Amend1 Questions and Answers.pdf
PDF 29 KB Posted
- Attached to
- RTI Dining Facility Dishwasher LCR Federal contract opportunity
- Solicitation number
- W911YN25QA017
About this file
This document is an Amendment 01 Questions and Answers file for Solicitation W911YN25QA017 for an RTI Dishwasher LCR. The Q&A addresses six key logistical details about the dishwasher installation, including doorway measurements (46" width x 80" height), electrical requirements, and delivery logistics. Specific details include confirmation that sheet pans can be run through the machine, no loading dock is available, a liftgate will be needed, and the route to the dish pit is clear. The procurement involves wall reconstruction by DPW (Department of Public Works), with equipment delivery and vendor assessment planned for June and installation scheduled for the end of July. The vendor will need to return after the wall is rebuilt to complete the dishwasher installation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combined Synopsis Solicitation - RTI_Dishwasher.pdf | ||
| Purchase Description_RTI DFAC Dishwasher.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation W911YN25QA017 - RTI Dishwasher LCR
Amendment 01
Questions & Answers
1. Can you provide the measurements of the doorways where the machines will enter and depart?
Answer: 46” width x 80” height
2. We may have to place a junction box on the wall for the booster heater, are you okay with this?
Answer: This is ok. DPW needs to rebuild the wall where dishwasher will be located.
This is why we need to have equipment delivered and an assessment with the vendor and DPW in June. The wall will be built in July based off the assessment.
Vendor will have to return to install dishwasher end of July.
3. Are the end users running sheet pans through the dish machine? However, the chamber opening of 20” accommodates sheet pans on their side.
Answer: Yes, we run sheet pans through the dish machine.
4. Is there a loading doc?
Answer: No
5. If not will they need a lift gate?
Answer: We will need a liftgate. We can arrange to have a forklift available.
6. Is it an easy route to the dish pit or will equipment need to be moved to get the dish machine in?
Answer: It is an easy route and equipment should not be moved to get the dish machine in. Current dishwasher will be removed prior to wall reconstruction and new dishwasher install.