W56MES90962389
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
American Recovery & Reinvestment Act
Fox River Dams Trunnion and Gate Repairs
This amendment is issued to update the Bid Schedule and revise Section 01 22 00.00 10 Measurement and Payment to the Specification. No other changes.
AMENDMENT 0002 WILL NOT BE ISSUED
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jun-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-09-B-0007
X 9B. DATED (SEE ITEM 11)
28-May-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jun-2009
CODE
CONTRACTING DIVISION
DETROIT DISTRICT, USAED
477 MICHIGAN AVE.
DETROIT MI 48226
W911XK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911XK-09-B-0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0003
DELETE: SECTION 01 22 00.00 10 MEASUREMENT AND PAYMENT
ADD REVISED: SECTION 01 22 00.00 10 MEASUREMENT AND PAYMENT
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
04/06
PART 1 GENERAL
1.1 GENERAL
Payment items for the work of this contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, electrical design, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1.1 Lump Sum Items
a. "Mob/ Demob" (Payment Item No. 0001, OPTION-1 0005AA, OPTION-2 0006AA, OPTION-3 0007AA )
(1) Payment will be made for costs associated with mobilizing and demobilizing all materials and equipment necessary for construction of all dam repairs specified in this contract.
(2) Unit of Measure: Lump Sum.
a. "Site Preparation" (Payment Item No. 0002AA, 0003AA, 0004AA, OPTION- 1 0005AB, OPTION-2
0006AB, and OPTION-3 0007AB)
(1) Payment will be made for costs associated with materials and operations necessary for construction of dam repairs as specified in Division 01 General Requirements and in SECTION 02 13 90 "SITE PREPARATION".
a. "Gate Repairs" (Payment Item No. 0002AB, 0003AB, 0004AB, OPTION-1 0005AC, OPTION-2 0006AC, and OPTION-3 0007AC) operations necessary for construction of dam repairs as specified in Division 01 General Requirements, SECTION 05 50 13"MISCELLANEOUS STEEL" and in SECTION 09 97 02 "PAINTING:
HYDRAULIC STRUCTURES".
a. "Associated Pier Repairs" (Payment Item No. 0002C, 0003C, 0004C, OPTION-1 0005AD, OPTION-2
0006AD, and OPTION-3 0007AD) operations necessary for construction of dam repairs as specified in Division 01 General Requirements and in SECTION 02 41 00 "DEMOLITION", SECTION 03 11 14.00 10 "STRUCTURAL
CONCRETE FORMWORK", SECTION 03 15 14.00 10 "EXPANSION JOINTS, CONTRACTION
JOINTS, AND WATERSTOPS", SECTION 03 16 00 "GROUTED DOWELS", SECTION 03 20
01.00 10 "CONCRETE REINFORCEMENT", SECTION 03 31 01.00 10"CAST-IN-PLACE
STRUCTURAL CONCRETE", and SECTION 03 93 00 "CONCRETE REPAIR".
1.1.2 Unit Price Items (Not Applicable)
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --
SECTION 00010 - SOLICITATION CONTRACT FORM
SUBCLIN 0002AA
The CLIN description has changed from TAS::96 3135:: Cedars Site Preparation to TAS::96 3135:: TAS.
The CLIN extended description Cedars Site Preparation has been added.
SUBCLIN 0002AB
The CLIN description has changed from TAS::96 3135::TAS Cedars Gate Repairs to TAS::96
3135::TAS.
The CLIN extended description Cedars Gate Repairs has been added.
SUBCLIN 0002AC
The CLIN description has changed from TAS::96 3135::TAS Cedars Pier Repairs to TAS::96
The CLIN extended description Cedars Pier Repairs has been added.
CLIN 0003
The CLIN description has changed from TAS::96 3135::TAS Little Chute Dam to TAS::96 3135::TAS.
The CLIN extended description Little Chute Dam has been added.
SUBCLIN 0003AA
The CLIN description has changed from TAS::96 3135::T Little Chute Site Prep to TAS::96 3135::TAS.
The CLIN extended description Little Chute Site Prep has been added.
SUBCLIN 0003AB
The CLIN description has changed from TAS::96 3135 Little Chute Gate Repairs to TAS::96 3135::
TAS.
The CLIN extended description Little Chute Gate Repairs has been added.
SUBCLIN 0003AC
The CLIN description has changed from TAS::96 313 Little Chute Pier Repairs to TAS::96 313:: TAS.
The CLIN extended description Little Chute Pier Repairs has been added.
CLIN 0004
The CLIN description has changed from TAS::96 3135::TAS Rapide Croche Dam to TAS::96
The CLIN extended description Rapide Croche Dam has been added.
SUBCLIN 0004AA
The CLIN description has changed from TAS::96 3135:: Rapide Croche Site Prep to TAS::96 3135::
The CLIN extended description Rapide Croche Site Prep has been added.
SUBCLIN 0004AB
The CLIN description has changed from TAS::96 313 Rapide Croche Gate Repairs to TAS::96
313::TAS.
The CLIN extended description Rapide Croche Gate Repairs has been added.
SUBCLIN 0004AC
The CLIN description has changed from TAS::96 313 Rapide Croche Pier Repairs to TAS::96 313::
The CLIN extended description Rapide Croche Pier Repairs has been added.
CLIN 0005
The CLIN description has changed from TAS::96 3135::TA Option 1 - DePere Dam to TAS::96
3135::TAS.
The CLIN extended description has changed from Mobilization and Demobilization to Option 1 - DePere Dam.
SUBCLIN 0005AA
This SUBCLIN has been renumbered to SUBCLIN 0005AB.
The CLIN description has changed from TAS::96 3135::TAS DePere Dam Site Prep to TAS::96
The CLIN extended description DePere Dam Site Prep has been added.
SUBCLIN 0005AB
This SUBCLIN has been renumbered to SUBCLIN 0005AC.
The CLIN description has changed from TAS::96 3135::TAS DePere Dam to TAS::96 3135::TAS.
The CLIN extended description has changed from Gate Repair to DePere Dam Gate Repair.
SUBCLIN 0005AC
This SUBCLIN has been renumbered to SUBCLIN 0005AD.
The CLIN description has changed from TAS::96 3135::TAS DePere Dam to TAS::96 3135::TAS.
The CLIN extended description has changed from Pier Repair to DePere Dam Pier Repair.
CLIN 0006
The CLIN extended description has changed from Kaukauna Dam Mobilization and Demobilization to Kaukauna Dam.
SUBCLIN 0006AA
This SUBCLIN has been renumbered to SUBCLIN 0006AB.
The CLIN description has changed from TAS::96 3135::TAS Kaukauna Dam to TAS::96 3135::TAS.
The CLIN extended description has changed from Site Prep to Kaukauna Dam Site Prep.
SUBCLIN 0006AB
This SUBCLIN has been renumbered to SUBCLIN 0006AC.
The CLIN extended description has changed from Gate Repair to Kaukauna Dam Gate Repair.
SUBCLIN 0006AC
This SUBCLIN has been renumbered to SUBCLIN 0006AD.
The CLIN extended description has changed from Pier Repair to Kaukauna Dam Pier Repair.
CLIN 0007
The CLIN extended description has changed from Little Kaukauna Dam Mobilization and Demobilization to Little Kaukauna Dam.
SUBCLIN 0007AA
This SUBCLIN has been renumbered to SUBCLIN 0007AB.
The CLIN description has changed from TAS::96 3135::TAS Little Kaukauna Dam to TAS::96
The CLIN extended description has changed from Site Prep to Little Kaukauna Dam Site Prep.
SUBCLIN 0007AB
This SUBCLIN has been renumbered to SUBCLIN 0007AC.
The CLIN description has changed from TAS::96 3135::TAS Little Kaukauna Dam to TAS::96
The CLIN extended description has changed from Gate Repair to Little Kaukauna Dam Gate Repair.
SUBCLIN 0007AC
This SUBCLIN has been renumbered to SUBCLIN 0007AD.
The CLIN description has changed from TAS::96 3135::TAS Little Kaukauna Dam to TAS::96
3135::TAS.
The CLIN extended description has changed from Pier Repair to Little Kaukauna Dam Pier Repair.
SUBCLIN 0005AA is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005AA
TAS::96 3135::TAS
FFP
Mobilization and Demobilization FOB: Destination
NET AMT
SUBCLIN 0006AA is added as follows:
0006AA
TAS::96 3135::TAS
FFP
SUBCLIN 0007AA is added as follows:
0007AA
TAS::96 3135::TAS
FFP
DELIVERIES AND PERFORMANCE
The following Delivery Schedule Item has been deleted from SUBCLIN 0005AA:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
15-JUN-2009 1 FOX RIVER SUB-OFFICE
KEWAUNEE AREA OFFICE 1008
AUGUSTINE STREE
KAUKAUNA WI 54130
H7M04M0
The following Delivery Schedule Item has been deleted from SUBCLIN 0006AA:
15-JUN-2009 1 FOX RIVER SUB-OFFICE
KEWAUNEE AREA OFFICE 1008
AUGUSTINE STREE
KAUKAUNA WI 54130
The following Delivery Schedule Item has been deleted from SUBCLIN 0007AA:
15-JUN-2009 1 FOX RIVER SUB-OFFICE
KEWAUNEE AREA OFFICE 1008
AUGUSTINE STREE
KAUKAUNA WI 54130
INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AA:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
The following Acceptance/Inspection Schedule was added for SUBCLIN 0006AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0007AA:
(End of Summary of Changes)