AMEND4Page1.pdf
PDF 11 KB Posted
- Attached to
- RECOVERY -- USEB889585B -- Fire Station, Phase 2 Federal contract opportunity
- Solicitation number
- W911YP-09-B-0001
About this file
AMEND4Page1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMEND4SF30.doc | DOC document | |
| AMEND3Page7.pdf | ||
| AMEND3Page6.pdf | ||
| AMEND3Page1.pdf | ||
| AMEND3Page15.pdf | ||
| AMEND3Page12.pdf | ||
| AMEND3Page8.pdf | ||
| AMEND3Page5.pdf | ||
| AMEND3Page14.pdf | ||
| AMEND3SF30.doc | DOC document | |
| AMEND3Page17.pdf | ||
| AMEND3Page13.pdf | ||
| AMEND3Page3.pdf | ||
| AMEND3Page16.pdf | ||
| AMEND3Page11.pdf | ||
| AMEND3Page9.pdf | ||
| AMEND3Page2.pdf | ||
| AMEND3Page4.pdf | ||
| AMEND3Page10.pdf | ||
| FireStationAmendment0002.pdf | ||
| 008b ENV-2_NEW Fire Station.pdf | ||
| 003.pdf | ||
| 002.pdf | ||
| 001.pdf | ||
| 009.pdf | ||
| 010.pdf | ||
| 016.pdf | ||
| 006.pdf | ||
| 005.pdf | ||
| 017.pdf | ||
| 001.pdf | ||
| 004.pdf | ||
| 002.pdf | ||
| 007.pdf | ||
| 003.pdf | ||
| 011.pdf | ||
| 014.pdf | ||
| 015.pdf | ||
| 013.pdf | ||
| 012.pdf | ||
| W911YP09B0001FireStation.doc | DOC document |
Show all 41
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMPOSITE FIRE STATION,
MOBILITY PROCESSING, AND EOD FACILITY
UTAH AIR NATIONAL GUARD BASE
SALT LAKE CITY INTERNATIONAL AIRPORT
SALT LAKE CITY, UTAH
PROJECT #USEB 889585
AMENDMENT #4
The original Project Manual and Drawings dated May 14, 2009 for the project referenced above, are amended as noted in this Amendment No. 4.
This addendum consists of 2 pages.
Date: June 25, 2009
Prepared By:
PASKER GOULD AMES & WEAVER, INC.
Architects-Planners 5263 South Commerce Drive Murray, Utah 84107 Telephone: (801) 266-4669
ADDENDUM CHANGES TO PROJECT MANUAL
CLARIFICATION TO SOLICITATION (page 49, item #8)
The cost of temporary utility services will be the responsibility of the owner.
SECTION 03300 – CAST-IN-PLACE CONCRETE, Article 2.7 paragraph A:
Replace reference to “Pentra Protect” with “Pentra Guard”.
SECTION 01352 – SUSTAINABLE DESIGN REQUIRMENTS, Article 2.3 paragraph A,1 delete the following:
c. Structural glued-laminated timber.
SECTION 01352 – SUSTAINABLE DESIGN REQUIRMENTS, Article 2.3 paragraph A,1 delete the following:
c. Structural glued-laminated timber.
SECTION 09681 – CARPET TILE, Article 3.5 paragraph A, add the following:
Carpet Tile: The “Modern Organics” Collection, River Rush, as manufactured by The Mowhawk Group.
1. Secondary Backing: ICT-RC
2. Tile Size: 24 x 24 inches
3. Colors: As selected by Contracting Officer.
SECTION 16385 – AUDIO & VIDEO SYSTEMS, Article 1.1 paragraph A, Replace “Santa Clara City Hall” with “Project”.
ADDENDUM CHANGES TO CIVIL DRAWINGS
None
ADDENDUM CHANGES TO LANDSCAPE DRAWINGS
None
ADDENDUM CHANGES TO ARCHITECTURAL DRAWINGS
SHEET A/7.1b MAIN FLOOR FINISH PLAN – E.O.D. AND MOBILITY
1. On the equipment list add RM. NO. E3B - Safe, G.F./G.I. (government furnished / government installed.
SHEETS A/7.1a, A/7.1b, A/7.2a AND A/7.2b FINISH PLANS.
1. Clarification: “VERT. BLINDS” refers to vertical blinds (project manual section 12492);
“BLINDS” refers to horizontal blinds (project manual section 12491).
ADDENDUM CHANGES TO STRUCTURAL DRAWINGS
SHEET S/101 GENERAL STRUCTURAL NOTES
1. Concrete section, article 3: Replace “light weight concrete” with “normal weight concrete”.
ADDENDUM CHANGES TO MECHANICAL DRAWINGS
None
ADDENDUM CHANGES TO ELECTRICAL DRAWINGS
None
END OF AMENDMENT #4
File details come from the government source that posted it. Updated .