W911XK-12-B-0004 Amendment 0002.pdf

PDF 35 KB Posted

Attached to
Grand Marais Breakwater Repair
Solicitation number
W911XK-12-B-0004
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
Bid Results Grand Marais W911XK-12-B-0004.pdf PDF
W911XK-12-B-0004 Pile Breakwater Reconstruction Grand Marais Amend 0004.pdf PDF
W911XK-12-B-0004 Amend 0003.pdf PDF
Grand Marais Q A 06142012.pdf PDF
SHEET 10 AMENDMENT 0002.pdf PDF
Pre-Bid Questions 6-7-12.pdf PDF
Instructions for Viewing Plans.pdf PDF
W911XK-12-B-0004 Pile Breakwater Reconstruction Grand Marais Amendment 0001.pdf PDF
Site Visit Map1pdf.pdf PDF
GMSS310C12.cal —
W911XK-12-B-0004 Pile Breakwater Reconstruction Grand Marais.pdf PDF
GMSS106C12.cal —
GMRC404C12.cal —
GMSS107C12.cal —
12B0004.pdf PDF
GMSS108C12.cal —
GMV-411C12.cal —
plans.maxfr.maxFR —
GMRC402C12.cal —
GMGI101C12.cal —
GMSD105C12.cal —
GMSS109C12.cal —
GMRC403C12.cal —
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W56MES21013396

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

FY12 Pile Breakw ater Reconstruction Grand Marais The purpose of this amendment is to:

1. ADD FAR Provision 52.217-3, Evaluation Exclusive of Options and DELETE FAR Provision 52.217-5, Evaluation of Options

2. Make changes to the Statement of Work, Specifications and Draw ings

3. DELETE w age determination MI20100134 dated 05/04/2012, and REPLACE w ith w age determination MI20100134 dated 06/01/2012.

4. Add language in Section 00100 of the solicitaiton to state "Requests for Information should be emailed to LRE-Quotes@usace.army.mil"

See attached for details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Jun-2012

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-12-B-0004

X 9B. DATED (SEE ITEM 11)

22-May-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Jun-2012

CODE

CONTRACTING DIVISION

DETROIT DISTRICT

477 MICHIGAN AVE

RM 700

DETROIT MI 48226-2550

W911XK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911XK-12-B-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

Solicitation Amendment No. 0002 For Solicitation No. W911XK-12-B-0004 FY12 Pile Breakwater Reconstruction, Grand Marais, Michigan

CHANGES TO THE SOLICITATION, OFFER, AND AWARD

Section 00010 – Solicitation Contract Form

DELETE: Page 3 of 37, SCOPE OF WORK, Sentence, The armor stone layer consists of 6 to 9 ton stone.

ADD: Page 3 of 37, SCOPE OF WORK, Sentence, The armor stone layer consists of 6 to 12 ton stone.

DELETE: Page 9 of 47

52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

(End of provision)

ADD: Page 9 of 47 52.217-3 Evaluation Exclusive of Options (ACT 1984)

The Government will evaluate offers for award purposes by including only the price for the basic requirement; i.e., options will not be included in the evaluation for award purposes.

(End of clause)

DELETE: Page 43 of 47 thru Page 47 of 47

WAGE DETERMINATION (MI)

Superseded General Decision Number: MI20100134 State: Michigan Construction Type: Heavy County: Alger County in Michigan.

HEAVY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 01/06/2012 1 02/03/2012

2 04/06/2012 3 05/04/2012

ADD: Page 43 of 47 General Decision Number: MI120030 06/01/2012 MI30 Superseded General Decision Number: MI20100134 State: Michigan Construction Type: Heavy County: Alger County in Michigan.

HEAVY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 01/06/2012 1 02/03/2012 2 04/06/2012 3 05/04/2012 4 06/01/2012

(SEE ATTACHED)

CHANGES TO THE SPECIFICATIONS

SECTION 35 31 19.45 03

STONE MATERIALS

DELETE: 2.3.1.3 Core Stone

The stone furnished for Core Stone shall weigh between 50 and 200 lbs each and 85 percent of all stones shall be greater than 100 lbs. The stones shall be free of fines, clay lumps or any other detrimental inclusions. Core Stone can be obtained from off-site quarried stone, or from the project site as stated on the contract drawings. Regardless of source, Core Stone shall conform to the Stone Material Quality requirement of this specification.

ADD: 2.3.1.3 Core Stone

The stone furnished for Core Stone shall weigh between 5 and 200 lbs each and 50 percent of all stones shall be greater than 100 lbs. The stones shall be free of fines, clay lumps or any other detrimental inclusions. Core Stone can be obtained from off-site quarried stone, or from the project site as stated on the contract drawings. Regardless of source, Core Stone shall conform to the Stone Material Quality requirement of this specification.

CHANGES TO PLANS

DELETE: SHEET: 10 OF 11 “REQUIRED BREAKWATER SECTIONS”

ADD: SHEET: 10 OF 11 AMENDMENT 1 “REQUIRED BREAKWATER SECTIONS”

END OF AMENDMENT

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been added by full text:

52.217-3 EVALUATION EXCLUSIVE OF OPTIONS (APR 1984)

The Government will evaluate offers for award purposes by including only the price for the basic requirement; i.e., options will not be included in the evaluation for award purposes.

(End of provision)

The following have been deleted:

52.217-5 Evaluation Of Options JUL 1990

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

WAGE DETERMINATION (MI)

General Decision Number: MI120030 06/01/2012 MI30

Superseded General Decision Number: MI20100134

State: Michigan

Construction Type: Heavy

County: Alger County in Michigan.

HEAVY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 01/06/2012 1 02/03/2012 2 04/06/2012 3 05/04/2012 4 06/01/2012

BRMI0006-002 05/01/2011

Rates Fringes

BRICKLAYER.......................$ 26.40 15.51

CARP1510-002 06/01/2011

Rates Fringes

CARPENTER, Includes Form Work....$ 23.37 15.65

ELEC1070-003 06/01/2011

Rates Fringes

ELECTRICIAN

Contracts $135,000 and under.......................$ 28.24 17.16 Contracts over $135,000.....$ 30.24 17.24

ENGI0326-006 05/01/2012

Rates Fringes

OPERATOR: Power Equipment Crane, main boom & jib 120' or longer..............$ 27.38 19.95 Crane, main boom & jib 140' or longer..............$ 27.63 19.95 Crane, main boom & jib 220' or longer..............$ 27.88 19.95

GROUP 1 -

Backhoe/Excavator;

Bulldozer; Crane;

Compactor; Scraper; Loader..$ 26.88 19.95 GROUP 2 - Boom truck (non-swing)......................$ 23.63 19.95 GROUP 3 - Oiler.............$ 22.11 19.95

FOOTNOTES: Premium rate: main boom and jib 300 feet or longer is $1.50 per hour above the 220 ft. boom and jib rate. Main boom and jib 400 feet or longer is $3.00 per hour above the 220 ft. boom and jib rate.

* IRON0008-009 06/06/2011

Rates Fringes

IRONWORKER, REINFORCING AND

STRUCTURAL

Contracts $10,000,000 or greater.....................$ 25.43 21.92 Contracts less than $10,000,000.................$ 22.34 21.92

LABO1329-002 05/01/2012

Rates Fringes

LABORER

Common or General; Mason Tender - Cement/Concrete....$ 21.87 12.20 Pipelayer...................$ 22.27 12.20

PLAS0016-035 06/01/2010

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 24.82 12.83

PLUM0111-009 04/29/2012

Rates Fringes

PLUMBER/PIPEFITTER...............$ 30.82 19.80

SUMI2010-028 11/09/2010

Rates Fringes

LABORER: Landscape..............$ 10.89 1.74

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 12.98 6.12

OPERATOR: Grader/Blade..........$ 16.63 5.85

OPERATOR: Roller................$ 13.74 7.93

TRUCK DRIVER: Dump Truck........$ 12.63 1.25

* TEAM0007-010 06/01/2012

Rates Fringes

TRUCK DRIVER

Lowboy/Semi-Trailer Truck...$ 25.145 6.24+a

FOOTNOTE: a.

Effective 4/1/2010 - $327.95 per week.

Effective 4/1/2011 - $331.00 per week.

Effective 4/1/2012 - $351.00 per week.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Summary of Changes)

File details come from the government source that posted it. Updated .