Purchase Description_RTI DFAC Dishwasher.pdf

PDF 364 KB Posted

Attached to
RTI Dining Facility Dishwasher LCR Federal contract opportunity
Solicitation number
W911YN25QA017
Issued by
Department of the Army Florida Army National Guard

About this file

This document is a Purchase Description for a dishwasher life cycle replacement for the RTI Dining Facility (DFAC) at the Florida Army National Guard's Camp Blanding location. The solicitation requires a commercial conveyor dishwasher with specific technical specifications, including a capacity of 200-250 racks per hour, 208-volt electrical connection, ENERGY STAR certification, and dimensions approximating 26 7/8" width, 83 5/8" length, and 70 1/4" height. The contractor must provide equipment delivery and on-site installation assessment by 13 June 2025, allow 30 days for wall reconstruction starting 01 July 2025, and target installation for 31 July 2025. Installation must occur during normal alternate work schedule hours (0730-1700, Monday through Friday), with the contractor responsible for testing functionality and adhering to FLARNG Standard Operating Procedures. A site visit may be scheduled up to 3 days before the solicitation closing date, with the point of contact being CPT Matthew VanFossen.

View the file

Other files for this federal contract opportunity

Other files attached to RTI Dining Facility Dishwasher LCR, newest first.
File Type Posted
Amend1 Questions and Answers.pdf PDF
Combined Synopsis Solicitation - RTI_Dishwasher.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Army National Guard

Purchase Description

Dishwasher Life Cycle Replacement for RTI Dining Facility

Current System Information: Note this information is provided to assist offeror in quoting suitable replacement only. SPECs do not need to be identical, but must be similar to meet form, fit, and function.

Components:

➢ Single tank rack conveyor

➢ Automatic conveyor

➢ Recirculating wash and fresh water final rinse.

➢ Capacity of 200-250 racks per hour

➢ PSI of 20

➢ Right to left operation

➢ Electric immersion tank heat, 18kw, 208v/60/144.8 amps

➢ Single point wiring

➢ Drive Motor Speed: 1/15 HP

➢ Wash Motor Speed: 2 HP

➢ Prewash Motor Speed: 1.5 HP

➢ Venting Load and Unload: 350 CFM per min

➢ Heat capacity: 18kW

➢ Booster Heat: 29.4kW

Technical Specifications Required:

Dimensions and weight:

➢ Width: 26 7/8 in. approximate

➢ Length: 83 5/8 in. approximate

➢ Height: 70 1/4 in. approximate

Loads and capacity:

➢ 200-250 racks per hour

➢ 200-400 meals per hour

Electrical connection conditions:

➢ 208 volts

➢ 60 hertz

➢ 144.8 amp

Connection conditions water:

➢ Standard

Water requirements:

➢ ENERGY STAR compliant

Current Dishwasher Pictures

General Information

➢ The contractor shall provide the equipment for the life cycle replacement in the dining facility also known as the DFAC. There will be a need for installation and functionality testing.

The government will remove the current dishwasher from the kitchen area prior to delivery of the new dishwasher.

➢ Installation: The contractor shall provide installation during normal alternate work schedule

(AWS) between the hours of 0730-1700 on Monday through Friday. This Government organization has every other Monday off (AWS Monday) and will ensure no scheduling of remote services take place on the AWS off Monday. At times this Government facility/installation may be closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings and federal holidays.

Coordination around any of those closures will be worked out with the contractor.

➢ The contractor shall abide by any Standard Operating Procedures (SOPs) and regulations set forth by the FLARNG.

➢ **The contractor shall provide equipment delivery and on-site installation assessment no later than 13 JUNE 2025. **

➢ **Must allow 30 days for wall reconstruction to be completed starting 01 July 2025.

Target installation date 31 JULY 2025. **

➢ The contractor shall test to confirm functionality.

➢ Quoted model must be ENERGY STAR CERTIFIED.

➢ Site visit may be scheduled no later than 3 days before the closing date of the solicitation. POC is CPT Matthew VanFossen, 904-682-3290 or matthew.r.vanfossen.mil@army.mil.

➢ Location:

HQ 211th REGT (RTI), 5629 State Rd 16 W, Camp Blanding BLDG 3416, Starke, FL

32091-8900 mailto:andrea.n.emerson.mil@army.mil

File details come from the government source that posted it. Updated .