This document provides details on a pre-solicitation for building and grounds maintenance services at Woodcock Creek Lake and Union City Dam. The solicitation number is W911WN24Q3001 and is being issued by the Department of the Army Corps of Engineers Engineering District Pittsburgh. The pre-solicitation is for maintenance services that include tasks such as landscaping, trash removal, and facility upkeep. The period of performance is expected to be one base year with four option years. The anticipated award date is in January 2023, with a response deadline that is likely outlined in the full solicitation when released.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1

PERFORMANCE REQUIREMENTS SUMMARY

The Government pays only for those services delivered and accepted.

Statements Standards Inspections C.2.

Grounds Maintenance

Deliverables:

AHAs

APP

MSDS

QCP

a) Performance In accordance with the PWS Section C-2 and PWS Attachments 2, 3 and 4.

b) Environmental In accordance with the PWS Section C-8.

c) Safety In accordance with the PWS Section C-1.9.

What: Grounds Maintenance How: 100% Inspection, Periodic Inspection, Random Inspection, Customer Feedback Who: COR Documented: Inspection Reports, Monthly Status Reports, CPARS Remedy: If standard is not met, the Contractor shall be penalized:

A minor (Level I) nonconformance is remedied via reperformance of the task.

A major (Level II) nonconformance up to 20% cost of the service.

Deductions will be calculated using the annual price divided by the estimated quantities times the deduction percent applicable.

A critical (Level III) nonconformance up to 50% cost of the service.

Deductions will be calculated using the annual price divided by the estimated quantities times the deduction percent applicable.

Standard(s): Inspection applies to all standards

C.3.

Cleaning Services

Deliverables:

AHAs

APP

MSDS

QCP

a) Performance In accordance with the PWS Section C-3 and PWS Attachment 5.

b) Environmental In accordance with the PWS Section C-8.

c) Safety

What: Cleaning Services

Customer Feedback Who: COR Documented: Inspection Reports, Monthly Status Reports, CPARS Remedy: If standard is not met, the Contractor shall be penalized:

A minor (Level I) nonconformance is remedied via reperformance of the task.

A major (Level II) nonconformance up to 20% cost of the service.

Deductions will be calculated using the annual price divided by the estimated quantities times the deduction percent applicable.

A critical (Level III) nonconformance up to 50% cost of the service.

Deductions will be calculated using the annual price divided by the estimated quantities times the deduction percent applicable.

Standard(s): Inspection applies to all standards

C.4.

Solid Waste Removal

Deliverables:

AHAs

APP

MSDS

QCP

a) Performance In accordance with the PWS Section C-4 and PWS Attachment 6.

b) Environmental In accordance with the PWS Section C-8.

c) Safety

What: Solid Waste Removal

Customer Feedback Who: COR Documented: Inspection Reports, Monthly Status Reports, CPARS Remedy: If standard is not met, the Contractor shall be penalized:

A minor (Level I) nonconformance is remedied via reperformance of the task.

A major (Level II) nonconformance up to 20% cost of the service.

Deductions will be calculated using the annual price divided by the estimated quantities times the deduction percent applicable.

A critical (Level III) nonconformance up to 50% cost of the service.

Deductions will be calculated using the annual price divided by the estimated quantities times the deduction percent applicable.

Standard(s): Inspection applies to all standards

Attachment 2

GRASS MOWING AND MAINTENANCE OF LANDSCAPED AREAS

Addendum to Performance Work Statement, Section C-2.1 – C-2.5, Grounds Maintenance

Location:

Project mowing areas are identified below and shown on accompanying maps, mow to existing established limits and as shown on the maps. All clippings are to be swept or blown from all sidewalks into grass (not parking lot nor drainage channels, ditches or swales where applicable). All discrepancies shall be reported to the COR for verification.

Site #1, Woodcock Dam Site. (Map 1 – WCL) Includes grass areas in the vicinity of the maintenance building area and dwellings, pathway down to lake & to boat dock, including all areas as defined by existing mowed area limits around roads, road berms, behind and around sewage pump station, turn around to the spillway structure, around guide rails and compost toilet at turnaround, 3' on each side of walking trail to concrete gutter bridge and along the utility corridor adjacent to Rt. #198. Type I Mow, approximately 7.4 acres.

Site #2, Woodcock Overlook. (Map 2 – WCL) The north shore of the lake to include all areas as defined by the mowing map around parking area, entrance road and along Rt. #198, including around new pavilion and mow to the lake. Type I Mow, approximately 6.9 acres.

Site #2A Woodcock Dickson Road. (Map 7 – WCL) This is the immediate area North and East of the cul-de-sac on Dickson Road. Area is defined by existing mowing boundaries. Includes approximately 32 bollards to be trimmed around. Does not include inside the gated maintenance area. Type I Mow, approximately 1.4 acres.

Site #3, Bossard Nature Area Visitor Center. (Map 1 – WCL) Includes all areas as defined by the mowing map around the parking area and the Information Center, including area around 3 park benches. Type I Mow, approximately 1.2 acres.

Site #4 and 4A, Outflow Recreation Area. (Maps 3, 4 & 5 – WCL) Site 4 is north of the outflow: includes picnic areas on the right bank below the dam; areas around the parking area, playground, disc golf course, trail to side of hill and trail to near the outflow of dam on both sides as defined by existing mowed areas. Type I Mow, approximately

8.8 acres. Site 4A is south of the outflow. Type I Mow, approximately 1.9 acres.

Site #7, Woodcock Guardrails. (Maps 3, 4 & 5 – WCL) The guardrails on the downstream side of the

Woodcock Dam includes areas around and between rail posts. Mow to 10 feet of the outside of the guardrail. Type I Mow, approximately 1.1 acres.

Site #8, Woodcock Field Mowing. Includes areas behind dwellings to the lake, the spillway, and areas east and southwest of the dam. Type II Mow, approximately 53.3 acres as indicated below:

Site 8.1 – Dam Site (Map 1 – WCL) – Approximately 2.7 acres

Site 8.2 – Spillway (Map 6 – WCL) – Approximately 26.7 acres-WILL NOT MOW due to switchgrass

Site 8.3 – Right bank (below Dam) (Maps 3, 4 & 5 – WCL) – Approximately 3.1 acres

Site 8.4 – Left bank (below Dam) (Maps 3, 4 & 5 – WCL) – Approximately 16.3 acres

Site 8.5 – TOE Mowing (Maps 3, 4 & 5– WCL) – Approximately 18.9 acres

Site 8.6 – Downstream Slope (Maps 3, 4 & 5 – WCL) – Approximately 11.8 acres

Site 8.9 – Weir Driveway (Map 6 – WCL) – Approximately 0.5 acres

Site #9, Union City Dam Site. (Maps 2 & 3 – UCD) Includes all areas as defined by the mowing drawing, around roads, parking lots and restroom. Type I Mow, approximately 4.9 acres.

Site #10, Union City Guardrails. (Maps 2 & 3 – UCD) Includes areas around and between guardrail posts.

Mow to 10 feet of the outside of the guardrail. Type I Mow, approximately 0.5 acres.

Site #11, Union City Safety Mowing. Includes areas on the East and West sides of Outflow area, the flat area above the spillway entrance channel and the North slope of the West upstream embankment. Type II Mow, approximately 5.3 acres as indicated below:

Site 11.1 (Maps 2 & 3 – UCD) – West bank upstream/Overflow – Approximately 1.9 acres

Site 11.2 (Maps 2 & 3 – UCD) – Downstream face of Dam – Approximately 3.4 acres

Site #12, Union City Maintenance Building. (Map 1 – UCD) Located on Hare Road. Area is defined by existing mowing boundaries. Does not include inside the gated maintenance area. Type I Mow, approximately 0.6 acres.

Suggested Schedules:

Sites 1, 2, 2A, 3, 4, 4A, (WCL) 9 and 12 (UCD) shall be mowed and maintained in accordance with the Type I specifications at C-2.5 April through October.

Historically, to maintain the PWS standards, these sites were mowed as follows:

Historical Frequency for mowing Sites #1, 2, 2A, 3, 4, 4A, 9 and 12 April Type I Two times per month May through June Type I Weekly July through August Type I Three times per month September through October Type I Two times per month

Sites 7 (WCL) and 10 (UCD) shall be mowed in accordance with the Type I specifications at C-2.5 monthly from April through September.

Sites 8.1, 8.3, 8.4 and 8.9 (WCL) shall be mowed and maintained in accordance with the Type II specifications at C-2.5 annually in August.

Sites 8.5, 8.6 (WCL) and 11.1 and 11.2 (UCD) shall be mowed in accordance with the Type II specifications at C-2.5 monthly from April through September.

Spring Clean Up:

These spot services are performed over 5.56 acres at Woodcock Creek Lake and 2.28 acres at Union City Dam as follows:

Sod Repair Debris Removal Woodcock Creek Lake ≈200 Square Yards ≈4640 Square Yards Union City Dam ≈50 Square Yards ≈1160 Square Yards Not to Exceed (NTE) 250 Square Yards 5,800 Square Yards

Spring Cleanup at Woodcock Creek Lake

Spring Cleanup at Union City Dam

Attachment 3

MULCHING

Addendum to Performance Work Statement, Section C-2.8 MULCHING

Project mulching areas are identified below and shown on accompanying maps.

Mulching of Shrub Beds, Individual Trees and Shrubs, according to latest established practices. Keep areas that are mulched free of weeds and foreign material.

Shown on maps for Attachment 2 and as described below.

Woodcock Cubic Yards of Mulch (Estimate)

Map

Woodcock Damsite, Site #1, Approximately 168 shrubs and 50 trees

17 1 WCL

Overlook Recreation Area, Site #2, Approximately 155 shrubs and 33 trees

15 2 WCL

Bossard Nature Area Visitor Center, Site #3, Approximately 29 shrubs and 32 trees

4 1 WCL

Outflow Recreation Area, Site #4, Approximately 75 trees

9 2 WCL

(See Outflow Recreation Area map)

Union City Cubic Yards of Mulch (Estimate)

Map

Union City Dam Site, Site #9, Approximately 108 shrubs and 105 trees

15 2 & 3 UCD

TOTAL: 60 Cubic Yards

Attachment 4

PESTICIDE APPLICATION

Addendum to Performance Work Statement, Section C-2.17 PESTICIDE APPLICATION

Project Pesticide/Herbicide (including pre-emergent spray) locations are identified below and shown on accompanying maps.

Pesticide Application

Woodcock Creek Lake. Herbicide/Pre-Emergent shall be applied to the following rock surfaces of Woodcock Dam and the surrounding areas as shown on maps:

Site: Description Map Application SP1 Stone face of dam to include upstream guardrail 3, 4 & 5 WCL 100% SP3 Toe ditches along the base of the downstream slope of the dam 3, 4 & 5 WCL 100% SP4 Stone slopes of the outflow structures of the dam 3, 4 & 5 WCL 100% SP5 Drainage ditched along the entrance road to the government dwellings 1 WCL 100% SP6 Maintenance compound on Dixon Road with a 3’ perimeter around fenced compound, 3’ strip to the left and right side of entrance road and 3 feet on inside of guard post to paved parking area

7 WCL 100%

SP7 Fenced area at sewage lift station with a 3' perimeter 1 WCL 100% SP8 Radio site on Peters Road with a 3' perimeter 8 WCL 100% SP9 3’ perimeter around the fenced in area at the maintenance complex 1 WCL 100% SP10 The concrete and rip-rap portion of the earthen dike below the dam 3, 4 & 5 WCL 100% SP11 The walking trail from the south end of the dam to Colonel Crawford

Park

6 WCL 100%

SP12 Crack spraying of pavement on parking areas and roadways on entire project

Spot

SP20 Overlook Recreation Area Slurry Gutter 2 WCL 100% Total approximate area is 19 acres.

NOTE: (SP2) is Reserved

Union City. Herbicide/Pre-Emergent shall be applied to the following rocks surfaces of Union City Dam and surrounding areas as shown on maps:

Site: Description Map Application SP13 Stone face of dam including lower section of dam below access rd.

access road with 3' berm

2 & 3 UCD 100%

SP13a Along the upstream berm of the road across the dam, including all cracks in pavement on the entire project

2 & 3 UCD 100%, Spot

SP14 TOE ditches along the downstream slope of dam 2 & 3 UCD 100% SP15 Stone slopes of the outflow structures of the dam 2 & 3 UCD 100% SP16 Maintenance Bull Pen—grass areas of storage yard at maintenance building including a 3' perimeter around the yard fence, 3' strip to the left and right side of entrance drive

1 UCD 100%

SP17 Slushed ditches at parking lots 2 & 3 UCD 100%

SP18 Riprap at the base of the downstream slope 2 & 3 UCD 100%

SP19 Access roads to outflow including the ditches 2 & 3 UCD 100% Total approximate area is 14 acres.

Attachment 5

CLEANING SERVICES

Addendum to Performance Work Statement, Section C-3.1-C-3.11, CLEANING SERVICES.

Project cleaning service areas are identified below and shown on accompanying maps.

Scope of Work. All materials used by the Contractor shall be approved by the COR prior to use. Materials required in the performance of the work which are not specified shall be similar and equal to the materials currently in use and/or the product specified below. The Contractor will be provided small storage areas for supplies.

*Trash Bags. Trash bags should be at least 4 mil thick heavy duty puncture and tear resistant plastic bags. The outside garbage cans use the 33 gallon, 75 lb. load capacity.

*Toilet tissue. Roll type white tissue of good quality. Must be two-ply and at least 500 sheets per roll.

*Hand Soap/Hand Sanitizer. Liquid and/or bar to be used in the restrooms; including Aerogreen antibacterial foam soap. Provide hand sanitizer in composting toilet on the South end of Woodcock Creek Lake Dam.

*Hand towels equivalent to Big Fold Jr.

*Cleaning supplies. The contractor shall furnish all cleaning, disinfectant and pesticide items necessary to perform the required work. The contractor shall inform the public that a restroom/area is out service while being cleaned by use of a sign provided by contractor.

Schedule and location of work. Various cleaning services may be requested periodically with work done in accordance with the following schedule:

*All cleaning to be completed by 1530 hours to allow for inspection of services.

Restroom Cleanings

Woodcock, Site #2: There is one set of restrooms located at the Overlook Recreation Area on the south side of the parking lot:

Woodcock, Site #2 Urinals Toilets Sinks Hand Dryer Square Feet Men’s Room 2 2 2 1 ≈ 256 Ladies Room 4 2 1 ≈ 279

To be cleaned: May through October – Mondays and Fridays preferred.

November through April – Closed

Woodcock, Site #3: There is one set of restrooms located in the Bossard Nature Area Visitor Center north of Route 198.

Woodcock, Site #3 Urinals Toilets Sinks Hand Dryer Square Feet Men’s Room 2 2 2 1 ≈ 256 Ladies Room 4 2 1 ≈ 279

To be cleaned: May through October – Mondays and Fridays preferred. When a federal holiday falls on a Monday, preference is to clean on Tuesday that week.

November through April – Fridays preferred.

Composting Toilet: There is one toilet at the south end of Woodcock Creek Lake Dam

To be cleaned: May through October – Mondays and Fridays preferred.

November through April – Fridays preferred.

Union City Dam Site, Site #9: There is one set of restrooms located at the Union City Dam Site. The entrance to the Dam is off Middleton Road.

Union City Dam Site, Site #9

Urinals Toilets Sinks Hand Dryer Square Feet

Men’s Room 2 2 0 0 ≈ 162 Ladies Room 4 0 0 ≈ 162

To be cleaned: May through October – Mondays and Fridays preferred. Restroom is closed November through April.

Emergency cleanings are rare.

Project Offices/Bossard Nature Area Visitor Center Area Cleanings

Woodcock Buildings 1, 2 & 3 cleaned weekly throughout the year, Fridays preferred.

Woodcock Building #1, Maintenance Building Maintenance Mechanic’s Office 256 square feet carpet Administrative Office 438 square feet carpet Office Restroom 112 square feet vinyl Maintenance Worker’s Office 24 square feet vinyl Office/Lunch Area 456 square feet concrete Maintenance Restroom and Shower Stall 28 square feet concrete

Woodcock Building #2, Resource Managers Office Manager’s Office 143 square feet vinyl Ranger’s Office 182 square feet vinyl Administrative Office 220 square feet carpet Lunch Area 265 square feet vinyl Downstairs Restroom 64 square feet vinyl Upstairs Restroom 20 square feet vinyl Stairwell 64 square feet wood, vinyl landing Downstairs Hallway 60 square feet carpet

Woodcock Building #3, Northern Area Office Large Conference Room 350 square feet carpet

Two Restrooms 56 square feet vinyl Three Offices 466 square feet carpet Kitchen 198 square feet vinyl Stairwell Landing 56 square feet carpet Stairwell 128 square feet wood Upstairs Hallway 48 square feet carpet

Bossard Nature Area Visitor Center cleaned upon request of COR, with 72 hours notice.

Woodcock Bossard Nature Area Visitor Center Main Visitor Center, including vestibule 747 square feet tile Room to left of the vestibule 911 square feet carpet Meeting Room 911 square feet carpet

Union City Dam Maintenance Building to be cleaned twice yearly in Spring and Fall.

Union City Dam Maintenance Building Maintenance Building 1350 square feet concrete

Building #1, Woodcock Northern Area Office

Building #2, Woodcock Resource Managers Office

Outside, Union City Dam Maintenance Building Shop, Union City Dam Maintenance Building

Bathroom and Office, Union City Dam Maintenance Building.

Building #3, Woodcock Maintenance Building

Exterior Trash Receptacles

Emptied May through October every Monday and Friday

November through April every Friday

Woodcock Site: Trash Receptacles Bossard Nature Area Visitor Center 2 Outflow Recreation Area, Fishing Access Area 8 Overlook Recreation Area, outside the shelter 3 Dam Site Recreation Area 1 Top of Dam 3 Overlook Recreation Area 4

Woodcock Totals: 21

Union City 4 Union City Totals: 4

NOTE: Bagged receptacle trash collected from trash Union City Dam to be transported and placed inside dumpster located at Woodcock Creek Lake for solid waste removal.

Attachment 6

SOLID WASTE REMOVAL

Addendum to Performance Work Statement, Section C-4.1 – C-4.4 SOLID WASTE REMOVAL

Site Quantity Size Schedule Location Pick ups

Woodcock Creek Lake One (1) 4-Cubic Yard Dumpster

Year-round Adjacent to Building #2, Resource Managers Office

Weekly, on Fridays

Union City Dam N/A, take bagged trash from receptacles to Woodcock Creek Lake solid waste dumpster

N/A N/A

Pub. 18 October 2023 USACE LRP Geospatial erik.w.breedon

Index Map Buildings & Grounds Contract Maintenance

WOODCOCK CREEK LAKE

Data: Esri, USGS, USACE

NY

PA

WCL

UCD

CHAUTAUQUA

CO.

CRAWFORD CO.

ERIE CO.

WARREN

CO.

PAOH

NY

VAWV

MD

Lake Erie

LOCATION Local VicinityDistrict à à à à J J… à à à à à à

J J

J J à à à à à à

J J

J J à à à J… à à à

J J

J J…

WO O D C O C K

TO W N S H I P

S a e g e r t o w n

M ai n St

D ickson R d

B el l D r

R os s D r

Beach Ct

VistaDr

W ood cock Ln

Ka ly Cir

B ra dw ay

R d

Matthew Ln

Handley Rd Fu lle r R d

Stoltz Rd

Meadow D r

Morris Rd

Brown Rd S iv er lin g

R d

Mitchell Rd

Fisher Rd

Boat Launch Dr

Cr ai g R d

Bradshaw Rd

Li m be r

R d

Flick Rd

Cannon Hollow Rd

South St

Shutz Rd

Erie St

Peters Rd

H us on R d

German Rd

Campground Circle

ST198

ST198

ST198

OP86

OP86

OP86

Woodcock Creek Lake

Full pool 1208.4'

Bossard Run

Spaid Run

W oodcock Creek

Resource Manager's Office

Dam

Legend

Map sheet, by number

Reservoir full pool

Incorporated area boundary

Corps boundary

0 ¼ ½ MILEI Coordinate System: NAD 1983 2011 StatePlane Pennsylvania North FIPS 3701 Ft US Projection: Lambert Conformal Conic

Maps - Woodcock Creek Lake

To C am br id ge

S pr in gs

To US-19

To M ea dv ill e

To BloomingValley

Attachment 8

WOODCOCK

TOWNSHIP

BossardLeft Trail

Boss ar d Left Trail

D am

R oa d

Bo ssard Left Trail

Bossard Right Trail

Out flo w Tra il

Woodcock Creek Lake

ST198

ST198

ST198

ST198

W oo dc oc k C re ek

D am

SP5

SP5

SP5

SP5

SP7

SP9

SP9

1280'

1270'

1250'

12 20'

1210'

120 0'

1190'

90'

1240'

1230 '

1200'

1190'

1180'

1170'

1260'

1180'

1160'

1220'

1250'

1150'

1150'

8.1

8.1

8.1

Sewage pump station

Northern Area Office

Resource Manager's

Office Maint.

Bldg/Info Ctr

Bossard Nature Area visitor center

Pub. 18 October 2023 USACE LRP Geospatial erik.w.breedon

Sheet 1 of 1

Dam Site & Bossard Nature Area Buildings & Grounds Maintenance

WOODCOCK CREEK LAKE

Mowing and herbicide regions labeled by site number.

Data: Esri, USGS, USACE, PEMA Google aerial photography supplemented with Esri hillshade.

Dam

WOODCOCK

TOWNSHIP

ST198

OP86

Full pool 1208.4'

Spaid Run

Woodcock Creek

LOCATION

Legend

Herbicide Mowing,Type I Mowing,Type II Mulch

Elevation contour (10')

Corps boundary

0 100 200 FEETI

Map 1

Mowing Sites 1, 3, and 8.1

Herbicide Sites SP5, SP7, and SP9

WO O D C O C K

TO W N S H I P

S iv er lin g R d

Woodcock Creek Lake

Full pool 1208.4'

ST198

ST198

ST198

SP20

1250'

1240'

1230'

1220'

1210'

1200'

1190'

1270'

1 26 0'

'12

1230'

20'

1260'

1240'

1180'

New pavilion

Restrooms

Pub. 18 October 2023 USACE LRP Geospatial erik.w.breedon

Sheet 1 of 1

Overlook Buildings & Grounds Maintenance

WOODCOCK CREEK LAKE

Mowing and herbicide regions labeled by site number.

Data: Esri, USGS, USACE, PEMA Google aerial photography supplemented with Esri hillshade.

Dam

WO O D C O C K

TO W N S H I P

ST198

OP86

Full pool 1208.4'

Spaid Run

Woodcock Creek

LOCATION

Legend

Herbicide Mowing,Type I Mulch

Trail

Reservoir full pool

Elevation contour (10')

Corps boundary

0 100 200 FEETI

Map 2

Mowing Site 2

Herbicide Site SP20

D am

R oa d

Outflow Trail

Woodcock Creek Lake

Fu ll po ol

8.4

WoodcockCreek

ST198

ST198

ST198

W oo dc oc k C re ek

D am

SP1

SP3

SP3

1230'

1220 '

117 0' 1150 '

1180' 1160'

1240'

1 200 '

1 220 '

121 0'

1220'

121 0'

1140'

1230'

200' 1190

1 18 0'

1150'

1140'

1140'

8.6

8.3

8.3

8.3

8.5

8.5

8.5

8.5

Playground

Legend

Herbicide Mowing,Type I Mowing,Type II Mulch

Trail

Reservoir full pool

Elevation contour (10')

Corps boundary

0 100 200 FEETI Coordinate System: NAD 1983 2011 StatePlane Pennsylvania North FIPS 3701 Ft US Projection: Lambert Conformal Conic

1,000 FEET

Map 3

Dam

WOODCOCK

TOWNSHIP

ST198

OP86

Full pool 1208.4'

Spaid Run

Woodcock Creek

LOCATION

Pub. 18 October 2023 USACE LRP Geospatial erik.w.breedon

Sheet 1 of 3

Dam and Outflow Buildings & Grounds Maintenance

WOODCOCK CREEK LAKE

Mowing and herbicide regions labeled by site number.

Data: Esri, USGS, USACE, PEMA Google aerial photography supplemented with Esri hillshade.

Mowing Sites 4, 4A, 7, 8.3, 8.4, 8.5, and 8.6

Herbicide Sites SP1, SP3, SP4, SP10

D am

R oa d

O ut flo w

T ra il

German Rd

Woodcock Creek Lake

Fu ll po ol

8.

4'

Woodcock Creek

W oo dc oc k C re ek

D am

SP1

SP3

SP3

SP3

SP3

SP4

SP4

SP10

'11

' 116

0'

0'

180'

1140'

8.4

8.6

8.5

8.5

8.5

4A

4A

Legend

Herbicide Mowing,Type I Mowing,Type II Mulch

Trail

Reservoir full pool

Elevation contour (10')

Corps boundary

0 100 200 FEETI Coordinate System: NAD 1983 2011 StatePlane Pennsylvania North FIPS 3701 Ft US Projection: Lambert Conformal Conic

1,000 FEET

Map 4

Dam

WOODCOCK

TOWNSHIP

ST198

OP86

Full pool 1208.4'

Spaid Run

Woodcock Creek

LOCATION

Pub. 18 October 2023 USACE LRP Geospatial erik.w.breedon

Sheet 2 of 3

Dam and Outflow Buildings & Grounds Maintenance

WOODCOCK CREEK LAKE

Mowing and herbicide regions labeled by site number.

Data: Esri, USGS, USACE, PEMA Google aerial photography supplemented with Esri hillshade.

Mowing Sites 4, 4A, 7, 8.3, 8.4, 8.5, and 8.6

Spillw ay T rail

D am

R oa d

O utflow

Trail

Fu ll po ol

8.

4'

W oo dc oc k C re ek

D am

SP1

SP3

SP10

1240'

1230'

122 0'

1210'

12 00'

'11

1230' 1220'

1220'

12 10'

1200'

1190'

1210'

1200'

1170'

1160'

1200'

1220'

1 20 0'

8.4

8.6

8.5

8.5

4A

Composting toilet

Legend

Herbicide Mowing,Type I Mowing,Type II

Trail

Reservoir full pool

Elevation contour (10')

Corps boundary

0 100 200 FEETI Coordinate System: NAD 1983 2011 StatePlane Pennsylvania North FIPS 3701 Ft US Projection: Lambert Conformal Conic

1,000 FEET

Map 5

Dam

WOODCOCK

TOWNSHIP

ST198

OP86

Full pool 1208.4'

Spaid Run

Woodcock Creek

LOCATION

Pub. 18 October 2023 USACE LRP Geospatial erik.w.breedon

Sheet 3 of 3

Dam and Outflow Buildings & Grounds Maintenance

WOODCOCK CREEK LAKE

Mowing and herbicide regions labeled by site number.

Data: Esri, USGS, USACE, PEMA Google aerial photography supplemented with Esri hillshade.

Mowing Sites 4, 4A, 7, 8.3, 8.4, 8.5, and 8.6

B oa tR am p Co nn ec tor

D ic ks on

R oa d Ac ce ss

Tr ai l

Cam pground

Trail

D am

R oa d

O utflow

Trail

Sp ill w ay

Tr ai l

Woodcock Creek Lake

Boat Launch Dr

Footpath Wy

D ickson R d

Full p ool 1

208.4'

Spaid Run

W oo dc oc k C re ek

D am

8.2

8.2

8.2 8.2

8.2

8.2

8.2

8.9 8.9

8.9

8.9

1220'

1200' 123

0'

1210'

1260'

1190'

1 1 80

1210'

120 0'

1230 '

1220 '

'11

1270'

1240'

0'

1270'

1260'

1250'

30'

1230'

1210'

1200'

SP11

Gated maintenance areaComposting toilet

Legend

Herbicide Mowing,Type II

Trail

Reservoir full pool

Elevation contour (10')

Corps boundary

0 250 500 FEETI

Map 6

Pub. 18 October 2023 USACE LRP Geospatial erik.w.breedon

Sheet 1 of 1

Spillway Buildings & Grounds Maintenance

WOODCOCK CREEK LAKE

Mowing and herbicide regions labeled by site number.

Data: Esri, USGS, USACE, PEMA Google aerial photography supplemented with Esri hillshade.

Mowing Sites 8.2 and 8.9

Herbicide Site SP11

Dam

WOODCOCK

TOWNSHIP

ST198

OP86

Full pool 1208.4'

Spaid Run

Woodcock Creek

LOCATION

erik.w.breedon

Sheet 1 of 1

Dickson Road Buildings & Grounds Maintenance

WOODCOCK CREEK LAKE

Mowing and herbicide regions labeled by site number.

Data: Esri, USGS, USACE, PEMA Google aerial photography supplemented with Esri hillshade.

Mowing Site 2A

Herbicide Site SP6

WOODCOCK

TOWNSHIP

D ic ks on

R oa d Ac ce ss

Tr ai l

D ickson R d Fu ll po ol

.4

Sp ai d Ru n

Spillway

SP6

2A

2A

30'

0'

210'

0' 124

Gated maintenance area

Legend

Herbicide Mowing,Type I

Trail

Reservoir full pool

Elevation contour (10')

Corps boundary

0 100 200 FEETI

Map 7

Dam

WOODCOCK

TOWNSHIP

ST198

OP86

Full pool 1208.4'

Spaid Run

Woodcock Creek erik.w.breedon

Sheet 1 of 1

Radio Site Buildings & Grounds Maintenance

WOODCOCK CREEK LAKE

Mowing and herbicide regions labeled by site number.

Data: Esri, USGS, USACE, PEMA Google aerial photography supplemented with Esri hillshade.

No Mowing Sites

Herbicide Site SP8

WOODCOCK

TOWNSHIP

M ai n St

Peters Rd

OP86

OP86

SP8

Legend

Herbicide

Corps boundary

0 100 200 FEETI

Map 8

Dam

WOODCOCK

TOWNSHIP

ST198

OP86

Full pool 1208.4'

Spaid Run

Woodcock Creek

LOCATION

To D am erik.w.breedon

Index Map Buildings & Grounds Contract Maintenance

UNION CITY DAM

Data: Esri, USGS, USACE

NY

PA

WCL

UCD

CHAUTAUQUA

CO.

CRAWFORD CO.

ERIE CO.

WARREN

CO.

PAOH

NY

VAWV

MD

Lake Erie

LOCATION Local VicinityDistrict à à à à à à à à à à à à à à à à à à

J J J J

J J J J à à à à à à à à J J

J J

L E B O E U F

TO W N S H I P

U N

IO

N

T O

W N

S H

IP

WAT E R F O R D

TO W N S H I P

Oak Hill (1421')

Short Hare Rd

Cross Rd

Wheelertown Rd

D orm an R d

H au gh R d

H ar e R d

M id dl et on R d

OP97

OP97

OP97

Full pool 1277.7'

Fr en ch C re ek

French Creek

Union City Dam2

Legend

Map sheet, by number

Reservoir full pool

Unincorporated area boundary

Corps boundary

0 ¼ ½ MILEI Coordinate System: NAD 1983 2011 StatePlane Pennsylvania North FIPS 3701 Ft US Projection: Lambert Conformal Conic

Maps - Union City Dam

To Waterford

To Union City

WATERFORD

H ar e R d

SP16

SP16

1390'

1380'

1370'

1360'

Maintenance building

Legend

Herbicide Mowing,Type I

Elevation contour (10')

Corps boundary

0 50 100 FEETI

Map 1

Pub. 18 October 2023 USACE LRP Geospatial erik.w.breedon

Sheet 1 of 1

Maintenance Building Buildings & Grounds Maintenance

UNION CITY DAM

Mowing and herbicide regions labeled by site number.

Data: Esri, USGS, USACE, PEMA Google aerial photography supplemented with Esri hillshade.

Mowing Site 12

Herbicide Site SP16

LEBOEUF

TOWNSHIP

Oak Hill (1421')

Ha u gh

R d

Cross Rd

M id dl et on R d

Ha re

R d

OP97

Full pool 1277.7'

French Creek

Dam 2 31

WAT E R F O R D

Full pool 1277.7'

Fr en ch Cre ek

French Creek

Union City Dam

11.2

11.1

1320'

1300'

1270'

1280'

1260'

1290' 1270'

' 1

1220' 1210'

1330'

1240'

1230'

1250' 1240'

1210'

SP18

SP15

SP13

SP13a

SP14

SP14

SP19

Legend

Herbicide Mowing,Type I Mowing,Type II Mulch

Trail

Reservoir full pool

Elevation contour (10')

Corps boundary

0 100 200 FEETI

1,000 FEET

Map 2

Pub. 18 October 2023 USACE LRP Geospatial erik.w.breedon

Sheet 1 of 2

Dam and Outflow Buildings & Grounds Maintenance

UNION CITY DAM

Mowing and herbicide regions labeled by site number.

Data: Esri, USGS, USACE, PEMA Google aerial photography supplemented with Esri hillshade.

Mowing Sites 9, 10, 11.1, and 11.2

Herbicide Sites SP13, SP13a, SP14, SP15, L E B O E U F

TO W N S H I P

Oak Hill (1421')

Ha u gh

R d

Cross Rd

M id dl et on R d

Ha re

R d

OP97

Full pool 1277.7'

French Creek

Dam

SP17, SP18, and SP19

L E B O E U F

WAT E R F O R D

TO W N S H I P

M iddleton R d

Fu ll po ol 1277.7'

9 9

11.2

1330'

1320'

1310'1300'1290'

1230'

1220'

1280'

1250'

1270' 1260'

1240'

'1

1350'

1340'

'12

1350'

1340'

1240'

1270'

1250'

1320'

SP18

SP13

SP13a

SP14

SP17

SP17

SP17

Restrooms

Legend

Herbicide Mowing,Type I Mowing,Type II Mulch

Trail

Reservoir full pool

Elevation contour (10')

Corps boundary

Unincorporated area boundary

0 100 200 FEETI

1,000 FEET

Map 3

Pub. 18 October 2023 USACE LRP Geospatial erik.w.breedon

Sheet 2 of 2

Dam and Outflow Buildings & Grounds Maintenance

UNION CITY DAM

Mowing and herbicide regions labeled by site number.

Data: Esri, USGS, USACE, PEMA Google aerial photography supplemented with Esri hillshade.

Mowing Sites 9, 10, 11.1, and 11.2

Herbicide Sites SP13, SP13a, SP14, SP15, L E B O E U F

TO W N S H I P

Oak Hill (1421')

Ha u gh

R d

Cross Rd

M id dl et on R d

Ha re

R d

OP97

Full pool 1277.7'

French Creek

Dam

SP17, SP18, and SP19

Attachment 8 - Wage Determinations

B08 Attachments 1-6
B08 Attachment 7 Maps WCL and UCD
WCL_BG_20231018b
UCD_BG_20231018
B08 Attachment 8 Wage Determinations
B08 Wage Determination Erie County
B08 Wage Determination Crawford County