W911WN24Q3008 0001.pdf
PDF 635 KB Posted
- Solicitation number
- W911WN24Q3008
About this file
This solicitation document describes a requirements contract for building and grounds maintenance services at Conemaugh River Lake. Key details include: the contractor must provide all labor, materials, equipment, and vehicles to perform grounds maintenance, cleaning services, solid waste removal, and sewage removal. The period of performance is from May 1, 2024 to April 30, 2025 with four optional one-year extensions. The NAICS code is 561730 and the procurement is set aside 100% for small businesses with a size standard of $9.5 million. Pre-proposal meetings and site visits will be held on January 17, 2024 or the alternate date of January 24, 2024 to review the requirements. Interested parties must register in the System for Award Management and complete representations and certifications prior to award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 8 - Price Schedule W911WN24Q3008 0002.xlsx | XLSX spreadsheet | |
| W911WN24Q3008 0002.pdf | ||
| Attachments 1-7 W911WN24Q3008 0001.pdf | ||
| W911WN24Q3008.pdf | ||
| Attachment 8 - Price Schedule.xlsx | XLSX spreadsheet | |
| Appendicies I-XII.pdf | ||
| Addendum to 51.212-1.pdf | ||
| Attachments 1-7.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Re: Building and Grounds Maintenance Services at Conemaugh River Lake, Saltsburg, PA
See Summary of Changes Narrative for details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 37
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Jan-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911WN24Q3008
X 9B. DATED (SEE ITEM 11)
12-Jan-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jan-2024
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CELRP-CT
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2203
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911WN24Q3008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SUMMARY OF CHANGES NARRATIVE
Amendment 0001
1. Attachment 2 – Grounds Maintenance
a. Added: “In accordance with Performance Work Statement (PWS) C-2.5.a, limbs up to 6" in diameter shall be policed prior to mowing.”
b. Added: “The area to be trimmed shall be prepped similar to areas to be mowed in accordance with PWS
C-2.5.a. Trimming shall be performed in accordance with PWS C-2.5 c-g.”
c. Added: “Deviation from PWS C-2.5f. Use of pesticides in lieu of trimming eventing grass growth on sidewalks, parking areas and road edges is NOT permitted at Connemaugh River Lake.”
d. Added: “Deviation from PWS C-2.7.b. The knotweed on the Abutment at site 2b need only be knocked down, not removed.”
e. Added picture of Abutment at site 2b.
f. References to Type II Mowing have been deleted and/or replaced with String-Trimming.
2. Attachment 3 – Cleaning Services
a. Updated the “Other” description for Visitor Information Center, men’s room.
b. Updated the “Other” description for Concession Building, men’s room.
3. Attachment 7 – Added Service Contract Act Wage Determination 2015-4235 Rev. 25 dated 12/26/2023
4. Performance Work Statement – Major Nonconformances identified as “Level I” were corrected to “Level II”.
5. Technical inquiries and questions may be submitted via ProjNet until 0800 ET on Monday 5 February 2024.
Instructions were provided in the original solicitation package posted to the Procurement Integrated Enterprise Environment Solicitation module (PIEE-SOL) and the System for Award Management (SAM.gov) as well as the Addendum to 52.212-1 incorpated by full text with this amendment.
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
ATTACHMENTS AND APPENDICES
Attachment 1 Performance Requirements Summary Attachment 2 Grounds Maintenance Attachment 3 Cleaning Services Attachment 4 Solid Waste Removal Attachment 5 Sewage Removal Attachment 6 Maps Attachment 7 Wage Determinations Attachment 8 Price Schedule
Appendix I Procurement Integrated Enterprise Environment (PIEE) Vendor Registration Appendix II Electronic Invoicing Instructions for the USACE Finance Center Appendix III Quality Control Plan Appendix IV Contract Overview Workbook Appendix V Accident Prevention Plan Appendix VI Activity Hazard Analysis Appendix VII AT/OPSEC Information Sheet Appendix VIII ENG Form 3394 Accident Investigation Report Appendix IX Actual Services Performed Appendix X Annual Pest Control Plan Appendix XI Pesticide Application Record Appendix XII NAVFAC/USACE Past Performance Questionnaire
PERFORMANCE WORK STATEMENT
SECTION C-1
General
C-1.1 PROJECT INFORMATION.
The Conemaugh River Lake project is located primarily in Indiana County on the Conemaugh River, above Tunnelton, Pennsylvania. Day-use areas owned and operated by the Corps of Engineers at Conemaugh are located at the Dam Site, Bow Ridge and Aultman’s Run. Facilities include boat launches, picnic pavilions, a Visitor Information Center, a playground area, outflow fishing access, multiple overlooks and Conemaugh Lake.
C-1.2 SCOPE OF WORK. The Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise provided herein, required to perform mowing, cleaning, janitorial, and other maintenance services at the Conemaugh River Lake project recreation areas, as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings, Attachments, Appendices, etc., contained herein or incorporated by reference.
It is emphasized that the work described in this contract is a critical part of the USACE mission. The work described will be performed in a public recreation area. USACE is committed to "Customer Care" and providing quality professional service.
C-1.3 TASK ORDERS. All work under this contract will be ordered by issuance of individual Task Orders (SF 1449). No work shall be performed under this contract before an individual Task Order has been issued by the Contracting Officer (KO). Under normal conditions, Task Orders will be issued that require response within twenty-four (24) hours after receipt. The Task Order will include funding for the ordered work, state the period of performance covered and provide invoicing instructions. Only the KO, by issuance of a modification, may make any change to a Task Order.
Upon contract award, the contractor shall establish a profile for the Procurement Integrated Enterprise Environment (PIEE) at https://pieetraining.eb.mil/wbt/xhtml/wbt/portal/overview/vendorRegister.xhtml. See Appendix I. The
Government will establish a file for each new task order. Contractors shall access PIEE for COR Designation Letters and other documents associated with contract and task order administration.
The weekly/bi-weekly/monthly schedule will be discussed at the pre-work meeting. The Contractor will provide a formal schedule for review and approval by the COR within three (3) business days, as needed per Task Order.
All invoices are to be submitted to the Contracting Officer’s Representative (COR) for review no later than the 15th day of the month following the month the services are performed. USACE does not use the Wide Area Workflow (WAWF) module in PIEE to pay invoices. Directions to submit invoices electronically to the USACE Finance Center are provided in Appendix II.
The Government pays only for those services performed and accepted.
If needed, after final payment has been made for services received on a Task Order, the Contract Specialist will send an email notification with information addressing service(s) not used during the performance period. Subsequently, a modification will be issued by the KO to de-obligate funds for services not used and to reflect the services received by the government.
C-1.4 DISTRIBUTION. The contractor will provide the site foreman with a copy of the contract (Performance Work Statement and Attachments/Appendices/Maps) and site supervisors with their pertinent section of the contract to ensure complete and thorough service to the Government.
C-1.5 WORKING HOURS.
a. Normal Working Hours. Normal working hours, except as otherwise specified herein, shall be Monday through Friday, 7:30 a.m. to 3:00 p.m. Eastern Time (ET) or as specified on the Task Order. Work inside Government buildings or other secured areas shall be performed during the above referenced work hours. Work that interferes with other ongoing functions at the project shall be scheduled around normal working hours, as specified by the COR. Refer to individual sections of this PWS and Attachments for specific schedules of work.
b. Holiday Work. The eleven (11) Federal holidays observed are:
New Year's Day (January 1st) Martin Luther King Day (3rd Monday in January) President's Day (3rd Monday in February) Memorial Day (Last Monday in May) Juneteenth (June 19th) Independence Day (July 4th) Labor Day (1st Monday in September) Columbus Day (2nd Monday in October) Veterans Day (November 11th) Thanksgiving Day (4th Thursday in November) Christmas Day (December 25th)
When one of the above designated holidays falls on a Sunday, the following Monday is observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday. Work shall be scheduled around the above listed Federal holidays except as specified herein or as approved by the COR.
c. Inclement Weather Work. The Contractor shall maintain the schedule of services regardless of inclement weather. Exceptions may be approved by the COR when severe conditions make it impractical or dangerous to perform the work.
d. Emergency and/or After Hours Work. Work may be required on holiday periods during heavy visitation, emergencies, or for other reasons as determined by the COR. Additional personnel may be required to handle the additional workload during holiday periods because of heavy visitation. The COR will notify the Contractor of actual work requirements.
e. Notifications. Inclement weather and emergency notifications will be made by telephone call to the contractor in a timely manner as the government is able once the determination is made that an emergency or weather situation warrants notification and it will be followed up with an email.
C-1.6 CONTRACTOR SUBMITTALS. Unless otherwise specified, the Contractor shall submit the following information to the COR at the pre-work conference for this contract:
a. Quality Control Plan (QCP). A suggested outline of components for the Contractor's QCP is in Appendix
III.
b. Contract Overview Workbook. This assists the COR in overseeing the contract. The contractor shall update this workbook monthly and submit it to the COR along with monthly invoices. A template is provided in Appendix IV. It includes tabs for Security, Quality Control Inspector, Contractor Representatives, Emergency Contacts, etc:
i. Contractor Quality Control Inspector. List of Quality Control Inspector(s) and contact information.
ii. Contractor Representatives. List of names of Contractor’s authorized representative(s) and contact information.
iii. Emergency Contacts. A prioritized list, including phone numbers, of those persons (normally Contractor authorized representatives) to call in case of emergencies.
c. Accident Prevention Plan (APP). A suggested outline for the Contractor’s Accident Prevention Plan is in Appendix V. See Section C-1.9.b for APP requirements.
d. Certificate of Insurance. See Section C-1.32a.for requirements.
e. Security Requirements. See Section C-1.9.j for requirements.
f. A letter of compliance and a signed release from the dump site property owner, if applicable.
g. A letter from either the sewage plant accepting sewage or the state environmental agency approval of an alternate dump site, if applicable.
h. Estimated hours to complete each service.
C-1.7 PERMITS AND LICENSES. Any licenses or permits required to perform all aspects, requirements, and work under this contract shall be obtained at the Contractor’s expense. The Contractor shall comply with all current Federal, State, and local laws and regulations and shall comply with any subsequent changes.
C-1.8 IDENTIFICATION OF CONTRACT EMPLOYEES AND VEHICLES. The Contractor’s employees, other than office and clerical personnel, shall be furnished with standardized uniforms (shirt-pants/shirt-skirt) with a company patch or embroidered identification on the breast pocket or on the sleeve at the top of the arm, within thirty
(30) calendar days after notice of award of the contract. A hat with the Contractor’s company logo may also be worn. Any employee hired thirty (30) calendar days after award of the Contract shall be in the required uniform within fourteen (14) calendar days of the date of hire. Contractor uniforms shall not resemble USACE uniforms.
Contractor employees and subcontractors shall wear these uniforms at all times they are performing work under this contract. Exceptions may be granted by the COR for short term workers, or during disasters, emergencies, wildfire suppression, or special circumstances specified by the COR. Stained or faded uniforms shall not be worn. All vehicles used by the Contractor to perform work under this contract shall be identified with the company name prominently displayed on the outside of both front doors of each vehicle in a professional manner to provide an attractive and readily visible means of identification. These are to be professionally- made vinyl stick-on magnetic type signs. ‘Homemade’ signs made on a computer or with magic marker or stick-on letters and numbers on cardboard, etc., are not acceptable.
The Contractor may require employees to report in their own vehicles to the project, but these personal vehicles must be parked at a site designated by the COR. All vehicles used in performance of work must be marked.
Vehicles used by the Contractor to perform administrative functions such as morning meetings or crew supervision must also be marked.
C-1.9 SAFETY AND SECURITY REQUIREMENTS.
a. General. If the Contractor fails or refuses to promptly comply with safety and security requirements as specified herein, the KO may issue a stop work order for all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such work stoppage shall be made subject to any claims for extension of time or for excess costs or damages sustained by the Contractor. Also, the Contractor will not be paid for work not performed as a result of the stop order.
The Contractor shall comply with the Occupational Safety and Health Act (OSHA), the Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 (https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf), and all applicable Federal, State, and Local laws, ordinances, criteria, rules and regulations. If there are any standards that require interpretation, submit matters to the appropriate administrative agency for resolution before the commencement of work. Where the requirements herein, applicable laws, criteria, ordinances, regulations, or referenced documents vary, the most stringent requirements govern.
b. Accident Prevention Plan (APP). Accident Prevention Plan (APP). Due to the nature of anticipated work, the Contractor may submit an abbreviated Accident Prevention Plan (APP). The Abbreviated APP shall be developed in accordance with EM 385-1-1 Appendix A, Paragraph K. In addition to the items specified as part of the Abbreviated APP, other programs and procedures pertinent to the Contractor’s anticipated activities shall be submitted as appendices to the APP. This APP and applicable appendices shall be submitted and approved by the COR at least one week prior to the pre-work conference and prior to commencement of any work. The Abbreviated APP Form, Form A-01, of the EM 385-1-1 may be used by the Contractor in the development of their Abbreviated APP.
Once accepted by the COR, the APP and all attachments will be enforced as part of the contract.
Disregarding provisions of this contract or the accepted APP is a cause for stopping of that portion of the work at the direction of the COR until the matter has been rectified.
A copy of the accepted APP shall be available on the worksite at all times. The Contractor shall provide on-going evaluations of the APP throughout the life of the contract. Changes, revisions, and updates to the APP shall be reviewed and accepted by the COR.
c. Activity Hazard Analysis. A risk management assessment tool, such as activity hazard analysis (AHA), job safety analysis (JSA), or job hazard analysis (JHA) shall be developed by the contractor performing the work for each activity, task, or defined feature of work (DFOW) (Appendix VI). The assessment shall identify the work sequence, specific anticipated hazards, site conditions, equipment, materials, personnel, and the control measures to be implemented to control the hazards. If Qualified or Competent Persons are required for a particular activity, they shall be identified and included in the assessment, and their competency/qualification identified. Work shall not begin until the assessment has been accepted by the COR and discussed with all engaged in the activity.
These risk assessment tools are considered living documents and shall be updated as needed. If the risk assessment code (RAC) increases from what was originally accepted by the KO, the assessment shall be re-submitted for acceptance prior to work proceeding. Changes that do not increase the RAC are not required to be resubmitted for acceptance.
The risk assessment shall be developed in accordance with EM 385-1-1 Section 1, or as specified by the KO.
Risk assessments shall be submitted for review at least fifteen (15) business days prior to the start of the activity, task, or defined feature of work is set to begin. The Government reserves the right to require the Contractor to revise and resubmit any documents if they fail to effectively identify the work sequence, specific anticipated hazards, site conditions, equipment, materials, personnel, and the control measures to be implemented.
Each employee performing work as part of an activity, task, or defined feature of work shall review the risk assessment for the activity and sign the signature log designated for the assessment prior to beginning work. A signature log shall be maintained for each risk assessment.
d. Public Safety. The Contractor shall ensure that reasonable precautions are taken to protect the public at all times where work is being performed. The Contractor shall immediately report to the COR any potential hazards found by their employees on the project. The APP shall include procedures to be taken to provide for public safety. Additionally, the Contractor shall not allow any persons, except employees, into work areas that are not otherwise open to the public; nor shall the Contractor transport in Contractor work vehicles any persons, except employees, during times the Contractor is on the project performing work under a Task Order.
e. Personal Protective Apparel and Equipment. Protective apparel and equipment, as identified in the AHA, shall be provided to eliminate or minimize hazards to personnel. As a minimum, each employee shall wear shirt-pants/shirt-skirt (as detailed in C-1.8), and appropriate footwear during all contract work. Face shields, spectacles with side-shields, or goggles, hearing protection, gloves, face masks, and/or infectious disease prevention measures shall be worn by employees when required by EM 385-1-1 and CDC guidelines.
Contractor personnel involved in handling or application of pesticides or herbicides shall use all protective apparel per manufacturer's recommendations. Fire extinguisher(s) and first aid kit(s) meeting the EM 385-1-1 standards shall also be provided and easily accessible to all employees.
f. Contractor Employees Certified in First Aid & CPR. The Contractor shall schedule employees so TWO (2) certified personnel are on duty to administer First Aid and CPR as required by the EM 385-1-1. Copies of their certification shall be provided to the COR. Individuals working alone shall be trained in First Aid. The Government has no responsibility to provide emergency medical treatment.
g. Implementation of Safety and Occupational Health (SOH) Program. Based on the limited scope of this Contract, in lieu of appointing a Site Safety and Health Officer (SSHO) at the project site, the Contractor may appoint a Designated Representative (DR) at the site to function as a collateral duty safety person, provided that an individual meeting the requirements of an SSHO as stated in EM 385-1-1 Section 1, Paragraph A.17 supervises the functioning of the DR. The DR shall perform safety programs and tasks as prescribed by the SSHO and report safety findings to the SSHO. SSHO or DR shall be on site at all times work is being done.
Note: Any activities that have a RAC of high or extremely high retracts the allowance to only have a DR, and shall have an SSHO on site.
h. Unforeseen Hazardous Materials. USACE shall identify and communicate all known hazardous materials in which the Contractor may come into contact with during the course of activities. If material is encountered that was not indicated, but may be hazardous to human health upon disturbance, that portion of the work shall stop, and the KO immediately notified. The Government will determine within fourteen (14) business days of notification if the materials is or is not considered hazardous. If the material is not hazardous or poses no danger, the Government will direct the Contractor to proceed without change. If the material is determined to be hazardous or dangerous and handling of the material is necessary to accomplish the work, the Government will address as appropriate.
i. Hazardous Material Exclusion. Notwithstanding any other hazardous material used in this contract, radioactive materials or instruments capable of producing ionizing/non-ionizing radiation, as well as materials which contain asbestos, mercury, polychlorinated biphenyls, diisocyanates, lead, or hexavalent chromium are prohibited. The KO, upon written request by the Contractor, may consider exceptions to the use of any of the above excluded materials.
j. Security Requirements.
1. ANTI-TERRORISM/OPERATIONAL SECURITY (AT/OPSEC) per ENG Form 6055.
i. AT/OPSEC 1. General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures—this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
ii. Antiterrorism (AT) Level I training: All contract personnel requiring routine access to Army installations, facilities, and controlled access areas, or requiring network access shall complete initial and annual refresher AT Level I awareness training. Online AT Level I awareness training is available at https://jko.jten.mil/ (website subject to change).
iii. Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location.
Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.
The Contractor shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation to the USACE Pittsburgh District Security Office within 2 weeks prior to onsite work. If any additional individuals are subsequently added to be onsite, their information must be submitted to Security for a background check via the process identified below. The Contractor must submit the Full Name, Date of Birth, and Social Security Number (Attachment 4) for all associated Contractor or subcontractor employees to the USACE Pittsburgh District Security Office. The USACE Pittsburgh District Security Office needs a minimum of 30 day lead time to process Foreign Nationals. Please contact the District’s Security Office directly to obtain submission requirements. The completed Form shall be emailed as password-protected to the USACE Pittsburgh District Security Office, to the following individuals: Ivan Russell, Security Specialist, 412- 395-7591, ivan.r.russell@usace.army.mil and Andrew Wasko, Security Specialist, 412-395-7643, andrew.j.wasko@usace.army.mil, followed by a new, separate email with the password to the Security Specialists (See Appendix VII AT/OPSEC Information Sheet). The District retains the right to deny any Contractor and subcontractor employee from working on one of its contracts based on final background investigation results. In addition to the employee information required above, the email or FAX) shall contain all the following information:
Company Name Point of contact in case of questions: Name, phone number & email Project Title and Location of project Name of COR
All employees must be approved through the Security Office BEFORE they are permitted to work on site. The approval process may take up to fourteen (14) business days so it is imperative to provide the employees information as soon after contract award as possible. All new employees commencing performance on this contract must be vetted through the same requirements stated herein. The District retains the right to deny any contractor and subcontractor employee from working on one of its contracts based on final background investigation results.
iv. Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
v. Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
C-1.10 ACCIDENT REPORTING. The Contractor is responsible for reporting all accidents to the COR immediately. Prompt action shall be taken to ensure immediate and appropriate medical treatment. The Contractor shall maintain an accurate record of any accidents in the manner and on the forms prescribed by the COR. The Contractor shall maintain an OSHA 300 Log of Work-Related Injuries and Illness:
https://www.osha.gov/recordkeeping/RKforms.html
C-1.11 DAMAGE REPORTS. All instances where Government materials, supplies, property, and/or equipment are damaged, as well as the public’s property, it shall be reported immediately to the COR. When the damage was caused by contractor employees, the contractor must submit a written report of the incident and extent of such damage to the COR, within two (2) business days of occurrence. For property damage accidents determined by the COR of $2,000 or more, the Contractor will complete and submit to the COR a copy of ENG 3394 (Appendix VIII).
C-1.12 CONTRACT EMPLOYEES' CONDUCT AND COMPETENCY. All contractor employees shall conduct themselves in a proper and courteous manner at all times. Since the majority of work is performed in the presence of the general public, the conduct of all contractor employees is critical and will be closely monitored. Contractor employees shall comply with all provisions of 36 CFR Part 327 and shall obey all posted signs and regulations in the performance of the work under this contract. Contractor employees shall not be under the influence of or consume alcoholic beverages or controlled substances while on duty.
a. Employee Dismissal. The Contractor expressly agrees to dismiss any employee or ask their subcontractor to remove the employee whose continued employment is deemed by the COR to be incompetent, endangers persons or property, or whose physical or mental condition would impair their ability to satisfactorily perform the work. Notification to the Contractor will be promptly made in writing if time and circumstances permit. Otherwise, notification will be verbal and confirmed in writing as soon as possible.
No removal shall reduce the Contractor's obligation to perform all work required under this contract nor be the basis for time extension. Immediate replacement of the employee shall be made.
b. Combatting Trafficking in Persons. The United States has adopted a zero-tolerance policy regarding trafficking in persons. Contractors and Contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy and the actions that will be taken against employees for violations of this policy. Such actions may include, but are not limited to, removal from the contract, reduction in benefits, or termination of employment. The Contractor shall take appropriate action, up and including termination, against employees or subcontractors that violate the U.S. Government policy as described at FAR 22.17.
C-1.13 DAMAGE OR LOSS OF CONTRACTOR'S SUPPLIES AND PROPERTY. The Contractor is responsible for taking the action necessary to protect Contractor supplies, materials, and equipment, and the personal property of Contractor employees from loss, damage, or theft. The Government assumes no responsibility for loss, theft, or damage of the property listed above.
C-1.14 SUPERVISION. The Contractor or Contractor Representative(s) shall personally supervise the work and respond to any contract issue that may arise when work is in progress. The Contractor Representative(s) shall conduct overall management coordination and be the central point of contact with the Government for performance of all work under the contract.
Each Contractor Representative shall have full authority to contractually commit the Contractor for prompt action on all matters pertaining to administration of this contract and shall be the on-site Contractor employee who is responsible for safety.
In addition to Contractor Representative(s), the Contractor shall also appoint Quality Control Inspectors (QCIs) who shall perform the Contractor's Quality Control Program. QCIs shall be responsible for implementing the Contractor’s Accident Prevention Plan. All QCIs shall have the authority to determine for the Contractor when work is ready for Government inspection and to make decisions for the Contractor on re-performance of the service when necessary. A QCI shall be appointed for each work crew. For work performed for Emergency and/or After Hours Work, a Contractor Representative or QCI shall be present at the work site.
The COR and Government Inspectors will deal directly with the QCIs or Contractor Representatives for normal day-to-day administration of the contract provisions.
The names and telephone numbers of all individuals authorized to act on behalf of the Contractor as Contractor Representatives shall be submitted in writing to the COR before work is performed.
The Contractor shall maintain copies of contract work requirements, specifications, and Activity Hazard Analysis at each work site which relate to each employee’s work responsibilities and shall review them to insure employees’ comprehension of the efforts prior to initiating work.
C-1.15 ENVIRONMENTAL PROGRAM. The Contractor shall comply with Federal, State, and local laws, regulations and standards regarding environmental protection. All environmental protection matters shall be coordinated with the COR. Any of the facilities operated by the Contractor may be inspected by the COR, or other Federal, State and local officials without advance notice. Access for inspection shall be granted upon request.
Citations against Government facilities operated by the Contractor for non-compliance with environmental standards are a matter for resolution between the Government Entity that issued the citation and the COR. Payment of fines or penalty charges associated with citations issued by Federal, State or local officials will be paid by the Government.
If the citations are issued due to faulty operation or maintenance practices of the Contractor, the KO or COR will deduct the fine from any monies due the Contractor.
The Contractor shall conduct all operations and maintenance activities in a manner to prevent contamination of Government land and property. The Contractor shall ensure all lubricants, petroleum products, paints, cleaning materials, or any other hazardous substances are not spilled, leaked or disposed of on Government property and are disposed of in accordance with environmental regulations. If spills or contamination occur, the Contractor shall be responsible for cleanup and any associated costs in accordance with Federal, State and Local Law. Such spills shall be reported to the COR immediately.
C-1.16 CONTRACT DISCREPANCY REPORT (CDR). A CDR will be issued to the Contractor for any failure to perform services. This report will be generated within the Procurement Management Integrated Enterprise Environment (PIEE) and then sent to the Contractor. The CDR describes the discrepancy or defect and will be discussed with the Contractor Representative when it is issued. The Contractor’s written response on the CDR form shall be returned to the COR within twenty-four (24) hours of issuance. The Contractor's response must:
a. Identify the cause and corrective action taken, and
b. Identify Contractor action to prevent recurrence.
The COR will evaluate the Contractor's response and record the corrective action to be taken, which may include the KO making necessary deductions in accordance with the Performance Requirements Summary (Attachment 1).
Upon finalization of the CDR, the Contractor and the COR must sign the form. The Contractor will be given a copy of the completed form. Should the Contractor not concur with any decision or finding, the Contractor may so state, in writing, and request a final decision by the KO. The KO will review all CDR's issued; CDRs will also become a part of the permanent contract file.
C-1.17 MEETINGS. The Contractor or Contractor Representative shall report each workday (Monday-Friday, with the schedule and location determined by the COR) to discuss contract work items. Specific topics of discussion at the morning meetings may include issuing Task Orders, inspections, quality control, performance evaluation meeting, discrepancy or defect, and upcoming work. The COR may alter this reporting schedule, or change the reporting method, time, or place if mutually agreeable between the COR and the Contractor.
C-1.18 QUALITY CONTROL. The Contractor shall have a Quality Control program to assure the requirements of the contract are provided as specified. The primary purpose of Quality Control is to identify and correct discrepancies in the quality of services performed before the level of performance is unacceptable.
The program shall include, but not be limited to the following:
a. An inspection system covering all the services stated in the contract Performance Work Statement.
b. A method of identifying and correcting discrepancies in the quality of services performed before the level of performance is unacceptable.
c. A file of all inspections conducted by the Contractor and the corrective actions taken. These files shall be made available for inspection upon request by the COR.
d. A method of insuring that employees have full knowledge of work assignments, and that appropriate technical expertise is utilized with each work assignment.
e. A method of coordinating each work crew’s activities with the COR.
A suggested outline of components for the Contractor's QCP is described in Appendix III. The Contractor may use any or all portions of this template to prepare a QCP. A signed plan, including Contractor specific information, shall be provided to the KO and the COR for review in advance of the pre-work conference. A COR-approved QCP must be in place prior to the start of work. A living document, upon the incorporation of any changes, updated copies of the QCP shall be provided to the KO and COR for review and COR approval.
Failure to provide appropriate Quality Control may result in issuance of a CDR, and/or termination of the contract.
C-1.19 QUALITY ASSURANCE. The Government will monitor the Contractor's performance in each functional area under this contract and reserves the rights to use whatever additional surveillance procedures are deemed appropriate. The Government will monitor the contract to ensure compliance using a Quality Assurance Surveillance Plan (QASP) but reserves the right to alter the plan at its own discretion. The Government reserves the right to change methods of inspection as deemed necessary.
The Government will keep a record of all complaints received by the public concerning Contractor performance.
Upon receipt of a written complaint by the public, the Government will attempt to verify the complaint and furnish a copy of the findings to the Contractor. Should the Government verification reveal a nonperformance by the Contractor, a CDR may be issued.
A Government employee shall not be considered an Inspector unless identified as such to the Contractor, the Contractor Representative, or Quality Control Inspector. No Inspector is authorized to change any provision of the specifications without written authorization of the KO nor shall the presence or absence of an inspector relieve the Contractor from any requirements of the Contract.
C-1.20 DISCREPANCIES. If any of the work performed does not conform to contract requirements, the Government may require the Contractor to perform the work again at no cost to the Government. When the defect in work cannot be corrected by re-performance, or cannot be corrected in the specified time frame, the Government may, by separate contract or otherwise, perform the work and charge the Contractor any costs incurred by the Government that are directly related to the performance of such work. The actual cost includes, but not limited to, labor costs including benefits, transportation, and materials.
C-1.21 INTERRUPTIONS TO SYSTEMS. All work that would necessitate an interruption of the use of the project or its support systems or otherwise disrupt building occupants and/or the visiting public shall be fully coordinated and approved in advance by the COR. Interruptions shall be kept to an absolute minimum, and all repairs or replacements of equipment or components shall be accomplished in an expeditious and efficient manner.
C-1.22 GOVERNMENT ASSETS FOR CONTRACTOR USE.
a. Government Courtesy Area(s). Where possible, suitable areas will be provided for the Contractor's use for work performed under this contract. Examples include but are not limited to, a closet for the storage of cleaning supplies and/or an exterior area for the temporary storage of equipment. The Contractor shall maintain courtesy areas to the same, or higher standards, as similar areas occupied by the Government and shall assume responsibility for the safekeeping and physical security of the areas provided. The Contractor shall not use areas as a place of habitation. Upon the completion of the contract, all areas shall be returned to the Government in the same condition as received, except for reasonable wear and tear. The Contractor shall be held responsible for the cost of any repairs caused by the fault or negligence of the Contractor or Contractor’s employees. Modifications or changes shall not be made without prior written approval of the COR. Any approved modifications shall be at the Contractor's expense. Should the Contractor reject any or all
Government courtesy areas, the Contractor shall provide all necessary areas at no cost to the Government. All Government provided areas shall be used only for the performance of work specified herein.
b. Utilities. The Government will furnish available utilities to perform the specified work. At remote locations the Contractor will be required to transport utilities, such as water, from another on-site source. The Contractor shall make a dedicated effort to conserve utilities and shall comply with all Government regulations regarding energy conservation. Government furnished utilities shall be used only in the performance of work specified in this contract.
c. Keys. The Contractor will be provided keys to allow access to certain secure areas and will be held responsible for losses due to the fault or negligence of the Contractor or its employees; including the replacement of any compromised locks resulting from the loss or duplication of keys. Upon contract completion, including any extensions, or termination, the Contractor shall return all Government keys in the same condition as received. Other than reasonable wear and tear, the Contractor is responsible for any damages to the keys or locks.
d. Forms. All Department of Defense forms, required by the Government to be used under this contract, will be provided by the Government during the contract period. The Government reserves the right to modify or supersede these forms during the contract period.
e. Control. The Contractor shall provide internal controls to ensure Government courtesy areas are utilized only for contract purposes.
C-1.23 CONTRACTOR FURNISHED ITEMS.
a. General. Except as described elsewhere in this contract, the Contractor shall furnish all personnel, facilities, vehicles, small tools, equipment and operators, supplies and materials necessary to accomplish all required services. All Contractor furnished tools, equipment, supplies, materials and vehicles shall meet all applicable Federal, Department of Defense, Department of the Army, State and local laws or regulations. The contractor will use recycled-content paper products (toilet paper, paper towels), trash bags, etc. as set forth by the Environmental Protection Agency (EPA) (see link in paragraph C-1.33 below). The contractor will meet the Bio-Preferred Program requirements set forth by US Department of Agriculture (USDA), e.g. glass cleaner, hand cleaners, and mulch (see link in paragraph C-1.33 below). A partial list of equipment needed by the Contractor is included in each section. The Contractor may be responsible for providing equipment that is not listed in the specifications.
b. Equipment. The Government requires that the Contractor provide adequate equipment to perform the work required within the specified time period for each job. Adequacy of the equipment (e.g., mowing equipment and vehicles) to perform certain repetitive work will be determined prior to award of the contract. Also, all equipment used by the Contractor must meet safety requirements outlined in EM 385-1-1.
c. Service Vehicle. It is the Contractor's responsibility to provide service or work vehicles as necessary. The vehicles must be capable of transporting, to and from job sites on the project, the same number and quantity of employees, equipment, tools, materials, and supplies that could reasonably be transported in a standard size ½-ton truck with a 4' x 8' bed. Contractor service vehicles used along project and public roads must be equipped with an orange rooftop revolving light, a rear mounted warning sign, and reflective tape on the rear bumper.
d. Contractor Equipment and Supply Inspection. The Contractor shall make available for inspection all service equipment, tools, and samples of supplies the Contractor proposes to use for work under this contract, along with proof of ownership or lease agreement. Such articles shall be made available for inspection within seven
(7) business days after notice from the COR. Only equipment and supplies inspected and approved shall be used for work under this contract. All subsequently procured equipment to be used for work under this contract must be inspected and approved by the Government prior to use.
C-1.24 SAFEGUARDING GOVERNMENT PROPERTY. The Contractor shall cooperate with Government personnel in safeguarding Government property. The Contractor shall be responsible for promptly reporting all acts of vandalism, larceny, or pilferage to Government property, and all malfunctioning Government equipment to the COR.
This is the start of the file's text. The full file is on GovTribe.