SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 26 PAGES
W911XK19R0017
Soo Locks Boiler Replacement
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.4.3 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.9 GSubmittal Register
01 35 13 SD-01 Preconstruction Submittals GConstruction Site Plan GUtility Location Plan GUtility Location Findings GSalvage Plan GPhoto Work Plan GPrework Photographs
SD-11 Closeout Submittals GConstruction Photographs GCompletion Photographs
GPHOTO DATABASE
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
1.8Activity Hazard Analysis (AHA)
SD-06 Test Reports 1.12.3LHE Inspection Reports
1.4 GMonthly Exposure Reports
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 26 PAGES
Soo Locks Boiler Replacement
01 35 26 Contractor Safety Self-Evaluation Checklist
1.6.1.4Crane Operators/Riggers
1.7.2.2 GStandard Lift Plan
1.7.2.3 GCritical Lift Plan
1.7.2.4 GNaval Architecture Analysis
1.12.4Certificate of Compliance
Third Party Certification of Floating Cranes and Barge-Mounted Mobile Cranes
1.14License Certificates GPortable Gauge Operations
Planning Worksheet 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit
01 45 00.00 10 SD-01 Preconstruction Submittals GContractor Quality Control (CQC)
Plan SD-06 Test Reports
3.10.2Verification Statement 01 57 19 SD-01 Preconstruction Submittals
1.7 G AOFEnvironmental Protection Plan
G AOFStormwater Notice of Intent
1.7.9.1 G AOFDirt and Dust Control Plan
SD-06 Test Reports Inspection Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 26 PAGES
Soo Locks Boiler Replacement
01 57 19 SD-11 Closeout Submittals G AOFStormwater Pollution Prevention
Plan Compliance Notebook G AOFStormwater Notice of Termination
3.7.1 G AOFWaste Determination
Documentation
3.7.3.4 G AOFDisposal Documentation for
Hazardous and Regulated Waste
1.9 G AOFSolid Waste Management Report
3.7.2.1 G AOFSolid Waste Management Report
01 58 00 SD-02 Shop Drawings
1.3.1 G AOFSign Legend Orders
01 78 00 SD-03 Product Data 1.6.1Warranty Management Plan 1.6.5Warranty Tags 3.6Final Cleaning
Spare Parts Data SD-11 Closeout Submittals
GAs-Built Drawings GRecord Drawings
Final Approved Shop Drawings Construction Contract Specifications
01 78 23 SD-10 Operation and Maintenance Data
GO&M Database
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 26 PAGES
Soo Locks Boiler Replacement
01 78 23 3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
01 91 00.15 SD-01 Preconstruction Submittals
1.7 G ECDGCommissioning Firm
1.7.1 G DOLead Commissioning Specialist
1.7.2 G DOTechnical Commissioning
Specialists
1.7 G DOCommissioning Firm's Contract
SD-06 Test Reports
3.1.3 G DODesign Review Report
3.1.2.1 G DOInterim Construction Phase
Commissioning Plan
3.1.2.2 G DOFinal Construction Phase
Commissioning Plan
3.1.5.2 G DOPre-Functional Checklists
1.8Issues Log
3.2 G DOCommissioning Report
G DOPost-Construction Trend Log Report
SD-07 Certificates
1.9 G DOCertificate of Readiness
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 26 PAGES
Soo Locks Boiler Replacement
01 91 00.15 SD-10 Operation and Maintenance Data
3.1.6 G ROTraining Plan
3.1.6 G ROTraining Attendance Rosters
3.1.7 G DOSystems Manual
3.1.8 G DOMaintenance and Service Life
Plans 02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.9Existing Conditions
SD-07 Certificates
1.6 GNotification
SD-11 Closeout Submittals Receipts
03 11 14 SD-02 Shop Drawings GFormwork
SD-03 Product Data Form Materials
03 15 00.00 10 SD-03 Product Data 2.2Preformed Expansion Joint Filler 2.4Sealant
SD-04 Samples 2.4.2Lubricant for Preformed
Compression Seals 2.4.3Field-Molded Type
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 26 PAGES
Soo Locks Boiler Replacement
03 15 00.00 10 3.1.3.3 G EC-DBentonite Waterproofing Membrane
SD-07 Certificates 2.2Preformed Expansion Joint Filler 2.4Sealant
03 15 15 SD-02 Shop Drawings
3.3.2 G ECDSTesting Apparatus
SD-03 Product Data
2.1.1 G ECDSTwo-part Epoxy Grout for
Concrete Anchors SD-07 Certificates
2.1.1Two-part Epoxy Grout for Concrete Anchors
3.4 GQuality Control
03 20 01 SD-02 Shop Drawings
GECDSReinforcement SD-06 Test Reports
GECDSReinforcing Steel 03 31 00 SD-03 Product Data
1.6Batch Plant
3.5 G ECGCuring and Protection
3.3.4 G ECGCold-Weather Placing
3.3.5 G ECGHot-Weather Placing
G ECGPlacing Equipment and Methods
3.2.3 G ECGConstruction Joint Treatment
2.1.6 G ECGEpoxy Resin
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 26 PAGES
Soo Locks Boiler Replacement
03 31 00 1.9 G ECGAggregate Source SD-05 Design Data
1.7 G ECGConcrete Mixture Proportions
SD-06 Test Reports
3.6Tests and Inspections SD-07 Certificates Testing Technicians Waybills and Delivery Tickets
04 01 00 SD-01 Preconstruction Submittals
1.3.1 GECDGQuality Control Plan
1.3.2 GECDGQualifications
SD-03 Product Data
2.2 GECDGMasonry Cleaner
2.3 GECDGWater Repellent
SD-04 Samples
1.4.2 GECDGRepointing Mock-up
1.4.4 GECDGWater Repellent Mock-up
1.4.3 GECDGMasonry Cleaning Mock-Up
04 20 00 SD-03 Product Data
2.2 GECDGConcrete Masonry Units
2.4 GECDGMasonry Mortar
2.9 GECDGFlashing And Accessories
2.10 GECDGSteel Lintels
2.11 GECDGJoint Reinforcement
SD-04 Samples
2.3 GECDGLimestone Veneer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 26 PAGES
Soo Locks Boiler Replacement
05 50 13 SD-02 Shop Drawings GECDSFloor Gratings GECDSAngles and Plates
2.4 GShop Drawings For Ladders
2.4 GInstallation Drawings For Ladders
SD-03 Product Data GECDSFloor Gratings GECDSRoof Walkways
2.4 GLadders
SD-07 Certificates
2.2Certified Mill SD-11 Closeout Submittals
2.1Recycled Content 05 50 14 SD-02 Shop Drawings
1.3.1 GECDSDetail Drawings
2.1.2.1Welding of Structural Steel 2.2.4Structural Steel Welding Repairs
SD-03 Product Data 2.1.2.1.3.1Filler Metal 2.1.5.3Lubricant
SD-06 Test Reports 2.2Tests, Inspections, and
Verifications SD-07 Certificates
1.3.2Welding Qualifications 2.1.2.2Welding of Aluminum
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 26 PAGES
Soo Locks Boiler Replacement
07 54 19 SD-02 Shop Drawings
1.6.1 GECDGDetail Drawings
2.1.5 GRoof Edge Protection
SD-03 Product Data
1.6.1 GECDGRoofing Membrane
2.1.2Accessories 2.1.4Roof Insulation 2.1.3Pre-Manufactured Accessories
2.1.5 GRoof Edge Protection Equipment
SD-07 Certificates 1.5.1Qualification of Manufacturer 1.5.2Qualifications of Applicator 1.10Sample Warranty Certificate
SD-10 Operation and Maintenance Data
GECDGInstructions To Government Personnel
SD-11 Closeout Submittals 1.10Warranty 2.1.1Information Card
07 60 00 SD-02 Shop Drawings
3.1.4 GECDGCopings
07 92 00 SD-03 Product Data
2.1 GECDGSealants
2.4 GECDGBacker Materials
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 26 PAGES
Soo Locks Boiler Replacement
07 92 00 2.1.1 GColor
2.1.2.1 GColor
2.1.2.2 GColor
08 11 13 SD-03 Product Data
2.1 GECDGDoors and Frames
08 39 19 SD-02 Shop Drawings
2.1 GECDGShop Drawings
SD-03 Product Data
2.1 GECDGProduct Data
SD-06 Test Reports
2.1 GECDGQuality Assurance
08 71 00 SD-03 Product Data
2.2 GECDGHardware Items
SD-11 Closeout Submittals
1.5 GCloseout Submittals
08 91 00 SD-02 Shop Drawings 1.4Wall louvers
SD-03 Product Data 2.2Metal Wall Louvers
09 67 23 SD-03 Product Data
2.1 G ECDGFlooring System
SD-04 Samples
1.3.3 GMock-Up
2.1 GResinous Flooring System
SD-07 Certificates
1.3.1.2 GInstaller
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 26 PAGES
Soo Locks Boiler Replacement
09 97 02 SD-03 Product Data
1.5.5.2 GRespirators
1.5.4.1 GVentilation
1.6 GMedical Status
1.8.2 GVisible Emissions Monitoring
SD-04 Samples
2.1 GSpecial Paint Formulas
2.3.3 GSolvent and Thinners
SD-07 Certificates
1.3 GQualifications
1.3.1 GQualified Painting Contractor
1.3.2Coating Thickness Gage
Qualification 22 00 00 SD-02 Shop Drawings
3.5.1 GPlumbing System
SD-03 Product Data
1.5.1Welding
3.2 GVibration-Absorbing Features
SD-06 Test Reports Tests, Flushing and Disinfection;
G
SD-11 Closeout Submittals
1.3.1 GQualified Permanent Service
Organizations 22 07 19.00 40 SD-02 Shop Drawings
3.1 GInstallation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 26 PAGES
Soo Locks Boiler Replacement
22 07 19.00 40 SD-03 Product Data
2.3 GAdhesives
2.3 GCoatings
2.3 GInsulating Cement
2.3 GInsulation Materials
2.3 GJacketing
2.3 GTape
SD-08 Manufacturer’s Instructions
3.1 GInstallation Manual
SD-11 Closeout Submittals 3.4Record Drawings
22 31 00 SD-02 Shop Drawings 3.2Installation
SD-03 Product Data
2.2 GSoftening Equipment
SD-06 Test Reports 2.2Softening Equipment 3.4.2Piping
SD-10 Operation and Maintenance Data
3.3.2 GOperating and Maintenance
Instructions
3.3.2Field Instructions 23 00 00 SD-02 Shop Drawings
1.4.4 GDetail Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 26 PAGES
Soo Locks Boiler Replacement
23 00 00 2.8.5Air Vents, Penthouses, and Goosenecks
2.9.1.1In-Line Centrifugal Fans 2.9.1.2Centrifugal Type Power Roof
Ventilators
2.1.1 GLouvers
2.1.1Registers And Grills 2.1.1Duct Access Doors 2.1.1Duct Connectors 2.1.1Insulated Nonmetalic Flexible
Duct Runouts 2.1.1Metallic Flexible Ducting
SD-06 Test Reports
3.10 GPerformance Tests
SD-07 Certificates Bolts
SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation
Instructions SD-10 Operation and Maintenance Data
3.12.1 GOperation and Maintenance
Manuals
2.9.1.1 GIn-Line Centrifugal Fans
2.9.1.2 GCentrifugal Type Power Roof
Ventilators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 26 PAGES
Soo Locks Boiler Replacement
23 05 15 SD-02 Shop Drawings
1.2 GConnection Diagrams
SD-03 Product Data
2.1.1 GHeat Trace Monitoring Panel
2.1.2 GHeat Trace Tape
SD-10 Operation and Maintenance Data
3.3 GOperation and Maintenance
Manuals
23 05 93 SD-01 Preconstruction Submittals
1.3.3 GRecords of Existing Conditions
1.5.1 GTAB Agency and Personnel
Qualifications
1.5.3.1 GTAB Firm
1.5.3.2 GTab Specialist
SD-02 Shop Drawings
1.3.3 GTAB Schematic Drawings and
Report Forms SD-03 Product Data
1.3 GEquipment and Performance
Data
1.5.3.4 GTAB Related HVAC Submittals
1.5.2 GTAB Procedures
1.5.2 GCalibration
1.5.4 GTAB Execution
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 26 PAGES
Soo Locks Boiler Replacement
23 05 93 1.5.5.1 GTab Report SD-07 Certificates
1.5.3.1 GTAB Firm
23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
3.2Pipe Insulation Systems
SD-03 Product Data
3.2 GPipe Insulation Systems
SD-04 Samples
2.2.1.1 GThermal Insulation
SD-08 Manufacturer’s Instructions
3.2 GPipe Insulation Systems
23 11 25 SD-02 Shop Drawings
2.2 GGas Piping System
SD-03 Product Data
2.2 GGas Piping System
2.1 GPipe Coating Materials
2.3 GValves
2.2.4 GWarning and Identification Tape
SD-06 Test Reports
3.9 GTesting
3.9.1 GPressure Tests
3.9.2 GTest with Gas
SD-07 Certificates
1.5.1 GWelders Procedures and
Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 26 PAGES
Soo Locks Boiler Replacement
23 11 25 1.5.1 GAssigned Number, Letter, or Symbol
SD-08 Manufacturer’s Instructions
2.1 GPipe Coating Materials
23 22 23.00 40 SD-02 Shop Drawings
3.1 GInstallation Drawings
SD-03 Product Data
2.1.1.1 GCondensate Pumps
SD-06 Test Reports
3.2.1.2 GFinal Test Reports
SD-07 Certificates
3.1 GProduct Installations
23 22 26.00 20 SD-02 Shop Drawings
2.1.1.1 GPiping Plan From The BIM Model
SD-03 Product Data
2.1.6 GValves
2.1.6.4 GValve Operating Mechanism;
2.1.9.2 GTraps
2.1.9.3 GStrainers
GExpansion Joints 2.1.8Instrumentation
SD-06 Test Reports 2.1.1Steam Piping
Copper Tubing 2.1.6Valves
Expansion Joints
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 26 PAGES
Soo Locks Boiler Replacement
23 22 26.00 20 2.1.8Instrumentation 2.1Pipe and Pipe System
SD-07 Certificates 1.4.1Welding Procedure 1.4.2Welder's Performance
Qualification Record 1.4.2List of Welders and Welder's
Symbols 23 52 49.00 20 SD-01 Preconstruction Submittals
2.5.5.1 GChemical Treatment Installation
Plan
1.5.1Finalized Purchase Agreements SD-02 Shop Drawings
1.5.3 GSteam Boiler System
SD-03 Product Data
2.5.3 GMedia Filter System
2.2 GBoilers
SD-05 Design Data 1.2.1Heating Surface and Volume
Measurements 1.2.1Heat Release Calculations 1.2.1Performance Data at Minimum, 25 Percent, 50 Percent, 75 Percent, and 100 Percent Load
1.2.2 GSeismic Design Calculations
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 26 PAGES
Soo Locks Boiler Replacement
23 52 49.00 20 3.2Boiler System Start-Up Tests SD-07 Certificates
2.2Boilers
2.2.8 GManufacturers Standard
Warranty SD-10 Operation and Maintenance Data
2.2Boilers 23 82 46.00 40 SD-02 Shop Drawings
1.2.1Fabrication Drawings SD-03 Product Data
2.1 GPerformance Data
2.1 GElectric Unit Heaters
2.2.1Heating Element 3.1.1Casings 2.2.3Propellers and Motors
SD-08 Manufacturer’s Instructions 1.2.1Manufacturer's Instructions
25 05 11.00 28 SD-01 Preconstruction Submittals
1.8.1 G CSAccount Level Permissions
Listing (Encrypted)
1.3.1 G CSSensitive Data Protection Plan
(Encrypted) SD-02 Shop Drawings
2.4 G CSNetwork Diagram (Encrypted)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 26 PAGES
Soo Locks Boiler Replacement
25 05 11.00 28 2.4 G CSSystem Data Flow Diagram (Encrypted)
SD-03 Product Data
2.1 G CSPre-Design Software Listing
(Encrypted)
2.2 G CSPre-Design Hardware Listing
(Encrypted)
2.1 G CSComplete Software Listing
(Encrypted)
2.2 G CSComplete Hardware Listing
(Encrypted)
2.3 G CSPorts, Protocols, and Services
List (Encrypted)
1.12 G CSCertificate Protection Status
(Encrypted)
2.7.1 I CSBackup Software (Encrypted)
SD-05 Design Data
1.13 G CSNetwork Configuration Files
(Encrypted)
3.2 G CSDeviations from the STIGs
(Encrypted) SD-06 Test Reports
3.2 G CSSCAP Tool Scan (Encrypted)
2.1.1 G CSAntivirus/Antimalware Scan
(Encrypted) SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 26 PAGES
Soo Locks Boiler Replacement
25 05 11.00 28 1.5 G CSContractor Personnel Qualifications
SD-11 Closeout Submittals
1.7 G CSVulnerability Resolution Report
(Encrypted)
2.5 G CSComprehensive
Password/Passphrase List (Encrypted)
2.6 G CSComprehensive Account List
(Encrypted)
2.7 G CSInitial Backups (Encrypted)
G CSBIOS Protection
Password/Passphrase List (Encrypted)
26 05 73.13 08 SD-06 Test Reports
3.2 G AOFArc Flash Analysis Report
SD-11 Closeout Submittals
1.5 GSKM Working Files
26 20 00 SD-02 Shop Drawings
2.12 GPanelboards
2.13 GTransformers
3.1.2.8 GCable trays
2.22 GWireways
SD-03 Product Data
2.11 GReceptacles
2.12.3 GCircuit breakers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 26 PAGES
Soo Locks Boiler Replacement
26 20 00 2.9 GSwitches
2.13 GTransformers
2.15 GManual motor starters
2.23 GSurge protective devices
GMeter Base Only SD-05 Design Data
3.1.6.1 GMarking Strips
3.1.6.1 GMarking Strips
SD-06 Test Reports 3.5.2600-volt wiring test 3.5.5Grounding system test 3.5.3Transformer tests 3.5.4Ground-fault receptacle test
SD-07 Certificates 2.10Fuses
SD-09 Manufacturer’s Field Reports
2.25.1Transformer factory tests SD-10 Operation and Maintenance Data
1.5.1 GElectrical Systems
26 24 19.00 40 SD-01 Preconstruction Submittals
1.5.1Finalized Purchase Agreements SD-02 Shop Drawings
2.3.4.2 GDrawings
2.3.2.1 GShop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 26 PAGES
Soo Locks Boiler Replacement
26 24 19.00 40 2.4 GMotor Control Center
3.2 GSwitchboards
SD-03 Product Data
1.6 GEquipment
SD-06 Test Reports
2.5 GFactory Test Procedures
2.5.1.4 GFactory Test Results
SD-07 Certificates
2.4 GMotor Control Center
SD-08 Manufacturer’s Instructions
3.3 GMotor Control Units
3.3 GProtective Devices
SD-11 Closeout Submittals
3.3 GWarranty
26 51 00 SD-03 Product Data 2.3DRIVERS, BALLASTS and
GENERATORS
2.2 GLuminaires
1.6.1 GLED Luminaire Warranty
2.6.1 GExit Signs
2.6.2 GLED Emergency Drivers
1.5.1 GLuminaire Design Data
2.4 GLight Sources
27 10 00 SD-03 Product Data
2.3 GTelecommunications cabling
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 26 PAGES
Soo Locks Boiler Replacement
27 10 00 2.4 GTelecommunications outlet/connector assemblies
SD-06 Test Reports
3.5.1 GTelecommunications Cabling
Testing SD-07 Certificates
1.6.2.1 GTelecommunications Contractor
1.6.2.2 GKey Personnel
1.6.2.3 GManufacturer Qualifications
SD-10 Operation and Maintenance Data
1.10.1 GTelecommunications cabling and
pathway system
SD-11 Closeout Submittals
1.10.2 GRecord Documentation
28 10 05 SD-02 Shop Drawings
1.3.3.1 GESS Components
1.3.3.2 GOverall System Schematic
SD-03 Product Data
2.3.3 GDetection Sensors
GBatteries
2.7 GComponent Enclosure
SD-07 Certificates
1.3.4.1 GContractor Qualifications
1.3.4.2 GInstructor Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 26 PAGES
Soo Locks Boiler Replacement
28 10 05 SD-10 Operation and Maintenance Data
3.5.1 GTraining Plan
3.5 GTraining Content
SD-11 Closeout Submittals
1.5 GAs-Built Drawings
28 31 64.00 10 SD-03 Product Data 3.6Training 3.7Testing
2.1.2 GLow Battery Voltage
SD-06 Test Reports 3.7Testing
SD-07 Certificates 2.2Equipment 1.3.1Qualifications
SD-10 Operation and Maintenance Data
3.6Operating and Maintenance Instructions
31 00 00 SD-01 Preconstruction Submittals G ECGContractor Furnished Borrow
Area(s) Disposal of Materials
SD-06 Test Reports Testing
32 11 23 SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 26 PAGES
Soo Locks Boiler Replacement
32 11 23 G ECGLaboratory Test;
G ECGField Testing;
G ECDNEnvironmental Sampling Test
Results;
SD-07 Certificates Waybills and Delivery Tickets
32 13 13 SD-01 Preconstruction Submittals
1.6 G ECGAggregate Source
1.3.1 G ECGCold Weather Placing
1.3.2 G ECGHot Weather Placing
SD-03 Product Data
2.6 G ECGField-Molded Sealants
2.4 G ECGPremolded Expansion Joint Filler
Strips
2.5 G ECGBacker Rod
2.7Form Materials 2.7.3Form Releasing Agent
2.3.2 G ECGCuring Compound
Construction Joint Materials SD-05 Design Data
1.5 G ECGConcrete Mixture Proportions
2.12 G ECGSelf-Consolidating Mixtures
3.6.4 G ECGConstruction Joints
SD-06 Test Reports
3.8 G ECGField Quality Control
33 11 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 26 PAGES
Soo Locks Boiler Replacement
33 11 00 2.1.1 GPiping Materials
2.1.2.3 GValve Boxes
SD-07 Certificates 3.1.1.1Pipe, Fittings, Joints and
Couplings SD-08 Manufacturer’s Instructions
1.4Delivery Storage and Handling 40 95 00 SD-02 Shop Drawings
3.1.1Installation 3.1.1Wiring
SD-03 Product Data 2.6Control Drawings 3.5.1Performance Verification Test
(PVT)
SD-06 Test Reports
3.5.1Testing, Adjusting and Commissioning
3.5.1Performance Verification Test(PVT)
3.7.2Endurance Test SD-10 Operation and Maintenance Data
3.7 GTraining Manual
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR