Abstract_--Construction_Kaukauna_Dam_Tainter_Gate.pdf

PDF 171 KB Posted

Attached to
FY18 Kaukauna Dam Tainter Gate Replacement and Pier Repair
Solicitation number
W911XK18B0003
Issued by

About this file

Abstract of Offers

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES

31 July 2018 6 Sep 2018 1 2

DATE SIGNED

7A. ITEM

NO 7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

D.

UNIT E. UNIT PRICE F. ESTIMATED

AMOUNT D. UNIT PRICE E. ESTIMATED

AMOUNT D. UNIT PRICE E. ESTIMATED

AMOUNT

Gate and Concrete Removal at Kaukauna Dam (Gates 1‐6 and Piers 4‐10)

1 JOB $715,188.00 $715,188.00 $524,676.00 $524,676.00 $2,500,000.00 $2,500,000.00

0002 Tainter Gate Fabrication for Kaukauna Dam (Gates 1‐6) 6 EA $124,107.00 $744,642.00 $144,596.00 $867,576.00 $150,000.00 $900,000.00

0003 Tainter Gate Installation at Kaukauna Dam (Gates 1‐6) 6 EA $8,407.00 $50,442.00 $14,334.00 $86,004.00 $200,000.00 $1,200,000.00

0004 Downstream Piers Concrete at Kaukauna Dam (Piers 4‐10) 1 JOB $312,130.00 $312,130.00 $533,469.00 $533,469.00 $450,000.00 $450,000.00

Supply and Install Rubber Side Seals, Clamp Plates and Bolts for Tainter Gates at Kaukauna Dam (Gates 1‐6)

1 JOB $32,496.00 $32,496.00 $49,500.00 $49,500.00 $30,000.00 $30,000.00

0006 Supply and Install Gate Sill Plates at Kaukauna Dam (Gates 1‐6) 6 EA $21,294.00 $127,764.00 $12,550.00 $75,300.00 $30,000.00 $30,000.00

0007 Trunnion Pin Transport 1 JOB $737.00 $737.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00

Total Base Bid $1,983,399.00 $2,137,525.00 $5,111,000.00

Gate and Concrete Removal, Tainter Gate Fabrication and Installation, Downstream Pier Concrete, Supply and Install Rubber Side Seal, Clamp Plate and Bolts for Tainter Gate, Supply and Install Gate Sill Plate at Kaukauna Dam (Gate 7 and Pier 11)

1 EA $258,792.00 $258,792.00 $360,000.00 $360,000.00 $1,014,000.00 $1,014,000.00

Gate and Concrete Removal, Tainter Gate Fabrication and Installation, Downstream Pier Concrete, Supply and Install Rubber Side Seal, Clamp Plate and Bolts for Tainter Gate, Supply and Install Gate Sill Plate at Kaukauna Dam (Gate 8 and Pier 12)

1 EA $258,792.00 $258,792.00 $360,000.00 $360,000.00 $1,014,000.00 $1,014,000.00

Embedded Side Seal Plates at Kaukauna Dam 2 (Per Gate – Gates 1‐8)

8 EA $49,086.00 $392,688.00 $25,638.00 $205,104.00 $30,000.00 $240,000.00

0011 Upstream Concrete Pier Repair at Kaukauna Dam (Piers 4‐12) 1 JOB $559,729.00 $559,729.00 $385,500.00 $385,500.00 $1,013,310.00 $1,013,310.00

Supply Rubber Side Seals, Clamp Plates and Bolts For Little Kaukauna Dam (Per Gate)

8 EA $5,142.00 $41,136.00 $4,082.00 $32,656.00 $5,000.00 $40,000.00

Install Rubber Side Seals, Clamp Plates and Bolts at Little Kaukauna Dam (Per Gate)

8 EA $17,167.00 $137,336.00 $6,270.00 $50,160.00 $10,000.00 $80,000.00

Supply Rubber Side Seals, Clamp Plates and Bolts For Appleton Upper Dam (Per Gate)

8 EA $5,142.00 $41,136.00 $4,082.00 $32,656.00 $15,000.00 $120,000.00

Install Rubber Side Seals, Clamp Plates and Bolts at Appleton Upper Dam (Per Gate)

8 EA $17,167.00 $137,336.00 $6,300.00 $50,400.00 $40,000.00 $320,000.00

$3,810,344.00 $3,614,001.00 $8,952,310.00

B. BID SECURITY (Type and Amount) Bid Bond 20% Bid Bond 20%

C. AMENDMENTS ACKNOWLEDGED

Total Bid (Base plus Options, all items 0001-0015)

C. AMENDMENTS ACKNOWLEDGED

Three (3) Yes Yes

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT (Including Profit)

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

FY18 Kaukauna Dam Tainter Gate Replacement and Pier Repair

(Check A, B, or C and complete D, E, and F) NO. 1 NO. 2

A. HIRED LABOR

A. OFFEROR: A. OFFEROR:

Michels Corporation Drax, Inc.

X B. REASONABLE CONTRACT (Without Profit)

B. BID SECURITY (Type and Amount)

ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER

W911XK18B0003

4. ISSUING OFFICE I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

U.S. Army Corps of Engineers Detroit District

Robert W. Austin, Contracting Officer

SIGNATURE

PAGE OF PAGES

2 2

A. ITEM

NO

B. ESTIMATED

QUANTITY C. UNIT D. UNIT PRICE E. ESTIMATED

AMOUNT D. UNIT PRICE E. ESTIMATED

AMOUNT D. UNIT PRICE E. ESTIMATED

AMOUNT D. UNIT PRICE E. ESTIMATED

AMOUNT

0001 1 JOB $605,000.00 $605,000.00 $409,200.00 $409,200.00 $1,036,000.00 $1,036,000.00

0002 6 EA $134,000.00 $804,000.00 $124,544.00 $747,264.00 $165,000.00 $990,000.00

0003 6 EA $153,000.00 $918,000.00 $64,000.00 $384,000.00 $23,500.00 $141,000.00

0004 1 JOB $1,160,000.00 $1,160,000.00 $416,900.00 $416,900.00 $1,410,000.00 $1,410,000.00

0005 1 JOB $333,000.00 $333,000.00 $53,777.00 $53,777.00 $130,000.00 $130,000.00

0006 6 EA $28,500.00 $171,000.00 $49,437.00 $296,622.00 $37,000.00 $222,000.00

0007 1 JOB $2,500.00 $2,500.00 $1,500.00 $1,500.00 $1,900.00 $1,900.00

$3,993,500.00 $2,309,263.00 $3,930,900.00

0008 1 EA $550,000.00 $550,000.00 $293,560.00 $293,560.00 $400,000.00 $400,000.00

0009 1 EA $500,000.00 $500,000.00 $265,140.00 $265,140.00 $325,000.00 $325,000.00

0010 8 EA $45,000.00 $360,000.00 $21,236.00 $169,888.00 $38,000.00 $304,000.00

0011 1 JOB $730,000.00 $730,000.00 $666,530.00 $666,530.00 $1,475,000.00 $1,475,000.00

0012 8 EA $4,000.00 $32,000.00 $3,680.00 $29,440.00 $9,750.00 $78,000.00

0013 8 EA $30,500.00 $244,000.00 $17,250.00 $138,000.00 $22,550.00 $180,400.00

0014 8 EA $4,000.00 $32,000.00 $3,680.00 $29,440.00 $9,750.00 $78,000.00

0015 8 EA $30,500.00 $244,000.00 $17,250.00 $138,000.00 $22,550.00 $180,400.00

$6,685,500.00 $4,039,261.00 $6,951,700.00 Total Bid (Base plus Options, all items 0001- 0015)

Total Base Bid

INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project.

Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419s for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.

ABSTRACT OF OFFERS -

CONSTRUCTION CONTINUATION

SHEET

1. SOLICITATION NUMBER

W911XK18B0003

C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR:

C. AMENDMENTS ACKNOWLEDGED

3. CONTRACT ITEMS

Lunda Construction Company Janke General Contractors, Inc.

A. OFFEROR:

Yes

2. PROJECT TITLE

NO. 5NO. 3 NO. 4FY18 Kaukauna Dam Tainter

Gate Replacement and Pier Repair

B. BID SECURITY (Type and Amount)

Bid Bond 20% B. BID SECURITY (Type and Amount)

4. OFFERS (Continued)

NO. 6

A. OFFEROR:

B. BID SECURITY (Type and Amount)

Bid Bond 20% Bid Bond 20%

A. OFFEROR:

J.F. Brennan Co., Inc.

B. BID SECURITY (Type and Amount)

C. AMENDMENTS ACKNOWLEDGED

YesYes

2018-09-11T13:08:38-0400
AUSTIN.ROBERT.WAYNE.JR.1186713296