Abstract of Bids - Construction - W911XK25BA026 - Keweenaw Upper Breakwater Repairs.pdf

PDF 344 KB Posted

Attached to
Keweenaw Upper Breakwater Repairs
Solicitation number
W911XK25BA026
Issued by

About this file

This is an Abstract of Bids - Construction document for the Keweenaw Upper Breakwater Repairs project, solicitation number W911XK25BA026, issued by the US Army Corps of Engineers, Detroit District. The solicitation includes a base bid and an option, with multiple line items for construction activities such as mobilization, demolition, excavation, stone supply and installation, and site restoration. Six bidders submitted proposals, with total bid amounts ranging from $1,836,178.12 to $6,791,918.69. The lowest bid was from Roen Salvage Co. at $2,133,900.00, while MJO Contracting Inc. submitted a bid of $2,525,362.74. The project involves detailed stone placement and armor stone work across two station areas (0+30 to 4+00 and 4+00 to 4+50), with specific tonnage requirements for different stone types. All bidders provided a 20% bid security and acknowledged one amendment to the original solicitation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER

ABSTRACT OF BIDS - Construction

W911XK25BA026

4. ISSUING OFFICE I CERTIFY that I have opened, read, and recorded

US Arn,y Corp of Engineers on this abstract all offers received in response to this

Contracting Branch, Detroit District solicitation.

5. PROJECT TITLE

Keweenaw Upper Breakwater Repairs

X

8. GOVERNMENT ESTIMATE

A. Hired Labor

B. Reasonable Contract (Without

Profit)

6. Number of Amendments Issued

C.Reasonable Contract (With Profit)

D. UNll E. UNIT PRICE

F. ESTIMATED

?A. ITEM 7C. EST.

AMOUNT

NO 7B. DESCRIPTION OF OFFERED ITEM QUANTITY

0001 Mobilization/Demobilization 1 JOB $ $ 0002 Temporary Works and Site Preparation 1 JOB $ $ 0003 Demolition 1 JOB $ $

Excavation, Hauling and Disposal of

78 BCV $ $

Stamp Sand STA 0+30 to 4+00

0005 Supply and Installation of Bedding "D" Stone STA 0+30 to 4+00

005AA First 900 Tons 900 TON $ $ 005AB Over 900 Tons 129 TON $ $ 0006 Supply and Installation of "C" Stone STA 0+30 to 4+00

006AA First 6 000 Tons 6 000 TON $ $ 006AB Over 6 000 Tons 422 TON $ $

Rework Existing Armor Stone STA 0+30 to

1 JOB $ $

4+00

0008 Supply and Installation of Armor "A" Stone STA 0+30 to 4+00 008AA First 2 000 Tons 2,000 TON $ $ 008AB Over 2 000 Tons 149 TON $ $ 0009 Site Restoration 1 JOB $ $

TOTAL AMOUNT OF BASE $

0010 Supply and Installation of Bedding "D' Stone STA 4+00 to 4+50

0010AA First 100 Tons 100 TON $ $ 0010AB Over 100 Tons 33 TON $ $

0011 Supply and Installation of "C" Stone STA 4+00 to 4+50 0011AA First 700 Tons 700 TON $ $ 0011AB Over 700 Tons 82 TON $ $

Rework Existing Armor Stone STA 4+00 to

1 JOB $ $

4+50

0013 Supply and Installation of Armor "A" Stone STA 4+00 to 4+50 0013AA First 300 Tons 300 TON $ $ 0013AB Over 300 Tons 56 TON $ $

TOTAL AMOUNT OF OPTION 1 $

TOTAL AMOUNT OF BASE AND OPTION $ 1 799 663.36

2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES

7/8/2025 817/2025 1 2

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

Kari L. Tauriainen, Contractina Officer

SIGNATURE DATE SIGNED

�� Date: 2025.08.11 07:33:43 -04'00'

9. OFFERS

NO.1

A. OFFEROR:

MJO Contracting Inc.

B. BID SECURITY (TYPE AND AMOUNT)

20%

C. AMENDMENTS ACKNOWLEDGED

Yes

D. UNIT PRICE

E. ESTIMATED

AMOUNT

$ 2 525 362.74

NO. 2

A. OFFEROR:

Roen Salvage Co.

B. BID SECURITY (TYPE AND AMOUNT)

20%

C. AMENDMENTS ACKNOWLEDGED

Yes

D. UNIT PRICE

E. ESTIMATED

AMOUNT

$ 2 133 900.00

1. SOLICITATION NUMBER PAGE OF PAGES

W911XK25BA026 2 2

ABSTRACT OF BIDS - CONSTRUCTION INSTRUCTIONS -Attach this form to OF 1419, Abstract of Offers -Commercial, when more than 2 offers are received.

Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF

1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE 4.0FFERS

N0.3 N0.4 N0.5 N0.6

A. OFFEROR: A. OFFEROR: A. OFFEROR: A. OFFEROR:

Keweenaw Upper Breakwater Repairs Dean Marine and Excavating, Inc Kovilic Construction Co. Inc Michels Construction, Inc

B. BID SECURITY (TYPE AND AMOUNT) B. BID SECURITY (TYPE AND AMOUNn B. BID SECURITY (TYPE AND AMOUNT) B. BID SECURITY (TYPE AND AMOUNT)

20% 20% 20%

6. Number of Amendments Issued C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

1 Yes Yes Yes

7C. EST.

E. ESTIMATED E. ESTIMATED E. ESTIMATED E. ESTIMATED

7A. ITEM QUANTIT D.UNIT D. UNIT PRICE

AMOUNT

D. UNIT PRICE

AMOUNT

D. UNIT PRICE

AMOUNT

D. UNIT PRICE

AMOUNT

NO 7B. DESCRIPTION OF OFFERED ITEM y

0001 Mobilization/Demobilization 1 JOB $ $ $ $ $ $

Temporary Works and Site

1 JOB $ $ $ $ $ $ Preoaration 0003 Demolition 1 JOB $ $ $ $ $ $

Excavation, Hauling and Disposal of

78 BCY $ $ $ $ $ $ Stamo Sand STA 0+30 to 4+00

::supply and Insta11ation ot Bedding ··D ::stone ::;TA 0+30 to 4+00

005AA First 900 Tons 900 TON $ $ $ $ $ $ 005AB Over 900 Tons 129 TON $ $ $ $ $ $ 0006 Supply and Installation of "C" Stone STA 0+30 to 4+00

006AA First 6,000 Tons 6,000 TON $ $ $ $ $ $ 006AB Over 6,000 Tons 422 TON $ $ $ $ $ $

Rework Existing Armor Stone ST A

1 JOB $ $ $ $ $ $ 0+30 to 4+00 0008 Supply and Installation of Armor "A" Stone STA 0+30 to

008AA First 2,000 Tons 2,000 TON $ $ $ $ $ $ 008AB Over 2,000 Tons 149 TON $ $ $ $ $ $ 0009 Site Restoration 1 JOB $ $ $ $ $ $

TOTAL AMOUNT OF BASE $ $ $

::;uppIy ana mstanauon or tseuumg u ::stone .:, 1 /-\ 4+uu to 4+50

0010AA First 100 Tons 100 TON $ $ $ $ $ $ 0010AB Over 100 Tons 33 TON $ $ $ $ $ $

0011 Supplv and Installation of "C" Stone ST A 4+00 to 4+50 0011AA First 700 Tons 700 TON $ $ $ $ $ $ 0011AB Over 700 Tons 82 TON $ $ $ $ $ $

Rework Existing Armor Stone ST A

1 JOB $ $ $ $ $ $ 4+00 to 4+50

Supply and Installation of Armor "A" Stone ST A 4+00 to 4+50

0013AA First 300 Tons 300 TON $ $ $ $ $ $ 0013AB Over 300 Tons 56 TON $ $ $ $ $ $

TOTAL AMOUNT OF OPTION 1 $ $ $

TOTAL AMOUNT OF BASE AND OPTION $ 6 791 918.69 $ 2 587 325.00 $ 1 836 178.12