This amendment modifies a solicitation for construction services. The U.S. Army Corps of Engineers, Pittsburgh District is seeking a firm-fixed price contract with one awardable option to construct a new boat ramp egress road, ADA parking area, and associated site work at the Big Bend Visitor Center in Warren County, Pennsylvania. The estimated value is between $250,000 and $500,000. The work includes earthwork, paving, drainage, guiderail and sign installation. The period of performance is 400 calendar days from notice to proceed. The solicitation is set aside for small businesses and responses are due by July 9, 2021. An optional four-space ADA parking area near an eagle viewing platform is included as an awardable option to be exercised by December 30, 2021.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81ET411388913

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

RE: Boat Ramp and ADA Parking, Kinzua Dam and Allegheny Reservoir, Warren County, Pennsylvania

The purpose of this amendment is to: 1) revise seven (7) sections of the Specif ications; 2) provide an answ er to a question received; and 3) update the applicable Davis-Bacon w age determination identifed in Addendum to Section 00 73 00.

Details are specified in the Summary of Changes of this Amendment.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Aug-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911WN21B8006

X 9B. DATED (SEE ITEM 11)

09-Jul-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Aug-2021

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CELRP-CT

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2203

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911WN21B8006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0001

Reference: Technical Specifications, Kinzua Dam and Allegheny Reservoir, Boat Ramp and ADA Parking, Attachment 1 to the Solicitation

The following sections have been revised:

01 22 00.00 08 PRICE AND PAYMENT PROCEDURES

Paragraph 1.2.3.1 Payment Grammatical revision.

01 33 00 SUBMITTAL PROCEDURES

Paragraph 1.1.3 Work Grammatical revision.

Paragraph 1.4.3.2 Format for SD-02 Shop Drawings Grammatical revision in second paragraph.

Section 1.5 Quantity of Submittals Grammatical revision in second paragraph.

Section 1.12 Approved Submittals Added sentence in first paragraph.

Section 1.13 Approved Samples Grammatical revision in second paragraph.

01 35 00.00 08 SPECIAL PROCEDURES

Paragraph 1.13.3 Coordination with Project Operations Grammatical revision in second paragraph.

01 35 26.00 08 GOVERNMENT SAFETY REQUIREMENTS

Paragraph 3.4.2 Load Handling Equipment (LHE) Grammatical revision in first paragraph.

01 45 00.00 08 QUALITY CONTROL

Section 3.6 Control Grammatical revision.

Paragraph 3.6.3 Follow-up Phase Grammatical revision.

Paragraph 3.7.2.2 Capability Recheck Grammatical revision.

01 57 19.00 08 TEMPORARY ENVIRONMENTAL CONTROLS

Paragraph 1.2.1 Contractor Generated Hazardous Waste Grammatical revision.

01 78 02.00 08 CLOSEOUT SUBMITTALS (AS-BUILT DRAWINGS)

Paragraph 1.2.6 Final As-Built Drawing Submittal Grammatical revision.

QUESTION AND ANSWER

A total of 1 question was received on this project. Listed below is the question and answer:

Q1: In the specification book it says the contractor is responsible and yesterday at the pre-bid we were told that would be handled on a separate contract. I just wanted to clarify that the stumps would also be removed in the separate contract for clearing and grubbing?

A1: Per the bid documents; the Government will clear trees on the slope in the area to receive the egress road. The Contractor will cut and remove the larger trees on the top of the slope, as identified within the bid documents. The Contractor will remove stumps on the slope in the area to receive the egress road and the stumps associated with the larger trees on the top of the slope.

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

ADDENDUM TO SECTION 00 73 00

00 73 00 - 1 WAGE RATES

For all work at Boat Ramp and ADA Parking, Kinzua Dam and Allegheny Reservoir, Warren, PA the following wage rates, as Attachment 3, are applicable, Wage Determination No: PA20210002 Revision No:8 Date of Last Revision: July 23, 2021 State: Pennsylvania Counties: Allegheny, Armstrong, Beaver, Bedford, Blair, Butler, Cambria, Cameron, Centre, Clarion, Clearfield, Clinton, Crawford, Elk, Erie, Fayette, Forest, Franklin, Fulton, Greene, Huntingdon, Indiana, Jefferson, Lawrence, McKean, Mercer, Mifflin, Potter, Somerset, Venango, Warren, Washington, Westmoreland https://sam.gov/wage-determination/PA20210002/8#document

00 73 00 - 2 COPYING, DISSEMINATION OR DISTRIBUTION OF INFORMATION

Those who disseminate information contained in the solicitations and/or drawings must ensure that the recipients have a legitimate need for the information and maintain a record of each recipient. Legitimate need means recognized business entities seeking to do business, or having business, with the Government as prime contractors, subcontractors or suppliers. You shall maintain a record of the following information on each recipient: Business name and address, the Unique Entity Identifier (formerly DUNS) Number, and name and telephone number of person receiving the information.

00 73 00 - 3 SUBMISSION OF CONTRACT DOCUMENTATION

Provide contract documentation in an electronic format to the greatest extent practicable. Contract documentation to be submitted electronically includes, but is not limited to, the following:

- Submittals, including ENG 4025 transmittal form

- Meeting Minutes

- Construction Photographs

- Correspondence

- Requests for Information

- Payroll Documents

- Statement and Acknowledgement Forms (SF 1413)

- Request for Additional Classification (SF 1444)

- Progress Payment Requests and Supporting Documentation

- Contract Modification Documentation, including SF 30, Contractor's Offer, Cost/Pricing Audit Report, and Certificate of Current Cost or Pricing Data

- Contractor Quality Control Reports (with attachments)

- Accident Reports

- Schedules and Schedule Updates

- Closeout Documentation, including Release of Claims

Electronic files must be of sufficient quality that all information is legible. Electronic format shall be in Adobe.PDF format, unless otherwise specified or directed by the Contracting Officer. Whenever possible, PDF files shall be generated from original documents so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Recognition (OCR) routines are required. Files exceeding 30 pages shall be indexed and bookmarked to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature.

Email electronic documents fewer than 10MB to an email address as directed by the Contracting Officer.

Electronic documents over 10MB shall be provided on a CD/DVD, or through an electronic file sharing system such as the DoD Secure Access File Exchange (SAFE) Web application located at the following website:

https://safe.apps.mil

The Contractor shall be prepared to provide up to five (5) additional paper hard copies of any contract document at the discretion of the Contracting Officer, at no additional cost to the Government. In addition to the electronic file format described above, the following list of documents shall be provided in their original format because law or other regulations require signed originals be kept in accordance with FAR 4.805 -- Storage, Handling, and Disposal of Contract Files:

• Advance Payment Bond

• Bid Bond including Annual Bid Bond

• Performance Bond including Annual Performance Bond

• Payment Bond

• Patent Infringement Bond

• Any performance security instruments

• Certificate of Insurance

• Novation/Change of Name Agreement

• Assignment of Claims

• Any document containing a raised seal. Examples include o Notarized documents o Architecture Drawings

• Paper Payroll Documents

• Physical signatures on contracts and modifications o SF 1442 o SF 30

00 73 00 - 4 REQUIRED INSURANCE

a. The Contractor shall procure and maintain during the entire performance period of this contract, the following minimum insurance. (See also Section CONTRACT CLAUSES, FAR 52.228-5 INSURANCE--WORK ON A

GOVERNMENT INSTALLATION (JAN 1997)

Type

Comprehensive General

Bodily Injury Amount Property Damage

Liability $500,000 Per Occurrence

$100,000

Automobile Liability $200,000 Each Person --

$500,000 Per Occurrence

$ 20,000

Workmen’s Compensation $100,000 (PA) and Employer’s Liability

b. The Contracting Officer will notify the Contractor of any noncompliance with the foregoing provisions. The Contractor shall, after receipt of such notice, immediately comply. Such notice, when delivered to the Contractor or his representative at the site or mailed to the Contractor's address, will be deemed sufficient for the purpose. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until the Contractor complies. No part of the time lost due to any such stop orders shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor. Compliance with the provisions of this article by subcontractors will be the responsibility of the Contractor

c. Longshoreman and Harbor Worker's Insurance MAY be required for this work. Please consult with your insurance carrier and applicable statutes (33 USC 901, et. seq.).

00 73 00-5 WORK UNDER OTHER CONTRACTS

Attention is directed to the fact that other Contractors may be employed by the Government or by local interests at or in the vicinity of the work covered by these specifications. All Contractors shall have equal rights to the use of all roads and grounds so far as practicable and this Contractor shall cooperate with other Contractors so that the work may be performed with the maximum efficiency. Should a disagreement occur between Contractors as to the use of facilities or in other matters, the decision of the Contracting Officer shall govern. ((See also the Section 00 70 00 CONDITIONS OF THE CONTRACT, FAR 52.236-8 Other Contracts (APR 1984)).

00 73 00-6 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

a. This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with FAR clause 52.249-10 entitled "Default (Fixed-Price Construction)". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied.

(1) The weather experienced at the project site during the contract period must be found to be unusually severe; that is, more severe than the adverse weather anticipated for the project location during any given month.

(2) The unusually severe weather must actually cause a delay to the completion of the project. This delay must be beyond the control and without the fault or negligence of the Contractor.

b. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY WORK DAYS BASED ON (5) DAY WORK

WEEK

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

14 13 9 9 9 8 8 7 7 6 9 13

c. Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more on the Contractor's scheduled work day. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph b. above, the Contracting Officer will convert any qualifying delays to work days, giving full consideration for equivalent fair weatherwork days, and issue a modification in accordance with the clause entitled, "Default (Fixed-Price Construction)".

d. The anticipated adverse weather work days listed above are based on days with precipitation greater than 0.1 inch and/or maximum temperature below 32 degrees F. The numbers shown represent the number of work days (not calendar days) normally expected to have these particular weather conditions based on historical data. The actual number of days will vary. This information is furnished for computation of possible time extensions due to weather delays and is not intended to imply that no work can be done on these days. The Contractor shall make his own determination of the effect of these conditions on his operations under this contract, and schedule his work accordingly.

00 73 00-7 CONTRACTOR QUALITY CONTROL

Section 01 45 00.00 08, QUALITY CONTROL, of this specification requires that the Contractor's Quality Control System Manager or person responsible for Contractor Quality Control complete the Corps of Engineers' "Construction Quality Management for Contractors" course not later than 90 days after receipt of the Notice to Proceed. The course consists of approximately 12 hours of classroom instruction and is offered periodically by the Pittsburgh District. For additional information on scheduling and location of the training, contact U.S. Army Engineer District, Pittsburgh, Theresa Bonanno,U.S. Army Engineer District, Pittsburgh, Upper Ohio Area Office, 3510 Grand Ave.,Pittsburgh, Pennsylvania 15225, telephone (412) 395-7677. Certification of course completion is valid for 5 years. Completion of training offered by other Corps of Engineers Districts will be acceptable provided a valid certification is presented.

00 73 00 - 8 WORK PERFORMED BY CONTRACTOR

Within ten (10) days after award of the contract, the successful bidder will be required to furnish a description of the work which he intends to perform with his own organization, the percentage of the total work this represents, and the estimated cost thereof.

00 73 00- 9 SAFETY AND HEALTH REQUIREMENTS MANUAL

A copy of the current US Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 and its changes are available at:

https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.

00 73 00-10 PAYMENT FOR PERFORMANCE AND PAYMENT BONDS

a. In order to ensure that sufficient funds have been set-aside for payment of performance and payment bond premiums, bidders shall insert in Bid Item No. 0001 an appropriate not-to-exceed dollar amount. Failure of bidders to insert a not-to exceed dollar amount in Bid Item No. 0001 will cause the bid to be rejected as non-responsive.

b. The Contractor shall be reimbursed the actual bond costs only, as established by evidence of full payment to the surety, up to the dollar amount set forth in Bid Item No. 0001. In no case will the Contractor be reimbursed an amount which exceeds the dollar amount set forth in Bid Item No. 0001.

c. The Government will reimburse only the Prime Contractor for actual paid bond premiums. The Government will not reimburse any subcontractor's paid bond premiums.

00 73 00-11 ELECTRONIC MAIL (E-MAIL) ADDRESS

Establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments as text files, pdf files, and other similar formats. Within 10 days after contract award, provide the Contracting Officer a single (only one) e-mail address for electronic communications from the Contracting Officer related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The Contracting Officer may also use email to notify the Contractor of base access conditions when emergency conditions warrant, such as hurricanes or terrorist threats. Multiple email addresses are not allowed.

It is the Contractor's responsibility to make timely distribution of all Contracting Officer initiated e-mail with its own organization including field office(s). Promptly notify the Contracting Officer, in writing, of any changes to this email address.

00 73 00-12 AWARDABLE OPTIONS

Only the basic contract items, Items Nos. 0001 thru 0024, will be awarded initially. Awardable Option Items (1001 thru 1002) will be made based upon availability and receipt of funds. Awardable Option Items within each of these groupings will be awarded as a group. The Not-to-Exceed amount for Items (0001 and 1001) should reflect bond costs for all awardable option items within each respective group. The determination to award these awardable option items will be made no later than the following dates:

Awardable Option 1, Items 1001 thru 1002 – 30 December 2021

The contract completion time will not be extended for of award of any of these optional items, and the optional item work shall be performed concurrently with the base contract work. The completion time for the base contract items will remain unchanged.

(End of Addendum)

(End of Summary of Changes)