W911WN21Q8003 Amendment 0002 Morgantown Roof Replacement.pdf

PDF 372 KB Posted

Attached to
Morgantown Roof Replacement
Solicitation number
W911WN21Q8003
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81ET410224775

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Operations Building Roof Replacement, Morgantow n Lock and Dam, Morgantow n, Monongalia County, West Virginia

The purpose of this Amendment is to:

1) Extend the due date for Quotes to 16 June 2021 @ 5:00 p.m. ET.

2) Answ er questions arising from the Solicitation.

3) Provide Draw ing 037-LMO-70_3.2 in tif format.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Jun-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911WN21Q8003

X 9B. DATED (SEE ITEM 11)

26-Apr-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Jun-2021

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CELRP-CT

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2203

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

joshua.k.westgate@usace.army.milEMAIL:502.315.6207TEL:

JOSHUA K WESTGATE / ADDED BY UPASS

W911WN21Q8003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 02-Jun-2021 05:00 PM to 16-Jun-2021 05:00 PM.

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been added by full text:

QUESTIONS AND ANSWERS

Q1: Could you verify what type of decking the building has? (i.e. metal, concrete, light weight concrete, or structural concrete deck) A1: It is listed on the drawings as 2 ½” “sawdust concrete” poured on a metal deck “ribbed metal lath” supported by S section steel beams.

Q2: Is it possible to supply the included drawing as a separate file? The current format is a bit blurry and somewhat not legible.

A2: See Drawing 037-LMO-70_3.2.tif.

Q3: Is the new system to be the following: Polyisocyanurate Insulation- Mechanically Fastened. EPDM Membrane and Flashing-Fully Adhered A3: Yes, the new system is to be Polyisocyanurate Insulation- Mechanically Fastened. EPDM Membrane and Flashing-Fully Adhered

Q4: Would buyer be opposed to using an ECO-White EPDM? The membrane is 90mill EPDM. It just has a white face, which reflects UV rays and prolongs life of membrane.

A4: Yes, ECO-White EPDM is acceptable.

(End of Questions and Answers)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .