W56MES90425202

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT: Superior Entry North Pier, Duluth-Superior Harbor, St. Louis County, MN

PURPOSE: The purpose of this amendment is to:

1. Provide the Pre-Bid and Site Visit Minutes.

2. The closing date for questions/Request for Information remains August 7, 2019. The bid due date is extended to August 20, 2019.

3. Revise the Specifications in accordance w ith the Summary of Changes.

4. Update DFARS 252.236-7001, Contract Draw ings and Specifications.

5. Update Wage Determination MN20190040.

6. FAR 52.252-3, Alterations in Solicitation is updated.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 21

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911XK19B0017

X 9B. DATED (SEE ITEM 11)

12-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Aug-2019

CODE

CONTRACTING BRANCH

USACE DETROIT DISTRICT

477 MICHIGAN AVENUE, 7TH FLOOR

DETROIT MI 48226-4523

965416 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911XK19B0017

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

PRE-BID/SITE VISIT MTG MINUTES

CELRN-RC-N 6 August 2019

MEMORANDUM FOR RECORD

SUBJECT: Minutes for Superior Entry North Pier Repair (W911XK19B0017)

1. Purpose: To summarize the Pre-Bid Meeting and Site Visit held on 31 July 2019.

2. Attendees:

Government:

Ms. Melissa Bosman, CELRE-OTS Mr. Steve Brossart, CELRE-EOU-C Mr. Joshua Hachey, CELRE-EOT Mr. Sean Strasser, CELRE-EOU-C Mr. Corey Weston, CELRE-EOU-C

Contractors:

Alliance Steel Construction Inc., Mr. Fred Paine Great Lakes Dock and Materials, L.L.C., Mr. Joseph Bailey J.F. Brennan Company, Inc., Mr. Nick Patterson J.F. Brennan Company, Inc., Mr. Zach Pontzer J.F. Brennan Company, Inc., Mr. Mike Rice Kraemer North America, Ms. Emy Dewitt Lunda Construction Company, Mr. Joe Larson Luedtke, Mr. Kurt Luedtke Marine Tech, Mr. Ted Smith Mavo Concrete Sawing Services, Inc., Mr. Nathan Hathway Mavo Concrete Sawing Services, Inc., Mr. Jake Viebahn Michels Corporation, Mr. Ryan Johnson Morrish-Wallace Construction, Inc., d/b/a Ryba Marine Construction Co., Mr. Thomas Bajko Nelson Industrial Catings, Mr. Stanley Nelson Roen Salvage Company, Mr. Dan Kuzay Roen Salvage Company, Mr. Peter Huber Sherwin Williams, Mr. Brayon Ball Sherwin Williams, Mr. Sinner Scott Wren Works, LLC, Mr. Troy Burkhart

3. Summary of Discussions: Mr. Corey Weston started the meeting at 2:00 p.m. Central Time with a brief overview of the project and contracting requirements.

a. INTRODUCTIONS: Government employees introduced themselves and attendees signed-in.

b. Solicitation W911XK19B0017, Superior Entry North Pier Repair is a firm fixed price construction contract with a 100% HUBZone set aside.

c. PROJECT DESCRIPTION:

This project is being solicited as Invitation for Bid (IFB). This procurement includes a base contract with two

(2) contract options.

The required and optional work consists of mobilizing to the site in Duluth-Superior Harbor, MN-WI and repairs to the Superior Entry North Pier. The total length of repairs to the north pier is approximately 1,000 linear feet.

Option 1 STA 17+70 to 19+50: Work consists of removing the 4’ by 5’ knee wall of the existing concrete pier. The existing north pier structure will be encased in a steel sheet pile wall with stone fill and grout. Scour stone will be placed at the base of the steel sheet pile. Stone removal and replacement will be required at the SSP drive line.

Option 2 STA 19+50 to 20+00: Work consists of removing the 4’ by 5’ knee wall of the existing concrete pier. The existing north pier structure will be encased in a steel sheet pile wall with stone fill and grout. Scour stone will be placed at the base of the steel sheet pile. Stone removal and replacement will be required at the SSP drive line.

Estimated range of construction is between: $10,000,000 and $25,000,000

d. QUESTIONS: Questions were addressed to the best of the Government’s ability, but anything said at the Pre-Bid Meeting or Site Visit are considered not official unless submitted through the Bidder Inquiry function in ProjNet at www.projnet.org/projnet. This is the Corps of Engineers’ standard platform for receiving and responding to questions and requests for information. Reference Section 00 21 00 of the solicitation, Instructions to Bidders, paragraph 6, for further details.

(1) An amendment will be posted with the information from the Pre-bid meeting and Site Visit on www.fbo.gov website.

e. SOLICITATION OVERVIEW:

(1) Bids are due on *August 14, 2019 by 2:00 p.m. Eastern Time. *(Bids are now due on August 20, 2019 by 2:00 p.m. Eastern Time with the issuance of Amendment 0001).

(2) Bids must be received at the address indicated in Block 8, at the front page of the Solicitation, by the date and time indicated in Block 13. Faxed or emailed bids will not be accepted.

(3) This contract will be a firm fixed price construction contract which means all costs, including administrative, need to be figured in the line items. This procurement includes Options that are listed in the bid schedule and may be exercised after contract award.

(4) Basis for Selection of Award: Award shall be made to the lowest priced bidder who is found to be responsive and responsible. See FAR Subpart 9.1, Responsible Prospective Contractors and FAR Provision 52.214- 19, Contract Award—Sealed Bidding—Construction, for more information.

In accordance with FAR 52.217-5, the Government intends to evaluate bids for award purposes by adding the total price for all options to the total price for the basic requirement.

(5) Evaluation of options will not obligate the Government to exercise the options. All options will be at the discretion of the Government.

(6) As stated under FAR 52.211-10 Commencement, Prosecution, and Completion of Work the contract completion including the exercise of all options the contract completion date is 1 July 2021. The completion date is based on the assumption the successful bidder will receive the notice to proceed by 17 October 2019. If Options 1 and 2 are exercised, the contract completion date will not be extended.

(7) Bid guarantee requirements are listed in the solicitation Section 00 21 00, Instruction to Bidders, paragraph 8A and FAR 52.228-1. The bid guarantee amount shall be at least 20 percent of the bid price or $3,000,000, whichever is less.

(8) Bonds and Insurance requirements for the successful Bidder are in Section 00 21 00, Instruction to Bidders, paragraph 8B and 8C of the solicitation.

(9) Reference Section 00 70 00, FAR 52.211-12 for the specifics on liquidated damages.

(10 Bidders are required to be registered in System for Award Management (SAM) prior to submission of bids (reference Section 00 21 00, Instruction to Bidders, paragraph 5).

(11) Bidders MUST acknowledge all amendments. See Section 00 21 00, Instruction to Bidders, paragraph 12 of the solicitation for details.

(12) Submission of bids information is listed in Section 00 21 00, Instruction to Bidders, paragraph 7 of the solicitation.

4. Mr. Corey Weston went through plans of the project.

5. Attendees toured the North Pier structure which ended approximately at 3:00 p.m. Central Time.

TECH SPEC CHANGES-AMEND 0001

Amendment 0001 Changes to W911XK19B0017 – Final RTA Specifications

CHANGES TO SPECIFICATIONS

1. Specification 01 22 00.00 10 Price and Payment Procedures

Added “Measurement” subparagraph to paragraph 1.3.5 with the below language

“Measurement of grout for payment will be on the basis of the number of cubic yards of material satisfactorily placed.”

2. Specification Section 31 32 23 ROCK FILL GROUTING:

Deleted “Sodium Silicate” from paragraph 1.4 Submittal SD-07 Certificates

3. Specification Section 31 32 23 ROCK FILL GROUTING:

Deleted “Sanded” from paragraph 3.1.1 Grouting Work Plan

4. Specification Section 31 32 23 ROCK FILL GROUTING:

Deleted paragraph 3.3.5.2.c Grout Injection

Added paragraph 3.3.5.2.c Grout Injection with the below language

“Should surface grout leaks develop stop grouting and proceed to the next TAM in the series.”

WAGE DETERMINATIONS-AMEND 0001

WAGE DETERMINATIONS:

- General Decision Number: IL20190018

- General Decision Number: MN20190040 *(REVISED 07/26/2019)

"General Decision Number: IL20190018 04/26/2019

Superseded General Decision Number: IL20180018

State: Illinois

Construction Types: Heavy (Dredging and Marine)

Counties: Illinois Statewide.

MECHANICAL DREDGING (CLAMSHELL, DRAGLINE, AND BACKHOE) AND

MARINE CONSTRUCTION):

ILLINOIS, INDIANA, MICHIGAN, MINNESOTA, NEW YORK, OHIO,

PENNSYLVANIA AND WISCONSIN DREDGING AND MARINE CONSTRUCTION

Dredging and Marine Construction Projects: floating/land equipment engaged in clamshell, backhoe and dragline dredging, marine construction, bridges,salvage operations and cranes, loaders, dozers, or other equipment used for disposal of dredge spoils or marine construction materials on land at the slip or dock, at the project site, where the above material/spoils is being handled, and all equipment utilized on breakwall/breakwater structures on the Great Lakes, Islands therein, their connecting and tributary waters, including the Illinois Waterway to the Lock at Lockport, Illinois, the New York State Barge Canal System between Tonawanda, New York and Waterford, New York and Oswego, New York, the Duluth-Superior area to the Fond du Lac Bridge Crossing (Minnesota State Highway 23) on the St. Louis River and on the St. Lawrence River eastward to the International Boundary near St. Regis, New York.

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/04/2019 1 03/08/2019 2 04/19/2019 3 04/26/2019

* SUIL2003-001 01/01/2019

MECHANICAL DREDGING (CLAMSHELL, DRAGLINE, AND BACKHOE) AND

MARINE CONSTRUCTION):

Rates Fringes

Dredging:

Fireman, Oiler, Deckhand, & Scowman (with dipper, hydraulic or other floating equipment engaged in hydraulic and dipper dredging operations) Pipeline men (both afloat & ashore including loading, unloading, maintaining, and handling pipelines for hydraulic dredges and sandboats Rangeman, Tankerman, Sweepman and service Truck Driver......................$ 22.51 7.61+a+b Lead Deckhand...............$ 29.68 7.61+a+b

Hydraulic Dredging LAUNCH OPERATOR - Vessel 800 Horse- Power Or Less....$ 25.15 7.61+a+b TUG ENGINEER................$ 26.49 7.61+a+b TUG OPERATOR - Vessel Over 800 Horse-Power.............$ 26.49 7.61+a+b TUG WORKERS: Fireman, Lineman, Oiler, Deckhand, Tankerman. Scowman, (on/or with tugboats, launches, or other self-propelled boats)......................$ 22.51 7.61+a+b

MECHANIC (Undefined)

FLOATING EQUIPMENT:

Illinois Class I....................$ 58.20 38.25+b&c Class II-A.................$ 56.70 38.25+b&c Class II-B.................$ 59.70 38.25+b&c Class III..................$ 50.45 38.25+b&c Class IV...................$ 41.95 38.25+b&c FLOATING EQUIPMENT: Indiana Class I....................$ 48.55 33.55+b&c Class II-A.................$ 47.05 33.55+b&c Class II-B.................$ 47.05 33.55+b&c Class III..................$ 41.85 33.55+b&c Class IV...................$ 34.80 33.55+b&c

FLOATING EQUIPMENT:

Michigan Class I....................$ 45.00 30.42+b&c Class II-A.................$ 43.50 30.42+b&c Class II-B.................$ 45.00 30.42+b&c Class III..................$ 38.95 30.42+b&c Class IV...................$ 32.75 30.42+b&c

FLOATING EQUIPMENT:

Minnesota Class I....................$ 45.10 20.65+b&c Class II-A.................$ 43.60 20.65+b&c Class II-B.................$ 43.60 20.65+b&c Class III..................$ 38.80 20.65+b&c Class IV...................$ 32.25 20.65+b&c

FLOATING EQUIPMENT:

New York:(Cattaraugus, Chautauga, Erie and Orleans Counties) Class I....................$ 47.20 30.71+b&c Class II-A.................$ 45.70 30.71+b&c Class II-B.................$ 48.70 30.71+b&c Class III..................$ 40.65 30.71+b&c Class IV...................$ 33.80 30.71+b&c

FLOATING EQUIPMENT:

New York:(Cayuga, Jefferson, Oswego, and St.

Lawrence Counties) Class I....................$ 50.05 26.05+b&c Class II-A.................$ 48.55 26.05+b&c Class II-B.................$ 51.55 26.05+b&c Class III..................$ 43.20 26.05+b+c Class IV...................$ 35.95 26.05+b&c

FLOATING EQUIPMENT:

New York:(Monroe and Wayne Counties and the City of Rochester) Class I....................$ 49.85 28.53+b&c Class II-A.................$ 48.35 28.53+b&c Class II-B.................$ 51.35 28.53+b&c Class III..................$ 43.00 28.53+b&c

Class IV...................$ 35.75 28.53+b&c

FLOATING EQUIPMENT:

New York:(Niagara) Class I....................$ 45.55 30.05+b&c Class II-A.................$ 44.05 30.05+b&c Class II-B.................$ 47.05 30.05+b&c Class III..................$ 39.20 30.05+b&c Class IV...................$ 32.60 30.05+b&c

FLOATING EQUIPMENT:

Ohio:(Ashtabula, Cuyahoga, Erie,Lake, and Lorain Counties) Class I....................$ 45.00 15.25+b&c Class II-A.................$ 43.50 15.25+b&c Class II-B.................$ 43.50 15.25+b&c Class III..................$ 38.95 15.25+b&c Class IV...................$ 32.75 15.25+b&c

FLOATING EQUIPMENT:

Ohio:(Lucas, Henry, Ottawa, Wood and Sandusky Counties) Class I....................$ 45.00 15.25+b&c Class II-A.................$ 43.50 15.25+b&c Class II-B.................$ 43.50 15.25+b&c Class III..................$ 38.95 15.25+b+c Class IV...................$ 32.75 15.25+b&c

FLOATING EQUIPMENT:

Pennsylvania:(Erie County):

Class I....................$ 45.00 22.03+b&c Class II-A.................$ 43.50 22.03+b&c Class II-B.................$ 43.50 22.03+a&b Class III..................$ 38.95 22.03+b&c Class IV...................$ 32.75 22.03+b&c

FLOATING EQUIPMENT:

Wisconsin:Includes all marine/floating type work on projects in the Superior/Duluth Harbor, Lake Superior.

Class I....................$ 48.35 22.18+b&c Class II-A.................$ 46.85 22.18+b&c Class II-B.................$ 47.35 22.18+b&c Class III..................$ 41.70 22.18+b&c Class IV...................$ 34.65 22.18+b&c

PAID HOLIDAYS (WHERE APPLICABLE):

A- NEW YEAR'S DAY

B- MEMORIAL DAY

C- INDEPENDENCE DAY

D- LABOR DAY

E- THANKSGIVING DAY

F- CHRISTMAS DAY

G- PRESIDENT'S DAY

H- VETERAN'S DAY.

FOOTNOTES:

a. $30.10 per day per employee for medical

b. Eight paid holidays: A thru H

c. Hazardous/Toxic Waste Material:

*Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour

Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency.

CLASSIFICATION DESCRIPTIONS

Class I - Master Mechanic - assist and direct Class II, Class III, and Class IV, diver/wet tender, engineer (hydraulic dredge) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender Class II-B Friction, Lattice Boom, or any Crane Certifications Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc.

Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division

U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

"General Decision Number: MN20190040 07/26/2019

Superseded General Decision Number: MN20180105

State: Minnesota

Construction Type: Heavy

County: St Louis County in Minnesota.

HEAVY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/04/2019 1 06/21/2019 2 07/26/2019

BOIL0647-004 03/01/2018

Rates Fringes

BOILERMAKER......................$ 37.22 27.14

CARP0361-020 05/01/2018

ST LOUIS COUNTY (Southern 1/3 including Cotton, Floodwood, Fond Du Lac, and Proctor)

CARPENTER (Including Form Work)............................$ 36.15 20.43

CARP0361-021 05/01/2018

ST LOUIS (Duluth)

Rates Fringes

CARPENTER (Including Form Work)............................$ 36.15 20.43

CARP0606-010 05/01/2018

ST LOUIS COUNTY (Northeast 2/3 including Cook, Cusson, Ely; and Western part including Chisholm, Greaney, and Orr)

CARPENTER (Including Form Work)............................$ 36.15 20.43

* ELEC0242-012 06/02/2019

ST. LOUIS (South part bounded on the north by the north line of Kelsey Township extended east & west)

ELECTRICIAN......................$ 38.46 27.13

* ELEC0294-006 06/02/2019

ST. LOUIS (North part bounded on the south by the south line of Ellsburg Township, extended east & west)

ELECTRICIAN......................$ 40.66 28.91

ENGI0049-064 05/01/2019

Rates Fringes

OPERATOR: Power Equipment Group 2.....................$ 38.64 20.50 Group 3.....................$ 38.09 20.50 Group 4.....................$ 37.79 20.50 Group 5.....................$ 34.75 20.50 Group 6.....................$ 33.54 20.50

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 2: Crane with over 135' Boom, excluding jib; Dragline & Hydraulic Backhoe with shovel-type controls, 3 cubic yards and over; Grader/Blade finishing earthwork and bituminous.

GROUP 3: Dragline & Hydraulic Backhoe with shovel-type controls up to 3 cubic yards; Loader 5 cu yd and over;

Mechanic; Tandem Scraper; Truck Crane; Crawler Crane

GROUP 4: Bituminous Roller 8 tons & over; Crusher/Crushing Plant; Drill Rig; Elevating Grader; Loader over 1 cu yd;

Grader; Pump; Scraper up; to 32 cu yd; Farm Tractor with Backhoe attachment; Skid Steer Loader over 1 cu yd with Backhoe attachment; Bulldozer over 50 hp.

GROUP 5: Bituminous Roller under 8 tons; Bituminous Rubber Tire Roller; Loader up to 1 cu yd; Bulldozer 50 hp or less.

GROUP 6: Oiler; Self-Propelled Vibrating Packer 35 hp and over.

CRANE OVER 135' BOOM, EXCLUDING JIB - $ .25 PREMIUM;

CRANE OVER 200' BOOM, EXCLUDING JIB - $ .50 PREMIUM

UNDERGROUND WORK:

UNNELS, SHAFTS, ETC. - $ .25 PREMIUM

UNDER AIR PRESSURE - $ .50 PREMIUM

HAZARDOUS WASTE PROJECTS (PPE Required):

LEVEL A - $1.25 PREMIUM

LEVEL B - $ .90 PREMIUM

LEVEL C - $ .60 PREMIUM

IRON0512-028 05/01/2018

Rates Fringes

IRONWORKER, STRUCTURAL AND

REINFORCING......................$ 32.64 27.85

LABO1091-006 05/01/2018

ST LOUIS (South of T. 55 N)

Rates Fringes

LABORERS

(1) Common or General.......$ 33.18 16.92

(2) Mason Tender Cement/Concrete.............$ 33.38 16.92

(6) Pipe Layer..............$ 35.68 16.92

LABO1091-007 05/01/2018

SOUTHERN ST. LOUIS COUNTY

Rates Fringes

LABORER

Common or General (Natural Gas Pipeline only)..........$ 33.18 16.92

LABO1097-002 05/01/2018

NORTHERN ST. LOUIS COUNTY

Rates Fringes

LABORER

Common or General (Natural Gas Pipeline only)..........$ 32.09 18.01

LABO1097-005 05/01/2018

ST LOUIS (North of T. 55 N)

LABORERS

(1) Common or General.......$ 32.09 18.01

(2) Mason Tender Cement/Concrete.............$ 32.29 18.01

(6) Pipe Layer..............$ 34.59 18.01

PLAS0633-036 05/01/2018

ST. LOUIS COUNTY (North of T 55N)

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 34.80 19.18

PLAS0633-039 05/01/2018

ST. LOUIS COUNTY (South of T 55N)

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 34.80 19.18

TEAM0160-018 05/01/2019

Rates Fringes

TRUCK DRIVER (DUMP)

(1) Articulated Dump Truck..$ 33.25 19.01

(2) 3 Axles/4 Axles; 5 Axles receive $0.30 additional per hour.........$ 32.70 19.01

(3) Tandem Axles; & Single Axles.......................$ 32.60 19.01

SUMN2009-072 09/28/2009

Rates Fringes

LABORER: Landscape..............$ 12.88 4.61

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 14-Aug-2019 02:00 PM to 20-Aug-2019 02:00 PM.

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment 0001:

PROJECT: Superior Entry North Pier, Duluth-Superior Harbor, St. Louis County, MN

PURPOSE: The purpose of this amendment is to:

1. Provide the Pre-Bid and Site Visit Minutes.

2. The closing date for questions/Request for Information remains August 7, 2019. The bid due date is extended to August 20, 2019.

3. Revise the Specifications in accordance with the Summary of Changes.

4. Update DFARS 252.236-7001, Contract Drawings and Specifications.

5. Update Wage Determination MN20190040.

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

W911XK19B0017 – Final RTA Specifications W911XK19B0017 – Final RTA Plans W911XK19B0017 - Final RTA Plans Signed Cover Sheet

*Amendment 0001 Changes to W911XK19B0017 – Final RTA Specifications

(End of clause)

(End of Summary of Changes)