Q&A.pdf
PDF 52 KB Posted
- Solicitation number
- W911YN19B5000
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract_(W911YN18B5000)a.pdf | ||
| Bid_Opening_Sign_in.pdf | ||
| imagejpeg_3003.jpg | JPG image | |
| imagejpeg_3005.jpg | JPG image | |
| imagejpeg_2001.jpg | JPG image | |
| imagejpeg_0003.jpg | JPG image | |
| imagejpeg_4.jpg | JPG image | |
| imagejpeg_2002.jpg | JPG image | |
| imagejpeg_0001.jpg | JPG image | |
| imagejpeg_1001.jpg | JPG image | |
| imagejpeg_3001.jpg | JPG image | |
| imagejpeg_3002.jpg | JPG image | |
| imagejpeg_1002.jpg | JPG image | |
| imagejpeg_0002.jpg | JPG image | |
| imagejpeg_1003.jpg | JPG image | |
| imagejpeg_2003.jpg | JPG image | |
| PIC.pdf | ||
| amendment_0003.pdf | ||
| W911YN19B5000-0002.pdf | ||
| Q&A.pdf | ||
| W911YN19B5000-0001.pdf | ||
| BLDG_1005_TOWER_PICs.pdf | ||
| PreBidSlides_W911YN19B5000.pdf | ||
| Site_Visit_Sign_in_Roster.pdf | ||
| W911YN19B5000_Roof_Repair_Bldg_1005.pdf | ||
| SOW_Building_1005_Drying_Tower_and_Roof_Water_Leak.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q.1 What is the time line for the site phots submission?
A.1 Photos are loaded in FBO
Q.2 Clarify “temporary repairs”?
A.2 The term “Temporary repairs” is a naming convention to distinguish this project from potential future projects on the same building.
Q.3 What is the time line of the base removal of the equipment; and how long after the award and before NTP will the work occur?
A.3 The contract awardee will be required to submit Payment and Performance Bonds within 10 days of Award. NTP will be issued when pre-construction submittals (i.e Bonds) are correct and legally binding.
See FAR Clause 52.211-10 Commencement and Prosecution and Completion of Work.
Q.4 Is there any specialized access for approval for the flight line access work?
A.4 Access to the flight line requires escort by NGB personnel.
Q.5 Can the requirement for no Monday and weekend work be amended, the 30 day POP is challenging since the leak location is undetermined?
A.5. The POP is 30 days.
Q.6 What is the Bid Bond requirement – percentage and/or amount?
A.6 The amount of the bonds should comply with FAR 28.101-2 (b)-- Solicitation Provision or Contract Clause. The bid guarantee amount shall be at least 20 percent of the bid price but shall not exceed $3 million.
Q.7 What is the Power of Attorney for?
A.7 The Power of Attorney gives the Bonding companies signatory the legal ability to act on behalf of the surety.
Q.8 Describe “and/or replace” drip edge and seals?
A.8 – Drip edge may be repaired if not distressed beyond said state and sealed to prevent water intrusion.
Q.9 Clarify “temporary/replace’ drip edge and seals?
A.9 – Refer to Q.8
Q.10 What are the crane access requirements?
A.10 – Define crane verse a high lift. Equipment extending above BLDG 1005 Tower would require contractor to coordinate permit through JIA.
Q.11 Clarify “temporarily/replace equipment infrastructure”?
A.11 – Any equipment attached to the tower that needs to be temporarily removed to complete work will need to be replaced in original location and condition.
Q.12 Will the shop drawings and as builts require engineer stamp?
A.12 – No
Q.13 Clarify the preparation requirements for the wall panel installation?
A.13 – This requirement will not apply to this contract.
Q.14 Clarify the Shop Drawing requirement
A.14 – All drawings to be submitted in PDF and AutoCAD DWG format.
Q.15 What is the duration for Construction permit approval?
A.15 – 180 Days, No exception