STATEMENT OF WORK
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site_Visit_Attendance.pdf | ||
| Q&A.pdf | ||
| SCA_WD.pdf | ||
| Attachment_A.pdf | ||
| Attachment_B.pdf | ||
| Attachment_D.pdf | ||
| Attachment_C.pdf | ||
| COMBINED_SYNOPSIS_SOLICITATION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
125th FIGHTER WING
FLORIDA AIR NATIONAL GUARD
BASE CIVIL ENGINEERING
14300 FANG ROAD, JACKSONVILLE IAP, FL 32218-7933
STATEMENT OF
WORK
4 April 2018
Demolish Mezzanine Modular Offices Building 1001
SW-1 SCOPE:
The project site is located at the Air National Guard Base, Jacksonville International Airport in Duval County, Florida. This project includes services involving demolition/deconstruction and removal of the existing modular offices on the mezzanine at the north end of Building 1001 (Maintenance Hangar).
SW-2 SCOPE OF WORK:
All requirements must be met as they appear in this statement of work. This statement of work does not supersede any Federal Acquisition Regulation stipulations that may appear in this contract.
2.1 The Contractor shall provide supervision, transportation, labor, materials, equipment, fuel and any other needed materials for the purpose of this document.
2.2 The Contractor is subject to all base fire, safety, security, environmental and traffic regulations.
2.3 The Government contracts on the understanding that the Contractor is complying with applicable laws concerning workplace safety.
2.4 The Contractor is subject to all citations and penalties for violation of applicable workplace safety laws. The burden of compliance rests with the Contractor.
2.5 The Contracting Officer may notify the Contractor of hazards in Contractor operations that endanger Government personnel or property and require appropriate abatement action.
This provision does not constitute assumption of liability for Occupational Safety and Health compliance on the part of the Government or negate other agency responsibility for enforcement of applicable laws.
2.6 Accident prevention principles must be thoroughly integrated into all operations. Unsafe Conditions and practices, as identified by the Contracting Officer or designated representative, must be corrected immediately.
2.7 Any and all debris generated by the Contractor’s operations shall be removed from the base. Disposal of all debris shall be in accordance with existing local, state and federal regulations. The Contractor shall be responsible for any permit or fees associated with the use of off-base disposal locations.
2.8 The Contractor shall be liable for any loss, destruction or damage and deterioration to Government property, including aircraft, resulting from Contractor operations. Any damage to government or personal property shall be repaired or replaced to the Contracting Officer’s satisfaction at the Contractor’s expense.
2.9 All work under this project shall meet applicable County, State, Federal and Air National Guard construction codes, regulations and policies.
SW-3 PROJECT DESCRIPTION:
3.1 Services, non-personal; the contractor shall provide all materials, supervision, labor, equipment, transportation, and supplies necessary to complete the demolition/deconstruction and removal of the existing modular offices on the mezzanine at the north end of Building 1001 (Maintenance Hangar) in accordance with the Statement of Work. Modular offices and all demolished materials will become the property of the contractor and removed from the base unless specifically noted otherwise. All work will be executed in accordance with specification 02 41 00, attached, and the following.
• Take care not to damage the existing plywood decking on the mezzanine, which is to remain.
• Removed unused wooden framing over back corner of tire shop. Framing supporting lights to remain.
• Reinstall railing at back side of mezzanine over tire shop.
• Do not damage existing railing, stairs or ladder.
• Recycle all removed materials as possible.
3.2 Electrical:
• All electrical power wiring and conduit will be disconnected from the offices and removed back to the source disconnects.
• All communications, cable TV and PA cables and conduits specifically serving the offices will be removed back to the source.
• Take great care not to damage or disconnect existing devices, wiring or conduit mounted to the mezzanine and serving the hangar or spaces below the mezzanine.
3.3 HVAC:
• Remove the existing window type air conditioning units from each of six offices and turn over to base State Maintenance personnel.
3.4 Coordination: Contractor will be working in an active aircraft maintenance hangar, which is a hazardous environment. Contractor will coordinate all activities with the maintenance supervisor via the Base Civil Engineer.
• Contractor will keep the work site clean at all times, including conduct daily FOD walk downs, to make sure no damage occurs to the aircraft.
• Comply with all hangar safety requirements.
• Employees must stay in designated work area unless escorted.
• No photography unless a camera permit is obtained from the maintenance supervisor.
SW-4 SUBMITTALS:
SW-5 DESIGN AND CONSTRUCTION STANDARDS:
5.1 ASTM (American Society for Testing and Materials)
5.2 UL (Underwriter’s Laboratories)
5.3 NFPA (National Fire Protection Association Standards as applicable)
5.3 Local, State and Federal Codes
5.4 ANGETL 15-01 Series (Air National Guard Design Policy)
5.5 Applicable UFCs – Latest Edition
SW- 6 Contractor Manpower Reporting
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the FLORIDA AIR NATIONAL GUARD via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address:
http://www.ecmra.mil/. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013.
Contractors may direct questions to the help desk at: http://www.ecmra.mil.”
Unit Identification Code (UIC) for the Requiring Activity:
Issuing Office DoDAAC: W911YN
SW-7 PERMITS/CLEARANCES:
7.1 Security Clearance: The Florida Air National Guard base has 24-hour security and entry control procedures. Contractors will be briefed on an ‘as needed’ basis concerning traffic routing and work site security restrictions. Base Access Letters for contractors are required
DESCRIPTION TYPE QTY DUE REMARKS
Demolition Plan and other submittals as required by section 02 41 00 (see attachment)
AF Form 3000 1 Approved 7 days before NTP
Must be signed by:
Contracting
COR
Contractor (return copy)
Environmental and Haz Mat Plan (see attachment)
AF Form 3000 1 Approved 7 days before NTP
Must be signed by:
Contracting
COR
Contractor (return copy)
Waste Management Plan AF Form 3000 1 Approved 7 days before NTP
Must be signed by:
Contracting
COR
Contractor (return copy) http://www.ecmra.mil/ http://www.ecmra.mil/ and will be obtained at either the preconstruction conference or when requesting a construction permit. Information required for the Base Access Letters shall include individual’s complete name, company name, driver’s license number, project or contract number and title of the project. Base Access Letters are provided by the Base Civil Engineer and approved by The Chief of Security. A 125FW Contractor Badge will be issued to all workers prior to work start. This badge will be required to enter the base and worn at all times while on base. To obtain a 125FW Contractor Badge, all workers must submit a police records check from the Jacksonville’s Sherriff’s Office (JSO) to the 125th Security Forces Squadron Pass and ID Office. This records check must be the original and signed copy issued from JSO. Furthermore, before the request is accepted and processed, each member must present a government issued photo ID to the Pass and ID Office when submitting the request.
Each identified contractor will ensure that the identified badge is properly displayed while performing work on the installation. Also, each individual who is issued a badge must maintain control of his or her assigned badge at all times. If lost or misplaced, it must be reported to Security Forces immediately. Any contractor driving on the installation will be required to have valid driver’s license, proof of insurance, and vehicle registration. Weapons and firearms are not allowed on the base regardless of any issued weapon/firearm permits. One escort badge will be issued to the site super for the purpose of receiving deliveries.
Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office.
The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
Advanced Distributed Learning Service (ADLS). All contractor employees and associated sub-contractor employees assigned to work on a government site and/or requiring access to a DoD network will be required to register with ADLS at commencement of services in order to complete the necessary training required of them initially and annually for the duration of the contract (i.e., DoD Information Assurance, OPSEC, Security Administration). ADLS website: https://golearn.csd.disa.mil/kc/rso/login/ADLS_login.asp https://golearn.csd.disa.mil/kc/rso/login/ADLS_login.asp
AT Level I Training. This standard language is for contractor employees with an area of performance within a Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Government Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training within 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Certificates of completion for each affected contractor employee and subcontractor employee will be maintained by the COR or Antiterrorism Representative. AT level I Awareness Training is available at the following website: http://jko.jten.mil
SW-8 HAZARDOUS MATERIALS PROCEDURES
8.1 PART 1 – GENERAL
8.1.1 SUMMARY
A. A key element to the Pollution Prevention program at the 125th Fighter Wing is the control of Hazardous Material (HM). To control HM use, a Hazardous Materials Pharmacy (HAZMART) program has been fully implemented within the installation. The HAZMART focuses on source reduction as the preferred method of pollution prevention.
Control of HM includes reducing the number of types and amounts of HM used, and controlling its proper distribution, storage, use, and disposal. The Contractor shall comply with all Federal, state and local Environmental Management System (EMS) environmental standards.
B. Contractor shall establish Hazardous Material (HM) storage and distribution system when HM is to be used.
1. All HM required to support the contract shall be reported to the Hazardous Material Pharmacy (HMP) using the Construction Hazardous Materials Submittal Form in (Attachment 1) of this specification section.
2. Contractor Construction Hazardous Materials Submittal Form will be provided to the Contractor at or prior to the Pre-Construction meeting.
3. All hazardous materials must be approved by the Installation Hazardous Materials Management Team prior to be brought on base.
4. Additional HM needed by the Contractor shall be identified to the Contracting Officer’s Representative (COR) for approval by the HMP.
C. Contractor shall register the installation HMP prior to start of work using Construction Hazardous Materials Submittal Form in order to support the installation’s compliance with Executive Order 12856, Federal Compliance with Right-to-Know Laws and Pollution Prevention Requirements.
D. Contractor shall maintain a Construction Hazardous Materials Submittal Form for all HM on the job site for inspection/verification.
E. COR will verify that the HM identified to the HMP is the only HM in use on the job site.
F. Contractor shall provide the following to the HMP:
1. A list of each material and quantity of material for all proposed HM. Hazardous Material (HM) shall be construed to mean any item that is:
a. A health hazard or physical hazard as defined in 29 CFR, 1910.1200(c).
b. Regulated in its disposal by federal Environmental Protection Agency (EPA) under 40 CFR.
c. Hazardous as defined by federal Department of Transportation (DOT) regulations under 49 CFR.
d. Hazardous as defined by the Dangerous Goods Regulations of the
International Air Transport Association.
2. All material safety data sheet (MSDS) for each item on the HM list. This listing shall also be provided electronically by individual MSDS for processing prior to work beginning. These MSDS shall also be maintained in a Binder within the Job Trailer or wherever the construction project is headquartered out of.
3. Examples of hazardous materials used on the job site include, but are not limited to:
a. Petroleum based liquids/gases (gasoline, kerosene, diesel, propane, butane, acetylene, etc.).
b. Adhesives and glues.
c. Shot charges for anchor systems.
d. Volatile solvents (such as PVC cleaner and glues, paint thinners).
e. Non-water-based paints.
f. Liquid sealants.
g. Epoxies and coating systems.
h. Acidic or alkali cleaners.
G. Contractor shall establish a construction-specific HM storage and issue location that fully complies with federal, state and local environmental regulations.
1. Materials issued shall be tracked for quantities used.
2. Unused materials shall be inventoried and removed from Base property prior to close-out of the contract or expiration date of the HM.
3. Reports of materials delivered, used and removed from the installation shall be submitted to the COR monthly and prior to contract close-out.
H. Contractor shall accompany the COR and the installation Environmental Manager (EM) on project close-out inspection to ensure all used and unused HM has been removed from the installation. This requirement shall not be a punch list item and must be accomplished prior to the government accepting beneficial occupancy of the facility or construction item. (See Attachment 2.)
8.1.2 ATTACHMENTS
A. The Attachments listed below, following “End of Section,” are part of this specification.
B. Attachment 1 - Contractor Hazardous Material Identification Form.
C. Attachment 2 - Contractor Hazardous Material Identification Form Close-Out Procedures.
8.2 PART 2 – PRODUCTS (NOT USED)
8.3 PART 3 – EXECUTION (NOT USED)
END OF SECTION
ATTACHMENT 1: Contractor Hazardous Material Identification Form or Electronic Equivalent
END OF ATTACHMENT 1
Part I
ATTACHMENT 2
Contractor Hazardous Material Identification Form Close-Out Procedures
Part II
Attach this part to Part I
Contractor shall accompany the Contracting Officer’s Representative and the Environmental Manager on the close-out inspection to ensure all used and unused HM has been removed from the installation.
Close-out Approval Signatures: Signature Date
Contractor ________________________________ ____________
Contracting Officer/Representative ________________________________ ____________
EM (Environmental Manager) ________________________________ ____________
END OF ATTACHMENT 2
SW-9 ENVIRONMENTAL PROTECTION
9.1 SCOPE
A. The work covered by this section concerns the furnishing all labor, materials, and equipment required for the prevention of environmental degradation during, and as a result of, operations under this contract.
1. For the purpose of this specification, environmental pollution is defined as “the presence of chemical, physical, or biological elements or agents, not naturally occurring at the site, which adversely affect human health or welfare; unfavorable alter ecological balances important to human life; affect other species of importance to man; or degrade the utility of the environment for aesthetic and recreational purposes.”
2. The control of environmental pollution by Contractor of this Project requires consideration of air, water, and land and involves noise control, solid waste management and management of radiant energy and radioactive materials, as well as other pollutants.
3. This section also requires the protection of cultural and historic resources.
B. The requirements listed in this Section are in addition to any environmental protection requirements listed in other provisions of these specifications. Contractor shall coordinate the work of this Section with the Work called for under the various sections of the Contract.
C. The basic environmental installation environmental protection guidelines are contained in the “Environmental Protection Plan for Contractors”.
D. Contact the Contracting Officer’s Representative (COR), concerning the content of these requirements.
9.2 125TH FIGHTER WING ENVIRONMENTAL MANAGEMENT SYSTEM (EMS)
BASE ENVIRONMENTAL STATEMENT VISA VIE CONTRACTOR
RESPONSIBILITIES
A. Protecting the environment is one of our highest priorities and will be a major factor in the decision making of Contractor selection of materials to be used on Base. The 125th Fighter Wing (FW) is dedicated through the use of a pro-active Environmental, Safety, and Occupational Health (ESOH) Council to the continued improvements of our processes to prevent and reduce waste generation by all means possible that are fiscally reasonable to implement. The Wing endorses the development and execution of an installation-wide EMS and a commitment to compliance with federal, state, and local environmental laws and regulations. We and the Contractor by presence on base will continue to pursue a course of responsible environmental stewardship in support of our environmental policy for the Base.
9.3 CONTRACTOR’S GENERAL ENVIRONMENTAL COMPLIANCE OBLIGATIONS
A. Contractor and any subcontractor, agent or representative shall comply with all applicable Federal, State, and local laws and regulations providing for environmental protection and pollution control and abatement including but not limited to the following:
1. Clean Air Act;
2. Clean Water Act;
3. Resource Conservation and Recovery Act;
4. Comprehensive Environmental Response, Compensation and Liability Act
(CERCLA);
5. Toxic Substances Control Act;
6. Federal Insecticide Fungicide and Rodenticide Act;
7. Coastal Zone Management Act;
8. Endangered Species Act;
9. National Historic Preservation Act;
10. Safe Drinking Water Act;
11. National Pollutant Discharge Elimination System (NPDES)
12. Emergency Planning and Community Right-to-Know Act;
13. Oil Pollution Act and Pollution Prevention Act.
B. Contractor is responsible for determining where such laws and regulations apply, although Contractor may request assistance from the COR in delineating applicable environmental laws and regulations. Contractor has an independent responsibility to make its own determination and to do so in a timely fashion.
C. Hazardous Material Spills: Spills shall be immediately contained, if possible, and reported to the base authorities in accordance with the installation’s “Oil and Hazardous Substances Spill Prevention and Response Plan” and also cross referenced in the “Environmental Protection Plan for Contractors.”
D. Contractor shall not discharge anything into the Base’s sanitary sewer system without coordination and approval from COR who will coordinate with the Base Civil Engineer and Base Environmental Manager.
E. The Base Civil Engineer and Base Environmental Manager may conduct inspections without notice at on-base work sites to ensure environmental compliance. Any items of non-compliance will be reported to the Contracting Officer.
F. The contractor shall use the 125th Fighter Wing “Environmental Protection Plan for
Contractors” for basic installation specific guidelines.
9.4 CONTACTS WITH ENVIRONMENTAL REGULATORY OFFICIALS
A. Contractor shall, through the Contracting Officer, immediately advise the installation environmental management function of the content of all contact with federal, state or local environmental regulators, before during and after the performance of this contract concerning the performance of this contract.
9.5 CONTRACTOR’S LIABILITY FOR ENVIRONMENTAL DAMAGES
A. Contractor agrees to hold harmless and indemnify the Air Force for any and all damages of any kind resulting from environmental violations by Contractor, Contractor’s employees, or agents or subcontractors.
1. Damages include, but are not limited to, personal injury, property damage (including diminution of value), or death, environmental restoration and response costs, natural resource damages, expert witness and attorney’s fees.
2. Reimbursement of any and all expenses incurred to obtain permits as a result of Contractor’s failure to identify or obtain permits shall be borne by the Contractor.
9.6 FINES OR PENALTIES FOR ENVIRONMENTAL NON-COMPLIANCE
A. Contractor shall be responsible for paying any fines or penalties assessed against the Air Force for environmental violations resulting from acts or omissions of Contractor or its employees, subcontractors, or agents.
1. This obligation is in addition to any fines or penalties that may be assessed against Contractor for the same conduct.
2. Contractor may either reimburse these fines or penalties through the Contracting Officer, or with the consent of the Base Civil Engineer, conveyed through the Contracting Officer, Contractor may pay such fines or penalties directly to the regulatory agency or agencies concerned.
9.7 WASTE DISPOSAL FOR CONTRACTS TO BE PERFORMED ON GOVERNMENT
FACILITIES
A. Hazardous Waste Generation, Handling and Disposal: Work under this contract is to be performed on a government facility. According to rules and procedures of the United States Environmental Protection Agency (EPA), a federal facility is required to have a generator identification number under the Resource Conservation and Recovery Act (RCRA) and to be responsible for hazardous wastes (as defined under RCRA) produced, managed, stored, disposed on or transported from the facility.
1. Contractor will, to the greatest extent practicable, use materials, processes and techniques that will avoid the creation of hazardous waste.
2. The Department of Defense (DOD) Solid Waste Measure of Merit (MoM) requires the Air Force to report all solid waste that is disposed in landfills, and, also diverted from landfills through reuse or recycling. Of the inevitable waste that is generated, as many of the waste materials as is economically feasible shall be reused, salvaged or recycled. Waste disposal in landfills shall be minimized.
3. With regard to this directive, the Contractor shall develop a written Waste Management Plan for this Project prior to the generation of hazardous materials and hazardous waste resulting from demolition. This plan, including disposal policies, shall be reviewed and approved by both the Contracting Officer and the Base Civil Engineer before such activities begin.
4. Contractor shall follow this plan once is has been approved by the Contracting Officer. Contractor shall coordinate all planned activities regarding hazardous materials and hazardous waste with the Base Civil Engineer office through the Contracting Officer.
5. Under no circumstances will the Contractor bring hazardous waste onto the facility.
B. Waste Management Plan:
1. Draft of Plan: Within FIFTEEN (15) CALENDAR DAYS after receipt of the Notice to Proceed, or prior to a waste removal, whichever occurs first, the Contractor shall submit to the Contracting Officer a draft of the Waste Management Plan for review by the Base Environmental Manager. This draft plan shall contain the following:
a. Analysis of the jobsite waste that is anticipated to be generated, including types of materials and their quantities; A manifest will be generated for each load off base, an electronic copy shall be provided to the COR for approval prior to its departure from the base. This will carry forward till the end of the job.
b. The name of the landfill(s) where trash will be disposed of, the applicable landfill tipping fee(s), and the projected cost of disposing of all Project waste in the landfill(s).
2. Alternates to Landfilling: Contractor to provide a list of each material proposed to be salvaged, reused or recycled during the course of the Project, the probable local market for each material, and the projected net cost savings or additional costs resulting from separating and recycling, versus landing, of each material.
a. “Net” means that the materials listed below have been subtracted from the cost of separating and recycling, including revenues from the sale of recycle or salvaged materials and landfill tipping fees saved due to diversion of materials from the landfill.
3. Materials Effected: The list of materials is to include, at a minimum, the following items:
a. Cardboard;
b. Clean dimensional lumber;
c. Beverage containers;
d. Land clearing debris;
e. Concrete;
f. Bricks;
g. Concrete masonry units (CMU);
h. Asphalt;
i. Galvanized sheet metal;
j. Stainless steel;
k. Aluminum;
l. Copper;
m. Zinc;
n. Lead;
o. Brass;
p. Bronze, and
q. Metals from banding, stud trim, ductwork, piping, reinforcing rods, roofing, other trim, steel, iron;
4. Final Waste Management Plan: Once the Contracting Officer has determined which of the recycling options listed in the draft Waste Management Plan are acceptable, the Contractor shall submit, within TEN (10) CALENDAR DAYS, a Final Waste Management Plan. The Waste Management Plan shall be implemented in the following fashion:
a. Manager: Contractor shall designate an on-site party or parties to be responsible for instructing workers, and overseeing and documenting results of the Waste Manage Plan.
b. Distribution: Contractor shall distribute copies of the Waste Management Plan to the Job Site foreman, each Subcontractor, the Contracting Officer and the Contracting Officer’s Representative.
c. Instruction: Contractor shall provide on-site training on appropriate separation, handling and recycling procedures, as well as instruction on salvage, reuse and return of materials to be used by all parties at appropriate stages of the project.
d. Separation Facilities: Contractor shall lay out and label a specific area of the job-site to facilitate separation of materials for potential recycling, salvage, reuse or return. Recycling and waste bin areas are to be kept clean and clearly marked as to contents in order to avoid contamination of materials.
e. Hazardous Materials: Such materials shall be separated, stored and legally disposed of according to federal, state and local regulations.
f. Documentation of Compliance: Each quarter, the contractor shall submit a solid waste disposal and diversion tracking form (attachment 1) by project to the COR, who in turn will send it to the base environmental office. Failure to provide these quarterly reports may delay progress payments. The report contains the following information:
1) The amount in tons of material land filled from the Project, the identity of the landfill(s), the total amount of tipping fees paid at the landfill(s), and total disposal costs.
2) For each material recycled, reused or salvaged from the Project, the amount in tons, the date removed for the Job Site, the receiving party, the transportation costs, the amount of any money paid or received for the recycled or salvaged materials, and the net cost or savings of salvage or recycling each material.
5. Contractor shall follow this Plan without deviation once Contracting Officer has approved it. Contractor shall not dispose refuse or debris on installation dumpsters. Wastes will not be created until the Waste Management Plan has been approved by the Contracting Officer.
9.8 PERMITS FOR WORK ON A GOVERNMENT INSTALLATION
A. CONSTRUCTION, EXCAVATION, MODIFICATION, RENOVATION,
DEMOLITION, INSTALLATION, OR OTHER ALTERATION OF BUILDING
STRUCTURES, EQUIPMENT, INSTALLATIONS, REAL PROPERTY, OR
SYSTEMS ON A GOVERNMENT INSTALLATION
1. General: Activities such as excavation, demolition, building modification or renovation, equipment installation or other alteration of building structures, equipment, real estate or systems require permits to allow that work to occur.
2. Contractor shall, after consultation as with the Base Civil Engineer, identify all Federal, State or local permit requirements under all applicable environmental laws and regulations as defined in Paragraph 1.2.A above.
3. Contractor shall then prepare and submit in draft all applicable permit applications and all supporting data to the Contracting Officer, who will submit these documents to the Base Civil Engineer.
4. Applications for permits that must be submitted by Contractor will be returned to Contractor after review.
9.9 COMPLIANCE WITH EXISTING INSTALLATION-HELD PERMITS
A. General: The United States Air Force (USAF) holds permits at the 125th Fighter Wing.
1. Contractor shall provide the Contracting Officer with notice of any activities it plans to undertake which may require the Base Civil Engineer to perform any action regarding these permits such as requesting a permit modification or reporting of required information.
2. Contractor will provide such notice as far in advance of planned activity as is practicable.
9.10 RECYCLED MATERIALS
A. Materials used in this contract shall be, to the greatest extent practicable and consistent with financial prudence, made of recycled materials or with materials that are recyclable.
9.11 ASBESTOS
A. No asbestos containing materials for any project shall be brought onto the Base.
Should this be discovered, the Contractor shall be solely responsible for all and any cost associated with the removal and subsequent corrective measures taken to correct the mishap.
B. Removal of asbestos material will be included in the project as required.
1. Identification of 125th Fighter Wing buildings to be demolished or renovated that are affected by this Work is as noted on Civil Engineering drawings and should be coordinated with the base asbestos manager prior to commencing work.
2. Procedures and criteria for accomplishing asbestos abatement in these buildings are established in Division 2 Section “Asbestos Abatement Procedures“.
3. Additional information is available in the “Asbestos Management Plan” for 125th Fighter Wing as published by the Air National Guard, Civil Engineering Services Center, Minot, North Dakota
a. Copies of this report can be obtained through the Base Civil Engineer or Environmental Office.
b. This report is part of the Bidding Documents if required.
c. Asbestos abatement work shall also comply with the Florida Administrative Code, Chapter 62-257, Asbestos Program) and can be obtained from the Florida Department of Environmental Protection, Tallahassee, Florida (http://www.dep.state.fl.us/air/rules/current.htm#62- 257)
9.12 POLYCHLORINATED BIPHENYL’S (PCBS)
A. PCBs will not be used or included on this project.
9.13 LEAD-BASED PAINT
A. No lead based paint containing materials for any project shall be brought onto the Base. Should this be discovered, the Contractor shall be solely responsible for all and any cost associated with the removal and subsequent corrective measures taken to correct the mishap.
B. If the presence of lead-based paint is encountered during the building demolition or renovation portion of this project, communicate with the Contracting Officer’s Representative and Base Environmental Manager. A subsequent change order upon confirmation will be submitted to the Contracting Officer. Related lead-based paint management procedures will be performed in accordance with applicable regulations, including, but not limited to, those established by the following agencies and governmental acts:
1. U.S Environmental Protection Agency, Region 4, Atlanta GA (http://www2.epa.gov/lead)
2. Florida Department of Environmental Protection, Northeast District, 8800 Baymeadows Way West, Suite 100, Jacksonville, Florida. (904) 256—1700 (http://www.dep.state.fl.us/northeast/)
3. Section V, Chapter 3 of the Technical Manual of the Occupational Safety and Health Administration (OSHA), dealing with controlling lead exposures in the construction Industry, in regards to engineering and work practice controls.
9.14 OZONE-DEPLETING SUBSTANCES
http://www.dep.state.fl.us/air/rules/current.htm%2362-257 http://www.dep.state.fl.us/air/rules/current.htm%2362-257 http://www2.epa.gov/lead http://www.dep.state.fl.us/northeast/
A. “Class I substance,” as used in this clause means any substance designated as class I by the Environmental Protection Agency (EPA) (40 CFR Part 82), including but not limited to chlorofluorocarbons, halos; carbon tetrachloride and methyl chloroform.
B. “Class II substance,” as used in this clauses means any substance designated as class II by EPA (40 CFR Part 82), including but not limited to hydro-chlorofluorocarbons.
C. As required by 42 USC 7671j(b), (g) and (d) and 40 CFR Part 82, Subpart E.
Contractor shall label products which contain Class I or Class II ozone-depleting substances or are manufactured with a process that uses Class I or Class II ozone-depleting substances, or containers of Class I or Class II ozone-depleting substances as follows:
“WARNING: Contains (or manufactured with, if applicable). ________ * ________ (a) substance(s) which harm(s) public health and the environment by destroying ozone in the upper atmosphere.” *Contractor shall insert the name of the substance(s).
“Contractor shall ensure no Class I ozone-depleting substances are used on the 125th Fighter Wing without prior approval of the Base Civil Engineer.”
“”Contractor shall comply with the applicable requirement of Sections 608 and 609 of the Clean Air Act (42 IS 7671g, National Recycling and Emission Reduction Program and 7671h. Servicing of Motor Vehicle Air Conditioners) as each or both apply to the contract.””
9.15 PESTICIDES
A. Except as may be specified elsewhere in this contract, Contractor will not apply any pesticides such as herbicides (weed-killers), insecticides, or rodenticides, without the specific written prior approval of the Base Civil Engineer.
9.16 PROTECTION OF WATER RESOURCES
A. General: Contractor shall not pollute storm drainage ways, streams, lakes or reservoirs with fuels, oils, bitumen, calcium chloride, acids, construction wastes or other harmful materials. It is the responsibility of Contractor to investigate and comply with all applicable federal, state and municipal regulations.
1. Contractor shall take particular care to prevent chemical, fuels, oils, greases, bituminous materials, waste washings, herbicides, cement and surface drainage from entering public waters.
2. In the event of a spill, the contractor shall follow spill response actions in the “Environmental Protection Plan for Contractors. In addition, the Base Fire Department and Environmental Office shall be notified immediately. Subsequent communication shall be accomplished to the Contracting Officer’s Representative who will notify the Contracting Officer of the mishap.
B. Waste and Curing Water: Water used in aggregate processing, concrete curing, foundation and concrete lift clean-up and other waste water shall not be allowed to enter the storm drainage system.
9.17 POLLUTION PREVENTION
A. General: Contractor should use prior planning to find those materials that will minimize the creation of waste in general and hazardous waste in particular.
9.18 UNEXPECTED SIDE CONDITIONS
A. Contaminated Soil or Groundwater: Unless otherwise specified elsewhere in the Contract Documents, the job-site has been inspected and is, consistent with best professional judgment, free of environmental contamination or pollution.
1. However, unexpected conditions can always arise. Contractor or subcontractor personnel may encounter soil or groundwater that is suspected to be contaminated, either because of odors, colors, free liquids or other suspicious conditions.
2. Should this occur, Contractor will immediately notify the Base Civil Engineer and the Base Environmental Manager and take necessary initial measures to protect workers, the site and other personnel.
B. Unexploded Munitions: No munitions or munitions-related materials are known or expected to be present on site. However, should suspected munitions-type material be encountered, Contractor should immediately Stop Work, Turn Off and Leave Equipment where it Rests, and Remove all personnel from the area and notify the COR and receive advice before disturbing the questionable material.
9.19 SITE DISTURBANCE DURING ACTIVITIES
A. Contractor shall use industry-recognized best management practices to avoid creation of fugitive dust emissions, and to avoid and control storm water runoff from the work site and any temporary roads that may be used for access to it.
1. Water sprinkling may be used to control dust.
2. Contractor shall perform all work under this contract in such a manner that no pollutants of any kind are released into ditches, storm drains, streams, lakes or other surface waters of the site.
9.20 PROTECTION OF LAND RESOURCES
A. General: It is intended that the land resources within the project boundaries and outside the limits of permanent work performed under this Contract be preserved in their present condition, or be restored to a condition after completion of construction that will appear to the natural and not detract from the appearance of the project. Contractor shall limit his construction activities to those areas defined by the Drawings or Specifications.
B. Prevention of Landscape Defacement: Except in area marked on the plans to be cleared, Contractor shall not deface, remove, cut, injure or destroy trees or shrubs without special authority.
1. Trees designated to be saved shall be protected from either excavation or filling within the root zone.
2. No ropes, cables or guys shall be fastened or attached to any existing trees for anchorage unless specifically authorized by the Contracting Officer.
3. Contractor shall, in any event, be responsible for any damage resulting from such use.
C. Restoration of Landscape Damage: Any trees or other landscape features scarred or damaged by Contractor s equipment or operations shall be restored as nearly as possible to the original condition at Contractor’s expense.
1. The Contracting Officer will decide what method of restoration shall be used, and whether damaged trees shall be treated and healed or removed and discarded.
2. All scars made on trees not designated on the plans to be removed by equipment construction operations or by the removal of limbs larger than 1 inch in diameter shall be coated immediately with an approved tree wound dressing.
3. Experienced landscape personnel shall perform all trimming or pruning in an approved manner. Tree trimming with axes shall not be permitted.
4. Trees that are to remain either within or outside established clearing limits that are subsequently damaged by Contractor, and that are beyond saving in the opinion of the Contracting Officer shall be immediately removed or replaced with a nursery-grown tree of the same species.
SW-10 PERFORMANCE PERIOD:
Services shall be completed within 120 calendar days after contract award.
SW-11 SITE VISIT:
A site visit has been scheduled for August 15th at 1000 EST at 14300 FANG Drive, Jacksonville, FL, 32218. Attendees will meet at the ANG base entry gate and all will be escorted together to the hangar bldg. 1001 for the site visit.
Please provide a list of all attendees NLT 24 hours prior to stacy.l.brenenstall.mil@mail.mil.
SW-12 ATTACHMENTS
A. Deconstruction Plan B. Electrical demolition Sketch C. Specification Section 02 41 00 Demolition and Deconstruction D. Mezzanine Photos
END OF SOW