This performance work statement outlines requirements for the repair and alteration of a tugboat and crane barge. The contractor will be responsible for mobilizing to receive the vessels, performing surface preparation to SSPC standards, and applying epoxy primer and paint. The work must be completed within the timeframe proposed in the contractor's bid. The government will transport the vessels to and from the contractor's facility and evaluate bids based on total cost including transport distance. The related solicitation is for these drydocking services and is issued by the US Army Corps of Engineers Detroit District. Responses are due on the date specified in the solicitation document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Floating Plant Scope of Work (2021)
SP-1 Description
The work to be done under this Job Order consists of furnishing all labor, material, equipment, supplies, facilities, and services required, and performing the work described herein for Repair and Alteration of the Tug DEMOLEN and associated Crane Barge VELER in strict accordance with provided specifications for Repair and Alteration of Vessels.
SP-2 SITE VISIT FOR POTENTAIL CONTRACTORS
The Government will allow bidders to come to the Detroit Area Office for a site visit of the floating plant. The bidder shall contact Tom Gramer (586-651-1209) no later than two days before expected visit. The government will only accommodate visits Monday through Thursday, between the hours of 0700 and 1730 eastern time.
SP-3 BID EVALUATION FACTORS
SP-3.1 The Tug Demolen and Crane Barge Veler will be delivered to and return from the shipyard by the Government. The cost of transporting the plant (Tug and Crane Barge) will be considered in the bid evaluations to determine the lowest cost to the government of qualified bids. The cost to transport is $284.98 per round trip nautical mile.
SP-4 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
SP-4.1 The government will deliver the plant to the Contractor in open water clear of the Contractor’s yard as close as is practical to the time agreed to by both parties to the contract.
SP-4.2 The Contractor shall be required to commence work under the Contract within one working day after delivery of the plant to him. The contractor shall execute the work with faithfulness and diligence, and to complete the work within the time specified in his bid. If the Contracting Officer (CO) orders any additional work to be done beyond that called for by these specifications and/or orders any work described and required in these specifications not be done, appropriate adjustments in the time and/or price shall be made. The time stated for completion is to include final cleanup of the plant in in its entirety, followed by a crew inspection.
SP-4.3 Upon completion and acceptance of the work, the Government will accept return of the plant at the point where it was delivered to the Contractor. The date and hour of return of the plant to the Government shall be considered to be the time of the completion of the work, subject to the provision under FINAL EXAMINATION AND ACCEPTANCE contract agreement.
SP-4.4 Any tug or pilot services required between open water and the drydock, slip, or berth at the Contractor’s yard shall be promptly furnished by the Contractor at his expense. Use of the Tug DEMOLEN and Crane Barge VELER by the Contractor for these services is prohibited.
SP-5 OPTIONAL ITEMS OF WORK
SP-5.1 The Government will evaluate the Base contract only, exclusive of Options.
Items of work designated in the specifications, price schedule, and in the schedule of quantities and prices in the Job Order as "Optional" are to be performed only to the extent required by the Government as determined by the Contracting Officer (CO). The Contractor shall perform the work included in any or all of such items as directed and shall be paid therefore at the rates appearing in the schedule of quantities and prices as applicable to the amount of work performed. The Government is under no obligation to require the performance of any such items of work.
SP-5.2 Optional items shall include all necessary costs to perform the work. The optional work shall include any additional dry dock time or expenses and shall be incidental to that optional item.
SP-6 DIMENSIONS OF PLANTS
The approximate physical dimensions and physical data of the plants covered by these specifications are as follows:
Tug Demolen
Type of Plant Sea-going Tug
Length, overall, 108-ft.
Max Beam - Including Guard Rails 29-ft.
Max Height - Exclusive of Mast, Antenna, Etc. 34-ft, Displacement 344 Long Tons
Draft, light 13-ft
Horsepower 2,000 hp
Construction Steel, welded
Crane Barge Veler
Type of Plant Crane Barge
Length, overall, 150-ft.
Max Beam - Including Guard Rails 46-ft.
Max Height – Including spuds lifted, Antenna, Etc. 65-ft.
Displacement 1,000 Tons
Draft, light 5.0-ft
Construction Steel, welded
SP-7 DRAWINGS
TUG DEMOLEN TITLE
YTB 809-845-4563497 Profile YTB 828-845-4489102 Plan & Elev.
600-4563464 CrossSec1 600-4563464 CrossSec2 204-4563431 CrossSec3 P203- 4563429
CRANE BARGE VELER TITLE
424-H140-B001 Profile
424-H210-B002 Steel frame 424-H140-B001 Plan View 424-H150-B001 Machinery 424-H210-B003 Sheet 3 of 5 Spud wells 424-H210-B003 Sheet 1 of 5 Cross Sec
The drawings are available at US Army Corps of Engineers, Detroit Area Office, 6309 West Jefferson Ave., P.O. Box 09258, Detroit, MI. 48209-3072. Point of Contact for drawings is Mr. Thomas Gramer at (586) 651-1209. Additional sets of the above listed drawings and these specifications will be furnished to the successful Contractor without charge upon request.
SP-8 SHIFTING, ALTERATIONS, ETC.
Should the removal or shifting of any parts of the plant or it’s fittings, stores, fuel, water, etc., be necessary for carrying out the repairs specified, the same shall be done by the Contractor at his expense and all such removals shall be subsequently replaced and any damage or loss resulting from such removal or shifting, or replacement, shall be made good by the contractor at his expense. Should any portion of the plant's structure, housing, fixtures, or equipment require alteration to carry out the work, the Contractor shall make such alterations at his expense.
SP-9 CUTTING
All edges and corners of plates and shapes shall be smooth and free of burrs. The use of a cutting torch is permissible for cutting plates and shapes to size. The burning of plate holes shall not be permitted. Prior to any hot work, clean and gas free all hot work areas.
SP-10 WELDER AND WELDING
SP-10.1 All welding done under this job order shall be done only by welders who have successfully passed the qualification test of the American Bureau of Shipping and are willing to present their certification to the onsite Contracting Officer's Representative
(CRO).
SP-10.2 The electrodes used throughout the work shall be received on the job in unbroken packages bearing the manufacturer’s label or be otherwise marked.
SP-10.3 Assembly of all welded joints before welding shall be such as to secure proper gaps in butt welds and metal to metal content on fillet welds. Welding shall not be used to close openings larger than stipulated for each plate thickness by the American Bureau of Shipping. Surfaces to be welded shall be free from paint, oils, scale, etc.
SP-10.4 Welding procedures, as to direction, length, number and sequences of beads shall be carefully planned so as to minimize locked up stresses.
SP-10.5 All welding is to conform to specifications set up by the American Welding
Society. A copy of such standards shall remain on site for reference throughout the completion of work.
SP-10.6 Prior to any hot work, clean and gas-free all hot work areas.
SP-10.7 Contractor shall follow the American Welder Society welding specifications.
This standard specification and general requirements shall be followed and documented to satisfy the Government, USCG and ABS Inspectors. Gas plugs Sch80 couplings shall be used, coupling/plugs shall be at the lowest point. Plugs shall be fastened with anti-seize. Contractor shall use appropriate size plug/coupling for the repairs.
SP-11 SURFACE PREPARATION AND PAINTING
SP-11.1 SURFACE PREPARATION STANDARDS
The Contractor shall prep all surfaces applicable to this contract to the following standards:
The coatings supplier will always designate the degree of surface preparation required for the materials you are using. The basic standards for preparing metal substrates are a joint effort between the Society for Protective Coatings (SSPC) and the National Association of Corrosion Engineers International (NACE).
SSPC-SP1 Solvent Cleaning
Removal of all visible oil, grease, soil, drawing and cutting compounds, and other soluble contaminants from steel surfaces with solvent, vapor, cleaning compound, alkali, emulsifying agent, or steam.
SSPC-SP2 Hand Tool Cleaning
Removes all loose mill scale, loose rust, loose paint, and other loose detrimental foreign matter by hand chipping, scraping, sanding, and wire brushing.
SSPC-SP3 Power Tool Cleaning
Removes all loose mill scale, loose rust, loose paint, and other loose detrimental foreign matter by power wire brushing, power sanding, power grinding, power tool chipping, and power tool descaling.
SSPC-SP5 / NACE 1 White Metal Blast Cleaning
When viewed without magnification, the surface shall be free of all visible oil, grease, dust, dirt, mill scale, rust, coating, oxides, corrosion products and other foreign matter.
SSPC-SP6 / NACE 3 Commercial Blast Cleaning
When viewed without magnification, the surface shall be free of all visible oil, grease, dust, dirt, mill scale, rust, coating, oxides, corrosion products and other foreign matter of at least 66-2/3% of unit area, which shall be a square 3 in. x 3 in. (9 sq. in.). Light shadows, slight streaks, or minor discolorations caused by stains of rust, stains of mill scale, or stains of previously applied coating in less than 33-1/3% of the unit area is acceptable.
SSPC-SP7 / NACE 4 Brush-Off Blast Cleaning
When viewed without magnification, the surface shall be free of all visible oil, grease, dirt, dust, loose mill scale, loose rust, and loose coating. Tightly adherent mill scale, rust, and coating may remain on the surface. Mill scale, rust, and coating are considered tightly adherent if they cannot be removed by lifting with a dull putty knife.
SSPC-SP10 / NACE 2 Near-White Blast Cleaning
When viewed without magnification shall be free of all visible oil, grease, dust, dirt, mill scale, rust, coating, oxides, corrosion products and other foreign matter of at least 95% of each unit area. Staining shall be limited to no more than 5 percent of each unit area, and may consist of light shadows, slight streaks, or minor discolorations caused by stains of rust, stains of mill scale, or stains of previously applied coatings. Unit area shall be approximately 3 in. x 3 in. (9 sq. in.).
SSPC-SP11 Power Tool Cleaning to Bare Metal
When viewed without magnification, the surface shall be free of all visible oil, grease, dirt, dust, mill scale, rust, paint, oxides, corrosion products, and other foreign matter.
Slight residues of rust and paint may be left in the lower portion of pits if the original surface is pitted. The surface profile shall not be less than 1 mil (25 microns).
SSPC-SP12 / NACE 5
Surface Preparation and Cleaning of Steel and Other Hard Materials by High- and Ultra High- Pressure Water Jetting Prior to Recoating. This standard requires water jetting at high-or ultra-high-pressure to prepare a surface for recoating using pressure above 10,000 psi. Water jetting will not produce a profile; rather, it exposes the original abrasive-blasted surface profile. Water jetting shall be performed to meet four conditions: WJ-1, WJ-2, WJ-3, and WJ-4, and a minimum acceptable surface shall have all loose rust, loose mill scale, and loose coatings uniformly removed.
SSPC-SP13 / NACE 6
Surface Preparation of Concrete. Provides requirements for surface preparation of concrete by mechanical, chemical, or thermal methods prior to the application of bonded protective coating or lining systems.
SSPC-SP14 / NACE 8
Industrial Blast Cleaning. Removal of all visible oil, grease, dust and dirt, when viewed without magnification. Traces of tightly adherent mil scale, rust, and coating residues are permitted to remain on 10% of each unit area of the surface if they are evenly distributed. Shadows, streaks, and discoloration caused by stains of rust, stains of mill scale, and stains of previously applied coating may be present on the remainder of the surface.
WATER JETTING STANDARDS
SSPC-SP12 / NACE 5
Surface Preparation and Cleaning of Steel and Other Hard Materials by High- and Ultra High- Pressure Water Jetting Prior to Recoating
This standard requires water jetting at high- or ultra-high-pressure to prepare a surface for recoating using pressure above 10,000 psi. Water jetting will not produce a profile;
rather, it exposes the original abrasive-blasted surface profile. The specifier shall use one of the visual surface preparation definitions (WJ-1 to WJ-4) and one of the non-visual surface preparation definitions (SC-1 to SC-3) to specify the degree of visible and non-visible surface matter to be removed.
Pressure Categorization
Low-Pressure Water Cleaning (LP WC)
Cleaning performed at pressures less than 34 Mpa (5,000 psi)
High-Pressure Water
Cleaning (HP WC) Cleaning performed at pressures from 34 to 70 Mpa (5,000 to
10,000 psi) High-Pressure Water Jetting (HP WJ) Cleaning performed at pressures from 70 to 170 Mpa (10,000 to 25,000 psi)
Ultrahigh-Pressure Water Jetting (UHP WJ)
Cleaning performed at pressures above 170 Mpa (25,000 psi)
Visual Conditions of Surface Cleanliness
WJ-1
Surface shall be free of all previously existing visible rust, coatings, mill scale, and foreign matter and have a matte metal finish
WJ-2
Surface shall be cleaned to a matte finish with at least 95% of the surface area free of all previously existing visible residues and the remaining
5% containing only randomly dispersed stains of rust, coatings, and foreign matter
WJ-3
Surface shall be cleaned to a matte finish with at least two-thirds of the surface area free of all previously existing visible residues (except mill scale), and the remaining one-third containing only randomly dispersed stains of previously existing rust, coatings, and foreign matter
WJ-4
Surface shall have all loose rust, loose mill scale, and loose coatings uniformly removed
Non-Visual Conditions of Surface Cleanliness
SC-1
Surface shall be free of all detectable levels of contaminants as determined using available field test equipment with sensitivity approximating laboratory test equipment. For purposes of this standard, contaminants are water-soluble chlorides, iron-soluble salts, and sulfates
SC-2
Surface shall have less than 7 μg/cm chloride contaminants, less than 10 μg/cm of soluble ferrous ion levels, and less than 17 μg /cm of sulfate contaminants as verified by field or laboratory analysis using reliable, reproducible test equipment
SC-3
Surface shall have less than 50 μg/cm chloride and sulfate contaminants as verified by field or laboratory analysis using reliable, reproducible test equipment
Surface Preparation by Substrate
Iron or
Steel Galvanized Aluminum
Pre-
Finished
Metals
Stainless
Steel
Non-
Ferrous
Metals
Plastics-
PVC/FRP
Concrete
Previously
Painted
Surfaces
SSPC-SP1
Solvent Cleaning X X X X X X X X
SSPC-SP2
Hand Tool
Cleaning
X X
SSPC-SP3
Power Tool
Cleaning
X X X
SSPC-SP11
Power Tool
Cleaning to Bare
Metal
X
SSPC-SP7-NACE4
Brush-Off Blast
Cleaning
X X X X X X X X
SSPC-
SP14/NACE8
Industrial Blast
Cleaning
X
SSPC-SP6/NACE3
Commercial Blast
Cleaning
X
SSPC-
SP10/NACE2
Near-White Blast
Cleaning
X
SSPC-SP5/NACE1
White Metal Blast
Cleaning
X
SSPC-
SP12/NACE5
High and Ultrahigh
Pressure Water
Jetting Prior to
Recoating
X X X X X
SSPC-
SP12/NACE6
Surface
Preparation
Concrete
X
SP-11.2 PAINTING STANDARDS
ASTM F 718-99 Standards for Shipbuilders and Marine Coatings Product/Data Procedure Sheet. Contractor shall prime and paint with epoxy paint and primer applicable to the type of surface which is to be painted. This project will require multiple areas with paint including Underwater and Hull Coatings, Deck, Crane Machinery Housing, and several more. The Contractor will then apply 3 coats of paint to each area/spot with paint as detailed below unless otherwise noted. The paint used shall meet the following technical characteristics:
Epoxy Primer
Formulated specifically for corrosion protection in immersion and atmospheric service in marine environments.
Required performance characteristics:
1. Phenalkamine chemistry
2. Self-priming
3. Low temperature application (20°F/-7°C)
4. Surface tolerant - damp surfaces
5. Required spread rate per coat:
a.Wet mils (microns) 8.0 (200) 11.0 (275) b.Dry mils (microns) 5.0 (125) 7.0 (175)
6. Volume solids: 67% ± 2%,
7. Mixed weight solids: 80% ± 2%,
8. VOC (EPA Method 24): unreduced: <300g/L (2.50 lb/gal)
9. Flash point greater than 100oF.
10. Mix ratio: 4:1 by volume (2 component)
11. Low sheen colors: Red Oxide, Gray, Off-White, Black, Buff, Aluminum, Bronze Tone
12. Tested by Det Norske Veritas (DNV) receiving highest obtainable rating B1.
Required DNV procedure for classification of ballast tank coatings, REV-02, over a pre-rusted and hydro-jetted substrate key qualification.
13. Corrosion weathering per ASTM D5894, 15 cycles, 5000 hours. Result in maximum rating of 10 for blistering (ASTM D714) and maximum rating of 10 for rusting (ASTM D610).
Urethane Finish Coat:
Formulated specifically for in-shop applications and industrial applications for superior color and gloss retention.
Required performance characteristics:
1. Polyester modified, aliphatic, acrylic polyurethane chemistry
2. Must be able to be used directly over epoxy, organic zinc rich primers (epoxy zinc primer and moisture cure urethane zinc primer)
3. Fast drying (minimum dry to touch time at 77oF of 30 minutes)
4. Recommended Spreading Rate per coat:
a. Wet mils (microns) 4.5 (112.5) - 9.0 (225)
b. Dry mils (microns) 3.0 (75) 6.0 (150)
5. Volume Solids: 65% ± 2%, mixed
6. Weight Solids: 78% ± 2%, mixed
7. Mix Ratio: 6:1 by volume
8. Finish: gloss
9. Provides color and gloss retention for exterior exposure by meeting the requirements of SSPC Paint No. 36, Level 3 for white and light colors.
10. Complies with ISO 12944-5 C5I and C5M requirements.
11. Conforms to AWWA D102 Outside Coating Systems #4 (OCS-4), #5 (OCS-5) & #6
(OCS-6).
12. Corrosion weathering per ASTM D5894, 27 cycles, 9072 hours. Result in maximum rating of 10 for blistering (ASTM D714) and maximum rating of 10 for rusting (ASTM D610) with suitable primer.
13. Abrasion resistance per ASTM D4060, CS17 Wheel, 1000 cycles, 1 kg load of 43 mg loss.
14. Flexibility per ASTM D522, 180o bend, 1/8” mandrel, with no cracking of delamination.
Universal Primer:
A high-performance primer that is designed to be used over a variety of substrates. This product contains an anticorrosive pigment specifically for the first coat on non-iron/steel substrates, providing outstanding adhesion and enhancing dielectric properties with additional epoxy topcoats. This may be used in immersion service with recommended topcoats.
Required performance characteristics:
1. Corrosion Resistant.
2. Provides dielectric properties when used within an epoxy coating system.
3. Contains high molecular weight epoxies.
4. Contains hygroscopic solvent system.
5. Finish: Flat
6. Recommended Spreading Rate per coat:
a. Wet mils (microns) 5.0 (125) – 7.0 (175)
b. Dry mils (microns) 3.0 (75) 4.0 (100)
7. Volume Solids: 62% ± 2%, mixed
8. Weight Solids: 76% ± 2%, mixed
9. Mix Ratio 1:1 by volume
10. Impact Resistant.
11. Compatible with multiple substrates.
12. Abrasion Resistant.
Marine Enamel:
A fast drying patented modified alkyd rust inhibitive high gloss marine enamel. A Marine Enamel has excellent non-yellowing characteristics and superior color and gloss retention on exterior exposure. Specifically formulated to withstand Marine and coastal environments. For both interior and exterior applications.
Required performance characteristics:
1. Corrosion Resistance.
2. Excellent Color & Gloss Retention
3. Finish: Gloss
4. Recommended Spreading Rate per coat:
a. Wet mils (microns) 4.0 (100) – 6.0 (150)
b. Dry mils (microns) 2.0 (50) 3.0 (75)
5. Volume Solids: 42% ± 2%, mixed
6. Weight Solids: 55% ± 2%, mixed
7. Passes Salt Fog Resistance Test ASTM B117, 500 hours
Exterior Hull/Spud/Spudwell Coating (includes areas where repairs are done):
1. Surface Preparation: Surface shall be prepared to SSPC-SP6/SP7 requirements based on existing conditions.
2. Base coat: Paint shall meet SP-11.2 technical specifications. Product to be applied uniformly. Final Dry film Thickness Minimum: 6 Mils, Color: Black 17038
3. Second Coat: Paint shall meet SP-11.2 technical specifications. Product to be applied uniformly. Final Dry film Thickness Minimum: 6 Mils, Color: Black 17038
4. Final Coat (Entire spud shall be coated): Paint shall meet SP-11.2 technical specifications. Product to be applied uniformly minimum: 2mils. Color: Black 17038
5. NOTE: Contractor shall repaint yellow safety marks on spuds.
Interior Hull Coatings (includes areas where repairs are done):
uniformly. Final Dry film Thickness Minimum: 2.5-3.5Mils, Color: Depends on existing interior Color. Must be preapproved by government representative.
3. Second Coat (Stripe Coat): Paint shall meet SP-11.2 technical specifications.
Product to be applied uniformly. Final Dry film Thickness Minimum: 2.0 – 3.0 Mils, Color: Depends on existing interior Color. Must be preapproved by government representative.
Deck Coating (includes areas where repairs are done).
uniformly. Final Dry film Thickness Minimum: 6 Mils, Color: Grey applied uniformly. Final Dry film Thickness Minimum: 6 Mils, Color: Grey
4. Third Coat: Paint shall meet SP-11.2 technical specifications with 36-mesh Garnet Grit, 0.3lb/sq.ft-Red or equivalent. Product to be applied uniformly. Final Dry film Thickness Minimum: 6 Mils, Color: Deck Red 10076
5. Final Coat: Paint shall meet SP-11.2 technical specifications. Minimum: 2mils. Color:
Dark red 10076 Crane Machinery House Roof, Crane Exterior Deck at Door Locations, Operators Cab, Back Leg, Jib, Ladder, Ladder Cage, Crane Railings, A- Frame, and other associated components.
Crane Machinery House Roof, Crane Exterior Deck at Door Locations, Operators Cab, Back Leg, Jib, Ladder, Ladder Cage, Crane Railings, A-Frame, and other associated components.
1. Surface Preparation: All roof surfaces shall be prepared to SSPC-SP6 requirements.
Integrity of substrate must be maintained at all times. Abrasive blasting with water will be acceptable to meet the SSPC-SP6 requirement. Sides and remaining structure shall be prepared with to SSPC-SP6/SP7 requirements based on existing conditions.
uniformly. Final Dry film Thickness Minimum: 6 Mils, Color: Red.
3. Second Coat: Paint shall meet SP-11.2 technical specifications. Product to be applied uniformly. Final Dry film Thickness Minimum: 6 Mils, Color: White (Crane House and Operators Cab), Black for Back leg and A-Frame Structure).
4. Third Coat: Paint shall meet SP-11.2 technical specifications. Minimum: 2mils. Color:
Old Ivory 17855 (Crane House and Operators Cab), Color: Black 17038 (A-Back leg and Frame Structure).
NOTE: Railings and ladder are to painted yellow. If the ladder is to be removed for painting, contractor shall provide ladder access to crane.
Deck Fittings, vents, cofferdams, sewage valve/piping, winch wire rope guards, safety zones, and other associated components.
1. Surface Preparation: Surface shall be prepared to SSPC-SP6/SP7 requirements uniformly. Final Dry film Thickness Minimum: 5 Mils, Color: Red.
applied uniformly. Final Dry film Thickness Minimum: 5 Mils, Color: Grey.
4.Third Coat: Paint shall meet SP-11.2 technical specifications. Minimum: 2mils. Color:
Yellow 13655.
Draft Marks and Vessel Names.
1. Draft Markings above water: Paint shall meet SP-11.2 technical specifications.
Minimum: 2mils. Color: White 27880
2. Hull Markings below water: Paint shall meet SP-11.2 technical specifications. Product to be applied uniformly. Final Dry film Thickness Minimum: 2 Mils, Color: White 27880.
SP-11.3 PAINT QUALITY CHECK
The Contractor shall ensure sufficient drying and curing time will be allowed for between coats and before the vessel is floated. They must adhere to the manufacturer’s specifications. The Contractor shall furnish a reasonable dry film thickness gauge and take random measurements in the presence of the Government Quality Assurance Representative, to demonstrate specified paint film thickness are achieved for each coat of paint. Random measurements are defined as 10 tests minimum.
SP-11.4 PAINT WELDED AREAS
All weld areas that were directly or indirectly worked on must be preserved with the required coatings. Areas behind, adjacent, or damaged during the welding procedure shall be cleaned and be repainted as necessary. This may include removing and reinstalling insulation where applicable. Q/A-Coated areas shall have the following:
surface preparation accomplished by certified blasters: coatings applied by certified painters: test and inspection records maintained in accordance with key checkpoints signed off by certified coating inspectors.
SP-12 CONFINED SPACE AND COMPARTMENT VENTILATION
Sewage tanks shall be ventilated to the exterior of the platform. All confined spaces or spaces that welding is performed or accessed, must be ventilated as per EM385 Safety and Health Requirements Manual, a copy can be provided by request to the COR
SP-13 DISPOSITION OF SCRAP AND SALVAGEABLE MATERIAL
All items designated as scrap resulting from the work shall become the property of the Contractor. This shall not apply to salvageable items ordered to remain property of the Government, which shall be loaded and returned to the Government on truck or on board the vessel as directed. The determination of whether or not an item is salvageable shall rest with the (COR) if not stated in the specifications.
SP-14 CLEANLINESS ABOARD PLANT
The Contractor shall keep working areas clean and shall clean up such working areas to a condition "as found prior to commencement of work." The Contractor shall install protective covering and protect craft’s equipment, components and electrical cables during work accomplished in this work item. Remove protective covering upon completion of work. The Contractor shall at all time refrain from marring, marking, or defacing any portion of the interior of the vessel. Any such marring, marking, or defacing shall be restored to its original condition by and at the expense of the Contractor prior to acceptance of the plant by the Government as provided under Paragraph SP-18 Final Examination and Acceptance.
SP-15 HULL PLATE RENEWAL AND REPAIR SUBCHAPTER “M” COMPLIANT
The Contractor shall make any and all repairs or renewal to the steel hull of the Tug Demolen or the Crane Barge Veler, to be in compliance with United States Coast Guard Subchapter M, NVIC 7-68 inspection and repair of steel hull specifications. Shall the repairs not meet United States Coast Guard Subchapter M, NVIC 7-68 inspection and repair of steel hull specifications, the Contractor shall rework the failed areas to meet specifications, at no cost to the Government. The contractor shall provide an ABS survey expert, relative to subchapter M, to inspect the hull plate renewal to ensure Subchapter M requirements are met.
SP-16 SERVICES TO BE FURNISHED BY THE CONTRACTOR WITHOUT FURTHER
COST
The Contractor shall furnish without further cost to the Government the services listed below.
SP-16.1 The Contractor shall furnish and connect a temporary auxiliary electric power supply to permit lighting and ventilation of holds, machinery spaces, quarters, the galley, and for the operation of necessary deck and auxiliary machinery of the Tug DEMOLEN and Crane barge VELER while it is in his possession.
SP-16.2 The Contractor shall furnish crane service to place stores and other Government equipment aboard the vessels and to remove supplies and equipment from the vessels.
Crane services shall be provided at times mutually agreeable to the Contractor and the Contracting Officer (CO).
SP-18 INSPECTIONS
SP-17.1 Inspections and tests shall be made at such times and in a manner satisfactory to the Contracting Officer (CO) and their appointed inspector(s). The Contractor shall be required to ensure strict compliance with the terms of the contract. Government Quality
Assurance Representative is not authorized to change any provision of the specification without written approval of the Contracting Officer (CO), nor shall the presence or absence of an inspector relieve the Contractor from any requirement of the Contract. The contractor shall keep the Contracting Officer (CO) and COR informed of the desired time of all proposed tests or inspections. Trial of machinery shall be conducted by the Contractor at his expense.
SP-17.2 When any workmanship, material or apparatus fails to pass any test or inspection, it shall be fully retested only after all known defects have been eliminated at no additional cost to the Government. This process will continue until item passes inspection or tests.
SP-17.3 The U.S. Army Corps of Engineers may bring various outside agencies to assist in the inspection of the vessels (American Bureau of Shipping, Coast Guard, etc.). These inspections will be scheduled to minimize impacts to the Contractors schedules. These inspections will be performed at no cost to the Contractors. Shall an inspector have questions, contractor shall make themselves available to answer all questions regarding work performed.
SP-18 MATERIALS
Any materials not specified shall be the best of its kind, suitable for the purpose intended, and subject to the approval of the Contracting Officer (CO). Where sizes, fits, operating characteristics or controls are not specified, they shall be as approved by the Contracting Officer (CO).
SP-19 FINAL EXAMINATION AND ACCEPTANCE
As soon as practical, after the completion of the entire work as may be designated in the specifications, a thorough examination thereof shall be made by the Contractor in the presence of the Contracting Officer’s Representative (COR) at the site of work. If such work is found to comply fully with the requirements of the Contract it will be accepted by the Contracting Officer’s Representative (COR) and final payment will be made in accordance with the Contract article entitled “Payment”. If deficiencies in the work are found, they shall be recorded by the Contractor and Contracting Officer’s Representative (COR) and corrective action shall be made immediately at no additional cost to the
Government.
SP-20 LIQUIDATED DAMAGES
SP-20.1 Liquidated damages will be based upon, and calculated in accordance with the following:
The Contractor shall include in his quote a statement of the number of workdays necessary to accomplish all the mandatory work items. If optional items or other additional work is required, an allowance will be made and the time to complete the work will be adjusted accordingly. In addition, allowances will be made for delays due to causes beyond the contractor’s control (e.g., rain delaying the painting of the hull), these days will be recorded and noted by the onsite Contracting Officer’s Representative (COR) to ensure accuracy. For the Purpose of this paragraph workdays consist of Monday through Friday inclusive with the exemption of Federal Holidays.
SP-21 SECURITY REQUIREMENTS
(a) All personnel employed by the contractor in the performance of the services specified in this contract or any representative of the Contractor entering the work area shall conform and comply with all applicable U.S. Army Corps of Engineers, facility access, security policies and procedures. Provided by U.S. Army Corps of Engineers Contracting Officer Representative (COR) or facility representative.
(b) Pre-screening of contractor candidates via E-verify Program: The Contractor must pre-screen candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that all contractors working on the site have two valid forms of Government issued identification prior to entering the information in E-Verify. The vendor must ensure the correct information is entered into the E-verify system. A verification sheet for each verified/eligible contractor candidate must be provided by the awarded contractor to the U.S. Army Corps of Engineers (USACE) Contracting Officer Representative (COR) or the site USACE representative, no later than 3 business days after the initial contract award. (The purpose of using E-Verify is to ensure all contractors are U.S. citizens or documented foreign citizens with authority to work in the United States of America). The COR will forward the verification sheets to the USACE, Detroit District Security Office for validation.
(c) Security Checks - All contract employees must carry pictured identification at all times. They must show I.D. upon request by City/State/Government personnel. The Contractor's employee must carry a copy of the contract requirements with them during the implementation of this contract.
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
TECHNICAL PROVISIONS (TP) FOR BID SCHEUDLE ITEMS
CLIN 0001 TUG DEMOLEN REPAIRS – BASE CONTRACT
TP-1. DOCKING AND UNDOCKING
Drydock the vessel to complete all underwater work specified herein including sight and survey, inspection, repairs, and to re-float the vessel upon completion of all work. The Contractor shall always provide safe and convenient means of boarding the vessel as detailed below in Platform Access and Egress. This item will include any charges for http://www.uscis.gov/e-verify altering blocks, providing the services specified under paragraph SP-15 SERVICES TO
BE FURNISHED BY THE CONTRACTOR WITHOUT FURTHER COST TO THE
GOVERNMENT, and for the drydock foreman's charge. Allow a sufficient number of days in drydock to complete the mandatory base contract underwater work. Security service will be provided for the Plant after hours as part of the dry dock service.
Platform Access and Egress: Contractor shall provide hand railed ramped brow from main deck of vessel to main deck of scaffold or structural surface. Along the main deck that does not have railings, there shall be lighting on all access and egress points. This will meet the requirements of the EM385-1-1 Safety and Health Requirements Manual.
Shore Power: Contractor shall supply a shore power connection including the electrical terminal between the vessel and shore. The Tug Demolen will require: 440volt, three phase, 90amp connection, AC current. The power cord must have adequate length to prevent kinking or parting. All parts of the power supply must have proper chaffing at pinch points and bends. This will give the Government the capability to use its electric deck winches and auxiliary power supply’s during shipyard repairs. Contractor shall supply an equivalent/compatible electrical shore connection.
TP-2. CLEAN HULL FOR VISUAL INSPECTION
The Contractor shall pressure wash the hull, propellers, rudder, and any other item of the vessel from the water line down as needed for visual inspection. This effort is to remove all sea growth as well as any zebra mussels that may have attached to the hull and make a better assessment of the condition of the steel hull, rudder, propeller, and sea chests. This pressure wash shall be completed as soon as possible upon entering the drydock. The pressure wash shall be a minimum requirement detailed in SP-11.
Containment and disposal of the water and debris shall be the responsibility of the Contractor. Care shall be taken by the contractor not to damage the existing protective paint system, seals, or any other plant features. If damage is occurring to the existing paint or any other feature the Contractor shall immediately notify the Government Quality Assurance Representative and the Contracting Officer’s Representative (COR), suspend the operation, adjust water pressure to minimize damage and resume operation at no additional cost to the Government. A thorough visual inspection of the exterior hull plate, welds, seams, etc. shall be made immediately after completion of the pressure wash cleaning to determine the condition of the hull. Repairs to the hull shall be identified by the Contractor. The Contractor will then notify the Government Quality Assurance Representative and the Contracting Officer’s Representative (COR) on the condition. The Contractor shall then coordinate the necessary repairs with the Contracting Officer’s Representative (COR) and immediately proceed with the repairs when they are approved by the Contracting Officer (CO) with a change order to the contract.
TP-3 INSPECTION OF TRANSDUCER WELL
The transducer well, located in the front berthing space with only one transducer sensor in the well, shall be opened, inspected, and reconditioned. The well vent shall be rebuilt and ensure that the sensor does not get air bound. During reconditioning, if any significant damage is found to the transducer steel well beyond reasonable repair the, Contractor will notify the Government’s Quality Assurance Representative and the Contracting Officer’s Representative (COR) of these repairs. Any necessary repairs will be subject to a change order when the extent of repairs is known. The change order will only be executed by the Contracting Officer (CO).
TP-4 INSPECTION OF RUDDER
Rudder shall be closely examined for corrosion, physical damage, and/or leakage that may have caused water to enter and fill void areas in the rudder. Rudder shall also be inspected for any straightness, alignment and bearing issues. If fitted with a plug, the plug shall be removed to check for any interior water intrusion. If a plug does not exist, the Contractor shall create an access/inspection hole that shall be plugged watertight.
The new plug shall be able to take the water pressure when the vessel is refloated and not come loose. If any significant damage is found to the rudder assembly, the Contractor will notify the Government’s Quality Assurance Representative and the Contracting Officer’s Representative (COR) of the repairs. Any necessary repairs will be subject to a change order when the extent of repairs is known. The change order will only be executed by the Contracting Officer (CO).
TP-5 INSPECTION OF PROPELLER
The Demolen has a single propeller, constructed of stainless steel, is 12ft in diameter, and has four blades. The hub and all propeller blades shall be cleaned and visually inspected by the Contractor. The propeller cone shall be removed from the shaft in order to inspect the propeller nut and hub welds. All rough edges and grooves in the propeller shall be ground smooth. The propeller shall be inspected for any broken welds, alignment of the blade angles, and the integrity of the casted metal for fatigue stress cracks. If any significant damage is found to the propeller assembly, the Contractor shall notify the Government’s Quality Assurance Representative and the Contracting Officer’s Representative (COR) of the repairs. Any necessary repairs will be subject to a change order when the extent of repairs is known. The change order will only be executed by the Contracting Officer (CO).
TP-6 REMOVE PROPELLER COLLAR AND REPALCE PACKING
The propeller shaft of the Tug Demolen needs to be inspected and repacked. The Contractor shall remove the brass flange, the collar, and all packing. The Contractor will repack the shaft with a 1”, high performance, non-asbestos, braided hydrophobic fiber for compression packing that is engineered specifically for the marine industry, then reinstall the collar, and the brass flange. All packing and hardware will be furnished by the Contractor. If any reusable component is damaged upon removal, the Contractor shall replace all damaged components at no cost of the Government.
Propeller flange and packing area.
TP-7 REPLACE ON/OFF VALVE FOR FRESH WATER AC UNIT
The below image illustrates the location of the freshwater valve in need of replacement in the Tug Demolen’s engine room. The Contractor shall remove the freshwater ac vale in a manner that does not damage the existing pipe or flanges. If existing pipe and flanges are damaged, the Contractor shall repair or replace damaged parts at no cost to the Government. The replacement valve will be an equally sized and rated valve furnished by the Contractor. If there are rubber seals present, the Contractor shall replace the seals or gaskets with direct replacements, under no circumstances will seal or gaskets ever be reused. If assembled and the fittings or joints leak, the valve will be disassembled and inspected.
On/Off Valve (Red)
TP-8 REPLACE ALL ABOVE DECK BALLAST TANK VENTS, PIPE, CHECK VALVE
The Tug Demolen has three (3) ballast tank check valve vents, all three (3) ballast tank check vent vents shall be removed and replaced with new 2.5” schedule 80 steel pipe and 2.5” check valve vent furnished by the Contractor. The Contractor shall cut the existing pipe at deck level leaving the area in a condition that a new pipe can be welded in place. The new pipe will extend upwards to the ships rail where a 90degree bend will be installed, after the 90degree bend the pipe will be threaded and a check valve installed that is of equal size and specifications of the existing valve. All pipe and valves will be furnished by the Contractor. All new vents and pipe will be painted in accordance with SP-11 and welded in accordance with SP-10
Forward Port
Aft Port
Aft Starboard
TP-9 REMOVE ALL FENDERS
The Contractor shall remove all fenders and hardware from the hull of the Tug Demolen.
Once removed, the Contractor shall identify damaged hardware and infrastructure i.e., angle plate, pipe, nuts, and bolts. The Contractor, before paint, shall make all necessary repairs to the fender infrastructure such as welding new pipe in place or patching pipe and angle plate. All steel and hardware shall be supplied by the Contractor.
TP-9.1 REPLACE ALL FENDER SUPPORT PIPE
The Contractor shall replace all fender support pipe. The Contractor will use 2.5in outside diameter schedule 80 pipe and will verify the size is identical as the existing pipe. All attached steel shall be painted in accordance with SP-11 and welded in accordance with
SP-10
Damaged Bumper Support Example
TP-9.2 ADD FENDER FOR HIGH WATER OPERATIONS
The Contractor shall install 200 feet of new 9.5in x 9.5in “D” type fender and supporting hardware for high water operations on the Tug Demolen. The fender will be a continuation of the center bow fender. The Contractor shall supply fenders that match the current fender, steel, and hardware as applicable. This new fender will be continued on both port and starboard, wrapping around the stern. It will be as close to the steel rub rail as practical. Once the steel rub rail ends the new fender will be installed approximately at the 14ft depth marker when wrapping to the stern of the Tug. The current bumper and supporting hardware on the stern will be removed to allow installation of new bumper.
Mounting hardware and infrastructure will be supplied by the Contractor and painted in accordance with SP-11 and welded in accordance with SP-10
New Fender Location (Red)
Old Stern Fender (Yellow)
New Fender Location (Red)
TP-10 DRAFT MARKINGS, NAME, ABS LOAD LINES CERTIFICATION
All draft marks, legends, names, and plimsoll lines on the bow, midship and stern shall be pressure washed cleaned and painted in accordance of SP-11
Draft Markings above water: Paint shall meet SP-11.2 technical specifications.
Minimum: 2mils. Color: White 27880
Hull Markings below water: Paint shall meet SP-11.2 technical specifications. Product to be applied uniformly. Final Dry film Thickness Minimum: 2 Mils, Color: White 27880
The contractor shall have an ABS Certification take place while in dry dock, and from the certification, the contractor shall create and paint Load Lines on the Tug DEMOLEN.
All applicable processes shall be followed including, but not limited to; structural integrity, watertight integrity and stability.
TP-11 FINAL PAINT COATING HULL
After completion of the water pressure wash the Contractor shall identify locations on the hull that require repairs to the existing protective coating system. The Contractor will then notify the Government Quality Assurance Representative and Contracting Officer’s Representative (COR) of these areas/spots. The Contractor shall then begin blasting operations to repair the protective coating system.
The Contractor shall perform sandblasting operations in accordance with specification section SP-11. Blasting shall be performed as necessary to properly prepare the surfaces per the requirements in specification section SP-11. If all coating is required to be removed the surface shall be blasted to a near-white metal cleaned surface. When viewed without magnification it shall be free of all visible oil, grease, dust, dirt, mill scale, rust, coating, oxides, corrosion products, and other foreign matter. The use of extension pipes for sandblasting shall be done from above when working on the sides of the vessel, with blast nozzles pointed downward to minimize the spread of sand to the upper portion of the vessel. Existing paint systems damaged by sandblasting overspray shall be repaired at no additional cost to the Government.
The vessel is to be free of media and debris prior to painting. The Contractor shall ensure that the removal and disposal of the media shall be in accordance with all applicable Local, State, and Federal regulations. Any removal and re-installation of the ships rubber fenders associated with sandblasting and painting of the ship’s hull surface will be the Contractor’s responsibility. All ventilating air inlets to the tug shall be secured so that no sandblast grit or debris enters the tug. Particular attention shall be paid to the air inlets for the main engine and engine room. Paint systems damaged by sandblasting overspray shall be repaired at no additional cost to the Government.
Immediately upon completion of sandblasting operations, the Contractor shall notify the Government’s Quality Assurance Representative and Contracting Officer Representative (COR) to review the areas/spots for proper paint preparation. The Contractor will then apply coating per specification section SP-11.
TP-12 ULTRASONIC TESTING
The purpose of this testing is to determine hull plate thickness of the entire hull of the Tug Demolen. After the completion of cleaning the hull and the visual inspection of the exterior hull to determine known problem areas, the Contractor shall layout a grid of test spots to cover the entire exterior hull. The grid shall be a minimum of 75 test spots evenly distributed throughout the ship. The Contractor shall notify the Government Quality Assurance Representative and the Contracting Officer’s Representative (COR) of the grid layout to ensure increased coverage in known problem areas. Preparation of the ultrasound testing includes that each test spot will require all paint and primer is to be removed down to bare white metal. The paint and primer shall be removed as to not damage the integrity of the steel thickness of the hull. The Contractor will then conduct ultrasonic testing at each test spot using an ultrasound thickness gauge. All testers shall be qualified in using an ultrasound thickness gauge for ultrasonic testing and have appropriate certification for this testing being performed. When pitting or pops are presents, the ultrasonic tester will need to furnish the correct equipment to take an accurate measurement. The Contractor cannot move test points due to the lack of proper instruments. At the conclusion of the ultrasound testing, all test spots that were taken down to bare white metal will need to be repainted as identified in paragraph SP-
11 and be incidental to this bid item.
A written record of each of these readings and a report of findings shall be provided to the Government Quality Assurance Representative and the Contracting Officer’s representative.
TP-13 REPLACE CHAIN LOCKER VALVE IN FRONT BALLAST TANK
This valve is in the bow ballast tank and allows water to exit chain locker. The Contractor shall enter the tank, which is a confined space and requires compliance to
EM-385-1-1, and replace the valve and seals, if applicable, and connecting rod to the point where there is clean and undamaged steel. The Contractor shall furnish and use new hardware (i.e. nuts and bolts) that have a protective coating or a corrosive resistant material to avoid future corrosion to the best of its abilities. The contractor shall furnish the replacement valve that is the best direct replacement (2.5” Gate Valve, 125lb, Cast Iron Flanged). If existing pipe and flanges are damaged, the Contractor shall repair or replace damaged parts at no cost to the Government. If there are rubber seals present, the Contractor shall replace the seals or gaskets, under no circumstances will seals or gaskets ever be reused. If assembled and the fittings or joints leak, the valve will be disassembled, inspected, and reinstalled.
Bow Ballast Tank Chain Locker Valve
TP-14 OPEN AND RECONDITION SEA CHESTS & VALVES
There are three (3) sea chests on the tug Demolen below the water line that need close inspection. The (3) sea chests are: UPPER (Starboard) sea chest, LOWER (center) sea chest, and GENERAL SERVICE (Port) sea chest. All three sea chests (UPPER, LOWER and GENERAL SERVICE) shall be opened, cleaned, and the encased piping and valves shall be inspected. Each valve shall be re-furbished to a satisfactory condition if issues are found upon inspection. The Contractor shall remove and replace all packing on the lower sea chest valve with contractor furnished packing to directly match the size of the current packing. Satisfactory condition means that the valves function correctly and there are no leaks in the chests or valves. Rusted areas shall be sanded to white metal and repainted to prevent future rusting in a marine environment.
Deteriorated fasteners and/ or valve parts shall be replaced as necessary. If any significant damage is found to the sea chest piping or valves that requires replacement and is not already identified to be replaced as an Option to this Contract, the Contractor shall notify the replacement work to the Government’s Quality Assurance Representative and the Contracting Officer’s Representative (COR). Any necessary replacement work will be subject to a change order when the extent of work is known.
The change order will only be executed by the Contracting Officer (CO).
TP-15 INSPECT AND REPAIR FRONT BALLAST…