Specs_FY18_Fox_River_Gate_Repairs_certified_final_RTA_27jul2018.pdf

PDF 1 MB Posted

Attached to
FY18 Kaukauna Dam Tainter Gate Replacement and Pier Repair
Solicitation number
W911XK18B0003
Issued by

About this file

SPECIFICATIONS

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY18 FOX RIVER GATE REPAIRS

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 10 10

REAL ESTATE

03/01

PART 1 GENERAL

1.1 SUBMITTALS

1.2 REGULATORY REQUIREMENTS

1.2.1 Real Estate Rights

1.2.2 Additional Real Estate Rights

1.3 PROJECT/SITE CONDITIONS

1.3.1 Location and Verification

1.3.2 Survey Markers

1.3.2.1 Semipermanent Markers

1.3.2.2 Temporary Markers

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)

-- End of Section Table of Contents --

SECTION 01 10 10 Page 1

CERTIFIED FINAL RTA

FY18 FOX RI VER GATE REPAI RS

SECTI ON 01 10 10

REAL ESTATE

03/01

PART 1 GENERAL

1. 1 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y or as ot her wi se desi gnat ed. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on

01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Addi t i onal Pr oper t y Agr eement s; G- RED.

Copi es of any agr eement s f or Cont r act or - acqui r ed r eal est at e r i ght s f or t hi s pr oj ect shal l be f ur ni shed bef or e ent er i ng t her eon.

Cer t i f i ed Sur vey Resul t s

For addi t i onal r eal est at e r i ght s beyond what i s shown i n t he dr awi ngs, f ur ni sh a copy of cer t i f i ed r esul t s of sur veys whi ch ver i f y ar eas and l i mi t s of Cont r act or - acqui r ed r eal est at e r i ght s.

1. 2 REGULATORY REQUI REMENTS

1. 2. 1 Real Est at e Ri ght s

Ri ght s f or t he use of t he wor k and st or age ar eas have been obt ai ned and t he gener al l i mi t s of t he ar eas ar e shown on t he dr awi ngs. No ot her r eal est at e r i ght s have been obt ai ned by t he Gover nment f or t hi s pr oj ect .

1. 2. 2 Addi t i onal Real Est at e Ri ght s

Any addi t i onal pr oper t y agr eement s and/ or r eal est at e r i ght s desi r ed by t he Cont r act or shal l be obt ai ned by t he Cont r act or at i t s own expense.

Such agr eement s shal l c l ear l y r el i eve t he Gover nment of any r esponsi bi l i t y f or damages or l i abi l i t y r esul t i ng f r om t he Cont r act or ' s use of such grounds.

1. 3 PROJECT/ SI TE CONDI TI ONS

1. 3. 1 Locat i on and Ver i f i cat i on

I t shal l be t he Cont r act or ' s r esponsi bi l i t y t o accur at el y l ocat e t he l i mi t s of al l l ands ut i l i zed under t he cont r act . The cor ner and angl e poi nt s of each ar ea f or whi ch r i ght s have been obt ai ned shal l be mar ked wi t h semi per manent mar ker s except wher e t her e i s an appr oved exi st i ng pr oper t y mar ker . Tempor ar y mar ker s shal l be pl aced at poi nt s on al i gnment . The poi nt s on al i gnment shal l be mar ked at st at i ons so t hat

SECTI ON 01 10 10 Page 2

CERTI FI ED FI NAL RTA

i nt er val s bet ween poi nt s do not exceed 200 f eet .

1. 3. 2 Sur vey Mar ker s

Al l mar ker s shal l be i nst al l ed i n an ar ea pr i or t o i t s use and t hey shal l be avai l abl e f or r ef er ence dur i ng and upon compl et i on of use of t he ar ea.

Wher e appr oved exi st i ng pr oper t y mar ker s ar e f ound, a wi t ness st ake, as speci f i ed i n Subpar agr aph, " Semi per manent Mar ker s" bel ow, shal l be pr ovi ded. I f t he t ypes of mar ker s speci f i ed her ei naf t er cannot be used, ot her t ypes, as appr oved by t he Cont r act i ng Of f i cer , shal l be pr ovi ded.

1. 3. 2. 1 Semi per manent Mar ker s

The mar ker s shal l be a st eel r od one- hal f i nch i n di amet er and f our ( 4) f eet l ong. The st eel r od shal l be dr i ven ver t i cal l y i nt o t he gr ound so t hat t he t op i s f l ush wi t h t he f i ni shed gr ound sur f ace. Each mar ker shal l be wi t nessed by a 2" x 2" yel l ow st ake ext endi ng t wo ( 2) f eet above t he gr ound sur f ace and dr i ven i nt o t he gr ound unt i l s t abl e, wi t h not l ess t han one ( 1) f oot penet r at i on.

1. 3. 2. 2 Tempor ar y Mar ker s

Mar ker s shal l be 2" x 2" , r ed- col or ed, wood hub st akes dr i ven i nt o t he gr ound unt i l s t abl e ( not l ess t han one ( 1) f oot penet r at i on) wi t h t wo ( 2) f eet pr oj ect i ng above t he gr ound sur f ace. I f t he per i od i n whi ch t empor ar y mar ker s ar e t o be i n pl ace exceeds one ( 1) const r uct i on season, a mor e per manent t ype of mar ker , as appr oved, shal l be pr ovi ded.

PART 2 PRODUCTS ( NOT APPLI CABLE)

PART 3 EXECUTI ON ( NOT APPLI CABLE)

- - End of Sect i on - -

SECTI ON 01 10 10 Page 3

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 22 00. 00 10

PRI CE AND PAYMENT PROCEDURES

08/15

PART 1 GENERAL

1. 1 SI NGLE JOB PAYMENT I TEMS

1. 2 UNI T PRI CE PAYMENT I TEMS

1. 3 BI DDI NG SCHEDULE

1. 3. 1 0001 Gat e and Concr et e Removal at Kaukauna Dam ( Gat es 1- 6 and

Pi er s 4- 10)

1. 3. 1. 1 Payment

1. 3. 1. 2 Uni t of Measur e

1. 3. 2 0002 Tai nt er Gat e Fabr i cat i on f or Kaukauna Dam ( Gat es 1- 6)

1. 3. 2. 1 Payment

1. 3. 2. 2 Uni t of Measur e

1. 3. 3 0003 Tai nt er Gat e I nst al l at i on at Kaukauna Dam ( Gat es 1- 6)

1. 3. 3. 1 Payment

1. 3. 3. 2 Uni t of Measur e

1. 3. 4 0004 Downst r eam Pi er s Concr et e at Kaukauna Dam ( Pi er s 4- 10)

1. 3. 4. 1 Payment

1. 3. 4. 2 Uni t of Measur e

1. 3. 5 0005 Suppl y and I nst al l Rubber Si de Seal s, Cl amp Pl at es and

Bol t s f or Tai nt er Gat es at Kaukauna Dam ( Gat es 1- 6)

1. 3. 5. 1 Payment

1. 3. 5. 2 Uni t of Measur e

1. 3. 6 0006 Suppl y and I nst al l Gat e Si l l Pl at es at Kaukauna Dam

( Gat es 1- 6)

1. 3. 6. 1 Payment

1. 3. 6. 2 Uni t of Measur e

1. 3. 7 0007 Tr unni on Pi n Tr anspor t

1. 3. 7. 1 Payment

1. 3. 7. 2 Uni t of Measur e

1. 3. 8 0008 Opt i on 1: Gat e and Concr et e Removal , Tai nt er Gat e

Fabr i cat i on and I nst al l at i on, Downst r eam Pi er Concr et e, Suppl y and I nst al l Rubber Si de Seal , Cl amp Pl at e and Bol t s f or Tai nt er Gat e, Suppl y and I nst al l Gat e Si l l Pl at e at Kaukauna Dam ( Gat e 7 and Pi er 11)

1. 3. 8. 1 Payment

1. 3. 8. 2 Uni t of Measur e

1. 3. 9 0009 Opt i on 2: Gat e and Concr et e Removal , Tai nt er Gat e

Fabr i cat i on and I nst al l at i on, Downst r eam Pi er Concr et e, Suppl y and I nst al l Rubber Si de Seal , Cl amp Pl at e and Bol t s f or Tai nt er Gat e, Suppl y and I nst al l Gat e Si l l Pl at e at Kaukauna Dam ( Gat e 8 and Pi er 12)

1. 3. 9. 1 Payment

1. 3. 9. 2 Uni t of Measur e

1. 3. 10 0010 Opt i on 3: Embedded Si de Seal Pl at es at Kaukauna Dam 2

( Per Gat e – Gat es 1- 8)

1. 3. 10. 1 Payment

SECTI ON 01 22 00. 00 10 Page 1

1. 3. 10. 2 Uni t of Measur e

1. 3. 11 0011 Opt i on 4: Upst r eam Concr et e Pi er Repai r at Kaukauna Dam

( Pi er s 4- 12)

1. 3. 11. 1 Payment

1. 3. 11. 2 Uni t of Measur e

1. 3. 12 0012 Opt i on 5: Suppl y Rubber Si de Seal s, Cl amp Pl at es and

Bol t s For Li t t l e Kaukauna Dam ( Per Gat e)

1. 3. 12. 1 Payment

1. 3. 12. 2 Uni t of Measur e

1. 3. 13 0013 Opt i on 6: I nst al l Rubber Si de Seal s, Cl amp Pl at es and

Bol t s at Li t t l e Kaukauna Dam ( Per Gat e)

1. 3. 13. 1 Payment

1. 3. 13. 2 Uni t of Measur e

1. 3. 14 0014 Opt i on 7: Suppl y Rubber Si de Seal s, Cl amp Pl at es and

Bol t s For Appl et on Upper Dam ( Per Gat e)

1. 3. 14. 1 Payment

1. 3. 14. 2 Uni t of Measur e

1. 3. 15 0015 Opt i on 8: I nst al l Rubber Si de Seal s, Cl amp Pl at es and

Bol t s at Appl et on Upper Dam ( Per Gat e)

1. 3. 15. 1 Payment

1. 3. 15. 2 Uni t of Measur e

PART 2 PRODUCTS

PART 3 EXECUTI ON

3. 1 BASI S FOR SETTLEMENT OF PROPOSALS

3. 2 EQUI PMENT OWNERSHI P AND OPERATI NG EXPENSE SCHEDULE ( MAR 1995)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 22 00. 00 10 Page 2

SECTI ON 01 22 00. 00 10

PRI CE AND PAYMENT PROCEDURES

08/15

PART 1 GENERAL

1. 1 SI NGLE JOB PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act j ob payment s wi l l be made ar e l i s t ed i n t he BI DDI NG SCHEDULE and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, ar e i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.

1. 2 UNI T PRI CE PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he BI DDI NG SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.

1. 3 BI DDI NG SCHEDULE

1. 3. 1 0001 Gat e and Concr et e Removal at Kaukauna Dam ( Gat es 1- 6 and Pi er s 4-10)

1. 3. 1. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h Gat e and Concr et e Removal at Kaukauna Dam ( Gat es 1- 6 and Pi er s 4- 10) as r equi r ed by t he pl ans and specifications.

1. 3. 1. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 3. 2 0002 Tai nt er Gat e Fabr i cat i on f or Kaukauna Dam ( Gat es 1- 6)

1. 3. 2. 1 Payment

Payment wi l l be made f or uni t pr i ce cost s associ at ed wi t h Tai nt er Gat e Fabr i cat i on f or Kaukauna Dam ( Gat es 1- 6) as r equi r ed by t he pl ans and specifications.

SECTI ON 01 22 00. 00 10 Page 3

1. 3. 2. 2 Uni t of Measur e

Uni t of measur e: Each.

1. 3. 3 0003 Tai nt er Gat e I nst al l at i on at Kaukauna Dam ( Gat es 1- 6)

1. 3. 3. 1 Payment

Payment wi l l be made f or uni t pr i ce cost s associ at ed wi t h Tai nt er Gat e I nst al l at i on at Kaukauna Dam ( Gat es 1- 6) as r equi r ed by t he pl ans and specifications.

1. 3. 3. 2 Uni t of Measur e

Uni t of measur e: Each.

1. 3. 4 0004 Downst r eam Pi er s Concr et e at Kaukauna Dam ( Pi er s 4- 10)

1. 3. 4. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h Downst r eam Pi er s Concr et e at Kaukauna Dam ( Pi er s 4- 10) as r equi r ed by t he pl ans and speci f i cat i ons.

1. 3. 4. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 3. 5 0005 Suppl y and I nst al l Rubber Si de Seal s, Cl amp Pl at es and Bol t s f or Tai nt er Gat es at Kaukauna Dam ( Gat es 1- 6)

1. 3. 5. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h Suppl y and I nst al l Rubber Si de Seal s, Cl amp Pl at es and Bol t s f or Tai nt er Gat es at Kaukauna Dam ( Gat es 1- 6) as r equi r ed by t he pl ans and speci f i cat i ons.

1. 3. 5. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 3. 6 0006 Suppl y and I nst al l Gat e Si l l Pl at es at Kaukauna Dam ( Gat es 1- 6)

1. 3. 6. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h t he opt i onal Suppl y and I nst al l Gat e Si l l Pl at es at Kaukauna Dam ( Gat es 1- 6) as r equi r ed by t he pl ans and speci f i cat i ons.

1. 3. 6. 2 Uni t of Measur e

Uni t of measur e: Each.

1. 3. 7 0007 Tr unni on Pi n Tr anspor t

1. 3. 7. 1 Payment

Payment wi l l be made f or uni t pr i ce cost s associ at ed wi t h t r anspor t i ng t he Gover nment f ur ni shed Tr unni on pi ns f r om t he Kewaunee Ar ea Of f i ce war ehouse as r equi r ed by t he pl ans and speci f i cat i ons.

SECTI ON 01 22 00. 00 10 Page 4

1. 3. 7. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 3. 8 0008 Opt i on 1: Gat e and Concr et e Removal , Tai nt er Gat e Fabr i cat i on and I nst al l at i on, Downst r eam Pi er Concr et e, Suppl y and I nst al l Rubber Si de Seal , Cl amp Pl at e and Bol t s f or Tai nt er Gat e, Suppl y and I nst al l Gat e Si l l Pl at e at Kaukauna Dam ( Gat e 7 and Pi er 11)

1. 3. 8. 1 Payment

Payment wi l l be made f or uni t pr i ce cost s associ at ed wi t h t he opt i onal Gat e and Concr et e Removal , Tai nt er Gat e Fabr i cat i on and I nst al l at i on, Downst r eam Pi er Concr et e, Suppl y and I nst al l Rubber Si de Seal , Cl amp Pl at e and Bol t s f or Tai nt er Gat e, Suppl y and I nst al l Gat e Si l l Pl at e at Kaukauna Dam ( Gat e 7 and Pi er 11) as r equi r ed by t he pl ans and speci f i cat i ons.

1. 3. 8. 2 Uni t of Measur e

Uni t of measur e: Each.

1. 3. 9 0009 Opt i on 2: Gat e and Concr et e Removal , Tai nt er Gat e Fabr i cat i on and I nst al l at i on, Downst r eam Pi er Concr et e, Suppl y and I nst al l Rubber Si de Seal , Cl amp Pl at e and Bol t s f or Tai nt er Gat e, Suppl y and I nst al l Gat e Si l l Pl at e at Kaukauna Dam ( Gat e 8 and Pi er 12)

1. 3. 9. 1 Payment

Payment wi l l be made f or uni t pr i ce cost s associ at ed wi t h t he opt i onal Gat e and Concr et e Removal , Tai nt er Gat e Fabr i cat i on and I nst al l at i on, Downst r eam Pi er Concr et e, Suppl y and I nst al l Rubber Si de Seal , Cl amp Pl at e and Bol t s f or Tai nt er Gat e, Suppl y and I nst al l Gat e Si l l Pl at e at Kaukauna Dam ( Gat e 8 and Pi er 12) ) as r equi r ed by t he pl ans and speci f i cat i ons.

1. 3. 9. 2 Uni t of Measur e

Uni t of measur e: Each.

1. 3. 10 0010 Opt i on 3: Embedded Si de Seal Pl at es at Kaukauna Dam 2 ( Per Gat e – Gat es 1- 8)

1. 3. 10. 1 Payment

Payment wi l l be made f or uni t pr i ce cost s associ at ed wi t h t he opt i onal Embedded Si de Seal Pl at es at Kaukauna Dam 2 ( Per Gat e – Gat es 1- 8) as r equi r ed by t he pl ans and speci f i cat i ons.

1. 3. 10. 2 Uni t of Measur e

Uni t of measur e: Each.

1. 3. 11 0011 Opt i on 4: Upst r eam Concr et e Pi er Repai r at Kaukauna Dam ( Pi er s 4-12)

1. 3. 11. 1 Payment

Payment wi l l be made f or uni t pr i ce cost s associ at ed wi t h t he opt i onal Upst r eam Concr et e Pi er Repai r at Kaukauna Dam ( Pi er s 4- 12) as r equi r ed by

SECTI ON 01 22 00. 00 10 Page 5 t he pl ans and speci f i cat i ons.

1. 3. 11. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 3. 12 0012 Opt i on 5: Suppl y Rubber Si de Seal s, Cl amp Pl at es and Bol t s For Li t t l e Kaukauna Dam ( Per Gat e)

1. 3. 12. 1 Payment

Payment wi l l be made f or uni t pr i ce cost s associ at ed wi t h t he opt i onal Suppl y Rubber Si de Seal s, Cl amp Pl at es and Bol t s For Li t t l e Kaukauna Dam ( Per Gat e) as r equi r ed by t he pl ans and speci f i cat i ons.

1. 3. 12. 2 Uni t of Measur e

Uni t of measur e: Each.

1. 3. 13 0013 Opt i on 6: I nst al l Rubber Si de Seal s, Cl amp Pl at es and Bol t s at Li t t l e Kaukauna Dam ( Per Gat e)

1. 3. 13. 1 Payment

Payment wi l l be made f or uni t pr i ce cost s associ at ed wi t h t he opt i onal I nst al l Rubber Si de Seal s, Cl amp Pl at es and Bol t s at Li t t l e Kaukauna Dam ( Per Gat e) as r equi r ed by t he pl ans and speci f i cat i ons.

1. 3. 13. 2 Uni t of Measur e

Uni t of measur e: Each.

1. 3. 14 0014 Opt i on 7: Suppl y Rubber Si de Seal s, Cl amp Pl at es and Bol t s For Appl et on Upper Dam ( Per Gat e)

1. 3. 14. 1 Payment

Payment wi l l be made f or uni t pr i ce cost s associ at ed wi t h t he opt i onal Suppl y Rubber Si de Seal s, Cl amp Pl at es and Bol t s For Appl et on Upper Dam ( Per Gat e) as r equi r ed by t he pl ans and speci f i cat i ons.

1. 3. 14. 2 Uni t of Measur e

Uni t of measur e: Each.

1. 3. 15 0015 Opt i on 8: I nst al l Rubber Si de Seal s, Cl amp Pl at es and Bol t s at Appl et on Upper Dam ( Per Gat e)

1. 3. 15. 1 Payment

Payment wi l l be made f or uni t pr i ce cost s associ at ed wi t h t he opt i onal I nst al l Rubber Si de Seal s, Cl amp Pl at es and Bol t s at Appl et on Upper Dam ( Per Gat e) as r equi r ed by t he pl ans and speci f i cat i ons.

1. 3. 15. 2 Uni t of Measur e

Uni t of measur e: Each.

SECTI ON 01 22 00. 00 10 Page 6

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

3. 1 BASI S FOR SETTLEMENT OF PROPOSALS

Act ual cost s wi l l be used t o det er mi ne equi pment cost s f or a set t l ement pr oposal submi t t ed on t he t ot al cost basi s under Feder al Acqui s i t i on Regul at i on ( FAR) 49. 206- 2( b) . I n eval uat i ng a t er mi nat i on set t l ement pr oposal usi ng t he t ot al cost basi s, t he f ol l owi ng pr i nci pl es wi l l be appl i ed t o det er mi ne al l owabl e equi pment cost s:

( a) Act ual cost s f or each pi ece of equi pment , or gr oups of s i mi l ar ser i al or ser i es equi pment , need not be avai l abl e i n t he cont r act or ' s account i ng r ecor ds t o det er mi ne t ot al act ual equi pment cost s.

( b) I f equi pment cost s have been al l ocat ed t o a cont r act usi ng pr edet er mi ned r at es, t hose char ges wi l l be adj ust ed t o act ual cost s.

( c) Recor ded j ob cost s adj ust ed f or unal l owabl e expenses wi l l be used t o det er mi ne equi pment oper at i ng expenses.

( d) Owner shi p cost s ( depr eci at i on) wi l l be det er mi ned usi ng t he cont r act or ' s depr eci at i on schedul e ( subj ect t o t he pr ovi s i ons of Feder al Acqui s i t i on Regul at i on ( FAR) 31. 205- 11) .

( e) Li cense, t axes, st or age and i nsur ance cost s ar e nor mal l y r ecover ed as an i ndi r ect expense and unl ess t he cont r act or char ges t hese cost s di r ect l y t o cont r act s, t hey wi l l be r ecover ed t hr ough t he i ndi r ect expense r at e.

3. 2 EQUI PMENT OWNERSHI P AND OPERATI NG EXPENSE SCHEDULE ( MAR 1995)

( a) Thi s c l ause does not appl y t o t er mi nat i ons. See UAI 5152. 249- 9000, Basi s f or Set t l ement of Pr oposal s, and Feder al Acqui s i t i on Regul at i on ( FAR) par t 49.

( b) Al l owabl e cost s f or const r uct i on and mar i ne pl ant and equi pment i n sound wor kabl e condi t i on owned or cont r ol l ed and f ur ni shed by a cont r act or or subcont r act or at any t i er shal l be based on act ual cost dat a f or each pi ece of equi pment or gr oups of s i mi l ar ser i al and ser i es f or whi ch t he Gover nment can det er mi ne bot h owner shi p and oper at i ng cost s f r om t he cont r act or ' s account i ng r ecor ds. When bot h owner shi p and oper at i ng cost s cannot be det er mi ned f or any pi ece of equi pment or gr oups of s i mi l ar ser i al or ser i es equi pment f r om t he cont r act or ' s account i ng r ecor ds, cost s f or t hat equi pment shal l be based upon t he appl i cabl e pr ovi s i ons of Engi neer Pamphl et ( EP) 1110- 1- 8, Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e, Regi on 4. Wor ki ng condi t i ons shal l be consi der ed t o be aver age f or det er mi ni ng equi pment r at es usi ng t he schedul e unl ess speci f i ed ot her wi se by t he cont r act i ng of f i cer . For equi pment not i ncl uded i n t he schedul e, r at es f or compar abl e pi eces of equi pment may be used or a r at e may be devel oped usi ng t he f or mul a pr ovi ded i n t he schedul e. For f or war d pr i c i ng, t he schedul e i n ef f ect at t he t i me of negot i at i ons shal l appl y. For r et r oact i ve pr i c i ng, t he schedul e i n ef f ect at t he t i me t he wor k was per f or med shal l appl y.

( c) Equi pment r ent al cost s ar e al l owabl e, subj ect t o t he pr ovi s i ons of FAR

31. 105( d) ( i i ) and FAR 31. 205- 36. Rat es f or equi pment r ent ed f r om an

SECTI ON 01 22 00. 00 10 Page 7 or gani zat i on under common cont r ol , l ease- pur chase ar r angement s, and sal e- l easeback ar r angement s, wi l l be det er mi ned usi ng t he schedul e, except t hat act ual r at es wi l l be used f or equi pment l eased f r om an or gani zat i on under common cont r ol t hat has an est abl i shed pr act i ce of l easi ng t he same or s i mi l ar equi pment t o unaf f i l i at ed l essees.

( d) When act ual equi pment cost s ar e pr oposed and t he t ot al amount of t he pr i c i ng act i on exceeds t he si mpl i f i ed acqui s i t i on t hr eshol d ( SAT) , t he cont r act i ng of f i cer shal l r equest t he cont r act or t o submi t ei t her cer t i f i ed cost or pr i c i ng dat a, or par t i al / l i mi t ed dat a, as appr opr i at e.

The dat a shal l be submi t t ed on St andar d For m 1411, Cont r act Pr i c i ng Pr oposal Cover Sheet .

- - End of Sect i on - -

SECTI ON 01 22 00. 00 10 Page 8

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 32 01. 00 10

PROJECT SCHEDULE

02/15

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 PROJECT SCHEDULER QUALI FI CATI ONS

PART 2 PRODUCTS

2. 1 SOFTWARE

2. 1. 1 Gover nment Def aul t Sof t war e

2. 1. 2 Cont r act or Sof t war e

2. 1. 2. 1 Pr i maver a

2. 1. 2. 2 Ot her Than Pr i maver a

PART 3 EXECUTI ON

3. 1 GENERAL REQUI REMENTS

3. 2 BASI S FOR PAYMENT AND COST LOADI NG

3. 2. 1 Act i v i t y Cost Loadi ng

3. 2. 2 Wi t hhol di ngs / Payment Rej ect i on

3. 3 PROJECT SCHEDULE DETAI LED REQUI REMENTS

3. 3. 1 Level of Det ai l Requi r ed

3. 3. 2 Act i v i t y Dur at i ons

3. 3. 3 Pr ocur ement Act i v i t i es

3. 3. 4 Mandat or y Tasks

3. 3. 5 Gover nment Act i v i t i es

3. 3. 6 St andar d Act i v i t y Codi ng Di ct i onar y

3. 3. 6. 1 Wor ker s Per Day ( WRKP)

3. 3. 6. 2 Responsi bl e Par t y Codi ng ( RESP)

3. 3. 6. 3 Ar ea of Wor k Codi ng ( AREA)

3. 3. 6. 4 Modi f i cat i on Number ( MODF)

3. 3. 6. 5 Bi d I t em Codi ng ( BI DI )

3. 3. 6. 6 Phase of Wor k Codi ng ( PHAS)

3. 3. 6. 7 Cat egor y of Wor k Codi ng ( CATW)

3. 3. 6. 8 Feat ur e of Wor k Codi ng ( FOW)

3. 3. 7 Cont r act Mi l est ones and Const r ai nt s

3. 3. 7. 1 Pr oj ect St ar t Dat e Mi l est one and Const r ai nt

3. 3. 7. 2 End Pr oj ect Fi ni sh Mi l est one and Const r ai nt

3. 3. 7. 3 I nt er i m Compl et i on Dat es and Const r ai nt s

3. 3. 7. 3. 1 St ar t Phase

3. 3. 7. 3. 2 End Phase

3. 3. 8 Cal endar s

3. 3. 9 Open Ended Logi c

3. 3. 10 Def aul t Pr ogr ess Dat a Di sal l owed

3. 3. 11 Out - of - Sequence Pr ogr ess

3. 3. 12 Added and Del et ed Act i v i t i es

SECTI ON 01 32 01. 00 10 Page 1

3. 3. 13 Or i gi nal Dur at i ons

3. 3. 14 Leads, Lags, and St ar t t o Fi ni sh Rel at i onshi ps

3. 3. 15 Ret ai ned Logi c

3. 3. 16 Per cent Compl et e

3. 3. 17 Remai ni ng Dur at i on

3. 3. 18 Cost Loadi ng of Cl oseout Act i v i t i es

3. 3. 18. 1 As- Bui l t Dr awi ngs

3. 3. 18. 2 O & M Manual s

3. 3. 19 Ant i c i pat ed Adver se Weat her

3. 3. 20 Ear l y Compl et i on Schedul e and t he Ri ght t o Fi ni sh Ear l y

3. 4 PROJECT SCHEDULE SUBMI SSI ONS

3. 4. 1 Pr el i mi nar y Pr oj ect Schedul e Submi ssi on

3. 4. 2 I ni t i al Pr oj ect Schedul e Submi ssi on

3. 4. 3 Per i odi c Schedul e Updat es

3. 5 SUBMI SSI ON REQUI REMENTS

3. 5. 1 Dat a CD/ DVDs

3. 5. 2 Nar r at i ve Repor t

3. 5. 3 Schedul e Repor t s

3. 5. 3. 1 Act i v i t y Repor t

3. 5. 3. 2 Logi c Repor t

3. 5. 3. 3 Tot al Fl oat Repor t

3. 5. 3. 4 Ear ni ngs Repor t by CLI N

3. 5. 3. 5 Schedul e Log

3. 5. 4 Net wor k Di agr am

3. 5. 4. 1 Cont i nuous Fl ow

3. 5. 4. 2 Pr oj ect Mi l est one Dat es

3. 5. 4. 3 Cr i t i cal Pat h

3. 5. 4. 4 Bandi ng

3. 5. 4. 5 Cash Fl ow / Schedul e Var i ance Cont r ol ( SVC) Di agr am

3. 6 WEEKLY PROGRESS MEETI NGS

3. 7 REQUESTS FOR TI ME EXTENSI ONS

3. 7. 1 Just i f i cat i on of Del ay

3. 7. 2 Ti me I mpact Anal ysi s ( Pr ospect i ve Anal ysi s)

3. 7. 3 For ensi c Schedul e Anal ysi s ( Ret r ospect i ve Anal ysi s)

3. 7. 4 Fr agment ar y Net wor k ( Fr agnet )

3. 7. 5 Ti me Ext ensi on

3. 7. 6 I mpact t o Ear l y Compl et i on Schedul e

3. 8 FAI LURE TO ACHI EVE PROGRESS

3. 8. 1 Ar t i f i c i al l y I mpr ovi ng Pr ogr ess

3. 8. 2 Fai l ur e t o Per f or m

3. 8. 3 Recover y Schedul e

3. 9 OWNERSHI P OF FLOAT

3. 10 TRANSFER OF SCHEDULE DATA I NTO RMS

3. 11 PRI MAVERA P6 MANDATORY REQUI REMENTS

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 32 01. 00 10 Page 2

SECTI ON 01 32 01. 00 10

PROJECT SCHEDULE

02/15

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AACE I NTERNATI ONAL ( AACE)

AACE 29R- 03 ( 2011) For ensi c Schedul e Anal ysi s

AACE 52R- 06 ( 2006) Ti me I mpact Anal ysi s - As Appl i ed i n Const r uct i on

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

ER 1- 1- 11 ( 2017) Admi ni st r at i on Pr oj ect Schedul es

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Pr oj ect Schedul er Qual i f i cat i ons; G, AOF Pr el i mi nar y Pr oj ect Schedul e; G, AOF I ni t i al Pr oj ect Schedul e; G, AOF Per i odi c Schedul e Updat e; G, AOF

1. 3 PROJECT SCHEDULER QUALI FI CATI ONS

Desi gnat e an aut hor i zed r epr esent at i ve t o be r esponsi bl e f or t he pr epar at i on of t he schedul e and al l r equi r ed updat i ng and pr oduct i on of r epor t s. The aut hor i zed r epr esent at i ve must have a mi ni mum of 2- year s exper i ence schedul i ng const r uct i on pr oj ect s s i mi l ar i n s i ze and nat ur e t o t hi s pr oj ect wi t h schedul i ng sof t war e t hat meet s t he r equi r ement s of t hi s speci f i cat i on. Repr esent at i ve must have a compr ehensi ve knowl edge of CPM schedul i ng pr i nci pl es and appl i cat i on.

PART 2 PRODUCTS

2. 1 SOFTWARE

The schedul i ng sof t war e ut i l i zed t o pr oduce and updat e t he schedul es r equi r ed her ei n must be capabl e of meet i ng al l r equi r ement s of t hi s specification.

SECTI ON 01 32 01. 00 10 Page 3

2. 1. 1 Gover nment Def aul t Sof t war e

The Gover nment i nt ends t o use Pr i maver a P6.

2. 1. 2 Cont r act or Sof t war e

Schedul i ng sof t war e used by t he cont r act or must be commer ci al l y avai l abl e f r om t he sof t war e vendor f or pur chase wi t h vendor sof t war e suppor t agr eement s avai l abl e. The sof t war e r out i ne used t o cr eat e t he r equi r ed sdef f i l e must be cr eat ed and suppor t ed by t he sof t war e manuf act ur er .

2. 1. 2. 1 Primavera

I f Pr i maver a P6 i s sel ect ed f or use, pr ovi de t he " xer " expor t f i l e i n a ver si on of P6 i mpor t abl e by t he Gover nment syst em.

2. 1. 2. 2 Ot her Than Pr i maver a

I f t he cont r act or chooses sof t war e ot her t han Pr i maver a P6, t hat i s compl i ant wi t h t hi s speci f i cat i on, pr ovi de f or t he Gover nment ' s use t wo l i censes, t wo comput er s, and t r ai ni ng f or t wo Gover nment empl oyees i n t he use of t he sof t war e. These comput er s wi l l be st and- al one and not connect ed t o Gover nment net wor k. Comput er s and l i censes wi l l be r et ur ned at pr oj ect compl et i on.

PART 3 EXECUTI ON

3. 1 GENERAL REQUI REMENTS

Pr epar e f or appr oval a Pr oj ect Schedul e, as speci f i ed her ei n, pur suant t o FAR Cl ause 52. 236- 15, SCHEDULE FOR CONSTRUCTI ON CONTRACTS. Show i n t he schedul e t he pr oposed sequence t o per f or m t he wor k and dat es cont empl at ed f or st ar t i ng and compl et i ng al l schedul e act i v i t i es. The schedul i ng of t he ent i r e pr oj ect i s r equi r ed. The schedul i ng of construction i s t he r esponsi bi l i t y of t he Cont r act or . Cont r act or management per sonnel must act i vel y par t i c i pat e i n i t s devel opment . Subcont r act or s and suppl i er s wor ki ng on t he pr oj ect must al so cont r i but e i n devel opi ng and mai nt ai ni ng an accur at e Pr oj ect Schedul e. Pr ovi de a schedul e t hat i s a f or war d pl anni ng as wel l as a pr oj ect moni t or i ng t ool . Use t he Cr i t i cal Pat h Met hod ( CPM) of net wor k cal cul at i on t o gener at e al l Pr oj ect Schedul es.

Pr epar e each Pr oj ect Schedul e usi ng t he Pr ecedence Di agr am Met hod ( PDM) .

3. 2 BASI S FOR PAYMENT AND COST LOADI NG

The schedul e i s t he basi s f or det er mi ni ng cont r act ear ni ngs dur i ng each updat e per i od and t her ef or e t he amount of each pr ogr ess payment . The aggr egat e val ue of al l act i v i t i es coded t o a cont r act CLI N must equal t he val ue of t he CLI N.

3. 2. 1 Act i v i t y Cost Loadi ng

Act i v i t y cost l oadi ng must be r easonabl e and wi t hout f r ont - end l oadi ng.

Pr ovi de addi t i onal document at i on t o demonst r at e r easonabl eness i f r equest ed by t he Cont r act i ng Of f i cer .

3. 2. 2 Wi t hhol di ngs / Payment Rej ect i on

Fai l ur e t o meet t he r equi r ement s of t hi s speci f i cat i on may r esul t i n t he

SECTI ON 01 32 01. 00 10 Page 4 di sappr oval of t he pr el i mi nar y, i ni t i al or per i odi c schedul e updat es and subsequent r ej ect i on of payment r equest s unt i l compl i ance i s met .

I n t he event t hat t he Cont r act i ng Of f i cer di r ect s schedul e r evi s i ons and t hose r evi s i ons have not been i ncl uded i n subsequent Pr oj ect Schedul e r evi s i ons or updat es, t he Cont r act i ng Of f i cer may wi t hhol d 10 per cent of pay r equest amount f r om each payment per i od unt i l such r evi s i ons t o t he pr oj ect schedul e have been made.

3. 3 PROJECT SCHEDULE DETAI LED REQUI REMENTS

3. 3. 1 Level of Det ai l Requi r ed

Devel op t he Pr oj ect Schedul e t o t he appr opr i at e l evel of det ai l t o addr ess maj or mi l est ones and t o al l ow f or sat i sf act or y pr oj ect pl anni ng and execut i on. Fai l ur e t o devel op t he Pr oj ect Schedul e t o an appr opr i at e l evel of det ai l wi l l r esul t i n i t s di sappr oval . The Cont r act i ng Of f i cer wi l l consi der , but i s not l i mi t ed t o, t he f ol l owi ng char act er i st i cs and r equi r ement s t o det er mi ne appr opr i at e l evel of det ai l :

3. 3. 2 Act i v i t y Dur at i ons

Reasonabl e act i v i t y dur at i ons ar e t hose t hat al l ow t he pr ogr ess of ongoi ng act i v i t i es t o be accur at el y det er mi ned bet ween updat e per i ods.

Less t han 2 per cent of al l non- pr ocur ement act i v i t i es may have Or i gi nal Dur at i ons ( OD) gr eat er t han 20 wor k days or 30 cal endar days.

3. 3. 3 Pr ocur ement Act i v i t i es

I ncl ude act i v i t i es associ at ed wi t h t he cr i t i cal submi t t al s and t hei r appr oval s, pr ocur ement , f abr i cat i on, and del i ver y of l ong l ead mat er i al s, equi pment , f abr i cat ed assembl i es, and suppl i es. Long l ead pr ocur ement act i v i t i es ar e t hose wi t h an ant i c i pat ed pr ocur ement sequence of over 90 cal endar days.

3. 3. 4 Mandat or y Tasks

I ncl ude t he f ol l owi ng act i v i t i es/ t asks i n t he i ni t i al pr oj ect schedul e and al l updat es.

a. Submi ssi on, r evi ew and accept ance of SD- 01 Pr econst r uct i on Submi t t al s ( i ndi v i dual act i v i t y f or each) .

b. Submi ssi on, r evi ew and accept ance of f eat ur es r equi r e desi gn compl et i on

c. Submi ssi on of mechani cal / el ect r i cal / i nf or mat i on syst ems l ayout drawings.

d. Long pr ocur ement act i v i t i es

e. Submi ssi on and appr oval of O & M manual s.

f . Submi ssi on and appr oval of as- bui l t dr awi ngs.

g. Submi ssi on and appr oval of DD1354 dat a and i nst al l ed equi pment l i s t s.

h. Submi ssi on and appr oval of t est i ng and ai r bal ance ( TAB) .

i . Submi ssi on of TAB speci al i st desi gn r evi ew r epor t .

SECTI ON 01 32 01. 00 10 Page 5 j . Submi ssi on and appr oval of f i r e pr ot ect i on speci al i st .

k. Submi ssi on and appr oval of Bui l di ng Commi ssi oni ng Pl an, t est dat a, and r epor t s: Devel op t he schedul e l ogi c associ at ed wi t h t est i ng and commi ssi oni ng of mechani cal syst ems t o a l evel of det ai l consi st ent wi t h t he cont r act commi ssi oni ng r equi r ement s. Al l t asks associ at ed wi t h al l bui l di ng t est i ng and commi ssi oni ng wi l l be compl et ed pr i or t o submi ssi on of bui l di ng commi ssi oni ng r epor t and subsequent cont r act completion.

l . Ai r and wat er bal anci ng.

m. Bui l di ng commi ssi oni ng - Funct i onal Per f or mance Test i ng.

n. Cont r ol s t est i ng pl an submi ssi on.

o. Cont r ol s t est i ng.

p. Per f or mance Ver i f i cat i on t est i ng.

q. Ot her syst ems t est i ng, i f r equi r ed.

r . Cont r act or ' s pr e- f i nal i nspect i on.

s. Cor r ect i on of punch l i s t f r om Cont r act or ' s pr e- f i nal i nspect i on.

t . Gover nment ' s pr e- f i nal i nspect i on.

u. Cor r ect i on of punch l i s t f r om Gover nment ' s pr e- f i nal i nspect i on.

v. Fi nal i nspect i on.

3. 3. 5 Gover nment Act i v i t i es

Show Gover nment and ot her agency act i v i t i es t hat coul d i mpact pr ogr ess.

These act i v i t i es i ncl ude, but ar e not l i mi t ed t o: approvals, envi r onment al per mi t appr oval s by St at e r egul at or s, i nspect i ons, ut i l i t y t i e- i n, Gover nment Fur ni shed Equi pment ( GFE) and Not i ce t o Pr oceed ( NTP) f or phasi ng r equi r ement s.

3. 3. 6 St andar d Act i v i t y Codi ng Di ct i onar y

Use t he act i v i t y codi ng st r uct ur e def i ned i n t he St andar d Dat a Exchange For mat ( SDEF) i n ER 1- 1- 11. Thi s exact st r uct ur e i s mandat or y. Devel op and assi gn al l Act i v i t y Codes t o act i v i t i es as det ai l ed her ei n. A t empl at e SDEF compat i bl e schedul e backup f i l e i s avai l abl e on t he RMS web site: http://rms.usace.army.mil .

The SDEF f or mat i s as f ol l ows:

Field Act i v i t y Code Length Description

1 WRKP 3 Wor ker s per day

2 RESP 4 Responsi bl e par t y

SECTI ON 01 32 01. 00 10 Page 6

Field Act i v i t y Code Length Description

3 AREA 4 Ar ea of wor k

4 MODF 6 Modi f i cat i on Number

5 BIDI 6 Bi d I t em ( CLI N)

6 PHAS 2 Phase of wor k

7 CATW 1 Cat egor y of wor k

8 FOW 20 Feat ur e of wor k*

* Some syst ems r equi r e t hat FEATURE OF WORK val ues be pl aced i n sever al act i v i t y code f i el ds. The not at i on shown i s f or Pr i maver a P6. Ref er t o t he speci f i c sof t war e gui del i nes wi t h r espect t o t he FEATURE OF WORK f i el d r equi r ement s.

3. 3. 6. 1 Wor ker s Per Day ( WRKP)

Assi gn Wor ker s per Day f or al l f i el d const r uct i on or di r ect wor k act i v i t i es, i f di r ect ed by t he Cont r act i ng Of f i cer . Wor ker s per day i s based on t he aver age number of wor ker s expect ed each day t o per f or m a t ask f or t he dur at i on of t hat act i v i t y.

3. 3. 6. 2 Responsi bl e Par t y Codi ng ( RESP)

Assi gn r esponsi bi l i t y code f or al l act i v i t i es t o t he Pr i me Cont r act or , Subcont r act or ( s) or Gover nment agency( i es) r esponsi bl e f or per f or mi ng t he activity.

a. Act i v i t i es coded wi t h a Gover nment Responsi bi l i t y code i ncl ude, but ar e not l i mi t ed t o: Gover nment appr oval s, Gover nment desi gn r evi ews, envi r onment al per mi t appr oval s by St at e r egul at or s, Gover nment Fur ni shed Pr oper t y/ Equi pment ( GFP) and Not i ce t o Pr oceed ( NTP) f or phasi ng r equi r ement s.

b. Act i v i t i es cannot have mor e t han one Responsi bi l i t y Code. Exampl es of accept abl e act i v i t y code val ues ar e: DOR ( f or t he desi gner of r ecor d) ;

ELEC ( f or t he el ect r i cal subcont r act or ) ; MECH ( f or t he mechani cal subcont r act or ) ; and GOVT ( f or USACE) .

3. 3. 6. 3 Ar ea of Wor k Codi ng ( AREA)

Assi gn Wor k Ar ea code t o act i v i t i es based upon t he wor k ar ea i n whi ch t he act i v i t y occur s. Def i ne wor k ar eas based on r esour ce const r ai nt s or space const r ai nt s t hat woul d pr ecl ude a r esour ce, such as a par t i cul ar t r ade or cr af t wor k cr ew f r om wor ki ng i n mor e t han one wor k ar ea at a t i me due t o r est r ai nt s on r esour ces or space. Exampl es of Wor k Ar ea Codi ng i ncl ude di f f er ent ar eas wi t hi n a f l oor of a bui l di ng, di f f er ent f l oor s wi t hi n a bui l di ng, and di f f er ent bui l di ngs wi t hi n a compl ex of bui l di ngs.

Act i v i t i es cannot have mor e t han one Wor k Ar ea Code.

Not al l act i v i t i es ar e r equi r ed t o be Wor k Ar ea coded. A l ack of Wor k Ar ea codi ng i ndi cat es t he act i v i t y i s not r esour ce or space const r ai ned.

SECTI ON 01 32 01. 00 10 Page 7

3. 3. 6. 4 Modi f i cat i on Number ( MODF)

Assi gn a Modi f i cat i on Number Code t o any act i v i t y or sequence of act i v i t i es added t o t he schedul e as a r esul t of a Cont r act Modi f i cat i on, when appr oved by Cont r act i ng Of f i cer . Key al l Code val ues t o t he Gover nment ' s modi f i cat i on number i ng syst em. An act i v i t y can have onl y one Modi f i cat i on Number Code.

3. 3. 6. 5 Bi d I t em Codi ng ( BI DI )

Assi gn a Bi d I t em Code t o al l act i v i t i es usi ng t he Cont r act Li ne I t em Schedul e ( CLI N) t o whi ch t he act i v i t y bel ongs, even when an act i v i t y i s not cost l oaded. An act i v i t y can have onl y one BI DI Code.

3. 3. 6. 6 Phase of Wor k Codi ng ( PHAS)

Assi gn Phase of Wor k Code t o al l act i v i t i es. Exampl es of phase of wor k are pr ocur ement phase and const r uct i on phase. Each act i v i t y can have onl y one Phase of Wor k code.

a. Code pr oposed f ast t r ack desi gn and const r uct i on phases pr oposed t o al l ow f i l t er i ng and or gani z i ng t he schedul e by f ast t r ack desi gn and const r uct i on packages.

b. I f t he cont r act speci f i es phasi ng wi t h separ at el y def i ned per f or mance per i ods, i dent i f y a Phase Code t o al l ow f i l t er i ng and or gani z i ng t he schedul e accor di ngl y.

3. 3. 6. 7 Cat egor y of Wor k Codi ng ( CATW)

Assi gn a Cat egor y of Wor k Code t o al l act i v i t i es. Cat egor y of Wor k Codes i ncl ude, but ar e not l i mi t ed t o const r uct i on submi t t al , pr ocur ement , f abr i cat i on, weat her sensi t i ve i nst al l at i on, non- weat her sensi t i ve i nst al l at i on, st ar t - up, and t est i ng act i v i t i es. Each act i v i t y can have no mor e t han one Cat egor y of Wor k Code.

3. 3. 6. 8 Feat ur e of Wor k Codi ng ( FOW)

Assi gn a Feat ur e of Wor k Code t o appr opr i at e act i v i t i es based on t he Def i nabl e Feat ur e of Wor k t o whi ch t he act i v i t y bel ongs based on t he appr oved QC pl an.

Def i nabl e Feat ur e of Wor k i s def i ned i n Sect i on 01 45 00. 00 10 QUALI TY CONTROL. An act i v i t y can have onl y one Feat ur e of Wor k Code.

3. 3. 7 Cont r act Mi l est ones and Const r ai nt s

Mi l est one act i v i t i es ar e t o be used f or s i gni f i cant pr oj ect event s i ncl udi ng, but not l i mi t ed t o, pr oj ect phasi ng, pr oj ect st ar t and end act i v i t i es, or i nt er i m compl et i on dat es. The use of ar t i f i c i al f l oat const r ai nt s such as " zer o f r ee f l oat " or " zer o t ot al f l oat " ar e pr ohi bi t ed.

Mandat or y const r ai nt s t hat i gnor e or ef f ect net wor k l ogi c ar e pr ohi bi t ed.

No const r ai ned dat es ar e al l owed i n t he schedul e ot her t han t hose speci f i ed her ei n. Submi t addi t i onal const r ai nt s t o t he Cont r act i ng Of f i cer f or appr oval on a case by case basi s.

SECTI ON 01 32 01. 00 10 Page 8

3. 3. 7. 1 Pr oj ect St ar t Dat e Mi l est one and Const r ai nt

The f i r st act i v i t y i n t he pr oj ect schedul e must be a st ar t mi l est one t i t l ed " NTP Acknowl edged, " whi ch must have a " St ar t On" const r ai nt dat e equal t o t he dat e t hat t he NTP i s acknowl edged.

3. 3. 7. 2 End Pr oj ect Fi ni sh Mi l est one and Const r ai nt

The l ast act i v i t y i n t he schedul e must be a f i ni sh mi l est one t i t l ed " End Project."

Const r ai n t he pr oj ect schedul e t o t he Cont r act Compl et i on Dat e i n such a way t hat i f t he schedul e cal cul at es an ear l y f i ni sh, t hen t he f l oat cal cul at i on f or " End Pr oj ect " mi l est one r ef l ect s posi t i ve f l oat on t he l ongest pat h. I f t he pr oj ect schedul e cal cul at es a l at e f i ni sh, t hen t he " End Pr oj ect " mi l est one f l oat cal cul at i on r ef l ect s negat i ve f l oat on t he l ongest pat h. The Gover nment i s under no obl i gat i on t o accel er at e Gover nment act i v i t i es t o suppor t a Cont r act or ' s ear l y compl et i on.

3. 3. 7. 3 I nt er i m Compl et i on Dat es and Const r ai nt s

Const r ai n cont r act ual l y speci f i ed i nt er i m compl et i on dat es t o show negat i ve f l oat when t he cal cul at ed l at e f i ni sh dat e of t he l ast act i v i t y i n t hat phase i s l at er t han t he speci f i ed i nt er i m compl et i on dat e.

3. 3. 7. 3. 1 St ar t Phase

Use a st ar t mi l est one as t he f i r st act i v i t y f or a pr oj ect phase. Cal l t he st ar t mi l est one " St ar t Phase X" wher e " X" r ef er s t o t he phase of wor k.

3. 3. 7. 3. 2 End Phase

Use a f i ni sh mi l est one as t he l ast act i v i t y f or a pr oj ect phase. Cal l t he f i ni sh mi l est one " End Phase X" wher e " X" r ef er s t o t he phase of wor k.

3. 3. 8 Calendars

Schedul e act i v i t i es on a Cal endar t o whi ch t he act i v i t y l ogi cal l y bel ongs. Devel op cal endar s t o accommodat e any cont r act def i ned wor k per i od such as a 7- day cal endar f or Gover nment Accept ance act i v i t i es, concr et e cur e t i mes, et c. Devel op t he def aul t Cal endar t o mat ch t he physi cal wor k pl an wi t h non- wor k per i ods i dent i f i ed i ncl udi ng weekends and hol i days. Devel op sSeasonal Cal endar ( s) and assi gn t o seasonal l y af f ect ed act i v i t i es as appl i cabl e.

3. 3. 9 Open Ended Logi c

Onl y t wo open ended act i v i t i es ar e al l owed: t he f i r st act i v i t y " NTP Acknowl edged" may have no pr edecessor l ogi c, and t he l ast act i v i t y - " End Pr oj ect " may have no successor l ogi c.

Pr edecessor open ended l ogi c may be al l owed i n a t i me i mpact anal yses upon t he Cont r act i ng Of f i cer ' s appr oval .

3. 3. 10 Def aul t Pr ogr ess Dat a Di sal l owed

Act ual St ar t and Fi ni sh dat es must not aut omat i cal l y updat e wi t h def aul t mechani sms i ncl uded i n t he schedul i ng sof t war e. Updat i ng of t he per cent compl et e and t he r emai ni ng dur at i on of any act i v i t y must be i ndependent

SECTI ON 01 32 01. 00 10 Page 9 f unct i ons. Di sabl e pr ogr am f eat ur es t hat cal cul at e one of t hese par amet er s f r om t he ot her . Act i v i t y Act ual St ar t ( AS) and Act ual Fi ni sh ( AF) dat es assi gned dur i ng t he updat i ng pr ocess must mat ch t hose dat es pr ovi ded i n t he Cont r act or Qual i t y Cont r ol Repor t s. Fai l ur e t o document t he AS and AF dat es i n t he Dai l y Qual i t y Cont r ol r epor t wi l l r esul t i n di sappr oval of t he Cont r act or ' s schedul e.

3. 3. 11 Out - of - Sequence Pr ogr ess

Act i v i t i es t hat have pr ogr essed bef or e al l pr ecedi ng l ogi c has been sat i sf i ed ( Out - of - Sequence Pr ogr ess) wi l l be al l owed onl y on a case- by- case basi s subj ect t o appr oval by t he Cont r act i ng Of f i cer .

Pr opose l ogi c cor r ect i ons t o el i mi nat e out of sequence pr ogr ess or j ust i f y not changi ng t he sequenci ng f or appr oval pr i or t o submi t t i ng an updat ed pr oj ect schedul e. Addr ess out of sequence pr ogr ess or l ogi c changes i n t he Nar r at i ve Repor t .

3. 3. 12 Added and Del et ed Act i v i t i es

Do not del et e act i v i t i es f r om t he pr oj ect schedul e or add new act i v i t i es t o t he schedul e wi t hout appr oval f r om t he Cont r act i ng Of f i cer . Act i v i t y I D and descr i pt i on changes ar e consi der ed new act i v i t i es and cannot be changed wi t hout Cont r act i ng Of f i cer appr oval .

3. 3. 13 Or i gi nal Dur at i ons

Act i v i t y Or i gi nal Dur at i ons ( OD) must be r easonabl e t o per f or m t he wor k i t em. OD changes ar e pr ohi bi t ed unl ess j ust i f i cat i on i s pr ovi ded and appr oved by t he Cont r act i ng Of f i cer .

3. 3. 14 Leads, Lags, and St ar t t o Fi ni sh Rel at i onshi ps

Lags must be r easonabl e as det er mi ned by t he Gover nment and not used i n pl ace of r eal i st i c or i gi nal dur at i ons, must not be i n pl ace t o ar t i f i c i al l y absor b f l oat , or t o r epl ace pr oper schedul e l ogi c.

a. Leads ( negat i ve l ags) ar e pr ohi bi t ed.

b. St ar t t o Fi ni sh ( SF) r el at i onshi ps ar e pr ohi bi t ed.

3. 3. 15 Ret ai ned Logi c

Schedul e cal cul at i ons must r et ai n t he l ogi c bet ween pr edecessor s and successor s ( " r et ai ned l ogi c" mode) even when t he successor act i v i t y( s) st ar t s and t he pr edecessor act i v i t y( s) has not f i ni shed ( out - of - sequence pr ogr ess) . Sof t war e f eat ur es t hat i n ef f ect sever t he t i e bet ween pr edecessor and successor act i v i t i es when t he successor has st ar t ed and t he pr edecessor l ogi c i s not sat i sf i ed ( " pr ogr ess over r i de" ) ar e not be allowed.

3. 3. 16 Per cent Compl et e

Updat e t he per cent compl et e f or each act i v i t y st ar t ed, based on t he r eal i st i c assessment of ear ned val ue. Act i v i t i es whi ch ar e compl et e but f or r emai ni ng mi nor punch l i s t wor k and whi ch do not r est r ai n t he i ni t i at i on of successor act i v i t i es may be decl ar ed 100 per cent compl et e t o al l ow f or pr oper schedul e management .

SECTI ON 01 32 01. 00 10 Page 10

3. 3. 17 Remai ni ng Dur at i on

Updat e t he r emai ni ng dur at i on f or each act i v i t y based on t he number of est i mat ed wor k days i t wi l l t ake t o compl et e t he act i v i t y. Remai ni ng dur at i on may not mat hemat i cal l y cor r el at e wi t h per cent age f ound under par agr aph ent i t l ed Per cent Compl et e.

3. 3. 18 Cost Loadi ng of Cl oseout Act i v i t i es

Cost l oad t he " Cor r ect i on of punch l i s t f r om Gover nment pr e- f i nal i nspect i on" act i v i t y( i es) not l ess t han 1 per cent of t he pr esent cont r act val ue. Act i v i t y( i es) may be decl ar ed 100 per cent compl et e upon t he Gover nment ' s ver i f i cat i on of compl et i on and cor r ect i on of al l punch l i s t wor k i dent i f i ed dur i ng Gover nment pr e- f i nal i nspect i on( s) .

3. 3. 18. 1 As- Bui l t Dr awi ngs

I f t her e i s no separ at e cont r act l i ne i t em ( CLI N) f or as- bui l t dr awi ngs, cost l oad t he " Submi ssi on and appr oval of as- bui l t dr awi ngs" act i v i t y not l ess t han $35, 000 or 1 per cent of t he pr esent cont r act val ue, whi ch ever i s gr eat er , up t o $200, 000. Act i v i t y wi l l be decl ar ed 100 per cent compl et e upon t he Gover nment ' s appr oval .

3. 3. 18. 2 O & M Manual s

Cost l oad t he " Submi ssi on and appr oval of O & M manual s" act i v i t y not l ess t han $20, 000. Act i v i t y wi l l be decl ar ed 100 per cent compl et e upon t he Gover nment ' s appr oval of al l O & M manual s.

3. 3. 19 Ant i c i pat ed Adver se Weat her

Par agr aph appl i cabl e t o cont r act s wi t h c l ause ent i t l ed TI ME EXTENSI ONS FOR UNUSUALLY SEVERE WEATHER. Ref l ect t he number of ant i c i pat ed adver se weat her del ays al l ocat ed t o a weat her sensi t i ve act i v i t y i n t he act i v i t y ' s calendar.

3. 3. 20 Ear l y Compl et i on Schedul e and t he Ri ght t o Fi ni sh Ear l y

An Ear l y Compl et i on Schedul e i s an I ni t i al Pr oj ect Schedul e ( I PS) t hat i ndi cat es al l scope of t he r equi r ed cont r act wor k wi l l be compl et ed bef or e t he cont r act ual l y r equi r ed compl et i on dat e.

a. No I PS i ndi cat i ng an Ear l y Compl et i on wi l l be accept ed wi t hout bei ng f ul l y r esour ce- l oaded ( i ncl udi ng cr ew si zes and manhour s) and t he Gover nment agr eei ng t hat t he schedul e i s r easonabl e and achi evabl e.

b. The Gover nment i s under no obl i gat i on t o accel er at e wor k i t ems i t i s r esponsi bl e f or t o ensur e t hat t he ear l y compl et i on i s met nor i s i t r esponsi bl e t o modi f y i ncr ement al f undi ng ( i f appl i cabl e) f or t he pr oj ect t o meet t he cont r act or ' s accel er at ed wor k.

3. 4 PROJECT SCHEDULE SUBMI SSI ONS

Pr ovi de t he submi ssi ons as descr i bed bel ow. The dat a CD/ DVD, r epor t s, and net wor k di agr ams r equi r ed f or each submi ssi on ar e cont ai ned i n par agr aph SUBMI SSI ON REQUI REMENTS. I f t he Cont r act or f ai l s or r ef uses t o f ur ni sh t he i nf or mat i on and schedul e updat es as set f or t h her ei n, t hen t he Cont r act or wi l l be deemed not t o have pr ovi ded an est i mat e upon whi ch a pr ogr ess payment can be made.

SECTI ON 01 32 01. 00 10 Page 11

Revi ew comment s made by t he Gover nment on t he schedul e( s) do not r el i eve t he Cont r act or f r om compl i ance wi t h r equi r ement s of t he Cont r act Document s.

3. 4. 1 Pr el i mi nar y Pr oj ect Schedul e Submi ssi on

Wi t hi n 15 cal endar days af t er t he NTP i s acknowl edged submi t t he Pr el i mi nar y Pr oj ect Schedul e def i ni ng t he pl anned oper at i ons det ai l ed f or t he f i r st 90 cal endar days f or appr oval . The appr oved Pr el i mi nar y Pr oj ect Schedul e wi l l be used f or payment pur poses not t o exceed 90 cal endar days af t er NTP. Compl et el y cost l oad t he Pr el i mi nar y Pr oj ect Schedul e t o bal ance t he cont r act awar d CLI NS shown on t he Pr i ce Schedul e. The Pr el i mi nar y Pr oj ect Schedul e may be summar y i n nat ur e f or t he r emai ni ng per f or mance per i od. I t must be ear l y st ar t and l at e f i ni sh const r ai ned and l ogi cal l y t i ed as speci f i ed.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.