SILVER PINES RD
HAMMOND RD W
BIRMLEY RD
N
K
E Y
S T
O N
E
R
D
C A
S
R
D
D R
A C
K A
N
E
A S
T
S
I L
V E
R
L A
E
SECOR RD
H
E
R
K
N
E
R
R
D
NORTH LONG LAKE RD
W SOUTH AIRPORT RD
U
S
I
L
V
L
K
E
R
D
N
O
R
T
H
O
N
G
L
A
H A
R R
I
BARNEY RD
G
A
N
D
V
I
E
W
P
K
W
Y
E FRONT ST
F
A
N I E
R
R
D
N
G
A R
F I E
BALDWIN ST
BOUGHEY ST
N
R
F
I
E
C
A
CARVER ST
W SOUTH
AIRPORT RD
N
R
U S
C H
HARTMAN RD
W
L
V
B
A
R
N
L
V
CENTRE ST
C
E
D
A
R
R
SILVER
LAKE
BOARDMAN
LAKE
BOARDMAN
IMPOUNDMENT
SABIN
POND
B
O
A
R
D
M
V
E
R
L O
P
G A
R F
I E
P
E A
B
Y
P
BROAD
RD
DIPLEY RD
G A
R F
I E
P
BLAIR TWP.
GARFIELD TWP.
EAST GRAND
TRAVERSE BAY
WEST GRAND
TRAVERSE BAY
TRAVERSE CITY
W I L
L I A
M
PROJECT
AREA
STATE LOCATION MAP
GRAND TRAVERSE
COUNTY
RESTORATION PLANS
R-0.1 SITE PLAN
R-0.2 SEQUENCING & SEDIMENT MANAGEMENT
R-1.1 CHANNEL GRADING & PROFILE 1 OF 2
R-1.2 CHANNEL GRADING & PROFILE 2 OF 2
R1.3 TRIBUTARY GRADING PLAN
R-2.1 CONSTRUCTION CROSS SECTIONS 1 OF 2
R-2.2 CONSTRUCTION CROSS SECTIONS 2 OF 2
R-3.1 LARGE WOOD & GRADING DETAILS
R-3.2 SEDIMENT CONTROL DETAILS
R-3.3 TYPICAL SECTIONS & FES LIFT DETAILS
R-4.1 PLANTING PLAN 1 OF 2
R-4.2 PLANTING PLAN 2 OF 2
Sheet Number Sheet Title
TITLE & GENERAL PLANS
T-1.1 TITLE & INDEX
T-1.2 GENERAL NOTES
T-2.1 GENERAL PLAN OF SITE
T-3.0 SOIL BORING LOCATION MAP
T-3.1 REAL ESTATE PLAN
STRUCTURAL DEMOLITION
S-0.1 STRUCTURAL REMOVAL SITE OVERVIEW
S-1.1 SPILLWAY & TAINTER GATE REMOVAL
S-2.1 DOWNSTREAM RETAINING WALL REMOVAL
S-3.1 TURBINE FLOOR REMOVAL
S-4.1 POWERHOUSE REMOVAL (1 OF 3)
S-4.2 POWERHOUSE REMOVAL (2 OF 3)
S-4.3 POWERHOUSE REMOVAL (3 OF 3)
BREACHING PLANS
B-0.1 EXISTING SITE TOPOGRAPHY
B-1.1 GENERAL SITE PLAN
B1.2 SOIL EROSION AND SEDIMENTATION CONTROL PLAN
B-1.3 SOIL EROSION DETAILS
B-2.1 DAM BREACHING PLAN VIEW - STAGE 1 & STAGE 2
B-2.2 DAM PROFILE VIEWS
B-3.1 DAM BREACHING PLAN VIEW - STAGE 3
B-4.1 DAM BREACHING PLAN VIEW - STAGE 4 & STAGE 5
B-4.2 DAM BREACHING PROFILE VIEW - STAGE 4 & STAGE 5
B-5.1 DAM BREACHING PLAN VIEW - STAGE 6
B-6.1 DAM BREACHING - RESTORATION
B-6.2 DAM BREACHING - RESTORATION DETAILS
DAN DEVAUN, PE
PROJECT MANAGER
CIVIL & HYDRAULICS
SHEETS T-1.1 - T-2.1, T-3.1, B-0.1 -
B-6.1, S-0.1 - S-4.3
MIKE BURKE, PE
RIVER RESTORATION
SHEETS R-0.1 - R-4.2
VIKRAM GAUTAM, PE
GEOTECHNICAL
SHEETS T-3.0, B-1.1 - B-6.1
TI
TL
E
IN
DE
X
T-1.1
EXISTING
RAILROAD
PHILLIP C. ROSS P.E., CHIEF ENGINEERING & CONSTRUCTION OFFICE
MARIE T. STRUM P.E., CHIEF ENGINEERING & TECHNICAL SERVICES
THIS PROJECT WAS DESIGNED BY AECOM, TRAVERSE CITY, MI. IT HAS
BEEN REVIEWED BY THE DETROIT DISTRICT, U.S. ARMY CORPS OF
ENGINEERS TO ENSURE COMPLIANCE WITH ER 1110-1-12 ENGINEERING
AND DESIGN QUALITY MANAGEMENT. THE INITIALS OR SIGNATURES AND
REGISTRATION DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE
PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR EMPLOYMENT AS
REQUIRED BY ER 1110-1-8152.
NICHOLAS J. ZAGER P.E., CHIEF GEOTECH & STRUCTURES BRANCH
WILLIAM D. MERTE P.E., CHIEF COST & GENERAL ENGINEERING BRANCH
/s/ TIM SMITH for
/s/ PHIL ROSS
/s/ WILLIAM MERTE
/s/ TINA KOWITZ for
CIVIL ABBREVIATIONS
EX./EXIST.
WM
C.P.
Y.D.
STM
SN
C & G
F.F.E.
I.E./INV.
T.P.
CB
MH
LB
EXISTING
WATER MAIN
CONTROL POINT WITH NUMBER
STORM YARD DRAIN
STORM SYSTEM
SANITARY SYSTEM
CURB & GUTTER
FINISH FLOOR ELEVATION
INVERT ELEVATION
TOP OF PIPE
STORM CATCH BASIN
STORM LEACH BASIN
PR./PROP. PROPOSED
DIA. DIAMETER
PVMT. PAVEMENT
TYP. TYPICAL
FRP FIBER REINFORCED PIPE
LF LINER FOOT
C.Y. CUBIC YARDS
S.Y. SQUARE YARDS
GAL. GALLON
CL CENTER LINE
MECH. MECHANICAL
RCP REINFORCED CONCRETE PIPE
INV INVERT
ELEV./EL. ELEVATION
N NORTHING
E EASTING
BTM. BOTTOM
C.O. CLEAN OUT
S.B. SOIL BORING
FT. FOOT
PP POWER POLE
ELEC. ELECTRICAL
PVC POLYVINYL CHLORIDE
W/L WATER LINE
HYD. HYDRANT
CONC. CONCRETE
P.O.B POINT OF BEGINNING
S.S. STAINLESS STEEL
1. THE CONTRACTOR SHALL HAVE SOLE AND COMPLETE
RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF
CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL
PERSONS AND PROPERTY.
2. THE CONTRACTOR SHALL DESIGN, CONSTRUCT, AND MAINTAIN ALL
SAFETY DEVICES, INCLUDING SHORING, AND SHALL BE SOLELY
RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE, AND
FEDERAL HEALTH AND SAFETY STANDARDS, LAWS, AND
REGULATIONS TO INCLUDE USACE EM 385-1-1.
3. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY
MEASURES TO PROTECT AND MAINTAIN ANY EXISTING UTILITY
SERVICES SHOWN ON THESE PLANS AND ANY OTHERS NOT OF
RECORD OR NOT SHOWN ON THESE PLANS. THE UTILITIES SHOWN
ON THE PLANS ARE APPROXIMATE LOCATIONS AND SHOULD BE
INTERPRETED AS SUCH. THE CONTRACTOR IS REQUIRED TO
PROVIDE A MARK-OUT OF ALL UTILITIES WITHIN THE AREA OF
WORK PRIOR TO COMMENCING CONSTRUCTION. CONTRACTOR TO
CALL MISS DIG (1-800-482-7171) TO OBTAIN A MARK-OUT OF
PUBLIC UNDERGROUND UTILITIES. THE CONTRACTOR SHALL
CONTACT THE PRIVATE UTILITIES LISTED ON THIS SHEET TO
ARRANGE FOR MARK-OUT OF PRIVATE UTILITIES NOT LOCATED BY
THE MISS DIG SYSTEM. CONTRACTOR SHALL BE AWARE OF
HIGH-VOLTAGE OVERHEAD ELECTRIC LINES. THE CONTRACTOR IS
RESPONSIBLE FOR ALL DAMAGE TO EXISTING UTILITIES AND ALL
COSTS TO REPAIR DAMAGE TO ANY UTILITY (SEWERS, WATER, GAS,
ELECTRICAL, CABLE, UNDERDRAIN SYSTEMS, & SPRINKLER SYSTEMS,
ETC.) KNOWN, OR OTHERWISE, SHALL BE BORNE SOLELY BY THE
CONTRACTOR. ACCEPTANCE & APPROVAL OF SAID REPAIRS SHALL
BE PER THE OWNER OF THE DAMAGED UTILITY.
4. THE CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO
ENSURE ALL UTILITY SERVICES WILL REMAIN FUNCTIONAL DURING
THE CONSTRUCTION PERIOD.
5. THE CONTRACTOR SHALL HAVE A FULL SIZE SET OF THE MOST
RECENTLY APPROVED FINAL PLANS MARKED “FOR CONSTRUCTION”
ON THE JOB SITE AT ALL TIMES.
6. UPON COMPLETION OF EACH DAY'S WORK, THE CONTRACTOR
SHALL BE RESPONSIBLE FOR LEAVING THE WORK AREA SECURED
AND FREE OF HAZARDS AND SHALL PROVIDE ALL NECESSARY
TEMPORARY SIGNS, WARNING DEVICES, AND BARRICADES.
7. THE CONTRACTOR SHALL KEEP ACCURATE AND LEGIBLE RECORDS
OF ALL CHANGES OF WORK THAT OCCUR DURING CONSTRUCTION
AND INFORMATION ON “AS-BUILT” CONDITIONS.
DOCUMENTATION OF CHANGES AND AS-BUILT INFORMATION
SHALL BE RECORDED ON AN APPROVED SET OF FULL SIZE FINAL
PROJECT PLANS AND DELIVERED TO THE COR WITHIN 90 DAYS
AFTER COMPLETION OF WORK.
8. THE CONTRACTOR SHALL TAKE THE NECESSARY STEPS TO PROTECT
THE PROJECT AND ADJACENT PROPERTY, STRUCTURES, UTILITIES
AND LANDSCAPING FROM ANY DAMAGE, EROSION AND SILTATION
THAT RESULTS FROM THE CONSTRUCTION BY APPROPRIATE MEANS
(SAND BAGS, HAY BALES, SILT FENCE, DIKES, ETC.) UNTIL SUCH TIME
THE PROJECT IS COMPLETED AND ACCEPTED BY THE GOVERNMENT.
GENERAL NOTES
1. PROTECTION OF WORK
DURING THE EXECUTION OF THE WORK SHOWN ON THESE PLANS, THE CONTRACTOR
SHALL BE RESPONSIBLE FOR PROTECTION OF THE WORK AREA AND EQUIPMENT
FROM FLOODS AND DAMAGE OR DELAYS DUE TO FLOODS. NO EQUIPMENT SHALL BE
LEFT IN CHANNEL AFTER WORK HOURS.
2. BREACHING SAFETY
IN THE CASE OF AN UNEXPECTED BREACH THROUGH THE DAM THE CONTRACTOR
SHALL HAVE A STOCKPILE OF DEMOLISHED CONCRETE MATERIALS NEARBY FOR
EMERGENCY PLACEMENT. THIS MATERIAL WILL COME FROM THE DEMOLITION OF
THE SPILLWAY. ALSO THE CONTRACTOR IS REQUIRED TO HAVE EXTRA SAND BAGS
AVAILABLE. CONTRACTOR SHALL PREPARE SITE SPECIFIC HEALTH & SAFETY PLAN,
INCLUDING AN EMERGENCY ACTION PLAN. THIS EMERGENCY ACTION PLAN SHALL BE
REVIEWED AND COORDINATED WITH THE GRAND TRAVERSE COUNTY EMERGENCY
MANAGER, GREGG BIRD (231-995-6059).
3. REMOVAL OF THIRD PARTY OWNED EQUIPMENT
CONTRACTOR IS REQUIRED TO COORDINATE THE REMOVAL OF THIRD PARTY OWNED
EQUIPMENT PER SECTION 02 41 16.
SPECIAL NOTES
SPW TEMPORARY SHEET PILE WALL
Know what's
R
MANHOLE (ANY UTILITY)
NAME OF OWNER TYPE OF UTILITY
CONSUMERS ENERGY ELECTRICAL
ATTENTION: CURTIS HANSEN
821 HASTING STREET
TRAVERSE CITY, MI 49684
CURTIS.HANSEN@CMSENERGY.COM
231-929-6265
CONSUMERS ENERGY ELECTRICAL TRANSMISSION
ATTENTION: KEN KING
1945 W. PARMALL ROAD
JACKSON, MI 49201
COMLINK TELECOM
ATTENTION: MIKE OHANNESIAN
1781 HOLLOWAY DR.
HOLT, MI 48842
AMOHANNESIAN@COMLINK.COM
517-742-4116
ATT TELECOM
ATTENTION: KATHY DOHM-BEISER
TEAM LEADER
142 E. STATE STREET, FLOOR 2 WEST
TRAVERSE CITY, MI 49684
KD1484@ATT.COM
231-941-2707
THE PURPOSE OF THE WORK SHOWN ON THESE PLANS IS THE DEWATERING OF THE
SABIN IMPOUNDMENT, EXCAVATION AND RELOCATION OR DISPOSAL OF SOILS AND
MATERIALS WITHIN THE LIMITS OF EXCAVATION, REMOVAL OF THE EXISTING
POWERHOUSE, SPILLWAY, AND APPURTENANCES, AND RESTORATION OF THE
BOARDMAN RIVER. THE WORK GENERALLY INCLUDES, BUT IS NOT LIMITED TO,
CONCRETE REMOVAL, REMOVAL AND DISPOSAL OF FILL/SEDIMENT MATERIALS,
CONSTRUCTION OF THE RIVER CHANNEL THROUGH THE POWERHOUSE,
CONSTRUCTION OF INSTREAM HABITAT IN THE RESTORED RIVER, AND RESTORATION
OF THE RIVER BANK AND FLOODPLAIN AREAS. THIS WORK WILL BE CONDUCTED
WHILE CONTRACTOR ACTIVELY MANAGES WATER LEVELS IN SABIN POND AND FLOW
OVER SABIN DAM WITHIN THE CONSTRAINTS SPECIFIED IN THESE PLANS.
THE MDEQ HYDROLOGIC STUDIES UNIT PROVIDED THE FOLLOWING HYDROLOGY
INFORMATION FOR THE BOARDMAN RIVER AT THE LOCATION OF SABIN DAM:
TOTAL DRAINAGE AREA OF 268.4 SQUARE MILES AND CONTRIBUTING DRAINAGE
AREA OF 206 SQUARE MILES
ENGINEER'S STATEMENT
CONTRACTOR SHALL COORDINATE AND ARRANGE FOR A PRECONSTRUCTION
MEETING AT THE SITE PRIOR TO THE START OF CONSTRUCTION TO BE
ATTENDED BY THE GRAND TRAVERSE COUNTY, CONTRACTOR, AND COR. PRIOR
TO THE TIME OF THE PRECONSTRUCTION MEETING, THE CONTRACTOR SHALL
HAVE THE LIMITS OF THE WORK (GRADING AND TEMPORARY ACCESS ROAD)
STAKED AND THE LOCATIONS OF EXISTING UTILITIES MARKED OUT. THE
PURPOSE OF THIS IS TO CONFIRM THE PROPOSED WORK WILL NOT CONFLICT
WITH THE ADJACENT SITES. IF A CONFLICT IS IDENTIFIED AT THAT TIME, THE
CONTRACTOR SHALL REQUEST DIRECTION FROM THE GOVERNMENT PER THE
CONTRACT.
PRECONSTRUCTION MEETING
AFTER BIDS HAVE BEEN SUBMITTED AND A SELECTION IS MADE, ELECTRONIC FILES
WILL BE PROVIDED TO THE CONTRACTOR FOR LOCATING KEY DESIGN ITEMS.
ELECTRONIC FILES
MORE DETAILS ABOUT THE OPERATION, HISTORY AND CONDITION OF THE DAM
ARE AVAILABLE IN THE FOLLOWING DOCUMENTS, WHICH ARE ON FILE AND
AVAILABLE FOR REVIEW BY APPOINTMENT WITH WILLIAM MERTE USACE -
DETROIT DISTRICT (313) 226-2433:
1. SABIN DAM DESIGN PLANS DATED 1930 PREPARED BY HARZA ENGINEERING
COMPANY FOR THE CITY OF TRAVERSE CITY.
2. BOARDMAN RIVER FEASIBILITY STUDY DATED JANUARY 2009 PREPARED BY
ENVIRONMENTAL CONSULTING AND TECHNOLOGY, INC.
3. PROBABLE MAXIMUM FLOOD STUDY, BOARDMAN AND SABIN
HYDROELECTRIC DAMS, FERC PROJECT. DATED SEPTEMBER 1995. PREPARED
BY MEAD AND HUNT, INC.
4. SPILLWAY DESIGN FLOOD STUDIES, BROWN BRIDGE, BOARDMAN, AND SABIN
PROJECTS DATED JULY 17, 1991 PREPARED BY MEAD AND HUNT, INC.
5. UNITED STATES ARMY CORP OF ENGINEERS (USACE) FEASIBILITY STUDY,
PHASE I REPORT DATED AUGUST 2013. PREPARED BY THE USACE.
GE
NE
RA
L N
OT
ES
T-1.2
WSE WATER SURFACE ELEVATION
FES FABRIC ENCAPSULATED SOIL
COR CONTRACTING OFFICER'S REPRESENTATIVE
1. INSTALL TEMPORARY SOIL EROSION MEASURES PRIOR TO EARTH
MOVING ACTIVITIES (SHEET B-1.2).
2. CONSTRUCT/REINFORCE CONSTRUCTION ACCESS ROADS TO THE EAST
AND WEST SIDE OF THE DAM, ACCESS ROAD FROM THE SOUTH BY THE
BEAVER POND PARKING AREA, AS WELL AS STAGING AREA(S) FOR
EQUIPMENT PARKING AND WASHING (SHEET B-1.1).
3. DEMOLISH SPILLWAY CONCRETE STRUCTURE AND APPURTENANCES (CAT
WALK, RAILINGS, ETC) TO WSE AT THE TIME OF CONSTRUCTION (~609'),
LEAVING SPILLWAY WALL AT ELEVATION 615' (SHEET B-2.1).
4. EXCAVATE SEDIMENT OUT FROM IN FRONT OF THE SPILLWAY INLET TO
FACILITATE RIVER FLOW. INSTALL A SEDIMENT TRAP UPSTREAM OF THE
SPILLWAY (SHEET B-2.1).
5. EXCAVATE BEHIND EXISTING SPILLWAY WALLS TO ELEVATION 614.5'
(SHEET B-2.1).
6. CONTINUE DEMOLITION OF SPILLWAY OGEE CREST AND CONCRETE
APRON AT 1 FOOT INCREMENTS (NO FASTER THAN 1FT PER DAY) TO
DRAWDOWN THE IMPOUNDMENT. EACH 1 FOOT INCREMENT MUST
REMOVE THE ENTIRE WIDTH OF THE OGEE CREST, SUCH THAT THE
ENTIRE OPENING IS AT THE SAME ELEVATION AT THE CLOSE OF THE
INCREMENT. INCREMENTALLY REMOVE BACKFILL FROM SPILLWAY
WALLS, SUCH THAT BACKFILL GRADE IS 6 FEET ABOVE CURRENT
SPILLWAY BREACH LEVEL (NO HIGHER, NO LOWER) (SHEET B-2.1).
7. CONSTRUCT DOWNSTREAM RIVER ACCESS TO THE WEST OF THE
POWERHOUSE (SHEET B-2.1).
8. AS THE WATER SURFACE WITHIN THE POND IS DRAWN DOWN AND
SEDIMENT IS EXPOSED, RIVER CHANNEL AND FLOODPLAIN WORK CAN
BEGIN WITHIN THE UPPER IMPOUNDMENT. ALSO, A PORTION OF THE
RIVER CHANNEL CONSTRUCTED TO CONVEY FLOW INTO THE SABIN
IMPOUNDMENT UNDER THE BOARDMAN DAM REMOVAL PROJECT WILL
BE FILLED AND REROUTED BASED ON THE SABIN DAM REMOVAL AND
RIVER RESTORATION PLANS (SHEET R-1.1).
9. ONCE THE POND IS DRAWN DOWN BELOW THE POWERHOUSE INTAKE
SILL, INSTALL STOP LOGS IN THE POWERHOUSE INTAKES TO ISOLATE
FLOW TO THE SPILLWAY (SHEET B-3.1).
10. INSTALL EARTHEN FLOW DIVERSION BERM DOWNSTREAM BETWEEN
THE POWERHOUSE AND SPILLWAY OUTLET TO ISOLATE DOWNSTREAM
RIVER FLOW TO THE EAST SIDE OF THE RIVER CHANNEL (SHEET B-3.1).
11. BEGIN CONSTRUCTION OF RESTORED RIVER CHANNEL DOWNSTREAM OF
THE POWERHOUSE (SHEET R-1.2).
12. AS THE WATER LEVEL WITHIN THE POND DECREASES, CONTINUE
EXCAVATION OF SEDIMENT IN THE PROPOSED RESTORED RIVER
CHANNEL THROUGH THE IMPOUNDMENT PLACING SPOILS IN THE
CLOSEST DESIGNATED AREAS AS APPROPRIATE (SHEET R-1.1).
13. UPON REACHING ELEVATION 598.5 AT THE SPILLWAY, STOP DEMOLITION
AT THE SPILLWAY. INSTALL BULK BAG COFFERDAM UPSTREAM OF THE
POWERHOUSE (SHEET B-4.1).
14. DEMOLISH POWERHOUSE TO 6 FEET BELOW THE PROPOSED RIVER
CHANNEL (APPROXIMATE DESIGN RIVER CHANNEL ELEVATION OF 595'
THROUGH THE POWERHOUSE) (SHEET B-4.1 AND S-4.1 - 4.3).
15. CONSTRUCT RESTORED RIVER CHANNEL THROUGH FORMER
POWERHOUSE LOCATION (SHEET B-4.1 AND R-1.2).
16. ONCE THE RESTORED RIVER CHANNEL HAS BEEN FULLY CONSTRUCTED
THROUGH THE POWERHOUSE LOCATION BEGIN FINAL DRAWDOWN BY
INCREMENTALLY LOWERING THE BULK BAG COFFERDAM UPSTREAM OF
THE POWERHOUSE (SHEET B-4.1).
17. COMPLETE RESTORED RIVER CHANNEL THROUGH THE BULK BAG
COFFERDAM AND MATCH DOWNSTREAM RESTORED CHANNEL TO
UPSTREAM RESTORED CHANNEL (SHEET R-1.2).
18. ONCE FLOW IS FULLY DIVERTED TO THE RESTORED RIVER CHANNEL,
DEMOLISH ANY REMAINING SPILLWAY STRUCTURE 2 FEET BELOW FINAL
GRADE AND FILL TO MATCH THE DESIGN PLANS (SHEET S-1.1, B-5.1, AND
R-1.2).
19. FINISH WORK BY COMPLETING FINAL GRADING AND SEEDING (SHEETS R-
4.1 AND R-4.2).
9. THE CONTRACTOR SHALL REFER TO SPECIFICATION SECTION 01 11 00 SUMMARY
OF WORK FOR ALL PERMIT REQUIREMENTS AND GUIDANCE IN OBTAINING THE
APPLICABLE PERMITS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
CONFORMANCE WITH ALL APPLICABLE PERMIT REQUIREMENTS DURING THE
EXECUTION OF THE WORK AND PRIOR TO FINAL ACCEPTANCE BY THE
GOVERNMENT. ADDITIONAL DETAILS ON CONTRACTOR RESPONSIBILITIES ARE
PROVIDED IN THE SPECIFICATIONS.
10. ALL NON-PAVED DISTURBED AREAS SHALL BE RESTORED AS SHOWN ON THE
PLANS.
11. THE CONTRACTOR SHALL ACCESS THE WORK AREAS USING THE PUBLIC
RIGHT-OF-WAY AND EXISTING EASEMENTS ONLY. CROSSING PRIVATE
PROPERTY TO ACCESS THESE AREAS WITHOUT WRITTEN PERMISSION FROM
THE PROPERTY OWNER IS PROHIBITED.
12. OTHER THAN PLANS THAT ARE ALREADY PART OF THE CONTRACT DOCUMENTS,
HISTORIC CONSTRUCTION DOCUMENTS ARE ALSO AVAILABLE FOR THE
POWERHOUSE, DAM INTAKE STRUCTURE, SPILLWAY, AND APPURTENANCES. IF
ADDITIONAL INFORMATION IS DESIRED, CONTRACTOR SHOULD SUBMIT
REQUEST TO THE COR.
13. TOPOGRAPHY SHOWN HERE REPRESENTS CONDITIONS EXISTING AT THE TIME
THE FIELD SURVEY WAS MADE (MAY & AUGUST 2014 AND JULY 2016).
14. WATER LEVEL IS SUBJECT TO CHANGE. THE CONTRACTOR IS RESPONSIBLE FOR
MAKING A DETERMINATION OF WATER LEVELS THAT MAY EXIST DURING
CONSTRUCTION.
15. MEASURES SHALL BE TAKEN TO PREVENT DEBRIS FROM FALLING FROM THE
EXISTING STRUCTURES AND BEING TRANSPORTED DOWNSTREAM.
16. ALL WORK FOR THE CONDITIONS SHOWN AS "PROPOSED", "FINISH", AND
"NEW" IS REQUIRED UNDER THIS CONTRACT.
MDEQ 50 % FREQUENCY DISCHARGE VALUES (HALF OF FLOWS ARE GREATER AND
HALF ARE LESS) FOR THE SUMMER MONTHS DURING WHICH CONSTRUCTION WILL
TAKE PLACE:
MAY 310 CFS
JUNE 270 CFS
JULY 240 CFS
AUG 230 CFS
SEPT 240 CFS
OCT 250 CFS
NOV 270 CFS
DEC 270 CFS
MDEQ PROVIDED ANNUAL PEAK FLOOD DISCHARGE VALUES:
50% (2 YEAR) 750 CFS
10% (10 YEAR) 1200 CFS
2% (50 YEAR) 1600 CFS
1% (100 YEAR) 1700 CFS
0.5% (200 YEAR) 1900 CFS
0.2% (500 YEAR) 2000 CFS
THE DESIGN DISCHARGE FOR THE DAM BREACHING PORTION OF THIS PROJECT IS
THE 10% (10 YEAR) FLOOD (1200 CFS).
TO COMPLY WITH THE MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY
REGULATION OF A MAXIMUM DEWATERING RATE OF 1 FT/DAY SHALL BE
MAINTAINED AT ALL TIMES FOR SABIN IMPOUNDMENT. CONTRACTOR SHALL
SURVEY WATER SURFACE ELEVATION AT THE DAM EVERY 12 HOURS, TO VERIFY
THIS REQUIREMENT IS BEING MET. DURING THE FINAL DEWATERING STAGE
THROUGH THE TEMPORARY BULK BAG COFFERDAM AN ACCELERATED
DEWATERING RATE IS ALLOWED. DURING THIS FINAL PHASE, THE DEWATERING
RATE SHALL NOT EXCEED HALF A FOOT PER HOUR.
SPECIFIC SEQUENCES AND REQUIREMENTS RELATED TO DEMOLITION OF THE
SPILLWAY ARE PROVIDED HEREIN AND HAVE BEEN EVALUATED BY THE ENGINEER
TO ALLOW PASSAGE OF FLOWS THROUGH THE SPILLWAY UNDER A 10-YEAR FLOW
SCENARIO. SEQUENCE, MEANS, AND METHODS FOR SAFE DEMOLITION OF THE
POWERHOUSE ARE THE RESPONSIBILITY OF THE CONTRACTOR
PUBLIC UTILITIES
THE EXISTING UTILITIES LISTED BELOW AND SHOWN ON THESE PLANS REPRESENT
THE BEST INFORMATION AVAILABLE AS OBTAINED ON OUR SURVEYS. THIS
INFORMATION DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO BE
SATISFIED AS TO IT'S ACCURACY AND THE LOCATION OF EXISTING UTILITIES.
NAME OF OWNER TYPE OF UTILITY
TRAVERSE CITY LIGHT AND POWER ELECTRICAL
ATTENTION: ROD SOLAK
CONSTRUCTION COORDINATOR
1131 HASTINGS ST.
TRAVERSE CITY, MI 49686
RSOLAK@TCLP.ORG
231-932-4554
DTE GAS
ATTENTION: MATT LOGAN
PI COORDINATOR
1250 MICHCONLANE
KALKASKA, MI 49646
LOGANM@DTEENERGY.COM
231-258-3785
SUGGESTED CONSTRUCTION SEQUENCING
RE
AD
Y
TO
A
DV
ER
TI
SE
3/1 3/2
FLOW
FLOW
REFER TO RIVER RESTORATION PLAN SHEETS FOR
WORK PERTAINING TO RIVER CHANNEL AND
FLOODPLAIN RESTORATION, EXCAVATION, AND
ENGINEERED RIFFLE AND POOL DESIGNS.
GENERAL NOTE:
SURVEY BYBENCHMARKS (DATUM NAVD 88)
BM# 1 FOUND RAILROAD SPIKE IN POWER POLE APPROXIMATELY 70'
EAST OF THE EAST EDGE OF THE SPILLWAY
BM# 2 SET SPIKE IN POWER POLE APPROXIMATELY 125' WEST OF THE
POWERHOUSE AND SOUTH OF ACCESS DRIVE
SABIN DAM TOPOGRAPHY
SURVEY BYDESCRIPTION
BATHYMETRY DATA WITHIN SABIN IMPOUNDMENT WAS COLLECTED BY
INTERFLUVE, INC. BETWEEN JULY 29 AND 31, 2014. DATA WAS COLLECTED
USING A SONAR DEVICE ATTACHED TO A BOAT WITH SINGLE BEAM ECHO
SOUNDER. SUPPLEMENTAL TOPOGRAPHIC AND BATHYMETRIC DATA
DOWNSTREAM OF SABIN DAM COLLECTED BY GROUND SURVEY JULY, 2016.
SABIN IMPOUNDMENT BATHYMETRY &
DOWNSTREAM TOPOGRAPHY
SURVEY BY
LIDAR DATA WAS COLLECTED WITHIN GRAND TRAVERSE COUNTY BY THE
COUNTY. 2' CONTOUR INTERVALS ARE SHOWN ON THIS DRAWING.
GRAND TRAVERSE
COUNTY LIDAR
GRAND TRAVERSE COUNTY
DESCRIPTION
ACCESS ROAD
KEYSTONE RD.
CA
SS
R
OA
D
LEGEND
PROJECT BOUNDARY
SUGGESTED
EXISTING MAJOR
OVERHEAD ELECTRIC
WETLAND AREA
CONTROL POINTS
ACCESS ROUTE
PROPERTY LINE
WETLA
ND AREA
WETLA
ND AREA
WETLA
ND AREA
WETLA
ND AREA
WETLA
ND AREA
WETLA
ND AREA
WETLA
ND AREA
WETLA
ND AREA
WETLA
ND AREA
PARCEL #
05-027-013-00
(PUBLIC)
PROPOSED
ACCESS ROAD
PROPOSED
ACCESS ROAD
TREE LINE
FIBER OPTIC CABLE
GE
NE
RA
L P
LA
N
OF
S
IT
E
T-2.1
APPROXIMATE LOCATION OF
UNDERGROUND FIBER OPTIC CABLE
AT APPROXIMATE ELEVATION OF 591.1 FT
(NAVD 88)
NOTE: CONTRACTOR SHOULD EXERCISE
CAUTION WHEN EXCAVATING TO WITHIN
10 FEET OF THE FIBER OPTIC
CABLE LINE.
POWERHOUSE.
SPILLWAY
SABIN IMPOUNDMENT
BOARDMAN RIVER
PROJECT
BOUNDARY
PARCEL #
05-027-014-00
(PUBLIC)
PARCEL #
05-027-001-10
(PRIVATE)
PARCEL #
05-065-900-00
(PRIVATE)
PARCEL #
05-027-033-00
(PUBLIC)
PARCEL #
05-027-036-00
(PUBLIC)
SEE BREACHING &
STRUCTURAL DEMOLITION
SHEETS
EASEMENT LINES
AECOM DELINEATED WETLANDS
JUNE 21-24 AND JULY 22, 2016
THIS SHEET SHOWS SOME WORK DONE
UNDER THE BOARDMAN DAM REMOVAL PROJECT
WETLAND SURVEY
COMPLETED BY
AECOM JUNE 21-24
AND JULY 22, 2016
LIMITS OF DISTURBANCE
PROJECT
BOUNDARY
LIMITS OF
DISTURBANCE
LIMITS OF
DISTURBANCE
END OF CONSTRUCTION
LIMITS FOR BOARDMAN PROJECT
START OF CONSTRUCTION
LIMITS FOR SABIN PROJECT
CP 1
CP 3
CP 2
CP 4
CP 5 CP 6
CP 7
CP 8
CP 10
CP 13
CP 14
CP 9
CP 11
CP 12
CASS ROAD
PROPOSED EDGE
OF RIVER CHANNEL
PROPOSED BOTTOM
OF RIVER CHANNEL
CONTOUR LINE
COORDINATE SYSTEM: STATE PLANE
ZONE: MICHIGAN CENTRAL 2112
ELLIPSOID: GRS 80
HORIZONTAL DATUM: NAD 83 (CORS 2011)
VERTICAL DATUM: NAVD 88
GEOID: GEOID 12A
UNITS: INTERNATIONAL FEET
SURVEY GENERAL NOTES
BENCHMARKS FOUND
1. BM N 509738.03 E 19358656.91 Z 619.58
RAILROAD SPIKE IN POWER POLE APPROXIMATELY 70 FEET
FROM EAST EDGE OF SPILLWAY.
BENCHMARKS SET
1. BM N 509740.04 E 19358290.32 Z 628.53
SET SPIKE IN POWER POLE APPROXIMATELY 125 FEET WEST
OF POWERHOUSE BUILDING, ON THE SOUTH SIDE OF
ACCESS DRIVE.
BENCHMARKS
THERE ARE NO GOVERNMENT CORNERS WITHIN THE PROJECT LIMITS.
GOVERNMENT CORNERS
NO ALIGNMENT POINTS WERE SET AS PART OF THIS PROJECT.
ALIGNMENT(S) POINTS
CP 1 N 509861.7 E 19358005.56 Z 658.5
CP2 N 509761.2 E 19358229.97 Z 635.47
CP3 N 509667 E 19358252.08 Z 642.02
CP4 N 509746.9 E 19358379.71 Z 619.48
CP5 N 509785.6 E 19358507.07 Z 605.17
CP6 N 509919.9 E 19358511.09 Z 592.27
CP7 N 509743.1 E 19358584.24 Z 617.7
CP8 N 509735.4 E 19358650.29 Z 618.29
CP9 N 509695.9 E 19358650.29 Z 618.14
CP10 N 509704.6 E 19358859.02 Z 617.75
CP11 N 509606 E 19359132.31 Z 623.07
CP12 N 509514.4 E 19359213.58 Z 627.82
CP13 N 509429.1 E 19359278.15 Z 630.43
CP14 N 510230.8 E 19359011.21 Z 596.83
CONTROL POINTS SET
2. BM N 506831.99 E 19357703.89 Z 655.15
SET SPIKE IN POWER POLE 36' WEST OF CASS ROAD
CENTERLINE 61' SOUTH OF PC OF CURVE.
RE
AD
Y
TO
A
DV
ER
TI
SE
3/1 3/2
FL
OW
05-027-014-00
05-065-900-00
HAMMOND RD W
BIRMLEY RD
N K
EY
ST
O N
E R
D
C
ASS R
D
D R
AC
KA
R D
LA
F
R
AN
N GARFIE
N R
U
SC
H R
D
HARTMAN RD
BOARDMAN
IMPOUNDMENT
SABIN
POND
BO
AR
D M
AN
R
IV
ER
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
HAMMOND RD W
BIRMLEY RD
N K
EY
ST
O N
E R
D
C
ASS R
D
D R
AC
KA
R D
LA
F
R
AN
N GARFIE
N R
U
SC
H R
D
HARTMAN RD
BOARDMAN
IMPOUNDMENT
SABIN
POND
BO
AR
D M
AN
R
IV
ER
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
SHEET
AREA
00 50' 100'
BOARDMAN RIVER
LEGEND
OR SHRUB LINE
EDGE OF TREE AND/
OHE
PROPERTY LINE
PAVEMENT BOUNDARY
EXISTING MAJOR
FENCE LINE
OVERHEAD ELECTRIC
WETLAND AREA
WATER SURFACE
ELEVATION AT TIME
CONTOUR LINE
EXISTING MINOR
CONTOUR LINE
RIP RAP MATERIAL
EXISTING
POWERHOUSE
HISTORICAL OVERFLOW
CHANNEL
EXISTING WATER
SURFACE ELEVATION
609.84' (MAY 2014)
SABIN IMPOUNDMENT
PARCEL #
05-027-013-00
GRAND TRAVERSE COUNTY
PARCEL #
05-027-014-00
GRAND TRAVERSE COUNTY
ROAD COMMISSION
PARCEL #
05-027-013-00
GRAND TRAVERSE COUNTY
PARCEL #
05-027-001-00
PRIVATE
PARCEL #
05-027-033-00
GRAND TRAVERSE COUNTY
SO
IL
BO
RI
NG
LO
CA
TI
ON
M
AP
T-3.0
TETRAHEDRON
RIP RAP MATERIAL
EXISTING
SPILLWAY
DOWNSTREAM
WSE = ~592
(MAY 2014)
EXISTING
INTAKE
SOIL BORING LOCATIONS
SOIL BORING
LOCATION (TYP.)
OF SURVEY
AECOM DELINEATED WETLANDS
JUNE 21-24 AND JULY 22, 2016
B-1
B-2 B-3
B-4
(AECOM, 2016)
RE
AD
Y
TO
A
DV
ER
TI
SE
3/1 3/2
LIMITS OF CONSTRUCTION
KEYSTONE RD.
LEGEND
COUNTY PROPERTY LINE
CONSTRUCTION ACCESS
TEMPORARY ACCESS,
WORK & STORAGE
EASEMENT (2.01 acre)
LIMITS OF DISTURBANCE
ROAD
LIMITS OF COUNTY
PROPERTY
CASS RD.
SABIN
IMPOUNDMENT
SABIN
IMPOUNDMENT
CHANNEL &
FLOODPLAIN
IMPROVEMENT
EASEMENT (12.34 acre)
LIMITS OF
CONSTRUCTION (43.96
acre)
STATE LOCATION MAP
GRAND TRAVERSE
COUNTY
RE
AL
E
ST
AT
E
PL
AN
CASS RD.
CONSTRUCTION ACCESS,
WORK & STORAGE EASEMENT
FROM GRAND TRAVERSE COUNTY
CONSTRUCTION ACCESS,
WORK & STORAGE EASEMENT
FROM GRAND TRAVERSE COUNTY
EXISTING
POWERHOUSE& SPILLWAY
CONSTRUCTION ACCESS,
WORK & STORAGE EASEMENT
FROM GRAND TRAVERSE COUNTY
KEYSTONE RD.
CA
SS
R D.
T- .1
RE
AD
Y
TO
A
DV
ER
TI
SE
3/1 3/2
WOODEN FOOT BRIDGE
(PROTECT)
BOARDWALK
(PROTECT)
TRAIL
FL
OW
05-027-014-00
05-065-900-00
HAMMOND RD W
BIRMLEY RD
N K
EY
ST
O N
E R
D
C
ASS R
D
D R
AC
KA
R D
LA
F
R
AN
N GARFIE
N R
U
SC
H R
D
HARTMAN RD
BOARDMAN
IMPOUNDMENT
SABIN
POND
BO
AR
D M
AN
R
IV
ER
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
HAMMOND RD W
BIRMLEY RD
N K
EY
ST
O N
E R
D
C
ASS R
D
D R
AC
KA
R D
LA
F
R
AN
N GARFIE
N R
U
SC
H R
D
HARTMAN RD
BOARDMAN
IMPOUNDMENT
SABIN
POND
BO
AR
D M
AN
R
IV
ER
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
SHEET
AREA
00 50' 100'
BOARDMAN RIVER
LEGEND
OR SHRUB LINE
EDGE OF TREE AND/
OHE
PROPERTY LINE
PAVEMENT BOUNDARY
EXISTING MAJOR
FENCE LINE
OVERHEAD ELECTRIC
WETLAND AREA
WATER SURFACE
ELEVATION AT TIME
CONTOUR LINE
EXISTING MINOR
CONTOUR LINE
RIP RAP MATERIAL
EXISTING
POWERHOUSE
HISTORICAL OVERFLOW
CHANNEL
EXISTING WATER
SURFACE ELEVATION
609.84' (MAY 2014)
SABIN IMPOUNDMENT
PARCEL #
05-027-013-00
GRAND TRAVERSE COUNTY
PARCEL #
05-027-014-00
GRAND TRAVERSE COUNTY
ROAD COMMISSION
PARCEL #
05-027-013-00
GRAND TRAVERSE COUNTY
PARCEL #
05-027-001-00
PRIVATE
PARCEL #
05-027-033-00
GRAND TRAVERSE COUNTY
15" CMP
EX
IS
TI
NG
S
IT
E
TO
PO
GR
AP
HY
B-0.1
TETRAHEDRON
RIP RAP MATERIAL
EXISTING
SPILLWAY
EXISTING
INTAKE
RIVER ACCESS
(REMOVE & RETURN TO OWNER)
RIVER ACCESS
(REMOVE AND RETURN TO OWNER)
OF SURVEY
AECOM DELINEATED WETLANDS
JUNE 21-24 AND JULY 22, 2016
STAIRS
(TO BE REMOVED)
TRAIL
EXISTING EARTHEN DAM
EMBANKMENT CREST = ~618
DOWNSTREAM
WSE = ~592
(MAY 2014)
NOTE: ALL REMOVED/SALVAGED TRAIL AND RIVER ACCESS
APPURTENANCES TO BE VERIFIED WITH OWNER. CARE SHALL BE
TAKEN WHEN REMOVING CEDAR FENCING.
RE
AD
Y
TO
A
DV
ER
TI
SE
3/1 3/2
HAMMOND RD W
BIRMLEY RD
N K
EY
ST
O N
E R
D
C
ASS R
D
D R
AC
KA
R D
LA
F
R
AN
N GARFIE
N R
U
SC
H R
D
HARTMAN RD
BOARDMAN
IMPOUNDMENT
SABIN
POND
BO
AR
D M
AN
R
IV
ER
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
HAMMOND RD W
BIRMLEY RD
N K
EY
ST
O N
E R
D
C
ASS R
D
D R
AC
KA
R D
LA
F
R
AN
N GARFIE
N R
U
SC
H R
D
HARTMAN RD
BOARDMAN
IMPOUNDMENT
SABIN
POND
BO
AR
D M
AN
R
IV
ER
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
SHEET
AREA
CASS ROAD
00 100' 200'
LEGEND
OR SHRUB LINE
EDGE OF TREE AND/
OHE
PAVEMENT BOUNDARY
EXISTING MAJOR
FENCE LINE
OVERHEAD ELECTRIC
WETLAND BOUNDARY
WATER SURFACE
ELEVATION
CONTOUR LINE
EXISTING MINOR
CONTOUR LINE
EQUIPMENT STAGING
EQUIPMENT STAGING
MATERIAL STORAGE
AREA / LEAVE OPEN FOR
POSSIBLE SPOILS AREA C
TEMPORARY CONSTRUCTION
ENTRANCE
TEMPORARY CONSTRUCTION
ENTRANCE
PROPOSED
ACCESS ROAD
EQUIPMENT STAGING
MATERIAL STORAGE
GE
NE
RA
L S
IT
E
PL
AN
B-1.1
POWERHOUSE
SPILLWAY
CA
SS
R
OA
D
RIP RAP
MATERIAL
TETRAHEDRON
RIPRAP
MOVE EXISTING GATE AND REINSTALL
APPROXIMATELY 100 FEET
BACK FROM KEYSTONE ROAD
TEMPORARY CONSTRUCTION
ENTRANCE (SEE DETAIL ON SHEET B-1.3)
EQUIPMENT STAGING
KE
YS
TO
NE
R
OA
D
CONTROL POINT 1
NORTHING: 509861.7
EASTING: 19358005.56
CONTROL POINT 2
NORTHING: 509761.2
EASTING: 19358229.97
CONTROL POINT 3
NORTHING: 509667
EASTING: 19358252.08
CONTROL POINT 4
NORTHING: 509746.9
EASTING: 19358376.718
CONTROL POINT 5
NORTHING: 509785.6
EASTING: 19358507.07
CONTROL POINT 6
NORTHING: 509919.9
EASTING: 19358511.09
CONTROL POINT 7
NORTHING: 509743.1
EASTING: 19358584.24
CONTROL POINT 8
NORTHING: 509735.4
EASTING: 19358650.29
CONTROL POINT 9
NORTHING: 509695.9
EASTING: 19358759.3
CONTROL POINT 10
NORTHING: 509704.6
EASTING: 19358859.02
CONTROL POINT 11
NORTHING: 509606
EASTING: 19359132.31
CONTROL POINT 12
NORTHING: 509514.4
EASTING: 19359213.58
CONTROL POINT 13
NORTHING: 509429.1
EASTING: 19359278.15
CONTROL POINT 14
NORTHING: 510230.8
EASTING: 19359011.21
SURVEY CONTROL
POINT
LIMITS OF
DISTURBANCE
RE
AD
Y
TO
A
DV
ER
TI
SE
3/1 3/2
BIRMLEY RD
K
EY
ST
O N
E
C
ASS R
D
D R
AC
KA
R D
SABIN
POND
BO
AR
D
BROAD
RD
DIPLEY RD
SHEET
AREA
OHE
OHE
OHE
OHE
OHE
OHE
OHE
00 100' 200'
MATERIAL STORAGE
AREA
WETLAND AREA
WETLAND AREA
EQUIPMENT STAGING
AREA
TEMPORARY CONSTRUCTION ENTRANCE
(SEE DETAIL SE50 - SHEET B-1.3)
CONSTRUCTION
ACCESS ROAD
LEGEND
OHE
PAVEMENT BOUNDARY
EXISTING MAJOR
OVERHEAD ELECTRIC
ACCESS ROAD
CONTOUR LINE
EXISTING MINOR
CONTOUR LINE
CONSTRUCTION ACCESS ROAD
EXISTING TREE
LINE
EXISTING TREE
LINE
POWERHOUSE
RELIC DAM AND
SPILLWAY
TEMPORARY CONSTRUCTION
ENTRANCE
(SEE DETAIL SE50 - SHEET B-1.3)
SILT FENCE
(SEE DETAIL SE26 - SHEET B-1.3)
SILT FENCE (SEE DETAIL
SE26 - SHEET B-1.3)
SILT FENCING
SILT FENCE (SEE DETAIL
SE26 - SHEET B-1.3)
GRAVEL ACCESS
PAD
SPILLWAY
1. THE CONTRACTOR SHALL COMPLY WITH GRAND TRAVERSE COUNTY
RULES & REGULATIONS FOR SOIL EROSION CONTROL & SUBMIT A
SCHEDULE OF SOIL EROSION ACTIVITIES TO THE LOCAL ENFORCING
AGENCY PRIOR TO ANY EARTH CHANGE AND AFTER RECEIVING A NOTICE
OF COVERAGE AND COMPLIANCE. AT COMPLETION OF CONSTRUCTION
ACTIVITIES OR UPON REQUEST FOR REVIEW, SUBMIT INSPECTION LOG
BOOK TO THE COUNTY AND THE COR.
2. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE
CATEGORIZED AS INITIAL, INTERIM, AND FINAL MEASURES. INITIAL
MEASURES SHALL BE IMPLEMENTED PRIOR TO ANY MAJOR SOIL
DISTURBANCE ON THE SITE, AND SHALL BE LOCATED AT AND ADJACENT
TO AREAS THAT WILL BE DISTURBED AT THE START OF CONSTRUCTION
(TEMPORARY ACCESS ROADS, ACCESS ROAD ENTRANCE/EXIT POINTS
FROM THE SITE, AND DOWNSLOPE OF THE EXCAVATIONS AT THE DAM,).
INTERIM MEASURES SHALL BE APPLIED TO AREAS THAT WILL BE
DISTURBED AS CONSTRUCTION PROGRESSES (DOWNSLOPE OF SPOIL
DISPOSAL AREAS, STOCKPILE PERIMETERS). FINAL MEASURES SHALL BE
APPLIED UPON COMPLETION OF CONSTRUCTION, AND MAY CONSIST OF
MAINTENANCE AND UPGRADES OF PREVIOUSLY PLACED INITIAL OR
INTERIM MEASURES.
3. ANY DISTURBED AREAS THAT WILL BE LEFT EXPOSED MORE THAN 30
DAYS, AND NOT SUBJECT TO CONSTRUCTION TRAFFIC, WILL
IMMEDIATELY RECEIVE TEMPORARY SEEDING AS SPECIFIED IN
SPECIFICATION SECTION 32 90 00.
4. CONTRACTOR SHALL FENCE OFF AND PROTECT TREES/AREAS
DESIGNATED BY COR.
5. THE LOCATION OF ANY STOCKPILES SHALL BE DESIGNATED BY THE COR
PRIOR TO CONSTRUCTION. THIS AREA SHALL BE ENCLOSED BY SILT FENCE
A REASONABLE DISTANCE FROM THE TOE OF SLOPE UNTIL SUCH TIME IT
IS USED.
EROSION CONTROL NOTES
WETLAND AREA
WETLAND AREA
WETLAND AREA
WETLAND AREA
WETLAND AREA
W
ET
LA
ND
A
RE
A
WETLAND AREA
SILT FENCE (SEE DETAIL
SE26 - SHEET B-1.3)
EXISTING 15' CMP
SO
IL
ER
OS
IO
N
AN
D
SE
DI
ME
NT
AT
IO
N
CO
NT
RO
L P
LA
N
B-1.2
RIP RAP
MATERIAL
TETRAHEDRON
RIPRAP
6. A CRUSHED STONE, STABILIZED CONSTRUCTION ACCESS PAD WILL BE
INSTALLED WHEREVER A CONSTRUCTION ACCESS ROAD INTERSECTS A
PAVED ROADWAY. SAID PAD WILL MEET THE REQUIREMENTS OF THE
TEMPORARY CONSTRUCTION ENTRANCE DETAIL ON SHEET B-1.3.
7. SLOPES STEEPER THAN 1V:4H (25%) LOCATED WITHIN THE DAM
BREACHING AREA ARE TO BE STABILIZED WITH EROSION CONTROL
BLANKETS PER SECTION 31 40 00.
8. ALL WETLANDS NOT LOCATED WITHIN LIMITS OF DISTURBANCE SHALL
BE PROTECTED WITH SILT FENCE AND SHALL NOT BE DISTURBED.
9. CONCRETE RUBBLE MAY BE SALVAGED AND USED FOR TEMPORARY
EROSION CONTROL, BUT ALL METAL SHALL BE CUT FLUSH AND
DISPOSED OF OFF-SITE.
SILT FENCE
(SEE DETAIL SE26 - SHEET B-1.3)
WETLAND BOUNDARY
TEMPORARY CONSTRUCTION
ENTRANCE (SEE DETAIL SE50 - SHEET B-1.3)
SILT FENCE
(SEE DETAIL SE26 - SHEET B-1.3)
WETLAND AREA
WETLAND AREA
BEAVER POND PARKING AREA
EQUIPMENT STAGING
BEAVER POND PARKING AREA ACCESS OFF OF CASS ROAD
EQUIPMENT
STAGING AREA
MATERIAL
STORAGE AREA
TEMPORARY IN-CHANNEL
SEDIMENT TRAPS
EQUIPMENT STAGING
AREA
SILT FENCE
(SEE DETAIL SE26 - SHEET B-1.3)
RE
AD
Y
TO
A
DV
ER
TI
SE
3/1 3/2
SE50
6" MIN. 1"-3" CLEAN WASHED STONE
6" MIN. OF 1"-3" CLEAN WASHED STONE
20' RADIUS
12" MIN.
6" MIN. OF 1"-3" CLEAN WASHED STONE10'EXISTING
PAVEMENT
1:4 OR
FLATTER
MATCH ELEVATION
OF TOP OF EXISTING
PAVEMENT
EXCAVATE TO CONFORM
TO PAVEMENT OR CURB,
SEE JOIN DETAIL
EXISTING PAVED
TAPER AT ALL EDGES
BERM, 8"
HEIGHT BY 36"
WIDTH
50' MIN.
20' MIN
NON-WOVEN GEOTEXTILE
FABRIC
TAPER EDGES
AT 2H : 1V
ORIGINAL
GROUND
6"
MIN
12"
TYP CROSS SLOPE
3% OR FLATTER
JOIN DETAIL
PERSPECTIVE
SECTION A-A
NON-WOVEN GEOTEXTILE FABRIC
SPACING PER MANUF.
MI
N.1'
SECTION A-A
GEOTEXTILE FILTER FABRIC
FASTENED ON UPHILL SIDE
TOWARDS EARTH
DISRUPTION
RIDGE OF COMPACTED EARTH
ON UPHILL SIDE OF GEOTEXTILE
FILTER FABRIC
6"x6"
ANCHORING
TRENCH
GEOTEXTILE FABRIC SHALL
BE WRAPPED AROUND EACH
FENCE POST
SILT FENCE A
SILT FENCE B
VIEW B-B
SILT FENCE JOINT
FRONT VIEW
GEOTEXTILE FILTER FABRIC
REFER TO M.D.O.T. SOIL EROSION &
SEDIMENTATION CONTROL MEASURES R-96-B
UNDISTURBED VEGETATIONGEOTEXTILE
FILTER
FABRIC
FENCE
POST
COMPACTED
EARTH
SH
EE
T
FL
OW
SILT FENCE JOINT,
REFER TO VIEW B-B
6" ANCHOR
TRENCH
UNDISTURBED
VEGETATION
SH
EE
T
FL
OW
A
TOE-IN BLANKET 8"
MIN. AT TOP (TYP.
BOTH SIDES)
REFER TO M.D.O.T. SOIL EROSION &
SEDIMENTATION CONTROL MEASURES R-96-B
EROSION CONTROL BLANKETS
STAPLING PATTERN PER MANUF.
RECOMMENDATIONS
REFER TO PLANS
FOR SLOPES & WIDTHS
SE48
SE50
6" MIN. OF MDOT 21 AA NON-WOVEN GEOTEXTILE
FABRIC
TAPER EDGES
AT 2H : 1V
ORIGINAL
GROUND
6"
MIN
CROSS SLOPE
3% OR FLATTER
SECTION A-A
SE26
20'
FILL AS NECESSARY
BETWEEN AGGREGATE
AND GEOTEXTILE
SLOPE AWAY FROM ROAD FOR 5'
10'
AGGREGATE OR SIMILAR
NOTE: CONTRACTOR TO INSTALL TEMPORARY
CULVERTS AS NECESSARY TO ACCOMMODATE
SEAPS AND TRIBUTARIES.
ROADWAY
1. SILT FENCE SHALL BE INSPECTED AND REPAIRED IMMEDIATELY FOLLOWING ANY
SIGNIFICANT RAINFALL (EQUAL TO OR GREATER THAN 0.5 INCHES/24HR) AND DAILY DURING
PROLONGED RAINFALL. OTHERWISE, INSPECTION SHALL BE WEEKLY, AT A MINIMUM.
2. SEDIMENT SHALL BE REMOVED FROM THE UPSTREAM FACE OF THE SEDIMENT BARRIER
WHEN IT HAS REACHED A 1/3 DEPTH OF THE BARRIER HEIGHT.
3. REPAIR OR REPLACE BARRIER (FABRIC, POSTS, BALES, ETC.) WHEN DAMAGED.
4. IF THE SILT FENCE DRIFTS FROM ITS INSTALLED LOCATION OR BECOMES PARTIALLY
SUBMERGED, REPAIR SHOULD BE IMMEDIATELY UNDERTAKEN.
5. REGULARLY REMOVE ANY COLLECTED DEBRIS THAT IMPEDES THE FUNCTION OF THE FENCE.
INSPECTION AND MAINTENANCE:
SEDIMENT BARRIERS:
1. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT
TRACKING OR FLOWING OF SEDIMENT ONTO PAVEMENT. THIS MAY REQUIRE PERIODIC
TOP DRESSING WITH ADDITIONAL STONE OR ADDITIONAL LENGTH AS CONDITIONS
DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT.
ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO ROADWAYS (PUBLIC OR
PRIVATE) OR OTHER IMPERVIOUS SURFACES MUST BE REMOVED IMMEDIATELY.
2. WHERE ACCUMULATION OF DUST/SEDIMENT IS INADEQUATELY CLEANED OR
REMOVED BY CONVENTIONAL METHODS, A POWER BROOM OR STREET SWEEPER WILL BE
REQUIRED TO CLEAN PAVED OR IMPERVIOUS SURFACES. ACCESS POINTS TO THE WORK
AREA SHALL BE CONTROLLED.
STABILIZED CONSTRUCTION ACCESS:
SO
IL
ER
OS
IO
N
DE
TA
ILS
B-1.3
RE
AD
Y
TO
A
DV
ER
TI
SE
3/1 3/2
HAMMOND RD W
BIRMLEY RD
N K
EY
ST
O N
E R
D
C
ASS R
D
D R
AC
KA
R D
LA
F
R
AN
N GARFIE
N R
U
SC
H R
D
HARTMAN RD
BOARDMAN
IMPOUNDMENT
SABIN
POND
BO
AR
D M
AN
R
IV
ER
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
HAMMOND RD W
BIRMLEY RD
N K
EY
ST
O N
E R
D
C
ASS R
D
D R
AC
KA
R D
LA
F
R
AN
N GARFIE
N R
U
SC
H R
D
HARTMAN RD
BOARDMAN
IMPOUNDMENT
SABIN
POND
BO
AR
D M
AN
R
IV
ER
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
SHEET
AREA 00 20' 40'
LEGEND
OR SHRUB LINE
EDGE OF TREE AND/
OHE
PAVEMENT BOUNDARY
EXISTING MAJOR
FENCE LINE
OVERHEAD ELECTRIC
WETLAND BOUNDARY
WATER SURFACE
ELEVATION
CONTOUR LINE
EXISTING MINOR
CONTOUR LINE
APPROXIMATE STARTING WSE
AT BEGINNING OF BREACHING
OPERATION. WSE = ~609'
DA
M
BR
EA
CH
IN
G
PL
AN
V
IE
W
ST
AG
E
1 &
ST
AG
E
B-2.1
RIP RAP
MATERIAL
TETRAHEDRON
RIPRAP
1. REMOVE SPILLWAY CONCRETE STRUCTURE DOWN TO WSE AT TIME OF
CONSTRUCTION (~609'), LEAVING SPILLWAY WALLS AT ELEVATION 615.
LOWER GRADES BEHIND SPILLWAY SIDEWALLS TO NO HIGHER THAN EL.
614.5 PRIOR TO BEGINNING STAGE 2 WORK. EXCAVATE SEDIMENT OUT
FROM IN FRONT OF SPILLWAY INLET TO FACILITATE RIVER FLOW.
INSTALL SEDIMENT TRAP UPSTREAM OF SPILLWAY. [STAGE 1]
2. CONTINUE DEMOLITION OF SPILLWAY CONCRETE AT 1' INCREMENTS TO
DRAW DOWN POND. CONSTRUCT DOWNSTREAM RIVER ACCESS TO
THE WEST OF THE POWERHOUSE. [STAGE 2] WORK ON UPSTREAM
CHANNEL RESTORATION CAN BEGIN AT THIS STAGE SEE RIVER
RESTORATION SHEETS FOR GRADES AND DETAILS.
3. ONCE IMPOUNDMENT IS DRAWN DOWN BELOW POWERHOUSE INTAKE
SILL, INSTALL STOP LOGS AT INTAKE GATES TO ISOLATE FLOW TO THE
SPILLWAY. INSTALL FLOW DIVERSION BERM DOWNSTREAM BETWEEN
THE POWERHOUSE AND SPILLWAY OUTLET TO ISOLATE DOWNSTREAM
RIVER FLOW TO THE EAST SIDE OF THE RIVER CHANNEL. BEGIN
CONSTRUCTION OF RESTORED RIVER CHANNEL DOWNSTREAM OF THE
POWERHOUSE. [STAGE 3]
4. DURING THIS TIME FLOW WILL BE EXCLUSIVELY PASSING THROUGH THE
SPILLWAY. UPON REACHING ELEVATION 598.5' AT THE SPILLWAY, STOP
DEMOLITION AT THE SPILLWAY. GRADE BEHIND THE SPILLWAY
SIDEWALLS SHALL BE MAINTAINED AT 6 FEET ABOVE THE CURRENT
ELEVATION OF THE SPILLWAY (NO HIGHER OR LOWER) AT ALL TIMES
DURING STAGE 2, 3, AND 4 ACTIVITIES. THIS WILL BE STRICTLY
ENFORCED. INSTALL TEMPORARY BULK BAG COFFERDAM UPSTREAM OF
POWERHOUSE. DEMOLISH POWERHOUSE 6 FEET BELOW PROPOSED
RIVER CHANNEL GRADES AND CONSTRUCT RESTORED RIVER CHANNEL
THROUGH AND UPSTREAM OF FORMER POWERHOUSE. [STAGE 4]
5. ONCE RESTORED RIVER CHANNEL HAS BEEN FULLY CONSTRUCTED
THROUGH THE POWERHOUSE, BEGIN FINAL DRAW DOWN BY
INCREMENTALLY LOWERING THE BULK BAG COFFERDAM UPSTREAM OF
THE POWERHOUSE. [STAGE 5]
6. ONCE FLOW IS FULLY DIVERTED TO RESTORED RIVER CHANNEL,
DEMOLISH ANY REMAINING SPILLWAY STRUCTURE AT LEAST 2 FEET
BELOW FINAL GRADE AND FILL TO MATCH THE DESIGN PLANS AND
COMPLETE SITE RESTORATION ACTIVITIES. [STAGE 6]
DAM BREACHING SEQUENCE
CONTRACTOR TO NOTIFY AND
COORDINATE WITH UTILITY
COMPANIES AS DESIGNATED
IN SPECIFICATIONS POWERHOUSE
SPILLWAY
REMOVE GATES, EQUIPMENT,
AND WALKWAY. REMOVE SPILLWAY
TO ELEVATION 609'. PROTECT SPILLWAY
WALLS DURING DEMOLITION. [STAGE 1]
REFER TO SHEET B-2.2
FOR SECTION A-A
REFER TO SHEET B-2.2
FOR SECTION B-B
CONTINUE OGEE SPILLWAY REMOVAL
AT 1' INCREMENTS TO ELEVATION 606'
[STAGE 2]
ACCESS ROAD
PROPOSED MAJOR
CONTOUR LINE
PROPOSED MINOR
CONTOUR LINE
INSTALL SEDIMENT TRAP
(SEE SHEET R-3.2)
[STAGE 1]
REMOVE FENCE [STAGE 1]
REMOVE FENCE [STAGE 1]
REMOVE FENCE
CONSTRUCTED RIVER ACCESS [STAGE 2]
LOWER GRADE BEHIND
WALLS TO 614.5 [STAGE 1]
EXCAVATION
EQUIPMENT STAGING AREA
EQUIPMENT STAGING
LIMITS OF
DISTURBANCE
EQUIPMENT
STAGING AREA
RE
AD
Y
TO
A
DV
ER
TI
SE
3/1 3/2
10'
1.5H:1V 1.5 H:
1V
10'
LEGEND
EXISTING GROUND SURFACE
CONCRETE BOUNDARIES
EXISTING PROFILE THROUGH THE DAM POWERHOUSE AND SPILLWAY
(REFER TO B-2.1 FOR PLAN VIEW)
EXISTING PROFILE THROUGH SPILLWAY
(REFER TO B-2.1 FOR PLAN VIEW)
POWERHOUSE
WALKWAY
WALKWAY
TURBINE FLOOR
(EL. 603')
TAINTER GATE
STOP LOG GATE
FLOOR
WINGWALL
TETRAHEDRON
RIP RAP
WALKWAY
TAINTER GATE OPENING
APPROX. EXTENT
OF RELIC DAM
Feet
60300
H/V RATIO = 4:1H/V RATIO = 4:1
SHEETPILE
CONCRETE
SPILLWAY
BOTTOM OF
CONCRETE SPILLWAY
608.9' 600.3'
DA
M
PR
OF
ILE
V
IE
W
S
B-2.2
INITIAL DEMOLITION TO
ELEVATION 609' [STAGE 1]
DEMOLITION TO 598.5'
[STAGE 2] - [STAGE 4]
STARTING WSE = ~609'
STAGE 1
WSE = 606' ACHIEVED
DURING INCREMEMTAL
DRAWDOWN STAGE 2 - STAGE 3
APPROX. WSE = 600'
STAGE 4
STARTING
WSE = ~609'
STAGE1
WSE = 606' ACHIEVED
DURING INCREMEMTAL
DRAWDOWN STAGE 2 - STAGE 3
APPROX. WSE = 600'
STAGE 4
APPROXIMATE INTAKE
SILL ELEVATION 606'
TOP OF TETRAHEDRON
RIP RAP (EL. 599')
SECTION A-A SECTION B-B
REMOVE SOIL TO EL 614.5
AT END OF STAGE 1
INCREMENTALLY REMOVE
BACKFILL FROM WALLS, SUCH
THAT BACKFILL GRADE IS 6 FEET
ABOVE CURRENT SPILLWAY BREACH
ELEVATION (NO HIGHER OR LOWER)
[STAGES 2, 3, AND 4]
RE
AD
Y
TO
A
DV
ER
TI
SE
3/1 3/2
C
FL
OW
7+
.00
8+
.00
9+
.0
0+
.0
1+
.0
2+
.0
3+
.0
6+
7+
.00
8+
.0
9+
.0
0+
.0
1+
.0
2+
.0
HAMMOND RD W
BIRMLEY RD
N K
EY
ST
O N
E R
D
C
ASS R
D
D R
AC
KA
R D
LA
F
R
AN
N GARFIE
N R
U
SC
H R
D
HARTMAN RD
BOARDMAN
IMPOUNDMENT
SABIN
POND
BO
AR
D M
AN
R
IV
ER
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
HAMMOND RD W
BIRMLEY RD
N K
EY
ST
O N
E R
D
C
ASS R
D
D R
AC
KA
R D
LA
F
R
AN
N GARFIE
N R
U
SC
H R
D
HARTMAN RD
BOARDMAN
IMPOUNDMENT
SABIN
POND
BO
AR
D M
AN
R
IV
ER
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
SHEET
AREA 00 30' 60'
LEGEND
OR SHRUB LINE
EDGE OF TREE AND/
OHE
PAVEMENT BOUNDARY
EXISTING MAJOR
FENCE LINE
OVERHEAD ELECTRIC
WETLAND BOUNDARY
WATER SURFACE
ELEVATION
CONTOUR LINE
EXISTING MINOR
CONTOUR LINE
DURING STAGE 3
DRAWDOWN IS OCCURING
IN 1 FOOT INCREMENTS
DA
M
BR
EA
CH
IN
G
PL
AN
V
IE
W
ST
AG
E
B-3.1
RIP RAP
MATERIAL
TETRAHEDRON
RIPRAP
POWERHOUSE
INSTALL STOPLOGS AT
INTAKE GATE TO ISOLATE
FLOW TO THE SPILLWAY.
[STAGE 3]
(STOPLOGS AVAILABLE
ONSITE)
SPILLWAY
RELICT SPILLWAY
FROM OLD DAM
INSTALL FLOW
DIVERSION BERM
TO SEPARATE FLOW.
[STAGE 3]
INCREMENTALLY LOWER/REMOVE
THE OGEE SPILLWAY AT A RATE
NO FASTER THAN 1 FOOT PER DAY
TO ELEVATION 600'. COORDINATE WITH
UPSTREAM CHANNEL CONSTRUCTION
SEQUENCE. [STAGE 2]
REFER TO SHEET B-2.2
FOR SECTION B-B
ACCESS ROAD
RESTORED RIVER
CHANNEL BOTTOM. [STAGE 3]
RESTORED RIVER
CHANNEL TOP OF BANK.
[STAGE 3]
FLOW DIVERSION
STRUCTURE
THROUGH THE DOWNSTREAM FLOW DIVERSION BERM
H/V RATIO = 4:1
THROUGH THE DOWNSTREAM FLOW DIVERSION BERM
H/V RATIO = 4:1
FLOW DIVERSION BERM
CREST EL. 596
FLOW DIVERSION
BERM
EXISTING GROUND
SURFACE
EXISTING GROUND
SURFACE
12'
2:1 SIDE SLOPES
APPROXIMATE 10-YEAR
FLOOD WSE
PROPOSED MAJOR
CONTOUR LINE
PROPOSED MINOR
CONTOUR LINE
REFER TO SHEET B-2.2
FOR SECTION A-A
SECTION C-C
SECTION D-D
INTERFACE WHERE FILL MATERIAL
MEETS EXISTING GROUND SHOULD BE
CONSTRUCTED TO ENSURE ADEQUATE
BOND BETWEEN TWO MATERIALS
MDOT PLAIN
RIP RAP ARMORING
2 TIMES THE D50,
OR 1.5 FT THICK
MDOT PLAIN
RIP RAP ARMORING
INSTALL MDOT PLAIN RIPRAP
ARMORING FOR FLOW
DIVERSION STRUCTURE.
[STAGE 3]
GEOTEXTILE
LINER
1. REMOVE SPILLWAY CONCRETE STRUCTURE DOWN TO WSE AT TIME OF
CONSTRUCTION (~609'), LEAVING SPILLWAY WALLS AT ELEVATION 615.
LOWER GRADES BEHIND SPILLWAY SIDEWALLS TO NO HIGHER THAN EL.
614.5 PRIOR TO BEGINNING STAGE 2 WORK. EXCAVATE SEDIMENT OUT
FROM IN FRONT OF SPILLWAY INLET TO FACILITATE RIVER FLOW. INSTALL
SEDIMENT TRAP UPSTREAM OF SPILLWAY. [STAGE 1]
2. CONTINUE DEMOLITION OF SPILLWAY CONCRETE AT 1' INCREMENTS TO
DRAW DOWN POND. CONSTRUCT DOWNSTREAM RIVER ACCESS TO THE
WEST OF THE POWERHOUSE. [STAGE 2] WORK ON UPSTREAM CHANNEL
RESTORATION CAN BEGIN AT THIS STAGE SEE RIVER RESTORATION
SHEETS FOR GRADES AND DETAILS.
3. ONCE IMPOUNDMENT IS DRAWN DOWN BELOW POWERHOUSE INTAKE
SILL, INSTALL STOP LOGS AT INTAKE GATES TO ISOLATE FLOW TO THE
SPILLWAY. INSTALL FLOW DIVERSION BERM DOWNSTREAM BETWEEN
THE POWERHOUSE AND SPILLWAY OUTLET TO ISOLATE DOWNSTREAM
RIVER FLOW TO THE EAST SIDE OF THE RIVER CHANNEL. BEGIN
CONSTRUCTION OF RESTORED RIVER CHANNEL DOWNSTREAM OF THE
POWERHOUSE. [STAGE 3]
4. DURING THIS TIME FLOW WILL BE EXCLUSIVELY PASSING THROUGH THE
SPILLWAY. UPON REACHING ELEVATION 598.5' AT THE SPILLWAY, STOP
DEMOLITION AT THE SPILLWAY. GRADE BEHIND THE SPILLWAY
SIDEWALLS SHALL BE MAINTAINED AT 6 FEET ABOVE THE CURRENT
ELEVATION OF THE SPILLWAY (NO HIGHER OR LOWER) AT ALL TIMES
DURING STAGE 2, 3, AND 4 ACTIVITIES. THIS WILL BE STRICTLY
ENFORCED. INSTALL TEMPORARY BULK BAG COFFERDAM UPSTREAM OF
POWERHOUSE. DEMOLISH POWERHOUSE 6 FEET BELOW PROPOSED
RIVER CHANNEL GRADES AND CONSTRUCT RESTORED RIVER CHANNEL
THROUGH AND UPSTREAM OF FORMER POWERHOUSE. [STAGE 4]
5. ONCE RESTORED RIVER CHANNEL HAS BEEN FULLY CONSTRUCTED
THROUGH THE POWERHOUSE, BEGIN FINAL DRAW DOWN BY
INCREMENTALLY LOWERING THE BULK BAG COFFERDAM UPSTREAM OF
THE POWERHOUSE. [STAGE 5]
6. ONCE FLOW IS FULLY DIVERTED TO RESTORED RIVER CHANNEL,
DEMOLISH ANY REMAINING SPILLWAY STRUCTURE AT LEAST 2 FEET
BELOW FINAL GRADE AND FILL TO MATCH THE DESIGN PLANS AND
COMPLETE SITE RESTORATION ACTIVITIES. [STAGE 6]
DAM BREACHING SEQUENCE
INCREMENTALLY REMOVE BACKFILL
FROM WALLS, SUCH THAT BACKFILL
GRADE IS 6 FEET ABOVE CURRENT
SPILLWAY BREACH LEVEL (NO HIGHER
OR LOWER) [STAGE 3]
EXCAVATION
BERM CONSTRUCTED OF
GRANULAR FILL MATERIAL
RESTORED RIVER
CHANNEL ALIGNMENT
LIMITS OF
DISTURBANCE
EQUIPMENT STAGING
EQUIPMENT STAGING
APPROXIMATE 10-YEAR
FLOOD WSE
RE
AD
Y
TO
A
DV
ER
TI
SE
3/1 3/2
F
FL
OW
8+
.00
9+
.0
0+
.0
1+
.0
2+
.0
HAMMOND RD W
BIRMLEY RD
N K
EY
ST
O N
E R
D
C
ASS R
D
D R
AC
KA
R D
LA
F
R
AN
N GARFIE
N R
U
SC
H R
D
HARTMAN RD
BOARDMAN
IMPOUNDMENT
SABIN
POND
BO
AR
D M
AN
R
IV
ER
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
HAMMOND RD W
BIRMLEY RD
N K
EY
ST
O N
E R
D
C
ASS R
D
D R
AC
KA
R D
LA
F
R
AN
N GARFIE
N R
U
SC
H R
D
HARTMAN RD
BOARDMAN
IMPOUNDMENT
SABIN
POND
BO
AR
D M
AN
R
IV
ER
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
SHEET
AREA 00 20' 40'
LEGEND
OR SHRUB LINE
EDGE OF TREE AND/
OHE OHE
PAVEMENT BOUNDARY
EXISTING MAJOR
FENCE LINE
OVERHEAD ELECTRIC
WETLAND BOUNDARY
WATER SURFACE
ELEVATION
CONTOUR LINE
EXISTING MINOR
CONTOUR LINE
APPROXIMATE WSE = 600'
WITH ALL FLOW PASSING
THROUGH SPILLWAY
DA
M
BR
EA
CH
IN
G
PL
AN
V
IE
W
ST
AG
E
4 &
ST
AG
E
B-4.1
RIP RAP
MATERIAL
TETRAHEDRON
RIPRAP
POWERHOUSE
SPILLWAY
INCREMENTALLY LOWER/REMOVE
THE REMAINING SPILLWAY AT A RATE
NO FASTER THAN 1 FOOT PER DAY
TO ELEVATION 598.5'. COORDINATE
WITH UPSTREAM CHANNEL CONSTRUCTION.
[STAGE 4]
REFER TO SHEET B-2.2
FOR SECTION B-B
REFER TO SHEET B-4.2
FOR SECTION E-E.
RESTORED RIVER
CHANNEL BOTTOM.
(REFER TO SHEET R-1.2)
[STAGE 3]
RESTORED RIVER
CHANNEL TOP OF BANK.
(REFER TO SHEET R-1.2)
[STAGE 3]
REMOVE POWERHOUSE
SUPERSTRUCTURE AND
APPURTENANCES.
[STAGE 4]
TEMPORARY BULK BAG COFFERDAM
TO ALLOW FOR DEMOLITION OF
POWERHOUSE AND CONSTRUCTION OF
RESTORED RIVER CHANNEL IN
NON-FLOWING CONDITIONS. [STAGE 4]
ACCESS ROAD
FLOW DIVERSION
STRUCTURE
TEMPORARY BULK BAG COFFERDAM
WRAP IMPERMEABLE
LAYER OVER UPSTREAM
SIDE OF BAGS
STACK TO HEIGHT NECESSARY FOR DIVERSION
PER MANUFACTURE'S RECOMMENDATION
MINIMUM SANDBAGS SIZE 3'X3'X3'
WITH ENCLOSED TOP
NOTE: BULK BAGS TO BE INSTALLED PER MANUFACTURE'S RECOMMENDATIONS. AFTER POWERHOUSE IS FULLY DEMOLISHED AND RIVER CHANNEL FULLY RESTORED DOWNSTREAM OF THE BAGS, REMOVE TOP ROW OF BULK BAGS, STARTING AT CHANNEL CENTERLINE, AT RATE THAT PRODUCES MAXIMUM DRAWDOWN IN IMPOUNDMENT OF ONE FOOT PER DAY. REPEAT FOR SUBSEQUENT ROWS. ULTIMATE DRAWDOWN RATE TO BE DETERMINED BY SEDIMENT MANAGEMENT NEEDS.
TOP OF BULK BAG
EL. 604.00
PLACE MDOT HEAVY RIPRAP LET DOWN RAMP
DOWNSTREAM OF BULK BAG COFFERDAM
WITHIN CHANNEL. ROCK TO BE CONSISTENT
WITH PROPOSED CHANNEL BED MATERIAL.
REFER TO SHEET B-4.2
FOR SECTION F-F
PROPOSED MAJOR
CONTOUR LINE
PROPOSED MINOR
CONTOUR LINE
REFER TO SHEET B-2.2
FOR SECTION A-A
REMOVE PAVEMENT, CONCRETE,
AND APPURTENANCES. [STAGE 4]
AFTER DEWATERING THROUGH
THE SPILLWAY IS COMPLETE,
CONTRACTOR MAY REMOVE OR
BURY TETRAHEDRONS.
[STAGE 5]
NON-WOVEN GEOTEXTILE
SEPARATOR, MDOT 910
PLACE 12" OF MDOT 6 AAA
AGGREGATE STONE LAYER
AS BASE OF BULK BAG BERM.
EXCAVATE INTO EXISTING SEDIMENTS TO
PLACE BOTTOM OF BULK BAGS 1 FOOT BELOW
PROPOSED RIVER GRADE OF 596.
FLOW
DEMOLITION
EXTENT
SAWCUT EDGE [STAGE 4]
1. REMOVE SPILLWAY CONCRETE STRUCTURE DOWN TO WSE AT TIME OF
CONSTRUCTION (~609'), LEAVING SPILLWAY WALLS AT ELEVATION 615. LOWER
GRADES BEHIND SPILLWAY SIDEWALLS TO NO HIGHER THAN EL. 614.5 PRIOR TO
BEGINNING STAGE 2 WORK. EXCAVATE SEDIMENT OUT FROM IN FRONT OF
SPILLWAY INLET TO FACILITATE RIVER FLOW. INSTALL SEDIMENT TRAP UPSTREAM OF
SPILLWAY. [STAGE 1]
2. CONTINUE DEMOLITION OF SPILLWAY CONCRETE AT 1' INCREMENTS TO DRAW
DOWN POND. CONSTRUCT DOWNSTREAM RIVER ACCESS TO THE WEST OF THE
POWERHOUSE. [STAGE 2] WORK ON UPSTREAM CHANNEL RESTORATION CAN BEGIN
AT THIS STAGE SEE RIVER RESTORATION SHEETS FOR GRADES AND DETAILS.
3. ONCE IMPOUNDMENT IS DRAWN DOWN BELOW POWERHOUSE INTAKE SILL, INSTALL
STOP LOGS AT INTAKE GATES TO ISOLATE FLOW TO THE SPILLWAY. INSTALL FLOW
DIVERSION BERM DOWNSTREAM BETWEEN THE POWERHOUSE AND SPILLWAY
OUTLET TO ISOLATE DOWNSTREAM RIVER FLOW TO THE EAST SIDE OF THE RIVER
CHANNEL. BEGIN CONSTRUCTION OF RESTORED RIVER CHANNEL DOWNSTREAM OF
THE POWERHOUSE. [STAGE 3]
4. DURING THIS TIME FLOW WILL BE EXCLUSIVELY PASSING THROUGH THE SPILLWAY.
UPON REACHING ELEVATION 598.5' AT THE SPILLWAY, STOP DEMOLITION AT THE
SPILLWAY. GRADE BEHIND THE SPILLWAY SIDEWALLS SHALL BE MAINTAINED AT 6
FEET ABOVE THE CURRENT ELEVATION OF THE SPILLWAY (NO HIGHER OR LOWER)
AT ALL TIMES DURING STAGE 2, 3, AND 4 ACTIVITIES. THIS WILL BE STRICTLY
ENFORCED. INSTALL TEMPORARY BULK BAG COFFERDAM UPSTREAM OF
POWERHOUSE. DEMOLISH POWERHOUSE 6 FEET BELOW PROPOSED RIVER
CHANNEL GRADES AND CONSTRUCT RESTORED RIVER CHANNEL THROUGH AND
UPSTREAM OF FORMER POWERHOUSE. [STAGE 4]
5. ONCE RESTORED RIVER CHANNEL HAS BEEN FULLY CONSTRUCTED THROUGH THE
POWERHOUSE, BEGIN FINAL DRAW DOWN BY INCREMENTALLY LOWERING THE
BULK BAG COFFERDAM UPSTREAM OF THE POWERHOUSE. [STAGE 5]
6. ONCE FLOW IS FULLY DIVERTED TO RESTORED RIVER CHANNEL, DEMOLISH ANY
REMAINING SPILLWAY STRUCTURE AT LEAST 2 FEET BELOW FINAL GRADE AND FILL
TO MATCH THE DESIGN PLANS AND COMPLETE SITE RESTORATION ACTIVITIES.
[STAGE 6]
DAM BREACHING SEQUENCE
INCREMENTALLY REMOVE BACKFILL
FROM WALLS, SUCH THAT BACKFILL
GRADE IS 6 FEET ABOVE CURRENT
SPILLWAY BREACH LEVEL (NO HIGHER
OR LOWER) [STAGE 4]
EXCAVATION
NON-FLOWING,
STANDING WATER
RESTORED RIVER
CHANNEL ALIGNMENT
LIMITS OF DISTURBANCE
MDOT HEAVY
RIPRAP
EXTEND GEOTEXTILE
UNDER RIPRAP
RE
AD
Y
TO
A
DV
ER
TI
SE
3/1 3/2
Know what's
EXISTING POWERHOUSE INLET
ELEVATION APPROX. 606'
PROFILE THROUGH POWERHOUSE
(REFER TO B-4.1 FOR PLAN VIEW)
H/V RATIO = 4:1
LEGEND
EXISTING GROUND SURFACE
CONCRETE BOUNDARIES
Feet
40200
DA
M
BR
EA
CH
IN
G
PR
OF
ILE
V
IE
W
ST
AG
E
ST
AG
E
B-4.2
DEMOLITION OF
POWERHOUSE STAGE 4
FINAL RESTORED
RIVER CHANNEL
SEE SHEET R-1.2
FOR DETAILS
CONSTRUCT BULK BAGS TO
MINIMUM ELEVATION 604'
IN STAGE 4. INCREMENTALLY
LOWER IN STAGE 5.
APPROXIMATE
BASEFLOW WSE = 600'
PLACE MDOT HEAVY RIP RAP LET DOWN
APRON DOWNSTREAM OF BULK BAGS
WITHIN CHANNEL.
PROFILE PROPOSED TEMPORARY
(REFER TO B-4.1 FOR PLAN VIEW)
H/V RATIO = 4:1
TOP OF BULK BAGS
AT 604'
PROPOSED RIVER
CHANNEL INVERT AT 596'
EXISTING GROUND
SURFACE
PROPOSED 10YR DESIGN
FLOOD ELEVATION
WSE = APPROX 603.5'
SECTION E-E
SECTION F-F
BOTTOM OF BULK BAGS AT 595'
APPROXIMATE 10-YEAR
DESIGN FLOOD WSE = 603.5'
PLACE 12" MDOT 6 AAA AGGREGATE BASE
LAYER UNDER BULK BAGS AS SPECIFIED IN
THE SPECIFICATIONS.
MDOT 6 AAA AGGREGATE BASE
LAYER UNDER BULK BAGS
PLACE GEOTEXTILE LAYER UNDER
AGGREGATE BASE AND RIPRAP LET DOWN
GEOTEXTILE LAYER
BULK BAG COFFERDAM
1.5:1
INLET TO EXISTING
SPILLWAY
IMPERMEABLE LAYER
RE
AD
Y
TO
A
DV
ER
TI
SE
3/1 3/2
HAMMOND RD W
BIRMLEY RD
N K
EY
ST
O N
E R
D
C
ASS R
D
D R
AC
KA
R D
LA
F
R
AN
N GARFIE
N R
U
SC
H R
D
HARTMAN RD
BOARDMAN
IMPOUNDMENT
SABIN
POND
BO
AR
D M
AN
R
IV
ER
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
HAMMOND RD W
BIRMLEY RD
N K
EY
ST
O N
E R
D
C
ASS R
D
D R
AC
KA
R D
LA
F
R
AN
N GARFIE
N R
U
SC
H R
D
HARTMAN RD
BOARDMAN
IMPOUNDMENT
SABIN
POND
BO
AR
D M
AN
R
IV
ER
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
SHEET
AREA 00 20' 40'
LEGEND
OHE
EXISTING MAJOR
OVERHEAD ELECTRIC
WETLAND BOUNDARY
CONTOUR LINE
EXISTING MINOR
CONTOUR LINE
DA
M
BR
EA
CH
IN
G
PL
AN
V
IE
W
ST
AG
E
B-5.1
MATCH EXISTING
FOR PROPOSED GRADING
PAVEMENT TO REMAIN
GB GB
EDGE OF FLOODPLAIN
(SEE SHEET R-1.2)
EDGE OF RIVER
BOTTOM
(SEE SHEET R-1.2)
RIVER TOP OF BANK
(SEE SHEET R-1.2)
EDGE OF FINAL GRADING/
DAYLIGHT LINE TO EXISTING
GROUND SURFACE
EDGE OF FINAL GRADING/
DAYLIGHT LINE TO EXISTING
GROUND SURFACE
REFER TO RIVER RESTORATION PLANS
FOR CHANNEL AND FLOODPLAIN GRADING
PROPOSED STORMWATER
BASIN
ACCESS ROAD TO BE
RESTORED
PROPOSED MAJOR
CONTOUR LINE
PROPOSED MINOR
CONTOUR LINE
MDOT PLAIN RIPRAP
INLET TRENCHES
MDOT PLAIN RIPRAP
OUTLET WEIR APRON
RIP RAP
1. REMOVE SPILLWAY CONCRETE STRUCTURE DOWN TO WSE AT TIME OF
CONSTRUCTION (~609'), LEAVING SPILLWAY WALLS AT ELEVATION 615.
LOWER GRADES BEHIND SPILLWAY SIDEWALLS TO NO HIGHER THAN EL.
614.5 PRIOR TO BEGINNING STAGE 2 WORK. EXCAVATE SEDIMENT OUT
FROM IN FRONT OF SPILLWAY INLET TO FACILITATE RIVER FLOW. INSTALL
SEDIMENT TRAP UPSTREAM OF SPILLWAY. [STAGE 1]
2. CONTINUE DEMOLITION OF SPILLWAY CONCRETE AT 1' INCREMENTS TO
DRAW DOWN POND. CONSTRUCT DOWNSTREAM RIVER ACCESS TO THE
WEST OF THE POWERHOUSE. [STAGE 2] WORK ON UPSTREAM CHANNEL
RESTORATION CAN BEGIN AT THIS STAGE SEE RIVER RESTORATION
SHEETS FOR GRADES AND DETAILS.
3. ONCE IMPOUNDMENT IS DRAWN DOWN BELOW POWERHOUSE INTAKE
SILL, INSTALL STOP LOGS AT INTAKE GATES TO ISOLATE FLOW TO THE
SPILLWAY. INSTALL FLOW DIVERSION BERM DOWNSTREAM BETWEEN
THE POWERHOUSE AND SPILLWAY OUTLET TO ISOLATE DOWNSTREAM
RIVER FLOW TO THE EAST SIDE OF THE RIVER CHANNEL. BEGIN
CONSTRUCTION OF RESTORED RIVER CHANNEL DOWNSTREAM OF THE
POWERHOUSE. [STAGE 3]
4. DURING THIS TIME FLOW WILL BE EXCLUSIVELY PASSING THROUGH THE
SPILLWAY. UPON REACHING ELEVATION 598.5' AT THE SPILLWAY, STOP
DEMOLITION AT THE SPILLWAY. GRADE BEHIND THE SPILLWAY
SIDEWALLS SHALL BE MAINTAINED AT 6 FEET ABOVE THE CURRENT
ELEVATION OF THE SPILLWAY (NO HIGHER OR LOWER) AT ALL TIMES
DURING STAGE 2, 3, AND 4 ACTIVITIES. THIS WILL BE STRICTLY
ENFORCED. INSTALL TEMPORARY BULK BAG COFFERDAM UPSTREAM OF
POWERHOUSE. DEMOLISH POWERHOUSE 6 FEET BELOW PROPOSED
RIVER CHANNEL GRADES AND CONSTRUCT RESTORED RIVER CHANNEL
THROUGH AND UPSTREAM OF FORMER POWERHOUSE. [STAGE 4]
5. ONCE RESTORED RIVER CHANNEL HAS BEEN FULLY CONSTRUCTED
THROUGH THE POWERHOUSE, BEGIN FINAL DRAW DOWN BY
INCREMENTALLY LOWERING THE BULK BAG COFFERDAM UPSTREAM OF
THE POWERHOUSE. [STAGE 5]
6. ONCE FLOW IS FULLY DIVERTED TO RESTORED RIVER CHANNEL,
DEMOLISH ANY REMAINING SPILLWAY STRUCTURE AT LEAST 2 FEET
BELOW FINAL GRADE AND FILL TO MATCH THE DESIGN PLANS AND
COMPLETE SITE RESTORATION ACTIVITIES. [STAGE 6]
DAM BREACHING SEQUENCE
STORMWATER BASIN CROSS SECTION
H/V RATIO = 4:1
SECTION A-A
STORMWATER BASIN SPILLWAY PROFILE
H/V RATIO = 4:1
SECTION B-B
BASIN BOTTOM DIMENSIONS:
4 FT WIDE X…