Bid_Abstract_W911XK-17-B-0004.pdf
PDF 189 KB Posted
- Solicitation number
- W911XK-17-B-0004
About this file
FY18 Sabin Dam Removal, Boardman River Restoration,, Traverse City, Michigan
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE OF PAGES
1 3
DATE SIGNED
22 April 2018
7A. ITEM
NO 7B. DESCRIPTION OF OFFERED ITEM UNIT QUANITY UNIT PRICE ESTIMATED
AMOUNT D. UNIT PRICE E. ESTIMATED
AMOUNT D. UNIT PRICE E. ESTIMATED AMOUNT D. UNIT PRICE E. ESTIMATED AMOUNT D. UNIT PRICE E. ESTIMATED AMOUNT
1 Site Clearing and Reuse JA 1 $9,697.00 $9,697.00 $13,000.00 $13,000.00 $5,600.00 $5,600.00 $32,004.78 $32,004.78 $11,000.00 $11,000.00 2 Spillway Demolition and Remova JA 1 $85,095.00 $85,095.00 $240,000.00 $240,000.00 $102,000.00 $102,000.00 $269,993.48 $269,993.48 $600,000.00 $600,000.00 3 Earth Fill-Downstream Flow Diversion Berm JA 1 $107,454.00 $107,454.00 $31,000.00 $31,000.00 $50,500.00 $50,500.00 $93,588.53 $93,588.53 $150,000.00 $150,000.00 4 Woven Geotexile-Down Flow Diversion Berm SY 350 $3.26 $1,141.00 $4.00 $1,400.00 $4.45 $1,557.50 $4.33 $1,515.50 $4.30 $1,505.00 5 Rip Rap - Downstream Flow Diversion Berm TN 334 $77.48 $25,878.32 $85.00 $28,390.00 $63.00 $21,042.00 $129.87 $43,376.58 $70.00 $23,380.00 6 Powerhouse superstructure and Appurtenances Demolition JA 1 $351,354.00 $351,354.00 $271,000.00 $271,000.00 $375,000.00 $375,000.00 $998,102.62 $998,102.62 $350,000.00 $350,000.00 7 Temorary Bulk Bag Cofferdam JA 1 $159,586.00 $159,586.00 $84,000.00 $84,000.00 $58,000.00 $58,000.00 $159,069.64 $159,069.64 $130,000.00 $130,000.00 8 Earthwork-River Access and Stormwater Bason CY 110 $12.84 $1,412.40 $90.00 $9,900.00 $108.00 $11,880.00 $207.49 $22,823.90 $48.00 $5,280.00 9 Erosion Control JA 1 $27,303.00 $27,303.00 $190,000.00 $190,000.00 $51,700.00 $51,700.00 $10,534.13 $10,534.13 $68,800.00 $68,800.00
$768,920.72 $868,690.00 $677,279.50 $1,631,009.16 $1,339,965.00
1 JA 1 $ 762,598.00 $762,598.00 $1,139,000.00 $1,139,000.00 $1,285,000.00 $1,285,000.00 $1,227,071.75 $1,227,071.75 $1,006,500.00 $1,006,500.00
2 JA 1 $ 27,866.00 $27,866.00 $55,000.00 $55,000.00 $188,000.00 $188,000.00 $41,252.54 $41,252.54 $28,000.00 $28,000.00
3 SY 3,667 $ 22.89 $83,937.63 $30.00 $110,010.00 $37.90 $138,979.30 $1.99 $7,297.33 $2.30 $8,434.10
4 JA 1 $ 25,534.00 $25,534.00 $44,000.00 $44,000.00 $30,500.00 $30,500.00 $200,152.21 $200,152.21 $110,000.00 $110,000.00
5 AC 5 $ 6,654.00 $33,270.00 $6,400.00 $32,000.00 $5,100.00 $25,500.00 $5,664.37 $28,321.85 $5,200.00 $26,000.00
6 AC 31 $ 6,654.00 $206,274.00 $5,900.00 $182,900.00 $5,100.00 $158,100.00 $5,664.37 $175,595.47 $4,700.00 $145,700.00
7 DAY 10 $ 2,930.00 $29,300.00 $4,100.00 $41,000.00 $2,400.00 $24,000.00 $3,565.38 $35,653.80 $3,000.00 $30,000.00 8 SY 4,012 $ 78.69 $315,704.28 $152.00 $609,824.00 $80.80 $324,169.60 $88.41 $354,700.92 $157.00 $629,884.00 9 LF 1,800 $ 44.80 $80,640.00 $146.00 $262,800.00 $46.00 $82,800.00 73.36 $132,048.00 $41.00 $73,800.00
10 EA 145 $ 1,064.00 $154,280.00 $1,040.00 $150,800.00 $995.00 $144,275.00 $1,234.24 $178,964.80 $530.00 $76,850.00
11 EA 86 $ 1,341.00 $115,326.00 $1,044.00 $89,784.00 $995.00 $85,570.00 $1,258.06 $108,193.16 $2,300.00 $197,800.00 12 EA 145 $ 1,277.00 $185,165.00 $1,274.97 $184,870.65 $995.00 $144,275.00 $1,500.80 $217,616.00 $1,300.00 $188,500.00 13 SY 3,000 $ 13.78 $41,340.00 $8.00 $24,000.00 $8.25 $24,750.00 $10.07 $30,210.00 $5.80 $17,400.00 14 EA 480 $ 194.90 $93,552.00 $52.16 $25,036.80 $53.75 $25,800.00 $49.84 $23,923.20 $45.00 $21,600.00 15 EA 1,100 $ 27.98 $30,778.00 $10.45 $11,495.00 $10.80 $11,880.00 $9.97 $10,967.00 $10.00 $11,000.00 16 EA 900 $ 5.60 $5,040.00 $5.80 $5,220.00 $6.00 $5,400.00 $5.54 $4,986.00 $5.30 $4,770.00
$2,190,604.91 $2,967,740.45 $2,698,998.90 $2,776,954.03 $2,576,238.10
I CERTIFY that I have opened, read, and recorded on this abstract all timely offers received in response to the solicitation for commercial items.
ABSTRACT OF OFFERS - COMMERCIAL
Michels CorporationElmer's Crane and Dozer, Inc.
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
CARLETTE L. KENDRICKS, CONTRACTING OFFICER
SIGNATURE
NO. 3
9. OFFERS
NO. 1 NO. 2
3. DATE OPENED
15 MAY 201814 APRIL 2018W911X-17-B-0004
4. ISSUING OFFICE
Park Construction Company
None
OFFEROR:OFFEROR:OFFEROR:
None
AMENDMENTS ACKNOWLEDGED
OFFEROR:
AMENDMENTS ACKNOWLEDGED
None
Job Site Services, Inc.
AMENDMENTS ACKNOWLEDGED
None
2. DATE ISSUED1. SOLICITATION NUMBER
NO. 4
Total Amount of Base Items - Division 2
Total Amount of Base Items - Division 1
U.S. Army Corps of Engineers Contracting Division, Detroit Branch
FY18 Sabin Dam Removal, Boardman River Restoration,, Traverse City, Michigan
DIVISION 2 - RIVER RESTORATION
6. NUMBER OF AMMENDMENTS ISSUED
None
DIVISION 1 - SABIN DAM BREACHING AND DEMOLITION
B. Estimate based on open market pricing
AMENDMENTS ACKNOWLEDGED
5. PROJECT TITLE
Impoundment and Dam Embankment Excavation
Earthwork-Downstream Transition Excavation & Fill (from Sabin Dam to downstream limit)
Earthwork-Downstream Floodplain Fill (Satation 121+70 to 115+75)
Install and Maintain Sediment Traps
8. GOVERNMENT ESTIMATE
Seed (Floodplain Mix) Floodplan Corridor
Seed (Upland Mix) Spoils and all other areas within the limits of disturbance
In-Channel Dig and Pitch (Operator and Excavator) Channel Bed Construction (Station 121+70-115+75) FES Bank Construction Large Wood Logs (Shown on Drawings Throughout Project Extent)
Trees and Shrubs (Live Stakes)
Large Wood Logs with Rootwads (Shown on Drawings Throughout Project Extent) Vegetation Salvage and Installation Tree and Shrubs (Potted Stock) Trees and Shrubs (Potted Stock) Trees and Shrubs (Bare Root Stock)
2 3
DATE SIGNED
None
7A. ITEM
NO UNIT QUANITY D. UNIT PRICE E. ESTIMATED
AMOUNT D. UNIT PRICE E. ESTIMATED
AMOUNT D. UNIT PRICE E. ESTIMATED
AMOUNT D. UNIT PRICE E. ESTIMATED AMOUNT D. UNIT PRICE E. ESTIMATED
AMOUNT
1 115 EA $ 1,064.00 $122,360.00 $1,043.00 $119,945.00 $995.00 $114,425.00 $1,035.20 $119,048.00 $575.00 $66,125.00 2 109 EA $ 1,341.00 $146,169.00 $1,043.00 $113,687.00 $995.00 $108,455.00 $1,037.31 $113,066.79 $2,100.00 $228,900.00 3 115 EA $ 1,277.00 $146,855.00 $1,275.00 $146,625.00 $875.00 $100,625.00 $1,256.73 $144,523.95 $1,300.00 $149,500.00 4 20 AC $ 8,629.00 $172,580.00 $10,568.00 $211,360.00 $1,800.00 $36,000.00 $32,495.14 $649,902.80 $9,700.00 $194,000.00 5 1000 LF $ 42.90 $42,900.00 $98.00 $98,000.00 $45.25 $45,250.00 $63.14 $63,140.00 $41.00 $41,000.00 6 5000 SY $ 2.40 $12,000.00 $11.00 $55,000.00 $6.90 $34,500.00 $9.97 $49,850.00 $3.20 $16,000.00 7 881 CY $ 78.84 $69,458.04 $118.00 $103,958.00 $66.00 $58,146.00 $74.43 $65,572.83 $160.00 $140,960.00 8 2000 CY $ 7.43 $14,860.00 $6.50 $13,000.00 $18.20 $36,400.00 $4.32 $8,640.00 $11.00 $22,000.00 9 100 EA $ 127.00 $12,700.00 $570.00 $57,000.00 $295.00 $29,500.00 $486.27 $48,627.00 $512.00 $51,200.00
$739,882.04 $918,575.00 $563,301.00 $1,262,371.37 $909,685.00
1 1 EA $ 189,922.00 $189,922.00 $500,000.00 $500,000.00 $325,000.00 $325,000.00 $255,982.41 $255,982.41 $200,000.00 $200,000.00 2 4000 EA $ 47.87 $191,480.00 $38.00 $152,000.00 $14.50 $58,000.00 $28.93 $115,720.00 $37.50 $150,000.00 3 1 EA $ 8,746.00 $8,746.00 $8,500.00 $8,500.00 $24,000.00 $24,000.00 $1,107.65 $1,107.65 $22,000.00 $22,000.00
$390,148.00 $660,500.00 $407,000.00 $372,810.06 $372,000.00
Park Construction Company
AMENDMENTS ACKNOWLEDGED6. NUMBER OF AMMENDMENTS ISSUED AMENDMENTS ACKNOWLEDGED AMENDMENTS ACKNOWLEDGED AMENDMENTS ACKNOWLEDGED
NoneNone
OFFEROR:
NO. 2 NO. 3
AMENDMENTS ACKNOWLEDGED
None
OFFEROR:
Total Amount of Incidentals
Haul road Signage
DIVISION 4 - INCIDENTALS
Mobilization
Channel Bed Construction (Upstream Transition) Earthwork - supplement East Tributary Grading Habitat Boulder (Station 121+70-115+75)
Total Amount of Optional Items
7B. DESCRIPTION OF OFFERED ITEM
FES Bank Construction (Restored Channel) Fabric Slope Protection (Restored Channel)
U.S. Army Corps of Engineers Contracting Division, Detroit Branch
CARLETTE L. KENDRICKS, CONTRACTING OFFICER
9. OFFERS
NO. 1 NO. 4
OFFEROR: OFFEROR:
FY18 Sabin Dam Removal, Boardman River Restoration,, Traverse City, Michigan
5. PROJECT TITLE
GOVERNMENT ESTIMATE
3. DATE OPENED
W911X-17-B-0004 14 APRIL 2018 15 MAY 2018
4. ISSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
ABSTRACT OF OFFERS - CONTINUE 1. SOLICITATION NUMBER 2. DATE ISSUED
Large Wood Logs (Restored Channel) Large Wood Piles (Restored Channel) Large Wood Logs with Rootwads (Restored Channel) Topsoil Spoils and Adjacent Upland Area
DIVISION 3 - OPTIONS
None None
Elmer's Crane & Dozer, Inc. Job Site Service, Inc. Michels Corporation
3 3
DATE SIGNED
E. ESTIMATED
AMOUNT E. ESTIMATED AMOUNT
$ 768,921.00 $868,690.00
$ 2,190,605.00 $2,967,740.45 $ 739,882.00 $918,575.00 $ 390,148.00 $660,500.00 $ 4,089,556.00 $5,415,505.45 $5,197,888.10
DIVISIONS
DIVISION 1 - SABIN DAM BREACHING AND DEMOLITION
DIVISION 2 – RIVER RESTORATION
DIVISION 3 – OPTIONS
DIVISION 4 – INCIDENTALS
TOTAL BID (SUM OF ALL 4 DIVISIONS)
E. ESTIMATED AMOUNT
$1,339,965.00
$2,576,238.10 $909,685.00 $372,000.00
$4,346,579.40
E. ESTIMATED AMOUNT
$1,631,009.16
$2,776,954.03 $1,262,371.37
$372,810.06 $6,043,144.62
E. ESTIMATED AMOUNT
$677,279.50
$2,698,998.90 $563,301.00 $407,000.00
AMENDMENTS ACKNOWLEDGED AMENDMENTS ACKNOWLEDGED AMENDMENTS ACKNOWLEDGEAMENDMENTS ACKNOWLEDGED
None None None None None
6. NUMBER OF AMMENDMENTS ISSUED
B. Estimate based on open market pricing
ABSTRACT OF OFFERS CONT. 1. SOLICITATION NUMBER
W911X-17-B-0004
CARLETTE L. KENDRICKS, CONTRACTING OFFICER
SIGNATURE
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
15 MAY 2018
3. DATE OPENED
4. ISSUING OFFICE I CERTIFY that I have opened, read, and recorded on this abstract all timely offers received in response to the solicitation for commercial items.
U.S. Army Corps of Engineers Contracting Division, Detroit Branch
2. DATE ISSUED
14 APRIL 2018
5. PROJECT TITLE
8. GOVERNMENT ESTIMATE
9. OFFERS
FY18 Sabin Dam Removal, Boardman River Restoration,, Traverse City, Michigan
NO. 1 NO. 2 NO. 3 NO. 4
OFFEROR: OFFEROR: OFFEROR: OFFEROR:
Elmer's Crane & Dozer, Inc Job Site Service Inc. Micheles Corporation Park Construction Company
| Abstract FY18 Sabin Dam Removal Boardman River Restoration |
| Abstract FY18 Sabin Dam Removal Boardman River Restoration (003) |
| 2018-05-22T11:36:12-0400 | |
| KENDRICKS.CARLETTE.LEE.1250985602 |
File details come from the government source that posted it.