Q&A.pdf

PDF 54 KB Posted

Attached to
Demo Mezzanine Service
Solicitation number
W911YN-18-Q-5010
Issued by

About this file

Questions and Answers

View the file

Other files

File Type Posted
Site_Visit_Attendance.pdf PDF
Statement_of_Work_04APR2018.pdf PDF
SCA_WD.pdf PDF
Attachment_A.pdf PDF
Attachment_B.pdf PDF
Attachment_D.pdf PDF
Attachment_C.pdf PDF
COMBINED_SYNOPSIS_SOLICITATION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A W911YN-18-Q-5010 DEMO MEZZANINE

Q1: Are there Asbilts on the FRP Building that will be demoed?

A1: This is a piece of equipment and there are no drawings of the structure.

Q2. Will we be responsible for portlets onsite?

A2. The contractor will have each worker vetted and badged and will be responsible for all workers, work areas and use of restroom facilities. No Port-a-lets will be necessary.

Q3. Will we be able to stage multiple roll off cans on the North side of the building?

A3. The Wing will provide a map/diagram for equipment staging areas.

Q4. Construction time allotted to completion.

A4. Due to it being removal only this will be a service contract not construction. Service POP is 120 days.

Q5. As-built information on the structure to be removed including but not limited to: wall, ceiling, and floor panel construction; attachment to structural deck; any hazardous material content.

A5. See A1 above.

Q6. What are acceptable portable toilet locations?

A6. See A2 above.

Q7. Will all authorized material removed become total property of contactor to be properly disposed of away from installation; not to be of any salvage value to the government?

A7. Property of contactor to be properly disposed of away from installation.

Q8. Will contractor, contractor’s vehicles and equipment have access to hanger area housing mezzanine structure for the entire duration of the contract?

A8. YES. All vehicles will be provided access by BCE, perform proper FOD checks, stay clear of critical areas, not to obstruct access lanes for fire/rescue.

Q9. Is there a survey or environmental report certifying that the modules to be removed are free of asbestos and lead?

A9. NO

Q10. Will the equipment and furniture at the ground level be removed and reinstated by the government?

A10. YES

Q11. Is the use of a torch allowed?

A11. YES… CONTRACTOR WILL BE REQUIRED TO CONTACT BASE FIRE DEPT. FOR A DAILY BURN PERMIT

Q12. Are Payment and Performance bonds required for the project?

A12. No

Q13. Is there any liquidated damages contemplated for this project?

A13. No

Q14. Is a Certified Industrial Hygienist required for this project?

A14. NO

File details come from the government source that posted it.