summary of Changes to PWS and Questions and Answers

View the file

Other files

File Type Posted
FL_CERFP_CTE_DEC_05-08_PWS_REV2.docx DOCX document
Route_Plan.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION W911YN-18-Q-0007 - AMENDMENT 1

This solicitation amendment affects the PWS as follows, addresses Questions from vendors and adds Route Plan document.

Summary of Changes:

1) We changed "Exercise Lead" to JITEC Exercise Planner, this is the appropriate verbiage that the contractors are familiar

2) Semantics such as NGB labeled positions should have been labeled JITEC positions.

3) Made the venue requirement "optional" stating it would have weight regarding the award of the contract. This will open options in regards to the number of contactors that can bid, we have reserved multiple sites here at CBJTC in case none of them include a venue. We would prefer they offer a venue on the 7th of December though.

4) We also changed the rubble pile size from 150 meters by 150 meters as a minimum to 50 feet by 50 feet as a minimum. There are NO rubble piles that size within 75 miles of Blanding making this requirement impossible.

5) Bumped the required number of SME's from 8 to 3 based on exercise size.

6) Provided more detail to the management of role players.

7) Changed the meeting dates requirements to open ended (must be prior to 04 DEC 2017) opposed to the unmeet able requirement of 21 November attendance.

8) Changed the requirement of confined space tunnels from 100 meters to 50 feet minimum.

9) Changed the SME support work days from 24 hours continuous support to 12 hours

10) Changed role player requirement number from 100 to 80 personnel.

**Note Changes are in RED and some lines have been edited.

QUESTIONS & ANSWERS

1. Is this a best value or LPTA opportunity?

A: Best Value

2. FAR 52.219-14 - Limitations on Subcontracting- Would the government consider dropping this clause if all subcontractors on the offering team met the $15 million size standard.

A: This clause is being deleted, the cost is not expected to exceed $150K.

3. 5.1.1.1.3 Can planning meetings be attended via telephone?

A: Yes

4. Paragraph 5.5.1 - Will the government provide incident command system, emergency response plan, and local emergency response plan for the ICS SMEs to implement?

A: All information will be provided by JITEC (Joint Interagency Training and Education Center) Exercise Planner.

5. Paragraph 5.5.1/PRS #3- What are the days and hours that casualty role players are required? What are the quantity, locations, time and conditions) for each of the exercises?

A: Casualty role players and manikins are needed on 05DEC2017 and 07DEC2017 form 0800-1600.

Quantity of role players is 80 individuals and 20 manikins, location is Camp Blanding Joint Training Center, Starke Florida on December 5th 2017, Incident Command SME's will be needed at Camp Blanding Joint Training Center on 05,06 and possibly 07 Dec 2017. Location on 07 DEC 2017 is TBD and will be based on if the contractor provides a venue for the 7th. If they don’t provide a venue the location will be Camp Blanding Joint Training Center.

6. PRS # 3 – Will the government make shelter available for moulage and role player holding sites?

A: No

7. PRS # 3 – How many 15 passenger vans does the government deem adequate to meet victim flow rates at Camp Blanding training locations? Please provide map depicting locations for Camp Blanding.

A: 2, See attached for map

8. Event Venue - If contractor elects to go with Camp Blanding Joint Training Center, will the government charge the contractor a use fee?

A: No Fees will be incurred by the contractor.

9. Venue Support- If contractor elects to propose Camp Blanding Joint Training Center, will the government charge for materials to support the venue: lumber, debris, junk vehicles, concrete slabs, etc?

A: No

10. Collapsed Structure set/reset- What support (MHE, equipment and labor) does the government provide to set/reset the collapsed structure?

A: We are setting all concrete pads and placing all dummies for the 05 DEC collective training day (No support needed). For the 07 DEC collective training day the contractor will be required to set is the dummies in accordance with JITEC Exercise Planner the afternoon of the 6th, our soldiers will move and place concrete pads after contractor has set the dummies. CAVEAT, if the contractor provides a location different than CBJTC for 07DEC they will be in charge of setting the concrete pads and dummies and have no additional support from our staff.

11. In absence of a government provided labor category for casualty role players, does the minimum hourly wage of $10.20 plus $4.41 health and warfare as provided in the WD met the requirements stipulated in FAR 52.222-41 and Executive Order 13658?

A: Default to the executive order.