ENVIRONMENTAL_COMPLIANCE_SPECIALIST_PWS.pdf

PDF 79 KB Posted

Attached to
ENVIRONMENTAL SERVICES Federal contract opportunity
Solicitation number
W911YU-17-R-0003
Issued by
Department of the Army Guam Army National Guard

About this file

PWS

View the file

Other files for this federal contract opportunity

Other files attached to ENVIRONMENTAL SERVICES, newest first.
File Type Posted
W911YU-17-R-0003_Q&A_(24_Feb_17)-signed.pdf PDF
W911YU-17-R-0003_Pricing_Sheet.xlsx XLSX spreadsheet
W911YU-17-R-0003_Q&A-signed.pdf PDF
W911YU-17-R-0003_ENV_SYNOPSIS.pdf PDF
W911YU-17-R-0003_Pricing_Sheet.xlsx XLSX spreadsheet
DOL_WAGE_RATES_9ROJ73YY.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MANDATORY FORMAT FOR

PERFORMANCE WORK STATEMENT (PWS)

FOR

EVIRONMENTAL COMPLIANCE SPECIALIST

1.0 General:

1.1 Scope: The contractor shall provide all equipment, tools, materials, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Environmental Compliance Specialist Services, as defined in this PWS

1.2 Background: This position is responsible for managing the Environmental Performance Assessment System (EPAS), and ensuring that audits are performed, required environmental reports are submitted and information is communicated as required for the Guam Army National Guard (GUARNG). Responsibilities are performed under minimal guidance and include the following: conduct inspection visits to all GUARNG facilities; assist in the selection and programming of corrective action projects resulting from internal or external EPAS findings; assist in the coordination and administration of environmental training and maintain records of personnel trained;

provide consultation and staff assistance to EPAS contractors and GUARNG personnel;

compile, prepare and submit environmental reports to National Guard Bureau (NGB), and Federal and State regulatory agencies. This position is responsible for communication of environmental policies and activities to GUARNG personnel through various means including updates to the environmental website.

1.3 Period of Performance (PoP): The Period of Performance shall be one Base Year of 12 months and ____4____ 12-month option years.

1.4 General Information: Knowledge of state and federal regulations pertaining to hazardous materials and waste; Federal Clean Water Act, Clean Air Act, Oil Pollution Act, OSHA and related state regulations; technical report writing skills; ability to review, analyze and interpret technical plans and reports; computer skills using Microsoft or similar software as well as ability to use webpage design applications; effective oral and written communication skills. The contractor will have academic preparation in environmental engineering or related field; and three or more years of professional work experience in an area of environmental compliance e.g. air or water quality, hazardous waste, etc.; or equivalent.

1.4.1 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary. After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s (KO) acceptance in writing of any proposed changes to its QCP.

1.4.2 Quality Assurance (QA): The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) (defect rate(s)).

1.4.3 Recognized Holidays: The following are recognized US holidays. The contractor shall not perform services on these days:

1.4.3.1 New Year’s Day: January 1st

1.4.3.2 Martin Luther King, Jr.’s Birthday

1.4.3.3 President’s Day

1.4.3.4 Memorial Day

1.4.3.5 Independence Day: July 4th

1.4.3.6 Labor Day

1.4.3.7 Columbus Day

1.4.3.8 Veteran’s Day: November 11th

1.4.3.9 Thanksgiving Day

1.4.3.10 Christmas Day

1.4.4 Place and Performance of Services: The contractor shall provide services between the hours of 0800-1700 on Monday through Friday, excluding Saturday, Sunday and US holidays. Work outside regular working hours requires Contracting Officer approval. Coordinate all work outside regular working hours with the Contracting Officer five (5) days in advance to allow arrangements to be made by the Government for the area to be available for necessary work and for inspecting the work in progress.

Performance shall be at All Guam Army National Guard (GUARNG) facilities to include Barrigada Readiness Complex and Fort Juan Muna, Guam. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Telecommuting is not authorized.

1.4.4.1 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.4.2 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times. The contractor shall ensure compliance with all regulations and orders of the installation which may affect performance.

1.4.5 Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.4.5.1 COMSEC/IT Security. All communications with DOD organizations are subject to communications security (COMSEC) review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DOD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DOD organizations. Therefore, the contractor is advised that any time contractor place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DOD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.5.2 Use of Government Information Systems (IS) and access to Government networks is a revocable privilege, not a right. Users are the foundation of the DoD strategy and their actions affect the most vulnerable portion of the AEI. Contractor employees shall have a favorable background investigation or hold a security clearance and access approvals commensurate with the level of information processed or available on the system. Contractor employees shall:

a. Comply with the command's Acceptable Use Policy (AUP) for Government owned IS and sign an AUP prior to or upon account activation.

b. Complete initial and/or annual Information Assurance (IA) training as defined in the IA Best Business Practices (BBP) training (https://informationassurance.us.army.mil).

https://informationassurance.us.army.mil/

c. Mark and safeguard files, output products, and storage media per classification level and disseminate them only to individuals authorized to receive them with a valid need to know.

d. Protect IS and IS peripherals located in their respective areas in accordance with physical security and data protection requirements.

e. Practice safe network and Internet operating principles and take no actions that threaten the integrity of the system or network.

1.4.5.3 Protection of Personally Identifiable Information (PII). The contractor shall protect all Personally Identifiable Information (PII) encountered in the performance of services in accordance with DFARS 224.103 and DoDD 5400.11, Department of Defense Privacy Program, and DoD 5400.11-R. If a PII breach results from the contractor’s violation of the aforementioned policies, the contractor shall bear all notification costs, call-center support costs, and credit monitoring service costs for all individuals who’s PII has been compromised.

1.4.5.4. CAC Requirements: The Common Access Card (CAC) is the Department of Defense (DOD) Federal Personal Identity Verification (PIV) credential. In accordance with Directive Type Memorandum (DTM) 08-003, December 1, 2008, incorporating Change 5, October 8, 2013, Initial issuance of a CAC requires at a minimum, the completion of FBI fingerprint check with favorable results reflecting "No Record" and submission of a National Agency Check with Inquiries (NACI) to the Office of Personnel Management (OPM), or a DoD-determined equivalent investigation. The issuance of a CAC will be based on four criteria; (a) eligibility for a CAC; (b) verification of DoD affiliation from an authoritative data source; (c) completion of background vetting requirements according to the Federal Information Processing Standards Publication 201-1, Personal Identity Verification (PIV) of Federal Employees and Contractors, March 2006, and DOD Regulation 5200.2-R, Department of Defense Personnel Security Program, January 1987, and (d) verification of a claimed identity. CAC eligible personnel must be registered in the Defense Enrollment Eligibility Reporting System (DEERS) through either an authoritative personnel data feed from the appropriate Service or Agency or Trusted Associate Sponsorship System (TASS).

1.4.5.4.i. HSPD-12 Background Investigation Requirements: The contractor ensure Common Access Cards (CACs) are obtained by all contract or subcontract personnel assigned to work on the Government site and by personnel requiring access to a DoD network (and other eligible populations as specified in DTM-08-003 Attachment 3, paragraph 3a.) are required to, at a minimum, have received a favorable FBI fingerprint check and must have submitted to the Office of Personnel Management (OPM) a National Agency Check with Inquiries (NACI) or equivalent/higher investigation. It is the responsibility of the contractor to ensure that all employees requiring an initial background investigation complete a Personnel Security Investigation Portal (PSIP) form at attachment (TBD), at the earliest possible date and that this form is forwarded to the COR immediately. The COR will review the form for completeness and accuracy and forward to the NGB Personnel Security manager who will initiate the investigation process via the PSIP. Contractor personnel will then receive two e-mail messages; the first will confirm that the request has been received by the Office of Personnel Management, and the second will provide instructions for the completion of the appropriate form via the Electronic Questionnaires for Investigations Processing (e-QIP) system. Upon completion of the e-QIP questionnaire and submittal of all required documents, including fingerprint card to the security manager, the BI will be initiated.

The contractor shall ensure all instructions regarding background investigation processing, including those provided verbally, by e-mail or via a Government system are complied with immediately. The contractor is cautioned that the entire process from submittal of the PSIP form to return of the FBI fingerprint check may routinely take from 2-6 weeks and shall factor this lead time into its hiring/placement process. The contractor shall make all reasonable efforts to ensure that contractor employees meet CAC eligibility standards upon assignment to the contract and shall be held responsible for delays, failure to meet performance requirements or decreases in efficiency in accordance with the applicable inspection clause.

1.4.5.5 AT Level 1 Awareness Training (AT): All contractor employees requiring access to Army Installations, facilities, and controlled access areas shall complete Level 1 AT within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR, or to the KO if a COR is not assigned, within 15 calendar days after completion of training Level 1 AT is available at https://atlevel1.dtic.mil/at/.

1.4.5.6 Information Assurance (IA)/Information Technology (IT) Training: All contractor employees shall complete the DoD IA Awareness Training before issuance of network access and annually thereafter. All contractor employees performing services involving IA/IT functions shall comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of the start of contract performance. In accordance with DoD 8570.01-M , DFARS 252.239.7001 and AR 25-2, contractor employees performing services supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M shall be completed upon contract award.

1.4.5.7 Information Awareness: All contractor employees with access to a government information system shall be registered in the ATCTS (Army Training Certification Tracking System) (https://atc.us.army.mil/iastar/index.php) prior to commencement of services, and shall successfully complete the DOD Information Assurance awareness training prior to access to the IS and then annually thereafter.

(https://ia.signal.army.mil/DoDIAA/).

1.4.5.8 OPSEC Training. In accordance with AR 530-1, Operations Security, new contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee, to the COR, or to the KO if a COR https://atlevel1.dtic.mil/at/ https://atc.us.army.mil/iastar/index.php https://ia.signal.army.mil/DoDIAA/ is not assigned, within 15 calendar days after completion of training. Level 1 OPSEC training is available at http://cdsetrain.dtic.mil/opsec/.

1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.6.1 Key Control. The contractor shall establish and implement methods of ensuring all keys/key cards issued by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued by the Government shall be duplicated. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The contractor shall immediately report any occurrences of lost or duplicated keys/key cards to the Contracting Officer’s Representative (COR).

1.4.6.1.1 In the event keys, other than master keys, are lost or duplicated the contractor shall, upon direction by the KO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the contractor.

1.4.6.1.2 The contactor shall prohibit the use of the Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contactor employees engaged in the performance of services in those areas, or personnel authorized entrance by the KO.

1.4.6.2 Lock Combinations: The contractor shall establish and implement methods of ensuring all lock combinations are not revealed to unauthorized persons. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.

1.4.7 Special Qualifications: The contractor must have strong organizational skills, mechanical aptitude, attention to detail and analytical thinking. The contractor shall possess and maintain a valid state license and be able to travel to job sites across the island of Guam. The contractor shall must be HAZMAT and HAZWASTE certified. The required license and/or certification requirements related to this Task Order are the responsibility of the contractor, as well as any continuing education to maintain required license/certification. The contractor must have the physical ability and agility to lift up to 50 lbs independently and to operate the following computer programs:

• EMS (Environmental Management System)

• EPAS (Environmental Program Assessment System) http://cdsetrain.dtic.mil/opsec/

• Information System, Cultural Natural Resources Database (CNR)

• MS Office Applications.

1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with Federal Acquisition Regulations Subpart 42.5. The KO, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the Contacting Officer will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced The contractor shall resolve outstanding issues raised by the Government.

Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.9. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. Such actions may include, but are not limited to, removal from the contract, reduction in benefits, or termination of employment. The Contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.

1.4.10 Contractor Travel

If contractor travel is required, a separate not to exceed (NTE) Contract Line Item Number (CLIN) will be added to the contract to pay for travel expenses. The contractor shall travel to scheduled training locations, when approved by the COR during the performance of this contract to attend meetings and training conferences.

The contractor shall be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. All travel requires COR recommendation for approval and authorization by the KO prior to travel arrangements being made.

1.4.13 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.4.11 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

2.0 Definitions and Acronyms:

2.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2 CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3 CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations.

This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5 DELIVERABLE. Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8 QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11 SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12 WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.13 WORK WEEK. Monday through Friday, unless specified otherwise.

2.2 ACRONYMS:

AEI

AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation AT/OPSEC Antiterrorism/Operational Security CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services IA Information Assurance IS Information System(s) KO Contracting Officer OCI Organizational Conflict of Interest ODC Other Direct Costs PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):

The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Property: The Government will provided adequate facilities located at Fort Juan Muna, Construction and Facilities Maintenance Office (CFMO), GUAM to include a complete workstation and chair, computer, telephone, expendable supplies, computer hardware and software (and support), internet/intranet/Local Area Network (LAN) (and support) and use of a fax machine, copier and printer, mail service and postage. All Government furnished supplies and equipment shall be for official use only.

3.1.1 All tool kits, survey equipment, drafting supplies, and equipment necessary to perform assigned duties will be provided by the Government and shall be for official use only.

3.2 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

5.0 Requirements: The contractor shall:

5.1 Plan and lead complex audits and special reviews of GUARNG functions, processes, military operation units, contracts and other activities to ensure reliability and integrity of information, proper recording of transactions, safeguarding of assets, compliance with policies and procedures, achievement of operational goals and objectives, and effective and efficient use of resources

5.2 Manage the audit process, including scoping, planning, walkthroughs, testing and status reporting.

5.3 Take a lead role in identifying root causes of GUARNG related problems, effectively define issues and propose solutions.

5.4 Contribute to timely and accurate completion of assigned audits in accordance with the National Guard Bureau (NGB).

5.5 Assist the Environmental Program Manager (EPM) in conducting audits or lead audits, identifying critical control issues, and recommending corrective actions

5.5.1 Draft audit programs that include identification of risks, controls and fraud indicators

5.5.2 Ensure that audit work papers are documented in accordance with NGB’s audit methodology and that they meet quality requirements.

5.5.3 Prepare draft audit reports with documented background, objectives, findings and recommendations.

5.6 As team lead, ensure that the work of staff auditors is performed in accordance with professional and organizational standard.

5.6.1 Identify team performance issues to EPM.

5.6.2 Participate in planning assignments for and providing technical assistance and information to audit team members.

5.6.3 Perform and manage follow-up on open audit issues, and work agreement to ensure closure of action plans.

5.7 Provide assistance to the CFMO with the development of the annual risk assessment, audit plan and departmental budget.

5.8 Maintain a thorough understanding of organizational goals, strategies, metrics, industry trends, products and services, and processes.

5.9 Ensure military units receive quality, timely, risk focused, efficient audit services.

5.9.1 Communicate audit findings to management in well written audit reports.

5.9.2 Implement process improvements and industry best practices with regards to environmental compliance, clean up and technical training.

5.9.3 Development of program schedules.

5.9.4 Analyzing program costs.

5.9.5 Perform resource management activities and tasks.

5.10 Review and maintaining compliance with DOD, Service, and command level policies and directives.

5.11 Support and provide input for presentations of findings and results to Government decision-making authorities.

5.12 Demonstrate effective interpersonal, presentation, and written and verbal communication skills.

5.13 Maintain professional development goals.

5.14 Demonstrate a commitment to diversity.

5.15 Participate on integrated audits and audits with co-sourcing partners

5.15.1 Build partnerships within audited areas.

6.0 Contractor Manpower Reporting Application (CMRA):

6.1 The contractor shall report ALL contractor labor hours required for performance of services provided under this contract for the Guam Army National Guard Construction & Facilities Management Office.

6.1.1 The contractor shall completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at http://www.ecmra.mil.

http://www.ecmra.mil/ http://www.ecmra.mil/

TECHNICAL EXHIBIT 1

This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

Task Order Objective: Provide Environmental Technician services to the Guam Army National Guard, Barrigada, GU.

Task/Service PWS

Paragraph Performance Standard and Acceptable Quality Level Surveillance Method/

Frequency/By Whom Plan, lead, manage Audits

Technical Specification

5.1-5.5

• Project documents are prepared in accordance with applicable standards and directives 95% of the time.

Periodic Inspection / Spot Checks / Monthly / COR

Monitor staff auditors

Technical Specification

5.6

• Protocols provide sufficient detail to allow another researcher to replicate the process 98% of the time.

Periodic Inspection /

Assist development of annual risk assessment

Technical Specification

5.7-5.8

• Project documents are prepared in accordance with applicable standards and directives 95% of the time.

• Research findings shall be accurate and complete, meeting established suspense 95% of the time.

Periodic Inspection /

Project Management

Technical Specification

5.9

• Data is entered into appropriate databases and maintained with current information, meeting 95% accuracy and timeliness.

• Data analysis shall be statistically valid. Reports shall be complete, shall discuss all significant results, and shall achieve 90% correctness for grammar, punctuation, and spelling.

• Electronic records archive is updated and maintained current, in accordance with records management and office guidelines, meeting 90% of suspense's.

Periodic Inspection /

TECHNICAL EXHIBIT 2

Deliverables Schedule

PWS Reference / Deliverable Title

Frequency Number of Copies

Medium/Format Submit To

1.4.5.5 AT Level 1

Awareness Training

Certificates

Provide within 30 calendar days after employee completes training.

1 Electronic Submission

COR

1.4.5.5 Information Assurance

(IA)/Information Technology (IT)

Provide within 6 months after employee starts contract

1 Electronic Submission

COR

1.4.5.11 OPSEC

Training

Certificates

Provide within 30 calendar days after employee completes training.

1 Electronic Submission

COR

File details come from the government source that posted it. Updated .