AMEND4Page1.pdf

PDF 11 KB Posted

Attached to
RECOVERY -- USEB889585B -- Fire Station, Phase 2 Federal contract opportunity
Solicitation number
W911YP-09-B-0001
Issued by
Department of the Army Utah Army National Guard

About this file

AMEND4Page1

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY -- USEB889585B -- Fire Station, Phase 2, newest first.
File Type Posted
AMEND4SF30.doc DOC document
AMEND3Page7.pdf PDF
AMEND3Page6.pdf PDF
AMEND3Page1.pdf PDF
AMEND3Page15.pdf PDF
AMEND3Page12.pdf PDF
AMEND3Page8.pdf PDF
AMEND3Page5.pdf PDF
AMEND3Page14.pdf PDF
AMEND3SF30.doc DOC document
AMEND3Page17.pdf PDF
AMEND3Page13.pdf PDF
AMEND3Page3.pdf PDF
AMEND3Page16.pdf PDF
AMEND3Page11.pdf PDF
AMEND3Page9.pdf PDF
AMEND3Page2.pdf PDF
AMEND3Page4.pdf PDF
AMEND3Page10.pdf PDF
FireStationAmendment0002.pdf PDF
008b ENV-2_NEW Fire Station.pdf PDF
003.pdf PDF
002.pdf PDF
001.pdf PDF
009.pdf PDF
010.pdf PDF
016.pdf PDF
006.pdf PDF
005.pdf PDF
017.pdf PDF
001.pdf PDF
004.pdf PDF
002.pdf PDF
007.pdf PDF
003.pdf PDF
011.pdf PDF
014.pdf PDF
015.pdf PDF
013.pdf PDF
012.pdf PDF
W911YP09B0001FireStation.doc DOC document
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMPOSITE FIRE STATION,

MOBILITY PROCESSING, AND EOD FACILITY

UTAH AIR NATIONAL GUARD BASE

SALT LAKE CITY INTERNATIONAL AIRPORT

SALT LAKE CITY, UTAH

PROJECT #USEB 889585

AMENDMENT #4

The original Project Manual and Drawings dated May 14, 2009 for the project referenced above, are amended as noted in this Amendment No. 4.

This addendum consists of 2 pages.

Date: June 25, 2009

Prepared By:

PASKER GOULD AMES & WEAVER, INC.

Architects-Planners 5263 South Commerce Drive Murray, Utah 84107 Telephone: (801) 266-4669

ADDENDUM CHANGES TO PROJECT MANUAL

CLARIFICATION TO SOLICITATION (page 49, item #8)

The cost of temporary utility services will be the responsibility of the owner.

SECTION 03300 – CAST-IN-PLACE CONCRETE, Article 2.7 paragraph A:

Replace reference to “Pentra Protect” with “Pentra Guard”.

SECTION 01352 – SUSTAINABLE DESIGN REQUIRMENTS, Article 2.3 paragraph A,1 delete the following:

c. Structural glued-laminated timber.

SECTION 01352 – SUSTAINABLE DESIGN REQUIRMENTS, Article 2.3 paragraph A,1 delete the following:

c. Structural glued-laminated timber.

SECTION 09681 – CARPET TILE, Article 3.5 paragraph A, add the following:

Carpet Tile: The “Modern Organics” Collection, River Rush, as manufactured by The Mowhawk Group.

1. Secondary Backing: ICT-RC

2. Tile Size: 24 x 24 inches

3. Colors: As selected by Contracting Officer.

SECTION 16385 – AUDIO & VIDEO SYSTEMS, Article 1.1 paragraph A, Replace “Santa Clara City Hall” with “Project”.

ADDENDUM CHANGES TO CIVIL DRAWINGS

None

ADDENDUM CHANGES TO LANDSCAPE DRAWINGS

None

ADDENDUM CHANGES TO ARCHITECTURAL DRAWINGS

SHEET A/7.1b MAIN FLOOR FINISH PLAN – E.O.D. AND MOBILITY

1. On the equipment list add RM. NO. E3B - Safe, G.F./G.I. (government furnished / government installed.

SHEETS A/7.1a, A/7.1b, A/7.2a AND A/7.2b FINISH PLANS.

1. Clarification: “VERT. BLINDS” refers to vertical blinds (project manual section 12492);

“BLINDS” refers to horizontal blinds (project manual section 12491).

ADDENDUM CHANGES TO STRUCTURAL DRAWINGS

SHEET S/101 GENERAL STRUCTURAL NOTES

1. Concrete section, article 3: Replace “light weight concrete” with “normal weight concrete”.

ADDENDUM CHANGES TO MECHANICAL DRAWINGS

None

ADDENDUM CHANGES TO ELECTRICAL DRAWINGS

None

END OF AMENDMENT #4

File details come from the government source that posted it. Updated .