SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 26 PAGES

W911XK19R0017

Soo Locks Boiler Replacement

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.4.3 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.9 GSubmittal Register

01 35 13 SD-01 Preconstruction Submittals GConstruction Site Plan GUtility Location Plan GUtility Location Findings GSalvage Plan GPhoto Work Plan GPrework Photographs

SD-11 Closeout Submittals GConstruction Photographs GCompletion Photographs

GPHOTO DATABASE

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

1.8Activity Hazard Analysis (AHA)

SD-06 Test Reports 1.12.3LHE Inspection Reports

1.4 GMonthly Exposure Reports

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 26 PAGES

Soo Locks Boiler Replacement

01 35 26 Contractor Safety Self-Evaluation Checklist

1.6.1.4Crane Operators/Riggers

1.7.2.2 GStandard Lift Plan

1.7.2.3 GCritical Lift Plan

1.7.2.4 GNaval Architecture Analysis

1.12.4Certificate of Compliance

Third Party Certification of Floating Cranes and Barge-Mounted Mobile Cranes

1.14License Certificates GPortable Gauge Operations

Planning Worksheet 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit

01 45 00.00 10 SD-01 Preconstruction Submittals GContractor Quality Control (CQC)

Plan SD-06 Test Reports

3.10.2Verification Statement 01 57 19 SD-01 Preconstruction Submittals

1.7 G AOFEnvironmental Protection Plan

G AOFStormwater Notice of Intent

1.7.9.1 G AOFDirt and Dust Control Plan

SD-06 Test Reports Inspection Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 26 PAGES

Soo Locks Boiler Replacement

01 57 19 SD-11 Closeout Submittals G AOFStormwater Pollution Prevention

Plan Compliance Notebook G AOFStormwater Notice of Termination

3.7.1 G AOFWaste Determination

Documentation

3.7.3.4 G AOFDisposal Documentation for

Hazardous and Regulated Waste

1.9 G AOFSolid Waste Management Report

3.7.2.1 G AOFSolid Waste Management Report

01 58 00 SD-02 Shop Drawings

1.3.1 G AOFSign Legend Orders

01 78 00 SD-03 Product Data 1.6.1Warranty Management Plan 1.6.5Warranty Tags 3.6Final Cleaning

Spare Parts Data SD-11 Closeout Submittals

GAs-Built Drawings GRecord Drawings

Final Approved Shop Drawings Construction Contract Specifications

01 78 23 SD-10 Operation and Maintenance Data

GO&M Database

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 26 PAGES

Soo Locks Boiler Replacement

01 78 23 3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

01 91 00.15 SD-01 Preconstruction Submittals

1.7 G ECDGCommissioning Firm

1.7.1 G DOLead Commissioning Specialist

1.7.2 G DOTechnical Commissioning

Specialists

1.7 G DOCommissioning Firm's Contract

SD-06 Test Reports

3.1.3 G DODesign Review Report

3.1.2.1 G DOInterim Construction Phase

Commissioning Plan

3.1.2.2 G DOFinal Construction Phase

Commissioning Plan

3.1.5.2 G DOPre-Functional Checklists

1.8Issues Log

3.2 G DOCommissioning Report

G DOPost-Construction Trend Log Report

SD-07 Certificates

1.9 G DOCertificate of Readiness

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 26 PAGES

Soo Locks Boiler Replacement

01 91 00.15 SD-10 Operation and Maintenance Data

3.1.6 G ROTraining Plan

3.1.6 G ROTraining Attendance Rosters

3.1.7 G DOSystems Manual

3.1.8 G DOMaintenance and Service Life

Plans 02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

1.9Existing Conditions

SD-07 Certificates

1.6 GNotification

SD-11 Closeout Submittals Receipts

03 11 14 SD-02 Shop Drawings GFormwork

SD-03 Product Data Form Materials

03 15 00.00 10 SD-03 Product Data 2.2Preformed Expansion Joint Filler 2.4Sealant

SD-04 Samples 2.4.2Lubricant for Preformed

Compression Seals 2.4.3Field-Molded Type

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 26 PAGES

Soo Locks Boiler Replacement

03 15 00.00 10 3.1.3.3 G EC-DBentonite Waterproofing Membrane

SD-07 Certificates 2.2Preformed Expansion Joint Filler 2.4Sealant

03 15 15 SD-02 Shop Drawings

3.3.2 G ECDSTesting Apparatus

SD-03 Product Data

2.1.1 G ECDSTwo-part Epoxy Grout for

Concrete Anchors SD-07 Certificates

2.1.1Two-part Epoxy Grout for Concrete Anchors

3.4 GQuality Control

03 20 01 SD-02 Shop Drawings

GECDSReinforcement SD-06 Test Reports

GECDSReinforcing Steel 03 31 00 SD-03 Product Data

1.6Batch Plant

3.5 G ECGCuring and Protection

3.3.4 G ECGCold-Weather Placing

3.3.5 G ECGHot-Weather Placing

G ECGPlacing Equipment and Methods

3.2.3 G ECGConstruction Joint Treatment

2.1.6 G ECGEpoxy Resin

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 26 PAGES

Soo Locks Boiler Replacement

03 31 00 1.9 G ECGAggregate Source SD-05 Design Data

1.7 G ECGConcrete Mixture Proportions

SD-06 Test Reports

3.6Tests and Inspections SD-07 Certificates Testing Technicians Waybills and Delivery Tickets

04 01 00 SD-01 Preconstruction Submittals

1.3.1 GECDGQuality Control Plan

1.3.2 GECDGQualifications

SD-03 Product Data

2.2 GECDGMasonry Cleaner

2.3 GECDGWater Repellent

SD-04 Samples

1.4.2 GECDGRepointing Mock-up

1.4.4 GECDGWater Repellent Mock-up

1.4.3 GECDGMasonry Cleaning Mock-Up

04 20 00 SD-03 Product Data

2.2 GECDGConcrete Masonry Units

2.4 GECDGMasonry Mortar

2.9 GECDGFlashing And Accessories

2.10 GECDGSteel Lintels

2.11 GECDGJoint Reinforcement

SD-04 Samples

2.3 GECDGLimestone Veneer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 26 PAGES

Soo Locks Boiler Replacement

05 50 13 SD-02 Shop Drawings GECDSFloor Gratings GECDSAngles and Plates

2.4 GShop Drawings For Ladders

2.4 GInstallation Drawings For Ladders

SD-03 Product Data GECDSFloor Gratings GECDSRoof Walkways

2.4 GLadders

SD-07 Certificates

2.2Certified Mill SD-11 Closeout Submittals

2.1Recycled Content 05 50 14 SD-02 Shop Drawings

1.3.1 GECDSDetail Drawings

2.1.2.1Welding of Structural Steel 2.2.4Structural Steel Welding Repairs

SD-03 Product Data 2.1.2.1.3.1Filler Metal 2.1.5.3Lubricant

SD-06 Test Reports 2.2Tests, Inspections, and

Verifications SD-07 Certificates

1.3.2Welding Qualifications 2.1.2.2Welding of Aluminum

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 26 PAGES

Soo Locks Boiler Replacement

07 54 19 SD-02 Shop Drawings

1.6.1 GECDGDetail Drawings

2.1.5 GRoof Edge Protection

SD-03 Product Data

1.6.1 GECDGRoofing Membrane

2.1.2Accessories 2.1.4Roof Insulation 2.1.3Pre-Manufactured Accessories

2.1.5 GRoof Edge Protection Equipment

SD-07 Certificates 1.5.1Qualification of Manufacturer 1.5.2Qualifications of Applicator 1.10Sample Warranty Certificate

SD-10 Operation and Maintenance Data

GECDGInstructions To Government Personnel

SD-11 Closeout Submittals 1.10Warranty 2.1.1Information Card

07 60 00 SD-02 Shop Drawings

3.1.4 GECDGCopings

07 92 00 SD-03 Product Data

2.1 GECDGSealants

2.4 GECDGBacker Materials

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 26 PAGES

Soo Locks Boiler Replacement

07 92 00 2.1.1 GColor

2.1.2.1 GColor

2.1.2.2 GColor

08 11 13 SD-03 Product Data

2.1 GECDGDoors and Frames

08 39 19 SD-02 Shop Drawings

2.1 GECDGShop Drawings

SD-03 Product Data

2.1 GECDGProduct Data

SD-06 Test Reports

2.1 GECDGQuality Assurance

08 71 00 SD-03 Product Data

2.2 GECDGHardware Items

SD-11 Closeout Submittals

1.5 GCloseout Submittals

08 91 00 SD-02 Shop Drawings 1.4Wall louvers

SD-03 Product Data 2.2Metal Wall Louvers

09 67 23 SD-03 Product Data

2.1 G ECDGFlooring System

SD-04 Samples

1.3.3 GMock-Up

2.1 GResinous Flooring System

SD-07 Certificates

1.3.1.2 GInstaller

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 26 PAGES

Soo Locks Boiler Replacement

09 97 02 SD-03 Product Data

1.5.5.2 GRespirators

1.5.4.1 GVentilation

1.6 GMedical Status

1.8.2 GVisible Emissions Monitoring

SD-04 Samples

2.1 GSpecial Paint Formulas

2.3.3 GSolvent and Thinners

SD-07 Certificates

1.3 GQualifications

1.3.1 GQualified Painting Contractor

1.3.2Coating Thickness Gage

Qualification 22 00 00 SD-02 Shop Drawings

3.5.1 GPlumbing System

SD-03 Product Data

1.5.1Welding

3.2 GVibration-Absorbing Features

SD-06 Test Reports Tests, Flushing and Disinfection;

G

SD-11 Closeout Submittals

1.3.1 GQualified Permanent Service

Organizations 22 07 19.00 40 SD-02 Shop Drawings

3.1 GInstallation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 26 PAGES

Soo Locks Boiler Replacement

22 07 19.00 40 SD-03 Product Data

2.3 GAdhesives

2.3 GCoatings

2.3 GInsulating Cement

2.3 GInsulation Materials

2.3 GJacketing

2.3 GTape

SD-08 Manufacturer’s Instructions

3.1 GInstallation Manual

SD-11 Closeout Submittals 3.4Record Drawings

22 31 00 SD-02 Shop Drawings 3.2Installation

SD-03 Product Data

2.2 GSoftening Equipment

SD-06 Test Reports 2.2Softening Equipment 3.4.2Piping

SD-10 Operation and Maintenance Data

3.3.2 GOperating and Maintenance

Instructions

3.3.2Field Instructions 23 00 00 SD-02 Shop Drawings

1.4.4 GDetail Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 26 PAGES

Soo Locks Boiler Replacement

23 00 00 2.8.5Air Vents, Penthouses, and Goosenecks

2.9.1.1In-Line Centrifugal Fans 2.9.1.2Centrifugal Type Power Roof

Ventilators

2.1.1 GLouvers

2.1.1Registers And Grills 2.1.1Duct Access Doors 2.1.1Duct Connectors 2.1.1Insulated Nonmetalic Flexible

Duct Runouts 2.1.1Metallic Flexible Ducting

SD-06 Test Reports

3.10 GPerformance Tests

SD-07 Certificates Bolts

SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation

Instructions SD-10 Operation and Maintenance Data

3.12.1 GOperation and Maintenance

Manuals

2.9.1.1 GIn-Line Centrifugal Fans

2.9.1.2 GCentrifugal Type Power Roof

Ventilators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 26 PAGES

Soo Locks Boiler Replacement

23 05 15 SD-02 Shop Drawings

1.2 GConnection Diagrams

SD-03 Product Data

2.1.1 GHeat Trace Monitoring Panel

2.1.2 GHeat Trace Tape

SD-10 Operation and Maintenance Data

3.3 GOperation and Maintenance

Manuals

23 05 93 SD-01 Preconstruction Submittals

1.3.3 GRecords of Existing Conditions

1.5.1 GTAB Agency and Personnel

Qualifications

1.5.3.1 GTAB Firm

1.5.3.2 GTab Specialist

SD-02 Shop Drawings

1.3.3 GTAB Schematic Drawings and

Report Forms SD-03 Product Data

1.3 GEquipment and Performance

Data

1.5.3.4 GTAB Related HVAC Submittals

1.5.2 GTAB Procedures

1.5.2 GCalibration

1.5.4 GTAB Execution

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 26 PAGES

Soo Locks Boiler Replacement

23 05 93 1.5.5.1 GTab Report SD-07 Certificates

1.5.3.1 GTAB Firm

23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

3.2Pipe Insulation Systems

SD-03 Product Data

3.2 GPipe Insulation Systems

SD-04 Samples

2.2.1.1 GThermal Insulation

SD-08 Manufacturer’s Instructions

3.2 GPipe Insulation Systems

23 11 25 SD-02 Shop Drawings

2.2 GGas Piping System

SD-03 Product Data

2.2 GGas Piping System

2.1 GPipe Coating Materials

2.3 GValves

2.2.4 GWarning and Identification Tape

SD-06 Test Reports

3.9 GTesting

3.9.1 GPressure Tests

3.9.2 GTest with Gas

SD-07 Certificates

1.5.1 GWelders Procedures and

Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 26 PAGES

Soo Locks Boiler Replacement

23 11 25 1.5.1 GAssigned Number, Letter, or Symbol

SD-08 Manufacturer’s Instructions

2.1 GPipe Coating Materials

23 22 23.00 40 SD-02 Shop Drawings

3.1 GInstallation Drawings

SD-03 Product Data

2.1.1.1 GCondensate Pumps

SD-06 Test Reports

3.2.1.2 GFinal Test Reports

SD-07 Certificates

3.1 GProduct Installations

23 22 26.00 20 SD-02 Shop Drawings

2.1.1.1 GPiping Plan From The BIM Model

SD-03 Product Data

2.1.6 GValves

2.1.6.4 GValve Operating Mechanism;

2.1.9.2 GTraps

2.1.9.3 GStrainers

GExpansion Joints 2.1.8Instrumentation

SD-06 Test Reports 2.1.1Steam Piping

Copper Tubing 2.1.6Valves

Expansion Joints

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 26 PAGES

Soo Locks Boiler Replacement

23 22 26.00 20 2.1.8Instrumentation 2.1Pipe and Pipe System

SD-07 Certificates 1.4.1Welding Procedure 1.4.2Welder's Performance

Qualification Record 1.4.2List of Welders and Welder's

Symbols 23 52 49.00 20 SD-01 Preconstruction Submittals

2.5.5.1 GChemical Treatment Installation

Plan

1.5.1Finalized Purchase Agreements SD-02 Shop Drawings

1.5.3 GSteam Boiler System

SD-03 Product Data

2.5.3 GMedia Filter System

2.2 GBoilers

SD-05 Design Data 1.2.1Heating Surface and Volume

Measurements 1.2.1Heat Release Calculations 1.2.1Performance Data at Minimum, 25 Percent, 50 Percent, 75 Percent, and 100 Percent Load

1.2.2 GSeismic Design Calculations

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 26 PAGES

Soo Locks Boiler Replacement

23 52 49.00 20 3.2Boiler System Start-Up Tests SD-07 Certificates

2.2Boilers

2.2.8 GManufacturers Standard

Warranty SD-10 Operation and Maintenance Data

2.2Boilers 23 82 46.00 40 SD-02 Shop Drawings

1.2.1Fabrication Drawings SD-03 Product Data

2.1 GPerformance Data

2.1 GElectric Unit Heaters

2.2.1Heating Element 3.1.1Casings 2.2.3Propellers and Motors

SD-08 Manufacturer’s Instructions 1.2.1Manufacturer's Instructions

25 05 11.00 28 SD-01 Preconstruction Submittals

1.8.1 G CSAccount Level Permissions

Listing (Encrypted)

1.3.1 G CSSensitive Data Protection Plan

(Encrypted) SD-02 Shop Drawings

2.4 G CSNetwork Diagram (Encrypted)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 26 PAGES

Soo Locks Boiler Replacement

25 05 11.00 28 2.4 G CSSystem Data Flow Diagram (Encrypted)

SD-03 Product Data

2.1 G CSPre-Design Software Listing

(Encrypted)

2.2 G CSPre-Design Hardware Listing

(Encrypted)

2.1 G CSComplete Software Listing

(Encrypted)

2.2 G CSComplete Hardware Listing

(Encrypted)

2.3 G CSPorts, Protocols, and Services

List (Encrypted)

1.12 G CSCertificate Protection Status

(Encrypted)

2.7.1 I CSBackup Software (Encrypted)

SD-05 Design Data

1.13 G CSNetwork Configuration Files

(Encrypted)

3.2 G CSDeviations from the STIGs

(Encrypted) SD-06 Test Reports

3.2 G CSSCAP Tool Scan (Encrypted)

2.1.1 G CSAntivirus/Antimalware Scan

(Encrypted) SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 26 PAGES

Soo Locks Boiler Replacement

25 05 11.00 28 1.5 G CSContractor Personnel Qualifications

SD-11 Closeout Submittals

1.7 G CSVulnerability Resolution Report

(Encrypted)

2.5 G CSComprehensive

Password/Passphrase List (Encrypted)

2.6 G CSComprehensive Account List

(Encrypted)

2.7 G CSInitial Backups (Encrypted)

G CSBIOS Protection

Password/Passphrase List (Encrypted)

26 05 73.13 08 SD-06 Test Reports

3.2 G AOFArc Flash Analysis Report

SD-11 Closeout Submittals

1.5 GSKM Working Files

26 20 00 SD-02 Shop Drawings

2.12 GPanelboards

2.13 GTransformers

3.1.2.8 GCable trays

2.22 GWireways

SD-03 Product Data

2.11 GReceptacles

2.12.3 GCircuit breakers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 26 PAGES

Soo Locks Boiler Replacement

26 20 00 2.9 GSwitches

2.13 GTransformers

2.15 GManual motor starters

2.23 GSurge protective devices

GMeter Base Only SD-05 Design Data

3.1.6.1 GMarking Strips

3.1.6.1 GMarking Strips

SD-06 Test Reports 3.5.2600-volt wiring test 3.5.5Grounding system test 3.5.3Transformer tests 3.5.4Ground-fault receptacle test

SD-07 Certificates 2.10Fuses

SD-09 Manufacturer’s Field Reports

2.25.1Transformer factory tests SD-10 Operation and Maintenance Data

1.5.1 GElectrical Systems

26 24 19.00 40 SD-01 Preconstruction Submittals

1.5.1Finalized Purchase Agreements SD-02 Shop Drawings

2.3.4.2 GDrawings

2.3.2.1 GShop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 26 PAGES

Soo Locks Boiler Replacement

26 24 19.00 40 2.4 GMotor Control Center

3.2 GSwitchboards

SD-03 Product Data

1.6 GEquipment

SD-06 Test Reports

2.5 GFactory Test Procedures

2.5.1.4 GFactory Test Results

SD-07 Certificates

2.4 GMotor Control Center

SD-08 Manufacturer’s Instructions

3.3 GMotor Control Units

3.3 GProtective Devices

SD-11 Closeout Submittals

3.3 GWarranty

26 51 00 SD-03 Product Data 2.3DRIVERS, BALLASTS and

GENERATORS

2.2 GLuminaires

1.6.1 GLED Luminaire Warranty

2.6.1 GExit Signs

2.6.2 GLED Emergency Drivers

1.5.1 GLuminaire Design Data

2.4 GLight Sources

27 10 00 SD-03 Product Data

2.3 GTelecommunications cabling

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 26 PAGES

Soo Locks Boiler Replacement

27 10 00 2.4 GTelecommunications outlet/connector assemblies

SD-06 Test Reports

3.5.1 GTelecommunications Cabling

Testing SD-07 Certificates

1.6.2.1 GTelecommunications Contractor

1.6.2.2 GKey Personnel

1.6.2.3 GManufacturer Qualifications

SD-10 Operation and Maintenance Data

1.10.1 GTelecommunications cabling and

pathway system

SD-11 Closeout Submittals

1.10.2 GRecord Documentation

28 10 05 SD-02 Shop Drawings

1.3.3.1 GESS Components

1.3.3.2 GOverall System Schematic

SD-03 Product Data

2.3.3 GDetection Sensors

GBatteries

2.7 GComponent Enclosure

SD-07 Certificates

1.3.4.1 GContractor Qualifications

1.3.4.2 GInstructor Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 26 PAGES

Soo Locks Boiler Replacement

28 10 05 SD-10 Operation and Maintenance Data

3.5.1 GTraining Plan

3.5 GTraining Content

SD-11 Closeout Submittals

1.5 GAs-Built Drawings

28 31 64.00 10 SD-03 Product Data 3.6Training 3.7Testing

2.1.2 GLow Battery Voltage

SD-06 Test Reports 3.7Testing

SD-07 Certificates 2.2Equipment 1.3.1Qualifications

SD-10 Operation and Maintenance Data

3.6Operating and Maintenance Instructions

31 00 00 SD-01 Preconstruction Submittals G ECGContractor Furnished Borrow

Area(s) Disposal of Materials

SD-06 Test Reports Testing

32 11 23 SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 26 PAGES

Soo Locks Boiler Replacement

32 11 23 G ECGLaboratory Test;

G ECGField Testing;

G ECDNEnvironmental Sampling Test

Results;

SD-07 Certificates Waybills and Delivery Tickets

32 13 13 SD-01 Preconstruction Submittals

1.6 G ECGAggregate Source

1.3.1 G ECGCold Weather Placing

1.3.2 G ECGHot Weather Placing

SD-03 Product Data

2.6 G ECGField-Molded Sealants

2.4 G ECGPremolded Expansion Joint Filler

Strips

2.5 G ECGBacker Rod

2.7Form Materials 2.7.3Form Releasing Agent

2.3.2 G ECGCuring Compound

Construction Joint Materials SD-05 Design Data

1.5 G ECGConcrete Mixture Proportions

2.12 G ECGSelf-Consolidating Mixtures

3.6.4 G ECGConstruction Joints

SD-06 Test Reports

3.8 G ECGField Quality Control

33 11 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 26 PAGES

Soo Locks Boiler Replacement

33 11 00 2.1.1 GPiping Materials

2.1.2.3 GValve Boxes

SD-07 Certificates 3.1.1.1Pipe, Fittings, Joints and

Couplings SD-08 Manufacturer’s Instructions

1.4Delivery Storage and Handling 40 95 00 SD-02 Shop Drawings

3.1.1Installation 3.1.1Wiring

SD-03 Product Data 2.6Control Drawings 3.5.1Performance Verification Test

(PVT)

SD-06 Test Reports

3.5.1Testing, Adjusting and Commissioning

3.5.1Performance Verification Test(PVT)

3.7.2Endurance Test SD-10 Operation and Maintenance Data

3.7 GTraining Manual

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR