W911XK-11-R-0017 VA Detroit Parking Deck Amendment 0001.pdf
PDF 40 KB Posted
- Solicitation number
- W911XK-11-R-0017
About this file
W911XK-11-R-0017 Amendment 0001
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FY11 South Parking Structure
The purpose of this Amendment is to:
1. UPDATE Bid Schedule CLIN 0004
2. Delete General Wage Determination MI 100205 dated 07/29/2011 and REPLACE w ith MI 100205 dated 08/05/2011
3. UPDATE Spec section 01 00 00 general requirements
Please refer to the follow ing pages for further information All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Aug-2011
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-11-R-0017
X 9B. DATED (SEE ITEM 11)
01-Aug-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Aug-2011
CODE
CONTRACTING DIVISION
DETROIT DISTRICT
477 MICHIGAN AVE
RM 700
DETROIT MI 48226-2550
W911XK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911XK-11-R-0017
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been added by full text:
AMENDMENT 0001
Solicitation Amendment No. 0001 For Solicitation No. W911XK-11-R-0017 FY11 South Parking Structure Addition at the John Dingell VA Medical Center, Detroit, MI
CHANGES TO THE SOLICITATION:
Section 00010 – Solicitation Contract Form
BID SCHEDULE
DELETE: Page 4 of 58, ITEM 0004, Option 2-Painting of Stairs and Handrails in Existing South Deck
ADD: Page 4 of 58, ITEM 0004, Option 2-Painting of Stairs, Handrails and Walls in Existing South Deck
DELETE: WAGES General Decision Number, MI100205 07/29/2011
ADD: WAGES General Decision Number, MI100205 08/05/2011 (See End of Amendment)
CHANGES TO THE SPECIFICATIONS:
SECTION 01 00 00
GENERAL REQUIREMENTS
DELETE: 1.2 Page 9 , D. OPTIONAL BID ITEM 0004
ADD: Page 9, D. OPTION 2 BID ITEM 0004, PAINTING OF STAIR, HANDRAILS, AND WALLS IN EXISTING SOUTH DECK: Work shall included the painting metal handrails, stairs and walls of stairs in elevator tower from level 1 to 4 and ceiling of 4th level. Painting metal handrails, stairs, columns and walls in stair tower, 2, 3, and 4 from level 1 to 4. Note that painting of metal handrails, stairs and walls in new level is included in the base bid item 0001.
Painting shall include required primer and minimum of two (2) coats of paint; color and finish to match existing. All work shall be in accordance with specification Section 09 91 00 Painting.
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
DELETE: 1.2.3 OPTIONAL WORK – Painting and Stairs and Handrails in Existing South (Blue) Painting Garage (Bid Item No. 0004)
Solicitation Amendment No. 0001 For Solicitation No. W911XK-11-R-0017 FY11 South Parking Structure Addition at the John Dingell VA Medical Center, Detroit, MI
ADD: 1.2.3 OPTIONAL WORK – Painting and Stair, Handrails, and Walls in Existing South (Blue) Painting Garage (Bid Item No. 0004)
END OF AMENDMENT
The following have been modified:
BID SCHEDULE
ITEM SUPPLIES/SERVICES QTY UNIT UNIT PRICE TOTAL
South Parking Deck Addition
1 LS
Thermal Movement Repairs
0002AA
Thermal Movement Repair 1 - Type R** (connection welded and concrete repair)
79 EA $__________ $__________________________
0002AB
Thermal Movement Repair 2 - Type R** (connection NOT welded and concrete repair)
2 EA $__________ $__________________________
0002AC
Thermal Movement Repair 3 - Type R** (connection welded and NO concrete repair)
2 EA $__________ $__________________________
0002AD
Thermal Movement Repair 4 - Type R** (connection NOT welded and NO concrete repair)
2 EA $__________ $__________________________
0002AE
Thermal Movement Repair - Type R* (Release of connections at spandrel and shear wall connection)
16 EA $__________ $__________________________
Subtotal for Base Bid
Option 1-Miscellaneous Structural Repairs to Existing South Deck
Option 2-Painting of Stairs and Handrails and Walls in Existing South Deck
Total for Both Options
TOTAL
See specification section 01 00 00 paragraph 1.2 for descriptions of Bid Items.
In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended proposed price. If the offeror shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
WAGE DETERMINATION
General Decision Number: MI100205 08/05/2011 MI205
State: Michigan
Construction Type: Building
County: Wayne County in Michigan.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date 0 04/01/2011 1 04/15/2011 2 05/13/2011 3 06/03/2011 4 07/01/2011 5 07/22/2011 6 07/29/2011 7 08/05/2011
ASBE0025-002 06/01/2010
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 31.07 23.88
BOIL0169-001 08/01/2010
Rates Fringes
BOILERMAKER......................$ 32.34 22.18
BRMI0001-001 06/01/2010
Rates Fringes
BRICKLAYER.......................$ 32.42 16.96
TILE FINISHER....................$ 24.88 16.51
TILE SETTER......................$ 30.75 16.51
CARP0687-003 06/01/2011
Rates Fringes
CARPENTER (Including
Acoustical Ceiling Installation, Drywall Hanging, Form Work, Metal Stud Installation & Scaffold Building)........................$ 29.41 21.71
CARP1045-001 06/01/2011
Rates Fringes
CARPENTER (Floor Layer - Carpet, Resilient, & Vinyl Flooring)........................$ 27.10 18.87
CARP1102-002 05/31/2010
Rates Fringes
MILLWRIGHT.......................$ 28.35 22.74
ELEC0058-001 10/24/2010
Rates Fringes
ELECTRICIAN (Low Voltage Wiring and Installation of Alarms) Installer...................$ 24.14 11.92 Technician..................$ 29.83 12.09
ELECTRICIAN......................$ 34.21 21.99
* ELEV0036-002 01/01/2011
Rates Fringes
ELEVATOR MECHANIC................$ 43.70 21.785
ENGI0324-017 06/01/2011
Rates Fringes
OPERATOR: Power Equipment
GROUP 1....................$ 38.29 19.70
GROUP 2....................$ 36.79 19.70
GROUP 3....................$ 35.29 19.70
GROUP 4....................$ 34.99 19.70
GROUP 5....................$ 34.17 19.70
GROUP 6....................$ 33.31 19.70
GROUP 7....................$ 32.34 19.70
GROUP 8....................$ 30.63 19.70
GROUP 9....................$ 22.29 19.70
FOOTNOTES:
Tower cranes: to be paid the crane operator rate determined by the combined length of the mast and the boom. If the worker must climb 50 ft. or more to the work station, $.25 per hour additional.
Derrick and cranes where the operator must climb 50 ft. or more to the work station, $.25 per hour additional to the applicable crane operator rate.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Crane with boom and jib or leads 400' or longer
GROUP 2: Crane with boom and jib or leads 300' or longer
GROUP 3: Crane with boom and jib or leads 220' or longer
GROUP 4: Crane with boom and jib or leads 140' or longer
GROUP 5: Crane with boom and jib or leads 120' or longer
GROUP 6: Regular crane operator, and concrete pump with boom operator
GROUP 7: Backhoe/Excavator/Trackhoe, bobcat/skid Loader, broom/sweeper, bulldozer, grader/blade, highlift, hoist, loader, roller, scraper, tractor & trencher
GROUP 8: Forklift & extend-a-boom forklift
GROUP 9: Oiler
IRON0025-019 01/01/2011
Rates Fringes
IRONWORKER
REINFORCING.................$ 29.49 22.10
STRUCTURAL..................$ 34.54 22.93
IRON0025-022 04/01/2010
Rates Fringes
IRONWORKER STRUCTURAL (METAL
BUILDING ERECTION)...............$ 24.19 18.63
LABO0259-002 08/01/2010
Rates Fringes
LABORER: Asbestos Abatement (Removal from Floors, Walls & Ceilings)........................$ 25.09 11.94
LABO0334-005 07/01/2011
LABORER: Landscape and Irrigation
GROUP 1.....................$ 20.51 6.25
GROUP 2.....................$ 16.29 6.25
CLASSIFICATIONS
GROUP 1: Landscape specialist, including air, gas and diesel equipment operator, lawn sprinkler installer, skidsteer (or equivalent)
GROUP 2: Landscape laborer: small power tool operator, material mover, truck driver and lawn sprinkler installer tender
LABO1191-002 06/01/2011
Rates Fringes
LABORER
Common or General; Grade Checker; Mason Tender - Brick/Cement/Concrete;
Pipelayer; Sandblaster......$ 25.94 14.97
PAIN0022-003 07/01/2009
Rates Fringes
PAINTER: Brush and Roller Only.............................$ 25.06 14.75 PAINTER: Drywall Finishing/Taping Only............$ 25.75 15.90 PAINTER: Spray Only.............$ 25.86 14.75
PAIN0357-002 06/01/2010
Rates Fringes
GLAZIER..........................$ 29.20 15.96
PAID HOLIDAYS: New Year's Day, Decoration Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day;
provided that the employee has worked the last full regular scheduled work day prior to the holiday, and the first full regular scheduled work day following the holiday, provided the employee is physically able to work.
PLAS0067-001 06/01/2010
CEMENT MASON/CONCRETE FINISHER...$ 30.78 13.92
PLAS0067-004 06/01/2010
Rates Fringes
PLASTERER........................$ 30.78 13.92
PLUM0098-001 06/27/2011
Rates Fringes
PLUMBER, Excluding HVAC Pipe and System Installation..........$ 37.08 25.80
PLUM0636-003 06/06/2011
Rates Fringes
PIPEFITTER, Including HVAC Pipe and System Installation.....$ 39.01 23.85
ROOF0149-001 06/28/2010
Rates Fringes
ROOFER...........................$ 28.66 17.57
SFMI0704-001 01/01/2011
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 38.88 23.04
SHEE0080-004 08/01/2010
Rates Fringes
SHEET METAL WORKER (Including HVAC Duct Installation;
Excluding HVAC System Installation)....................$ 33.77 23.42
SUMI2011-026 02/01/2011
Rates Fringes
INSTALLER - OVERHEAD DOOR........$ 27.98 0.00
IRONWORKER, ORNAMENTAL...........$ 18.48 7.93
OPERATOR: Compactor.............$ 17.68 6.70
TRUCK DRIVER: Tractor Haul Truck............................$ 13.57 1.18
TEAM0247-001 06/01/2011
Rates Fringes
TRUCK DRIVER
GROUP 1
Flatbed; Pickup; Dump & Tandem.....................$ 25.37 a
GROUP 2
Semi.......................$ 25.52 a
GROUP 3
Lowboy.....................$ 25.62 a
PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day. If any of the above holidays fall on a Sunday, the following Monday shall be considered the holiday and, if work is performed, the rate shall be double time.
FOOTNOTE:
a. $331.00 per week, plus $47.60 per day.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
File details come from the government source that posted it. Updated .