Question and Answer from 09 JUL 2019 Site Visit
| 1) | Q: Can we can get a floor plan for the 1st floor corridors where the lockers will be installed? |
| A: Yes, attached with corridors highlighted on plan |
| 2) | Q: Do we want to add a specification that there be no legs or base in the lockers? |
| A: No legs on locker |
| 3) | Q: Verify the minimum and maximum height for the lockers (what is the tolerance/deviation that will still be technically acceptable for an equivalent. Are there any deviations allowed for depth or width? If so, what are these? |
| A: Acceptable height is 72-78”; allowable deviations is not more than ½” on H X W X D specifications |
| 4) | Q: Is there to be a change in the specification for the gauge of steel used to 14 ga front, 16 ga sides, top and bottom and 18 ga back? Currently it is 14 ga for all |
| A: No change, 14 ga for entire construction |
5) Q: What is the total width and length of the two hallways where the lockers will be installed?
A: See floor plan with scale
| 6) | Q: Is there a change of requirement for Contractor being responsible for removal of waste materials/packaging offsite to Government providing recycling of cardboard packaging? |
| A: Yes, the contractor is still responsible for the removal of any waste materials from site other than cardboard. Only cardboard can be requested to be recycled by requiring activity. |
| 7) | Q: Is there to be a change to the specification from welded steel construction to welded and/or knockdown w/rivets construction? |
| A: Yes, solicitation has been updated to allow either. |
| 8) | Q: Is there a requirement for the lockers to be ventilated? |
| A: Yes, the specification for perforated front and side panels has been added |