B-8_Revised_Question_and_Answer_from_09_JUL_2019_Site_Visit.docx
DOCX document 14 KB Posted
- Solicitation number
- W911YP-19-R-0017
About this file
Revised Q&A
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B-8_Solicitation_for_OCIE_Lockers_rev_3.doc | DOC document | |
| B-8_Solicitation_for_OCIE_Lockers_rev_2.doc | DOC document | |
| B-8_First_Floor_Plan_-_Clean__March_23_2018.pdf | ||
| B-8_Question_and_Answer_from_09_JUL_2019_Site_Visit.docx | DOCX document | |
| First_Floor_-_Clean__March_23_2018.pdf | ||
| B-8_Solicitation_for_OCIE_Lockers_(revised).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question and Answer from 09 JUL 2019 Site Visit
| 1) | Q: Can we can get a floor plan for the 1st floor corridors where the lockers will be installed? |
| A: Yes, attached with corridors highlighted on plan |
| 2) | Q: Do we want to add a specification that there be no legs or base in the lockers? |
| A: No legs on locker |
| 3) | Q: Verify the minimum and maximum height for the lockers (what is the tolerance/deviation that will still be technically acceptable for an equivalent. Are there any deviations allowed for depth or width? If so, what are these? |
| A: Acceptable height is 72-78”; allowable deviations is not more than ½” on H X W X D specifications |
Revised:
4) Q: Is there to be a change in the specification for the gauge of steel used to 14 ga front, 16 ga sides, top and bottom and 18 ga back?
A: Frame consisting of a minimum 16 gauge steel top and bottom, minimum 18 gauge perforated steel sides, minimum 18 gauge steel shelf and minimum 14 gauge perforated steel doors.
5) Q: What is the total width and length of the two hallways where the lockers will be installed?
A: See floor plan with scale
| 6) | Q: Is there a change of requirement for Contractor being responsible for removal of waste materials/packaging offsite to Government providing recycling of cardboard packaging? |
| A: Yes, the contractor is still responsible for the removal of any waste materials from site other than cardboard. Only cardboard can be requested to be recycled by requiring activity. |
| 7) | Q: Is there to be a change to the specification from welded steel construction to welded and/or knockdown w/rivets construction? |
| A: Yes, solicitation has been updated to allow either. |
| 8) | Q: Is there a requirement for the lockers to be ventilated? |
| A: Yes, the specification for perforated front and side panels has been added |
File details come from the government source that posted it.