract Line items in a sealed envelope marked “Price Breakdown Information”, in Excel format. This information will not be needed sooner than three working days after the proposal submission due date. This information may be required for the initial proposal and, if requested, for any revised proposals. This information is not an opportunity for an Offeror to revise its non-price or price proposal. This information shall be provided to the Contracting Office, the same location and identifications as were provided with the original proposal.

5.1.2. Evaluation Criteria:

5.1.2.1. Price will not be rated or scored, but will be evaluated for fairness and reasonableness through the use of a price analysis. The price evaluators will also check for appearance of unbalanced line item prices.

Offerors are cautioned to distribute direct costs, such as material, labor, equipment, subcontracts, etc.

and to evenly distribute indirect costs, such as job overhead, home office overhead, bond, etc., to the appropriate contract line items. Both parties shall presume that field overhead costs through the proposed contract duration are inclusive in the offered price for the contract.

5.1.2.2. The supplemental price breakdown information will be used to assist the Government in performing the price evaluations described above.

5.1.2.3. Award cannot be made for project cost for construction exceeding the contract cost limitation described herein.

5.2. TAB B –BID GUARANTEE EVIDENCE OF BONDABILITY

5.2.1. Submission Requirements:

Submit the Bid Bond in accordance with the Instructions, Provision 52.228-1 Bid Guarantee. Submit information showing Offeror's bondability in the amount of the proposal. Include the name, address and telephone number of the prime contractor's bonding agent.

5.2.2. Evaluation requirements:

This item is not rated. The Government will review the Bid Bond for legal sufficiency. The Bond must be legally sufficient. Bonding information will be reviewed to determine the Offeror's ability to obtain the required Performance and Payment Bonds. The prime contractor is required to be able to obtain the level of bonding required by the solicitation from an acceptable surety.

5.3. TAB C – REQUIRED PRE-AWARD INFORMATION

5.3.1. Submission Requirements:

5.3.1.1. Submit this information for the Contracting Officer’s determination of Offeror responsibility, which includes, but is not limited to the following:

5.3.1.1.1. A list of present commitments, including the dollar value thereof, and name of the organization under which the work is being performed. Include names and telephone numbers of personnel within each organization who are familiar with the prospective contractor’s performance.

5.3.1.1.2. A certified statement listing; (a) each contract awarded within the preceding three month period exceeding $1,000,000.00 in value with a brief description of the contract; and (b) each contract awarded within the preceding three year period not already physically completed and exceeding $5,000,000.00 in value with a brief description of the contract.

5.3.1.1.3. If the prospective contractor is a joint venture, each joint venture member will be required to submit the above defined certification.

5.3.1.2. One copy of the following information shall be provided:

5.3.1.2.1. Proof of Financial Ability (Most recent financial statement covering assets and liabilities)

5.3.1.2.2. Number of years the firm has been in business

5.3.1.2.3. Name, address and telephone number of firm’s bonding company

5.3.1.2.4. Information showing Offer or’s bondability for this project. Include the bond rate.

5.3.1.2.5. Name, address and telephone numbers of two credit/trade references.

5.3.2. Evaluation Criteria:

In addition to the other proposal information, the Contracting Officer shall use this information in making an affirmative responsibility determination for award to the Successful Offeror, in accordance with FAR Part 9.

6. EVALUATION PROCEDURES

6.1. SOURCE SELECTION EVALUATION BOARD (SSEB)

The SSEB will be established to conduct the evaluation of proposals received in response to this solicitation. The evaluation will be based on the content of the proposal and any subsequent discussions required, as well as information obtained from other sources, e.g. past performance information. The SSEB will not consider any information incorporated by reference, except as expressly allowed by this solicitation.

6.2. EVALUATION

6.2.1. The SSEB will evaluate the proposals and assign a consensus rating for each evaluation factor and subfactor.

6.2.2. The Government intends to award without discussions. Offerors are cautioned to put forth their best efforts, and to furnish all information clearly to allow the Government to evaluate proposals. Offerors should not assume that they will have an opportunity to clarify or correct anything in their proposal after submitting it.

6.2.3. A “Competitive Range” is a subjective determination of the most highly rated proposals in the event that the Government decides that discussions with Offerors are required or are considered to be in the Government’s best interests. In such an event, the Contracting Officer will establish a competitive range of all the most highly rated proposals.

6.2.4. If discussions are held, the Government may engage in a broad give and take with those Offerors in the competitive range, in accordance with FAR 15.306 (d). The Government will provide the Offeror an advance agenda for the discussions. During discussions, the Government may ask the Offeror to further explain its proposal and to answer questions about it.

6.2.5. Upon conclusion of discussions, those Offerors still considered the most highly rated, will be afforded an opportunity to submit their proposal revisions for final evaluation and selection.

6.3. EVALUATION RATING SYSTEM

Adjective Ratings: The following adjective ratings will be used in evaluation of both the major factors and the subfactors.

6.3.1. Unacceptable (U): The proposal fails to meet stated criteria and is not capable of becoming acceptable without major revisions.

6.3.2. Acceptable (A): The proposal essentially satisfies the standards; minor weaknesses¸ even if not corrected, do not render this proposal/factor unacceptable.

6.4. BASIS OF AWARD

The award shall be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for all non-cost factors. Proposals receiving an unacceptable rating in any of the evaluation factors or sub-factors will be excluded from consideration for award.

SECTION 00 22 11 - ATTACHMENT 1

COMPANY SPECIALIZED EXPERIENCE

(PRIME CONTRACTOR)

Provide the following information to show examples of projects your company constructed within the last five years indicating experience with projects of similar type and scope. Use one form per project.

1. Type of Facility Represented _________________________________________________________________

2. Your Firm’s Name _________________________________________________________________________

3. Name of Project____________________________________________________________________________

4. Location of Project__________________________________________________________________________

5. Owner ___________________________________________________________________________________

6. General Scope of Construction Project __________________________________________________________

7. Your Role (Prime, Joint Venture, or Subcontractor, etc.) and Work Your Company Self-Performed :

8. Construction Cost __________________________________________________________________________

9. Extent and Type of Work You Subcontracted Out ________________________________________________

10. Was construction documentation created in accordance with LEED requirements? _________________

11. Dates Construction: Began___________________ Completed______________

12. Your Performance Evaluation by Owner, if known ___________________________________________

13. Were You Terminated or Assessed Liquidated Damages? _____________________________________

(If either is “Yes”, attach an Explanation)

14. Owner’s Point of Contact for Reference (Name and Company) __________________________________

15. Current Telephone Number of Reference POC________________________________________________

SECTION 00 22 11 - ATTACHMENT 2

COMPANY SPECIALIZED EXPERIENCE

(KEY SUBCONTRACTOR)

Provide the following information to show examples of projects your company constructed within the last five years indicating experience with projects of similar type and scope. Use one form per project.

(a) Type of Facility Represented _________________________________________________________________

(b) Your Firm’s Name _________________________________________________________________________

(c) Name of Project____________________________________________________________________________

(d) Owner ___________________________________________________________________________________

(e) General Scope of Construction Project __________________________________________________________

(f) Your Role (Prime, Joint Venture, or Subcontractor, etc.) and Work Your Company Self-Performed :

(g) Your Contract or Subcontract Amount __________________________________________________________

(h) Detailed Description of Your Self-Performed Work ________________________________________________

(i) Describe any Work You Subcontract to Others ____________________________________________________

(j) Was construction documentation created in accordance with LEED requirements? _______________________

(k) Dates Your (sub) contract: Started___________________ Completed______________

(l) Your Performance Evaluation by Owner, if any___________________________________________________

By Prime: ____________________________________________________________________________________

(m) Were You Terminated or Assessed Liquidated Damages? ___________________________________________

(If either is “Yes”, attach an Explanation)

(n) Name and company of Point of Contact (POC) for reference (If you were a subcontractor, also list the firm you were hired by): _____________________________________________________________________________

(o) Current Telephone Number of Reference POC____________________________________________________

SECTION 00 22 11 - ATTACHMENT 3

PAST PERFORMANCE EVALUATION QUESTIONNAIRE

Customer Reference Name: ___________________________________________________________________

Customer Reference company affiliation: ________________________________________________________

Customer Reference current phone number: _____________________________________________________

1. Contractor/Name & Address (City and State):

2. Type of Contract: Fixed Price ________ Cost Reimbursement ________ Other (Specify) ________________________________

3. Title of Project/Contract Number:

4. Description of Work:

5. Complexity of Work: High ________ Mid _________ Routine __________

6. Location of Work:______________________________________________

7. Date of Award: ________________________

8. Status: Active _________ (Please provide percent complete) Complete __________ (Please provide completion date)

9. Name and telephone number of Owner’s Technical Representative:

QUALITY OF PRODUCT/SERVICE:

10. Please evaluate the contractor's performance in complying with contract requirements, quality achieved and overall technical expertise demonstrated.

Excellent Good Satisfactory Marginal Unsatisfactory

Remarks:

11. To what extent were the contractor’s reports and documentation accurate, complete and submitted in a timely manner?

Excellent Good Satisfactory Marginal Unsatisfactory

Remarks:

12. To what extent was the contractor able to solve contract performance problems without extensive guidance from Owner counterparts?

Excellent Good Satisfactory Marginal Unsatisfactory

Remarks:

13. How well did the contractor manage and coordinate subcontractors, suppliers, and the labor force?

Excellent Good Satisfactory Marginal Unsatisfactory

Remarks:

CUSTOMER SATISFACTION:

14. To what extent were the end users satisfied with:

Quality? Cost? Schedule?

Exceptionally Satisfied Highly Satisfied Satisfied Somewhat Dissatisfied

Highly Dissatisfied

Remarks:

TIMELINESS OF PERFORMANCE:

15. To what extent did the contractor meet the required schedules?

Completed Substantially Ahead of Schedule Completed on Schedule with no Time Delays Completed on Schedule with Minor Delays Under Extenuating Circumstances

Experienced Significant Delays without Justification

Remarks:

16. If given the opportunity, would you work with this contractor again?

Yes ___________ No ____________ Not Sure ____________

OTHER REMARKS:

17. Please use the space below to provide other information related to the contractor's performance. This may include the contractor's selection and management of subcontractors, flexibility in dealing with contract challenges, their overall concern for the Owner’s interest, project awards received, etc.

END OF QUESTIONNAIRE

SECTION 00 22 11 - ATTACHMENT 4

KEY PERSONNEL RESUME

Use a continuation sheet, if needed. NOTE: Match the positions on this page to the list of key personnel in the narrative submission requirements and evaluation criteria.

1. Your Name and Title_________________________________________________________________

2. Your Assignment on this Project________________________________________________________

3. Name of Your Firm___________________________________________________________________

4. No. of Years: With this Firm__________ With other Firms____________

5. Education: Degree(s)/Year/Specialization_________________________________________________

6. Active Registration, if any: No._______, State(s) ______, First Year/ Current Year ______/______

7. Describe Your Specific Experience and Qualifications Relevant to this Project:

SECTION 00 22 11 - ATTACHMENT 5

LETTER OF COMMITMENT FOR KEY PERSONNEL

(PRIME CONTRACTOR)

TO: Contracting Officer

SUBJECT: Letter of Commitment for Proposed Contract for ____________________

Dear Sir or Madam:

I hereby make the unequivocal commitment that, in the event of an award of a contract to (Fill in name of Proposer), that I will fulfill the duty of (Job Title).

Sincerely, (prospective employee signs) Date: __________

SECTION 00 22 11 – ATTACHMENT 6

LETTER OF COMMITMENT FOR KEY PERSONNEL

(KEY SUBCONTRACTOR)

(USE SUBCONTRATOR’S COMPANY LETTERHEAD)

TO: Contracting Officer

SUBJECT: Letter of Commitment for Proposed Contract for ____________________

Dear Sir or Madam:

I hereby make the unequivocal commitment that, in the event of an award of a contract to (Fill in name of Proposer), that (insert name of firm) will fulfill the duties of (state role on a project)

Sincerely, (Authorized Subcontractor Official) Date: __________

SECTION 00 22 11 – ATTACHMENT 7

PROPOSAL DATA SHEET

1. Name of Solicitation:

Name of Firm:

Address:

Phone:

Fax:

E-mail:

DUNS # (used for accessing the Construction Contractor Appraisal Support System (CCASS) or A-E Contractor Administration Support System (ACASS) Database) Also provide any other assigned number that identifies the member firm(s) in the ACASS or CCASS databases.

If a separate DUNS has been created for a joint venture (J-V) it must also be submitted. Provide a DUNS number for each company identified in any proposed Contractor-subcontractor association of firms. If the firm is a joint venture or contractor-subcontractor association of firms, list the individual firms and briefly describe the nature of the association. Provide DUNS for each.

Firm 1:

Firm 2:

Firm 3:

Nature of Association:

2. AUTHORIZED NEGOTIATORS. FAR 52.215-11

The Offeror represents that the following persons are authorized to negotiate on its behalf with the Government in connection with this Request for Proposals (RFP).

[List names, titles, and telephone number of the authorized negotiator.] Name of Person Authorized to Negotiate:

Negotiator's Address:

Negotiator's Telephone:

Negotiator’s E-mail: