W56MES90254684

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0003 is to make the changes summarized in SF 30. The bid schedule has changed. There are tw o PDF attachments in addition to this PDF amendment 0003. Please note that acknow ledged amendments for this project w ill not be accepted via email. For contractors w ho have responded w ith a bid package and w hose total bid price does not change, may elect to use bid bonds already submitted in their package.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK19B0016

X 9B. DATED (SEE ITEM 11)

12-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Aug-2019

CODE

U.S.ARMY ENGINEER DISTRICT, DETROIT

477 MICHIGAN AVENUE, 7TH FLOOR

DETROIT MI 48226-4523

W911XK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911XK19B0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0003

Solicitation Amendment No. 0003 For Solicitation No. W911XK19B0016 FY19 Muskegon South Breakwater Connector Repair, Muskegon, Michigan

CHANGES TO SOLICITATION

Section 00 10 00, Bid Schedule:

Delete: Bid Schedule Add Revised: Bid Schedule

CHANGES TO SPECIFICATION

Delete: 01 22 00.00 10 PRICE AND PAYMENT PROCEDURES Add Revised: 01 22 00.00 10 PRICE AND PAYMENT PROCEDURES, see attached file titled ‘01 22 00.00 10 Price & Payment Procedures.pdf

CHANGES TO PLANS

Sheet CG104:

Delete note “REQUIRED GROUTED STONE”, see attached file titled ‘MUFY16-CG104 AMEND 2.pdf’

END OF AMENDMENT

SECTION 00 10 00 - SOLICITATION

The following have been modified:

BID SCHEDULE

FY19 Muskegon South Breakwater Connector Repairs

BID SCHEDULE

ITEM SUPPLIES/SERVICES QUANTI

TY

UNI

T

UNIT

PRICE

TOTAL

Base Includes Section F1 ‐ 100LF, Section F ‐ 501LF and 287LF of Section G

0001 Mobilization/Demobilization 1 JA

0002 Existing Structure Demolition 1 JA

0003 Concrete Slab Cap 1 JA

0004 8 ‐ 13 ton Armor Stone for Sections F‐1 and F

0004aa First 1025 ton 1025 TON

0004ab Over 1025 ton 440 TON

0005 2 ‐ 4 ton Armor Stone For Section G

0005aa First 548 ton 548 TON

0005ab Over 548 ton 234 TON

0006 Stone Fill 1"x 3" stone Sections F‐1, F, G, and Existing Voids

0006aa First 440 ton 440 TON

0006ab Over 440 ton 188 TON

Total Amount of Base Items

Option 1 Includes remaining portion of Section G ‐ 386LF

0007 Existing Structure Demolition 1 JA

0008 Concrete Slab Cap 1 JA

0009 2 ‐ 4 ton Armor Stone For Section G

0009aa First 737 ton 737 TON

0009ab Over 737 ton 315 TON

0010 Stone Fill 1"x 3" stone Sections F‐1, F, G, and Existing Voids

0010aa First 97 ton 97 TON

0010ab Over 97 ton 41 TON

Total Amount of Option 1 Items

Option 2 Includes Section H ‐ 94LF

0011 Existing Structure Demolition 1 JA

0012 Concrete Slab Cap 1 JA

Total Amount of Option 2 Items

Total Amount of Bid

(End of Summary of Changes)