PLANS - Attachment 2- W911WN208004 Shenango Recreation Area Paving.pdf
PDF 14 MB Posted
- Solicitation number
- W911WN20B8004
About this file
This federal contract opportunity notice describes requirements for a road paving project. The U.S. Army Corps of Engineers, Pittsburgh District, requires paving of approximately 3,000 linear feet of access roads within the Shenango River Lake Recreation Area in Hermitage, Pennsylvania, including removal of existing road layers and replacement with a 1.5 inch asphalt overlay. There are also two awardable options, including repaving of around 400 linear feet of entrance road and 1,000 linear feet of a campground road. The work must be completed within 365 days of notice to proceed. The estimated budget is between $500,000 and $1,000,000. This will be procured as a 100% small business set-aside and awarded as a firm-fixed-price contract through a solicitation to be issued on or around May 1, 2020 via SAM.gov. Bidders must be registered in SAM before submitting. The NAICS code is 237310 and the small business size standard is $39.5 million.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
C T
N
O
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
PITTSBURGH DISTRICT
BEAVER RIVER BASIN
SHENANGO RIVER LAKE
RECREATION AREA PAVING REHABILITATION
W911WN-20-B-8004
30 MAR 2020
S
S
T E
P H
E N
S O
N
C
M
A R
T I N
M
R
O T
H E
R
C O
V E
R
S
H E
E T
G-001
C U
S E
R S
H
E
C N
S E
S D
E S
K T
O P
S
H E
N A
N G
O D
E S
I G
N S
S
H E
E T
S G
D
W G
P
M
A E
C B
W
S
T B
H E
C N
S E
S
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
P I T
T S
B U
R G
H
D
I S
T R
I C
T
L I B
E R
Y
V E
N U
E
P I T
T S
B U
R G
H
P
A
M
R
F I L E
M
E
A N
S I
D
W W
N B
B E
A V
I V
B
S
I N
S H
E N
A N
G
V
K E
R E
C R
E A
T I O
N
A
R E
A
P
A V
I N
G
R
E H
A B
I L I T
A T
I O
N
C E
R T
I F
I E
D
F
I N
A L
D
O C
U M
E N
T S
US Army Corps of Engineers
PROJECT
LOCATION
J
R
U S
N A
K
APPROVAL RECOMMENDED BY:
CHIEF, NAVIGATION DESIGN BRANCH
APPROVED BY:
CHIEF, ENGINEERING & CONSTRUCTION DIVISION
SUBMITTED BY:
CHIEF, CIVIL DESIGN SECTION
SUBMITTED BY:
PROJECT ENGINEER
THIS PROJECT WAS DESIGNED BY THE PITTSBURGH
DISTRICT OF THE U.S. ARMY CORPS OF ENGINEERS.
THE INITIALS OR SIGNATURES AND REGISTRATION
DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE
PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR
EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
C U
S E
R S
H
E
C N
S E
S D
E S
K T
O P
S
H E
N A
N G
O D
E S
I G
N S
S
H E
E T
S G
D
W G
P
M
A E
C B
W
S
T B
H E
C N
S E
S
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S
S
T E
P H
E N
S O
N
C
M
A R
T I N
M
R
O T
H E
R
C O
N T
R A
D
A
W I N
D E
X
S
H E
E T
G-002
P I T
T S
B U
R G
H
D
I S
T R
I C
T
L I B
E R
E
N U
E
P I T
T S
B U
R G
H
P
A
M
F I
M
E
A N
S I
D
W W
N B
B E
A V
V
S
I N
S H
E N
A N
V
K E
R E
C R
E A
T I O
N
A
R E
A
P
A V
I N
G
R
E H
A B
I L I T
A T
I O
N
C E
R T
I F
I E
D
F
I N
A L
D
O C
U M
E N
T S
CONTRACT DRAWINGS
SHEET ID
NO.
FILE NAME DRAWING TITLE
GENERAL
G-001 G-001
COVER SHEET
G-002 G-002
CONTRACT DRAWINGS INDEX SHEET
G-003 G-003
STANDARD ABBREVIATIONS SHEET
G-004 G-004
GENERAL NOTES SHEET
G-101 G-101
CONTRACTOR WORK LIMITS - PLAN AND NOTES
CIVIL
C-101 C-101
OVERALL PROJECT WORK AREAS PLAN
C-401 C-401
AWARDABLE OPTION 1 - MAIN ACCESS ROAD "A" ST 0+00 TO 6+00 AND ENTRANCE ACCESS ROAD "R"- ENLARGED PLAN AND NOTES
C-402 C-402
MAIN ACCESS ROAD "A" ST 6+00 TO 16+30 - ENLARGED PLAN AND NOTES
C-403 C-403
MAIN ACCESS ROAD "A" ST 16+30 TO 24+90 - ENLARGED PLAN AND NOTES
C-404 C-404
MAIN ACCESS ROAD "A" ST 24+90 TO 34+10 - ENLARGED PLAN AND NOTES
C-405 C-405 AWARDABLE OPTION 2 - OLD DUCK LOOP - ACCESS ROAD "M" - ENLARGED PLAN, TYPICAL DETAILS, AND NOTES
C-301 C-301
MAIN ACCESS ROAD "A" AND ENTRANCE ACCESS ROAD "R" - TYPICAL DETAILS - SHEET 1 OF 2
C-302 C-302
MAIN ACCESS ROAD "A" AND ENTRANCE ACCESS ROAD "R" - TYPICAL DETAILS - SHEET 2 OF 2
EROSION AND SEDIMENT CONTROL
X-002 X-002 EROSION AND SEDIMENT CONTROL PLAN BMP INSTALLATION, MAINTENANCE, AND GENERAL EROSION AND SEDIMENT CONTROL NOTES
X-501 X-501
EROSION AND SEDIMENT CONTROL PLAN - BMP DETAILS
J
R
U S
N
K
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
ABBREVIATIONS
L ANGLE
A/C AIR CONDITIONING
A/C UNIT AIR CONDITIONING UNIT
AB ANCHOR BOLT
ABV ABOVE
AC ALTERNATING CURRENT
ACC ACCESSIBLE
ACI AMERICAN CONCRETE INSTITUTE
ACR ACRYLIC PLASTIC
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACSR ALUMINUM CABLE STEEL REINFORCED
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
ADDM ADDENDUM
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, ADJUSTABLE
ADO AUTOMATIC DOOR OPERATOR
AFF ABOVE FINISHED FLOOR
AGGR AGGREGATE
AHR ANCHOR
AHU AIR HANDLING UNIT
AI AREA INLET
AIC AMPERE INTERRUPTING CAPACITY
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
A.L. ACTIVE LEAF
ALT ALTERNATE
ALUM ALUMINUM
AMB AMBIENT
AMP AMPERE
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APPD APPROVED
APPROX APPROXIMATE
ARCH ARCHITECT
ARI AMERICAN REFRIGERATION INSTITUTE
ASB ASBESTOS
ASC ABOVE SUSPENDED CEILING
ASPH ASPHALT
ATC ACOUSTICAL TILE CEILING
AUTO AUTOMATIC
AVG AVERAGE
AWG AMERICAN WIRE GAUGE
AWT ACOUSTICAL WALL TREATMENT
BB BULLETIN BOARD
BC BOOKCASE
BD BOARD
BDRY BOUNDARY
BEJ BRICK EXPANSION JOINT
BEV BEVEL
BITUM BITUMINOUS
BJT BED JOINT
BL BUILDING LINE
BLDG BUILDING
BLW BELOW
BM BENCHMARK
BO BOTTOM OF
BOT BOTTOM
BP BACK PLASTER(ED)
BRCG BRACING
BRDG BRIDGING
BRG BEARING
BRG PL BEARING PLATE
BRK BRICK
BRKT BRACKET
BRZ BRONZE
BS BOTH SIDES
BSMT BASEMENT
Btu BRITISH THERMAL UNIT
BtuH BTU PER HOUR
BTWN BETWEEN
BUR BUILT-UP ROOFING
BW BOTH WAYS
CAB CABINET
CAP CAPACITY
CB CATCH BASIN
CCT CUBICLE CURTAIN TRACK
CCTV CLOSED CIRCUIT TELEVISION
CE COVER ELEVATION
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CFI CONDUCTIVE FLOORING
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CG CORNER GUARD
CH BD CHALKBOARD
CHFR CHAMFER
CHIM CHIMNEY
CHK CHECK
CHR PL CHROME PLATED
CI CAST IRON
CI CURB INLET
CIP CAST-IN-PLACE
CIRC CIRCULAR
CJ CONTROL JOINT
CJ CONSTRUCTION JOINT
CKT CIRCUIT
CKT BRKR CIRCUIT BREAKER
CL CENTER LINE
CLG CEILING
CLG HT CEILING HEIGHT
CLGL CLEAR GLASS
CLL CONTRACT LIMIT LINE
CLO CLOSET
CLOS CLOSURE
CLR CLEAR(ANCE)
CLWG CLEAR WIRED GLASS
cm CENTIMETER(S)
CMP CORRUGATED METAL PIPE
CMPST COMPOSITE
CMU CONCRETE MASONRY UNIT
CND CONDUIT
CNL CONDUCTIVE NEOPRENE LATEX
CNR CORNER
CNTR COUNTER
CO CLEANOUT
CO2 CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBUSTION
COMPT COMPARTMENT
CONC CONCRETE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
CORR CORRIDOR
COV COVER
CPRS COMPRESSIBLE
CPT CARPET
CRCMF CIRCUMFERENCE
CRES CORROSIVE RESISTANT STEEL
CRG CROSS GRAIN
CRS COURSE(S)
CS CAST STONE
CSK COUNTERSUNK
CSMT CASEMENT
CT CERAMIC TILE
CT CURRENT TRANSFORMER
C TO C CENTER TO CENTER
CTR CENTER
CU CONDENSING UNIT
Cu COPPER
CU FT CUBIC FEET
CUH CABINET UNIT HEATER
CU YD CUBIC YARDS
CV CEILING VENT
CVH CONDUCTIVE VINYL HOMOGENEOUS (SHEET TYPE)
CW COLD WATER
CYL CYLINDER
d PENNY (AS IN NAIL - 10D)
DAT DATUM
DB DRY BULB
DBL DOUBLE
DBL ACT DR DOUBLE ACTING DOOR
DCJ DOWELED CONTROL JOINT
DCJT DUMMY CONTROL JOINT
DEG DEGREE
DEMO DEMOLITION
DEPR DEPRESSION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DH DUCT HEATER
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISC DISCONNECT
DISP DISPENSER
DISTR PNL DISTRIBUTION PANEL
DIV DIVISION
DL DEAD LOAD
DMPF DAMPPROOFING
DMPR DAMPER
DMT DEMOUNTABLE
DN DOWN
DR DOOR
DR DRAIN
DRB DRAINBOARD
DR CL DOOR CLOSER
DS DOUBLE STRENGTH (GLASS)
DS DOWNSPOUT
DT DRAIN TILE
DVTL DOVETAIL
DWG DRAWING
DWLS DOWELS
DWR DRAWER
DWTR DUMBWAITER
DX DIRECT EXPANSION
E EAST
EA EACH
EAT ENTERING AIR TEMPERATURE
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION - GRADE OR BUILDING
ELEC ELECTRIC
EM EXPANDED METAL
EMD ESTIMATED MAXIMUM DEMAND
EMER EMERGENCY
ENCL ENCLOSE(URE)
ENTR ENTRANCE, ENTERING
EP ELECTRICAL PANELBOARD
EPRF EXPLOSION PROOF
EPY EPOXY COATING
EQ EQUAL
EQUIP EQUIPMENT
ESCAL ESCALATOR
EST ESTIMATE(D)
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
EXC EXCAVATE
EXH EXHAUST
EXH A EXHAUST AIR
EXST EXISTING
EXP EXPANSION
EXP EXPOSED
EXP BT EXPANSION BOLT
EXT EXTERIOR
F FAHRENHEIT
FA FIRE ALARM
FA FRESH AIR
FAC FIRE APPARATUS CLOSET
FAI FRESH AIR INTAKE
F BRK FIRE BRICK
FC FOOT CANDLE
FC BRK FACE BRICK
FCG FACING
FCJ FLOOR CONSTRUCTION JOINT
FCO FLOOR CLEANOUT
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDMPR FIRE DAMPER
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEB FIRE EXTINGUISHER BRACKET
FEC FIRE EXTINGUISHER CABINET
FF FACTORY FINISH
FGL FIBERGLASS
FH FIRE HYDRANT
FH FLAT HEAD
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHR FIRE HOSE RACK
FHS FIRE HOSE STATION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIN FINISH
FIN FLR FINISH FLOOR
FIXT FIXTURE
FJT FLUSH JOINT
FLASH FLASHING
FLR FLOOR
FLEX FLEXIBLE
FLG FLOORING
FLR PL FLOOR PLATE
FLUOR FLUORESCENT
FN FENCE
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FP FIRE PARTITION
FP FIREPROOF
FPM FEET PER MINUTE
FR FIRE RESISTANT
FR FRAME
FRG FORGED
FRMG FRAMING
FRT FIRE-RETARDANT
FS FULL SIZE
FSTNR FASTEN(ER)
FT FEET
FTG FOOTING
FURG FURRING
FUT FUTURE
FW FIRE WATER
FWC FABRIC WALL COVERING
G NATURAL GAS
GA GAGE
GAL GALLON(S)
GALV GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GEN GENERAL
GF GROUND FACE
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GFE GOVERNMENT-FURNISHED EQUIPMENT
GFE/CI GOVERNMENT-FURNISHED EQUIPMENT CONTRACTOR INSTALLED
GI GALVANIZED IRON
GIP GALVANIZED IRON PIPE
GKT GASKET(ED)
GL GLASS
GL BLK GLASS BLOCK
GLF GLASS FIBER
GLZ GLAZING
GLZ CMU GLAZED CONCRETE MASONRY UNITS
G GROUND
GOVT GOVERNMENT
GPM GALLONS PER MINUTE
GPT GYPSUM TILE
GRAN GRANITE
GR LN GRADE LINE
GRTG GRATING
GST GLAZED STRUCTURAL TILE
GSU GLAZED STRUCTURAL UNITS
GT GROUT
GWT GLAZED WALL TILE
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
HB HOSE BIBB
HC HOLLOW CORE
HCD HALON CONTAINMENT DAMPER
HCP HANDICAPPED
HD HEAD
HD HEAVY DUTY
HDBD HARDBOARD
HD JT HEAD JOINT
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HES HIGH EARLY-STRENGTH CEMENT
HEX HEXAGON
HH HANDHOLE
HK HOOK(S)
HM HOLLOW METAL
HNDRL HANDRAIL
HORIZ HORIZONTAL
HP HIGH PRESSURE
HP HORSEPOWER
HPT HIGH POINT
HR HOUR
HS HIGH STRENGTH
HSGYP HIGH-STRENGTH GYPSUM PLASTER
HSKPG HOUSEKEEPING
HT HEIGHT
HTG HEATING
HTR HEATER
HVAC HEATING, VENTILATING AND AIR CONDITIONING
HYDR HYDRAULIC
Hz HERTZ
IC INTERCOM
ID INSIDE DIAMETER
IESNA ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA
ILK INTERLOCK
IN INCH
INCIN INCINERATOR
INCL INCLUDED
INSF INSULATING FILL
INSUL INSULATION
INT INTERIOR
INTM INTERMEDIATE
INV INVERT
IP IRON PIPE
IPS IRON PIPE SIZE
I.P.S. INSIDE PIPE SIZE
JAN CLO JANITOR’S CLOSET
J-BOX JUNCTION BOX
JCT JUNCTION
JST JOIST
JT JOINT
KIP KILOPOUND (1000 POUNDS)
KIT KITCHEN
KOP KNOCKOUT PANEL
KPL KICKPLATE
km KILOMETER kV KILOVOLTS kVA KILOVOLT AMPERES kVAR KILOVOLT AMPERES REACTIVE kW KILOWATT
KWY KEYWAY
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAT LEAVING AIR TEMPERATURE
LAU LAUNDRY
LAV LAVATORY
LB LAG BOLT
LB POUND
LBL LABEL
LBR LUMBER
LC LIGHT CONTROL
LD LOAD
LDG LOADING
LG LENGTH
LH LEFT HAND(ED)
LIN LINEAR
LKR LOCKER
LL LIVE LOAD
LLD LEAD-LINED DOOR
LM LUMEN
LMST LIMESTONE
LNTL LINTEL
LONG LONGITUDINAL
LP LIGHTPROOF
LPD LIGHTPROOF DOOR
LPL LIGHTPROOF LOUVER
LPT LOW POINT
LR LIVING ROOM
LS LAWN SPRINKLER
LT LIGHT
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWT LEAVING WATER TEMPERATURE
m METER(S)
M&B MATCHED AND BEADED
MACH MACHINE
MAS MASONRY
MATL MATERIAL(S)
MAX MAXIMUM
MB MACHINE BOLTS
MBR MEMBER
MC MEDICINE CABINET
MCJ MASONRY CONTROL JOINT
MCO METAL-CASED OPENING
MDS METAL DIVIDER STRIP
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDIUM
MEMB MEMBRANE
MES METAL EDGE STRIP
MFD METAL FLOOR DECKING
MFG MANUFACTURING
MFR MANUFACTURER
MG MOTOR GENERATOR
MGT MATTE-GLAZED TILE
MH MANHOLE
MI MALLEABLE IRON
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
ML METAL LATH
ML MONOLITHIC
MLDG MOULDING
MLWK MILLWORK
mm MILLIMETER(S)
MNIC MATERIAL NOT IN CONTRACT (INSTALLATION BY CONTRACTOR)
MO MASONRY OPENING
MOD MODULAR
MOD. MODIFIED
MOT MOTOR
MP MOVABLE PARTITION
MR MOP RECEPTOR
MRB MARBLE BASE
MRD METAL ROOF DECKING
MS MACHINE SCREWS
MT METAL THRESHOLD
MT MOUNT
MTD MOUNTED
MTFR METAL FURRING
MTL METAL
MVBL MOVABLE
MULL MULLION
N NORTH
NAT NATURAL
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
Ni NICKEL
NIC NOT IN CONTRACT
NL NAILABLE
N.L. NEOPRENE LATEX
NM NONMETALLIC
NO NORMALLY OPEN
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
N’’REQD NOT REQUIRED
NTS NOT TO SCALE
OA OUTSIDE AIR
OBSC OBSCURE
OBW OBSERVATION WINDOW
OC ON CENTER
OCEW ON CENTER EACH WAY
OD OUTSIDE DIAMETER
OFC OFFICE
OGL OBSCURE GLASS
OH OVERHEAD
OHMS OVALHEAD MACHINE SCREW
OHWS OVALHEAD WOOD SCREW
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPQ OPAQUE
OPS OPERATIONS
OS & Y OUTSIDE SCREW AND YOKE
OWGL OBSCURE WIRED GLASS
P POLE
PA PUBLIC ADDRESS
PAR PARALLEL
PB PANIC BAR
PBD PARTICLE BOARD
PBS PUSH BUTTON STATION
PC PIECE
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCP CEMENT PLASTER (PORTLAND)
PD PAVEMENT DRAIN
PED PEDESTAL
PERF PERFORATE(D)
PERIM PERIMETER
PH PHASE
PHAR PHARMACY
PI POINT OF INTERSECTION
PIPU PREFAB ISOLATION POWER UNIT
PIV POST INDICATING VALVE
PL PLATE
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLAT PLATFORM
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PLG PILING
PL GL PLATE GLASS
PLYWD PLYWOOD
PNL PANEL
PT PAINT(ED)
POL POLISHED
PORC PORCELAIN
PORT PORTABLE
PPGL POLISHED PLATE GLASS
PPM PARTS PER MILLION
PR PAIR
PREFAB PREFABRICATE(D)
PREFIN PREFINISHED
PREFMD PREFORMED
PRKG PARKING
PROJ PROJECT
PRV PRESSURE-REGULATING VALVE
PS PIPE SPACE
P.S. PRESSED STEEL
PS CONC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PNEUMATIC TUBE
PT. POINT
PT CONC POST-TENSIONED CONCRETE
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PTR PAPER TOWEL RECEPTACLE
PV PAVED
PVC POLYVINYL CHLORIDE
PVG PAVING
PW PASS WINDOW
QT QUARRY TILE
QT. QUART
QTR QUARTER
1/4 RND QUARTER ROUND
QTY QUANTITY
R RADIUS
R RANGE
R RISER
RA RETURN AIR
RAB RABBETED
RA GR RETURN AIR GRILLE
RAR RETURN AIR REGISTER
RB RUBBER BASE, RESILIENT BASE
RBL RUBBLE STONE
RBR RUBBER
RC REMOTE CONTROL
RCP REINFORCED CONCRETE PIPE
RCVR RECEIVER
RD ROOF DRAIN
RDG INS RIGID INSULATION
RECPT RECEPTACLE
REC ROOM RECREATION ROOM
RECT RECTIFIER
REF REFERENCE
REFL REFLECT
REFR REFRIGERATION
REG REGISTER
REG REGLET
REINF REINFORCE
REM REMOVE(ABLE)
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RFG ROOFING
RH RELATIVE HUMIDITY
RH RIGHT HAND
RH ROOF HATCH
RK RACK
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RP RETRACTABLE PARTITION
RPM REVOLUTIONS PER MINUTE
RPRT RAISED PATTERN RUBBER TILE
RTF RUBBER TILE FLOOR
RVS REVERSE
RVT RIVET
RWC RAINWATER CONDUCTOR
S SOUTH
SA SUPPLY AIR
SB SPLASH BLOCK
S.B. SECURITY BARS
SC SOLID CORE
SCHED SCHEDULE
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SD STORM DRAIN
SDI STEEL DOOR INSTITUTE
SECT SECTION
SEQ SEQUENCE
SFGL SAFETY GLASS
SFTU STRUCTURAL FACING TILE UNIT
SFU STRUCTURAL FACING UNIT
SG SHEET GLASS
SHLDR SHOULDER
SHT SHEET
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJI STEEL JOIST INSTITUTE
SKLT SKYLIGHT
SLNT SEALANT
SLV SLEEVE
SM SHEET METAL
SMS SHEET METAL SCREWS
SOV SHUT OFF VALVE
SPC SPACER
SPCL SPECIAL
SPD SOUNDPROOF DOOR
SPEC SPECIFICATION
SPF SOUNDPROOF
SP FIN SPECIAL FINISH
SPH SPACE HEATER
SPKR SPEAKER
SQ SQUARE
SQHD SQUARE HEAD
S&R SHELF AND ROD
SS SERVICE SINK
SS STANDING SEAM (ROOF)
SST STAINLESS STEEL
STA STATION
STD STANDARD
STG SEATING
STL STEEL
STOR STORAGE
ST PR STATIC PRESSURE
STR STRINGER
STRUCT STRUCTURAL
STWY STAIRWAY
SUB FL SUBFLOOR
SUSP SUSPENDED
SV SHEET VINYL
SW SWITCH
SWBD SWITCHBOARD
SYMM SYMMETRICAL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD
TAN TANGENT
TB TOWEL BAR
TC TERRA COTTA
TEL TELEPHONE
TEMP TEMPERATURE
TEMP TEMPORARY
TER TERRAZZO
TERM TERMINAL
T&G TONGUE AND GROOVE
TGL TOGGLE
TH TRUSS HEAD
THK THICK(NESS)
THRES THRESHOLD
TK BD TACKBOARD
TKS TACKSTRIP
TO TOP OF
TOL TOLERANCE
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPTN TOILET PARTITION
TRANS TRANSOM
TRANS TRANSVERSE
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
UC UNIT COOLER
UGND UNDERGROUND
UH UNIT HEATER
UL UNDERWRITERS LABORATORIES
UNEX UNEXCAVATED
UNFIN UNFINISHED
UPS UNINTERRUPTABLE POWER SUPPLY
UR URINAL
UTIL UTILITY
UV UNIT VENTILATOR
V VOLT
VAR VARNISH
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VCT VITRIFIED CLAY TILE
VD VAULT DOOR
VENT VENTILATOR(TION)
VERT VERTICAL
VEST VESTIBULE
VF VINYL FABRIC
VG VERTICAL GRAIN
VH VINYL HOMOGENEOUS
VJ V-JOINT(ED)
VNR VENEER
VOL VOLUME
VR VAPOR RETARDER
VRM VERMICULITE
VS VENT STACK
V.T. VOLTAGE TRANSFORMER
VTR VENT THRU ROOF
VWC VINYL WALL COVERING
W WEST
W/ WITH
WB WET BULB
WBL WOOD BLOCKING
WC WATER CLOSET
W/C WHEELCHAIR
WCO WOOD-CASED OPENING
WD WOOD
WD WOOD DOOR
WDSP WASTE DISPOSER
WDW WINDOW
WF WIDE FLANGE
WGL WIRED GLASS
WH WALL HUNG
WH WATER HEATER
WHB WHEEL BUMPER
WHM WATT-HOUR METER
WI WROUGHT IRON
WKSH WORK SHOP
WM WIRE MESH
W/O WITHOUT
WP WATERPROOF(ING)
WP WEATHERPROOF
WP WORKING POINT
WR WASTE RECEPTACLE
WRB WARDROBE
WS WATERSTOP
W.S. WASTE STACK
WSCT WAINSCOT
WT WEIGHT
WTH WIDTH
W/W WALL TO WALL
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
WWR WELDED WIRE REINFORCEMENT
XFMR TRANSFORMER
YD YARD
YD YARD DRAIN
C U
S E
R S
H
E
C N
S E
S D
E S
K T
O P
S
H E
N A
N G
O D
E S
I G
N S
S
H E
E T
S G
D
W G
P
M
A E
C B
W
S
T B
H E
C N
S E
S
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S
S
T E
P H
E N
S O
N
C
M
A R
T I N
M
R
O T
H E
R
S T
A N
D A
B
R E
V I A
T I O
H E
E T
G-003
P I T
T S
B U
R G
H
D
I S
T R
I C
T
L I B
E R
E
N U
E
P I T
T S
B U
R G
H
P
A
M
F I
M
E
A N
S I
D
W W
N B
B E
A V
V
S
I N
S H
E N
A N
V
K E
R E
C R
E A
T I O
N
A
R E
A
P
A V
I N
G
R
E H
A B
I L I T
A T
I O
N
C E
R T
I F
I E
D
F
I N
A L
D
O C
U M
E N
T S
J
R
U S
N
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
C U
S E
R S
H
E
C N
S E
S D
E S
K T
O P
S
H E
N A
N G
O D
E S
I G
N S
S
H E
E T
S G
D
W G
P
M
A E
C B
W
S
T B
H E
C N
S E
S
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S
S
T E
P H
E N
S O
N
C
M
A R
T I N
M
R
O T
H E
R
G E
N E
R A
L
N
O T
H E
E T
G-004
P I T
T S
B U
R G
H
D
I S
T R
I C
T
L I B
E R
E
N U
E
P I T
T S
B U
R G
H
P
A
M
F I
M
E
A N
S I
D
W W
N B
B E
A V
V
S
I N
S H
E N
A N
V
K E
R E
C R
E A
T I O
N
A
R E
A
P
A V
I N
G
R
E H
A B
I L I T
A T
I O
N
C E
R T
I F
I E
D
F
I N
A L
D
O C
U M
E N
T S
1. ALL MATERIAL FURNISHED AND WORK COMPLETED UNDER THIS CONTRACT SHALL BE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
2. REPORT DISCREPANCIES IN DIMENSIONS BETWEEN DIFFERENT DRAWINGS TO THE CONTRACTING OFFICER OR DESIGNATED REPRESENTATIVE PRIOR TO BEGINNING WORK IN AREAS THAT WILL
BE AFFECTED.
3. THE BASE MAPPING UTILIZED FOR PROJECT DESIGN ILLUSTRATE GENERAL SITE FEATURES ONLY. LIMITED FIELD SURVEY OF THE SITE IS AVAILABLE. ALL UTILITIES, FEATURES AND DIMENSIONS
SHOWN ARE APPROXIMATE AND MAY NOT REFLECT ACTUAL FIELD CONDITIONS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ANY AND ALL DIMENSIONS, ELEVATIONS AND SITE
CONDITIONS. CONTRACTOR SHALL PROVIDE ALL SURVEY SERVICES NECESSARY TO ENSURE POSITIVE ROAD DRAINAGE.
4. CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER OR DESIGNATED REPRESENTATIVE OF ANY DISCREPANCIES OR UNDOCUMENTED CONDITIONS THAT MAY AFFECT THE COMPLETION OF
WORK ON THIS CONTRACT.
5. CONTRACTOR SHALL CONFINE CONSTRUCTION ACTIVITIES TO WITHIN THE WORK LIMITS SHOWN ON THE DRAWINGS.
6. THE CONTRACTOR SHALL NOT PERFORM ANY WORK DURING NIGHT, FEDERAL HOLIDAYS OR WEEKENDS EXCEPT WHEN ORDERED BY THE CONTRACTING OFFICER OR DESIGNATED
REPRESENTATIVE OR AT THE REQUEST OF THE CONTRACTOR WITH THE APPROVAL OF THE CONTRACTING OFFICER OR CONTRACTING OFFICER REPRESENTATIVE.
7. CONTRACTOR SHALL NOTE THE PRESENCE OF OVERHEAD POWER LINES AND UNDERGROUND UTILITIES. DAMAGE CAUSED BY THE CONTRACTOR TO ANY PUBLICLY OR PRIVATELY OWNED
STRUCTURE SHALL BE REPAIRED IN KIND AT THE CONTRACTOR'S EXPENSE. PRIOR TO ANY EXCAVATION OR DEMOLITION WORK, THE CONTRACTOR SHALL CONTACT THE PA ONE CALL SYSTEM, INC (1-800-242-1776) AND COMPLY WITH THE PROVISIONS OF PA ACT 287 OF 1974.
8. GOVERNMENT UTILITIES (INCLUDING WATER, ELECTRICITY, FUEL, ETC.) AND EQUIPMENT WILL NOT BE MADE AVAILABLE TO THE CONTRACTOR. UTILITIES, INCLUDING TEMPORARY CONSTRUCTION
POWER AND WATER, SHALL BE PROVIDED BY THE CONTRACTOR.
9. REMOVAL & DISPOSAL OF EXISTING MATERIALS SHALL BE IN ACCORDANCE WITH CONTRACT SPECIFICATIONS.
10. ITEMS CALLED OUT IN ITALICS AND/OR DISPLAYED IN GRAYSCALE REPRESENT EXISTING FEATURES.
11. DETAILS ENTITLED OR NOTED AS ''TYPICAL" APPLY NOT ONLY WHERE SPECIFICALLY INDICATED OR REFERENCED, BUT ALSO IN ALL OTHER CASES WHERE THE NATURE OF THE CONSTRUCTION
REQUIRES THEIR USE. DETERMINE APPLICABILITY OF TYPICAL DETAILS FROM DESCRIPTIVE TITLES OR FROM THE SIMILARITY OF A CONSTRUCTION CONDITION TO ANOTHER CONDITION WHERE
THE DETAIL IS SPECIFICALLY INDICATED OR REFERENCED.
12. REFERENCE DRAWINGS ARE DRAWINGS OF RECORD, INCLUDED SOLELY FOR THE CONTRACTOR'S BENEFIT. NO REQUIRED WORK UNDER THIS CONTRACT IS SHOWN ON THE REFERENCE
DRAWINGS. THE REFERENCE DRAWINGS ARE NOT "AS BUILT", SO THEY DO NOT NECESSARILY REPRESENT ACTUAL FIELD CONDITIONS. REFERENCE DRAWINGS ARE NOT PRINTED TO SCALE.
GENERAL NOTES
PENNSYLVANIA ONE CALL SYSTEM
CALL 3 BUSINESS DAYS BEFORE YOU DIG!
1-800-242-1776 OR 811
J
R
U S
N
R
O
R
O
R
O
M
R
O
R
O
CONTRACTOR
LAYDOWN
AREA
W
OLD DUCK
LOOP
CANAL
LOOP
LAKE VIEW
LOOP
GOLDEN
LOOP
R
O
R
O
U
C
E
E
A
S
T
A
U
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
S
S
T E
P H
E N
S O
N
C
M
A R
T I N
M
R
O T
H E
R
P L A
N
A
T
E S
C O
N T
R A
C T
R
K
L I M
I T
S
G-101
C U
S E
R S
H
E
C N
S E
S D
E S
K T
O P
S
H E
N A
N G
O D
E S
I G
N S
S
H E
E T
S G
D
W G
P
M
A E
C B
W
S
T B
H E
C N
S E
S
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
P I T
T S
B U
R G
H
D
I S
T R
I C
T
L I B
E R
E
N U
E
P I T
T S
B U
R G
H
P
A
M
F I
M
E
A N
S I
D
W W
N B
B E
A V
V
S
I N
S H
E N
A N
V
K E
R E
C R
E A
T I O
N
A
R E
A
P
A V
I N
G
R
E H
A B
I L I T
A T
I O
N
C E
R T
I F
I E
D
F
I N
A L
D
O C
U M
E N
T S
A1
SCALE: 1" = 200'
PLAN - CONTRACTOR WORK LIMITS
GENERAL SHEET NOTES
PLAN
NORTH
400'0 200'
1. FOR GENERAL PROJECT ABBREVIATIONS AND PROJECT GENERAL NOTES,
SEE SHEET G-003 AND G-004.
CONTRACTOR WORK LIMITS NOTES
1. THE CONTRACTOR SHALL USE ACCESS ROADS "A" AND "B", TO INGRESS AND
EGRESS THE SITE. REFER TO SPECIAL PROCEDURES SPECIFICATION IN
REGARDS TO RESTRICTIONS ON UTILIZATION OF ACCESS ROADS "A" AND "B".
2. CONTRACTOR WORK LIMITS ARE RESTRICTED TO THE PAVED LIMITS OF THE
ACCESS ROADS AND CONTRACTOR LAYDOWN AREA, AND GRAVEL LIMITS OF
THE ROUTE 18 ACCESS AREA.
3. THE CONTRACTOR LAYDOWN AREA SHALL BE UTILIZED AS THE STAGING
AREA FOR DAILY CONSTRUCTION USE, STORAGE OF EQUIPMENT, AND FOR
PERSONAL VEHICLE PARKING. REFER TO THE SPECIAL PROCEDURE
SPECIFICATION IN REGARDS TO RESTRICTIONS ON UTILIZATION OF
CONTRACTOR LAYDOWN AREA FOR STORAGE OF MATERIALS.
4. THE ROUTE 18 ACCESS AREA SHALL BE UTILIZED AS THE STAGING AREA FOR
MATERIALS. ALL MATERIAL IN THE ROUTE 18 ACCESS AREA SHALL BE USED
TO REGRADE THE EXSITING GRAVEL ROAD TO A REASONABLE HEIGHT.
LEFTOVER MATERIAL SHALL BE STOCKPILED IN AREAS CALLED OUT BY A
KEYNOTE ON THIS SHEET.
5. CONTRACTOR ACCESS TO THE ROUTE 18 ACCESS AREA SHALL BE VIA
TOWNSHIP ROAD 585, W LAKE ROAD, AS SHOWN IN THE PLAN VIEW ON THIS
SHEET. THE CONTRACTOR SHALL NOT USE THE TOWNSHIP ROAD FOR
VEHICLE PARKING, AS A STAGING AREA FOR CONSTRUCTION, OR FOR
STORAGE OF MATERIALS AND /OR EQUIPMENT.
6. THE CONTRACTOR SHALL NOT BE PERMITTED TO ACCESS OLD DUCK LOOP
(OPTION 2) AREA NORTH OF THE ROAD "R" AND ROAD "A" INTERSECTION
SHOWN IN THE CONSTRUCTION WORK LIMITS, UNLESS CONTRACT OPTION 2
IS EXERCISED.
7. THE CONTRACTOR SHALL BE PERMITTED TO ONLY USE THE FIRST 30 FEET
OF THE LOOPS DIRECTLY ADJACENT TO ROAD "A" FOR EQUIPMENT TURN
AROUND DURING CONSTRUCTION WORK.
1. THE CONTRACTOR SHALL BE PERMITTED TO USE THE PARKING LOT FOR
STAGING OF CONSTRUCTION, STORAGE OF EQUIPMENT, AND FOR PERSONAL
VEHICLE PARKING.
2. PLACE ASPHALT MILLINGS ALONG THE ENTIRE LENGTH AND WIDTH OF
ROUTE 18 ACCESS ROAD AREA. PLACE AND COMPACT MILLING TO
NON-MOVEMENT AT A MINIMUM THICKNESS OF 12".
3. PROPOSED STOCKPILE AREAS FOR EXCESS DISPOSAL MATERIAL REMOVED
DURING CONSTRUCTION.
4. ROCK CONSTRUCTION ENTRANCE LOCATION TO THE ROUTE 18 ACCESS
AREA (SEE DETAIL D2 ON SHEET X-501).
LEGEND
CONTRACTOR WORK LIMITS
SHEET KEYNOTES
J
R
U S
N
5+00
R
O
R
O
R
O
R
O
R
O
A D
A
OLD DUCK
LOOP
CONTRACTOR
LAYDOWN
AREA
CANAL
LOOP
LAKE VIEW
LOOP
GOLDEN
LOOP
OLD DUCKLOOP
R
O
A1
C-405
OLD DUCK LOOP - ROAD "M"
SEE SHEET C-405 FOR ENLARGED
PLAN VIEW AND TYPICAL SECTION
A1
C-404
MAIN ACCESS ROAD - ROAD "A"
SEE SHEET C-404 FOR ENLARGED
PLAN VIEW
A1
C-403
MAIN ACCESS ROAD - ROAD "A"
SEE SHEET C-403 FOR ENLARGED
PLAN VIEW
A1
C-401
MAIN ACCESS ROAD ENTRANCE -
ROAD "A" AND ROAD "R"
SEE SHEET C-401 FOR ENLARGED
PLAN VIEW
A1
C-402
MAIN ACCESS ROAD - ROAD "A"
SEE SHEET C-402 FOR ENLARGED
PLAN VIEW
ROCK
CONSTRUCTION
ENTRANCE
12" COMPOST
FILTER SOCK
12" COMPOST
FILTER SOCK
12" COMPOST
FILTER SOCK
R
O
R
O
U
C
E
E
A
S
T
A
U
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
S
S
T E
P H
E N
S O
N
C
M
A R
T I N
M
R
O T
H E
R
O V
E R
A L L
P
R O
J E
R
K
A
R E
C-101
U
S E
R S
H
E
C N
S E
S D
E S
K T
O P
S
H E
N A
N G
O D
E S
I G
N S
S
H E
E T
S C
D
W G
P
M
A E
C B
W
S
T B
H E
C N
S E
S
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
P I T
T S
B U
R G
H
D
I S
T R
I C
T
L I B
E R
E
N U
E
P I T
T S
B U
R G
H
P
A
M
F I
M
E
A N
S I
D
W W
N B
B E
A V
V
S
I N
S H
E N
A N
V
K E
R E
C R
E A
T I O
N
A
R E
A
P
A V
I N
G
R
E H
A B
I L I T
A T
I O
N
C E
R T
I F
I E
D
F
I N
A L
D
O C
U M
E N
T S
A1
SCALE: 1" = 30'
OVERALL PLAN - RECREATION AREA PAVEMENT REHABILITATION
GENERAL SHEET NOTES
PLAN
NORTH
1. FOR GENERAL PROJECT ABBREVIATIONS AND PROJECT GENERAL NOTES,
SEE SHEET G-003 AND G-004.
1. REHABILITATION OF PAVEMENT STRUCTURES ON THE ACCESS ROADS SHALL
CONFORM TO THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS.
2. SUPERPAVE MIXTURE DESIGN AND INSTALLATION SHALL CONFORM TO
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION (PADOT) PUBLICATION
408.
ACCESS ROADS REHABILITATION NOTES
1. FOR EROSION & SEDIMENT CONTROL BEST MANAGEMENT PRACTICE (BMP)
INSTALLATION AND MAINTENANCE NOTES, SEE SHEET X-002.
2. FOR EROSION & SEDIMENT CONTROL BMP DETAILS, SEE SHEET X-501.
EROSION AND SEDIMENT CONTROL NOTES
LEGEND
12" COMPOST FILTER SOCK
LIMITS OF PAVEMENT REHABILITATION
LIMITS OF PAVEMENT REHABILITATION AWARDABLE OPTIONS
J
R
U S
N A
K
TRAFFIC ISLAND REMOVAL AREA
ROCK CONSTRUCTION ENTRANCE
R
O
R
O
A D
A
R
O
R
O
R
O
A D
A
R
O
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
S
S
T E
P H
E N
S O
N
C
M
A R
T I N
M
R
O T
H E
R
E N
L A
R G
A
N
A
T
S
T
T
O
A
T
R A
N C
E
A
C C
E S
S
R
O A
D
R
A W
A R
D A
B
T
I O
N
M
A
C
E S
S
R
O A
D
C-401
OPTION 1
C U
S E
R S
H
E
C N
S E
S D
E S
K T
O P
S
H E
N A
N G
O D
E S
I G
N S
S
H E
E T
S C
D
W G
P
M
A E
C B
W
S
T B
H E
C N
S E
S
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
P I T
T S
B U
R G
H
D
I S
T R
I C
T
L I B
E R
E
N U
E
P I T
T S
B U
R G
H
P
A
M
F I
M
E
A N
S I
D
W W
N B
B E
A V
V
S
I N
S H
E N
A N
V
K E
R E
C R
E A
T I O
N
A
R E
A
P
A V
I N
G
R
E H
A B
I L I T
A T
I O
N
C E
R T
I F
I E
D
F
I N
A L
D
O C
U M
E N
T S
A1
SCALE: 1" = 30'
ENLARGED PLAN - AWARDABLE OPTION 1 - ACCESS ROAD "A" AND ACCESS ROAD "R" (ENTRANCE) PAVEMENT REHABILITATION
PLAN
NORTH
30' 60'0
M A
T C
H
L I N
E
L C
EXISTING CONCRETE CURB TO BE
REMOVED (BY OTHERS)
START OF ROAD REHABILITATION ACCESS
ROAD "A" STA 00+07 TO STA 00+72 (SEE
SHEET C-301, TYPICAL SECTION H1 FOR
ADDITIONAL INFORMATION)
ACCESS ROAD "R" STA 10+00
END OF ROAD REHABILITATION
ACCESS ROAD "R" STA 13+40
START OF ROAD REHABILITATION
ACCESS ROAD "R" STA 13+95
START OF ROAD REHABILITATION
ACCESS ROAD "A" STA 4+81
GENERAL SHEET NOTES
1. FOR GENERAL PROJECT ABBREVIATIONS AND PROJECT GENERAL NOTES,
SEE SHEET G-003 AND G-004.
1. REHABILITATION OF PAVEMENT STRUCTURES ON THE ACCESS ROADS SHALL
CONFORM TO THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS.
2. SUPERPAVE MIXTURE DESIGN AND INSTALLATION SHALL CONFORM TO
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION (PADOT) PUBLICATION
408.
ACCESS ROADS REHABILITATION NOTES
SHEET KEYNOTES - TRAFFIC ISLAND
1. EXISTING CONCRETE CURB FORMING THE TRAFFIC ISLAND TO BE REMOVED
(BY OTHERS).
1. ALL EXCAVATION AND ASPHALT PAVEMENT CONSTRUCTION SHALL
CONFORM TO THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS.
1. FOR ALL DETAILS AND NOTES REGARDING DEPTH OF EXCAVATION,
THICKNESS OF STONE SUBBASE, AND ASPHALT PLACEMENT, SEE SHEET
C-301, TYPICAL SECTION A11.
1. FOR EROSION & SEDIMENT CONTROL BEST MANAGEMENT PRACTICE (BMP)
INSTALLATION AND MAINTENANCE NOTES, SEE SHEET X-002.
2. FOR EROSION & SEDIMENT CONTROL BMP DETAILS, SEE SHEET X-501.
EROSION AND SEDIMENT CONTROL NOTES
LEGEND
LIMITS OF PAVEMENT REHABILITATION
LIMITS OF PAVEMENT REHABILITATION AWARDABLE OPTION 1
ROAD REHABILITATION ACCESS ROAD
"R" STA 10+00 TO STA 10+40 AND STA
10+84 TO STA 13+40 (SEE SHEET C-301,
TYPICAL SECTION A1 FOR ADDITIONAL
INFORMATION)
ROAD REHABILITATION ACCESS ROAD "A"
STA 4+81 TO STA 6+00 AND ACCESS ROAD "R"
STA 13+95 TO STA 15+20 (SEE SHEET C-302,
TYPICAL SECTION H1 FOR MORE
INFORMATION)
ROAD REHABILITATION ACCESS ROAD "A"
STA 6+00 TO 34+10 (SEE SHEET C-302,
TYPICAL SECTION A1 FOR ADDITIONAL
INFORMATION)
J
R
U S
N A
TRAFFIC ISLAND REMOVAL AREA
R
O
A D
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
S
S
T E
P H
E N
S O
N
C
M
A R
T I N
M
R
O T
H E
R
E N
L A
R G
A
N
A
T
E S
M A
C
E S
S
R
O A
D
A
S
T
T
O
C-402
U
S E
R S
H
E
C N
S E
S D
E S
K T
O P
S
H E
N A
N G
O D
E S
I G
N S
S
H E
E T
S C
D
W G
P
M
A E
C B
W
S
T B
H E
C N
S E
S
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
P I T
T S
B U
R G
H
D
I S
T R
I C
T
L I B
E R
E
N U
E
P I T
T S
B U
R G
H
P
A
M
F I
M
E
A N
S I
D
W W
N B
B E
A V
V
S
I N
S H
E N
A N
V
K E
R E
C R
E A
T I O
N
A
R E
A
P
A V
I N
G
R
E H
A B
I L I T
A T
I O
N
C E
R T
I F
I E
D
F
I N
A L
D
O C
U M
E N
T S
D1
SCALE: 1" = 40'
ENLARGED PLAN - ACCESS ROAD "A" PAVEMENT REHABILITATION AND CONTRACTOR LAYDOWN AREA
PLAN
NORTH
40' 80'0
MATCH LINE
P13/C-403
M A
T C
H
L I N
E
H C
GENERAL SHEET NOTES
1. FOR GENERAL PROJECT ABBREVIATIONS AND PROJECT GENERAL NOTES,
SEE SHEET G-003 AND G-004.
1. REHABILITATION OF PAVEMENT STRUCTURES ON THE ACCESS ROADS SHALL
CONFORM TO THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS
2. SUPERPAVE MIXTURE DESIGN AND INSTALLATION SHALL CONFORM TO
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION (PADOT) PUBLICATION
408.
ACCESS ROADS REHABILITATION NOTES
1. FOR EROSION & SEDIMENT CONTROL BEST MANAGEMENT PRACTICE (BMP)
INSTALLATION AND MAINTENANCE NOTES, SEE SHEET X-002.
2. FOR EROSION & SEDIMENT CONTROL BMP DETAILS, SEE SHEET X-501.
EROSION AND SEDIMENT CONTROL NOTES
LEGEND
LIMITS OF PAVEMENT REHABILITATION
ROAD REHABILITATION ACCESS ROAD "A"
(SEE SHEET C-302, TYPICAL SECTION A1
FOR ADDITIONAL INFORMATION)
J
R
U S
N
GOLDEN
LOOP
R
O
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
S
S
T E
P H
E N
S O
N
C
M
A R
T I N
M
R
O T
H E
R
E N
L A
R G
A
N
A
T
E S
M A
C
E S
S
R
O A
D
A
S
T
T
O
C-403
U
S E
R S
H
E
C N
S E
S D
E S
K T
O P
S
H E
N A
N G
O D
E S
I G
N S
S
H E
E T
S C
D
W G
P
M
A E
C B
W
S
T B
H E
C N
S E
S
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
P I T
T S
B U
R G
H
D
I S
T R
I C
T
L I B
E R
E
N U
E
P I T
T S
B U
R G
H
P
A
M
F I
M
E
A N
S I
D
W W
N B
B E
A V
V
S
I N
S H
E N
A N
V
K E
R E
C R
E A
T I O
N
A
R E
A
P
A V
I N
G
R
E H
A B
I L I T
A T
I O
N
C E
R T
I F
I E
D
F
I N
A L
D
O C
U M
E N
T S
A1
SCALE: 1" = 40'
ENLARGED PLAN - ACCESS ROAD "A" PAVEMENT REHABILITATION
PLAN
NORTH
40' 80'0
MATCH LINE
M11/C-404
MATCH LINE
E3/C-402
GENERAL SHEET NOTES
1. FOR GENERAL PROJECT ABBREVIATIONS AND PROJECT GENERAL NOTES,
SEE SHEET G-003 AND G-004.
1. REHABILITATION OF PAVEMENT STRUCTURES ON THE ACCESS ROADS SHALL
CONFORM TO THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS.
2. SUPERPAVE MIXTURE DESIGN AND INSTALLATION SHALL CONFORM TO
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION (PADOT) PUBLICATION
408.
ACCESS ROADS REHABILITATION NOTES
1. FOR EROSION & SEDIMENT CONTROL BEST MANAGEMENT PRACTICE (BMP)
INSTALLATION AND MAINTENANCE NOTES, SEE SHEET X-002.
2. FOR EROSION & SEDIMENT CONTROL BMP DETAILS, SEE SHEET X-501.
EROSION AND SEDIMENT CONTROL NOTES
LEGEND
LIMITS OF PAVEMENT REHABILITATION
ROAD REHABILITATION ACCESS ROAD "A"
(SEE SHEET C-302, TYPICAL SECTION A1
FOR ADDITIONAL INFORMATION)
J
R
U S
N
CANAL
LOOP
LAKE VIEW
LOOP
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
S
S
T E
P H
E N
S O
N
C
M
A R
T I N
M
R
O T
H E
R
E N
L A
R G
A
N
A
T
E S
M A
C
E S
S
R
O A
D
A
S
T
T
O
C-404
C U
S E
R S
H
E
C N
S E
S D
E S
K T
O P
S
H E
N A
N G
O D
E S
I G
N S
S
H E
E T
S C
D
W G
P
M
A E
C B
W
S
T B
H E
C N
S E
S
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
P I T
T S
B U
R G
H
D
I S
T R
I C
T
L I B
E R
E
N U
E
P I T
T S
B U
R G
H
P
A
M
F I
M
E
A N
S I
D
W W
N B
B E
A V
V
S
I N
S H
E N
A N
V
K E
R E
C R
E A
T I O
N
A
R E
A
P
A V
I N
G
R
E H
A B
I L I T
A T
I O
N
C E
R T
I F
I E
D
F
I N
A L
D
O C
U M
E N
T S
A1
SCALE: 1" = 60'
ENLARGED PLAN - ACCESS ROAD "A" PAVEMENT REHABILITATION
PLAN
NORTH
60' 120'0
MATCH LINE
B6/C-403
GENERAL SHEET NOTES
1. FOR GENERAL PROJECT ABBREVIATIONS AND PROJECT GENERAL NOTES,
SEE SHEET G-003 AND G-004.
1. REHABILITATION OF PAVEMENT STRUCTURES ON THE ACCESS ROADS SHALL
CONFORM TO THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS.
2. SUPERPAVE MIXTURE DESIGN AND INSTALLATION SHALL CONFORM TO
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION (PADOT) PUBLICATION
408.
ACCESS ROADS REHABILITATION NOTES
END OF ROAD
REHABILITATION ACCESS
ROAD "A" STA 34+10
1. FOR EROSION & SEDIMENT CONTROL BEST MANAGEMENT PRACTICE (BMP)
INSTALLATION AND MAINTENANCE NOTES, SEE SHEET X-002.
2. FOR EROSION & SEDIMENT CONTROL BMP DETAILS, SEE SHEET X-501.
EROSION AND SEDIMENT CONTROL NOTES
LEGEND
LIMITS OF PAVEMENT REHABILITATION
ROAD REHABILITATION ACCESS ROAD "A"
(SEE SHEET C-302, TYPICAL SECTION A1
FOR ADDITIONAL INFORMATION)
J
R
U S
N
5+00
R
O
OLD DUCK
LOOP
OLD DUCK
LOOP
R O
A D
M
1. MILL AND REPLACE EXISTING BITUMINOUS PAVEMENT TO A COMPACTED DEPTH OF 2" ON THE TOTAL WIDTH OF ACCESS ROAD "M" STARTING AT STATION 00+10 AND ENDING
AT STATION 10+34, AS SHOWN ON THE ENLARGED PLAN ON THIS SHEET.
2. CLEAN ALL VERTICAL BITUMINOUS PAVEMENT EDGES AND PAINT WITH PG 64-22 BINDER.
3. BINDER COURSE SHALL BE SWEPT CLEAN PRIOR TO APPLYING THE TACK COAT AND WEARING COURSE.
4. ALL EXPOSED JOINTS WHERE NEW BITUMINOUS PAVEMENT IS IN CONTACT WITH EXISTING BITUMINOUS PAVEMENT SHALL BE NEATLY SEALED WITH AN ASPHALT SEALANT 6"
WIDE AND CENTERED ON THE SEAM.
EXISTING ROAD WIDTH ±18'
EXISTING CRUSHED
AGGREGATE/ SLAG LAYER
±6" THICK
EXISTING BITUMINOUS
PAVEMENT AND SLURRY SEAL
±5" THICK
ROAD NOTES:
EXISTING GRADE
SEED AND MULCH
DISTURBED AREAS
EXISTING GRADE
SEED AND MULCH
DISTURBED AREAS
COMPACT SUPERPAVE HMA 9.5 MM
WEARING COURSE, 2" THICK
PLACE PADOT PUBLICATION 408,
SECTION 460 - BITUMINOUS
TACK COAT
MILL AND REMOVE EXISTING
BITUMINOUS PAVEMENT AND
SLURRY SEAL TO A DEPTH OF 2"
SLOPE TO MATCH EXISTING
PAVEMENT
SLOPE TO MATCH EXISTING
PAVEMENT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
S
S
T E
P H
E N
S O
N
C
M
A R
T I N
M
R
O T
H E
R
E N
L A
R G
A
N
T
Y P
I C
A L
D
E T
A I L S
A
T
E S
O
U C
K
L O
C C
E S
S
R
O A
D
M
A W
A R
D A
B
T
I O
N
C-405
OPTION 2
C U
S E
R S
H
E
C N
S E
S D
E S
K T
O P
S
H E
N A
N G
O D
E S
I G
N S
S
H E
E T
S C
D
W G
P
M
A E
C B
W
S
T B
H E
C N
S E
S
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
P I T
T S
B U
R G
H
D
I S
T R
I C
T
L I B
E R
E
N U
E
P I T
T S
B U
R G
H
P
A
M
F I
M
E
A N
S I
D
W W
N B
B E
A V
V
S
I N
S H
E N
A N
V
K E
R E
C R
E A
T I O
N
A
R E
A
P
A V
I N
G
R
E H
A B
I L I T
A T
I O
N
C E
R T
I F
I E
D
F
I N
A L
D
O C
U M
E N
T S
A1
SCALE: 1" = 40'
ENLARGED PLAN - AWARDABLE OPTION 2 - ACCESS ROAD "M" PAVEMENT REHABILITATION
40' 80'0
PLAN
NORTH
SCALE: NTS
E10
SCALE: NTS
TYPICAL SECTION - OLD DUCK LOOP ACCESS ROAD "M" RECONSTRUCTION STATIONS 00+10 TO 10+34
GENERAL SHEET NOTES
1. FOR GENERAL PROJECT ABBREVIATIONS AND PROJECT GENERAL NOTES,
SEE SHEET G-003 AND G-004.
ACCESS ROADS REHABILITATION NOTES
GENERAL SHEET NOTES
1. FOR GENERAL PROJECT ABBREVIATIONS AND PROJECT GENERAL NOTES,
SEE SHEET G-003 AND G-004.
ACCESS ROADS REHABILITATION NOTES
1. REHABILITATION OF PAVEMENT STRUCTURES ON THE ACCESS ROADS SHALL
CONFORM TO THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS.
2. SUPERPAVE MIXTURE DESIGN AND INSTALLATION SHALL CONFORM TO
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION (PADOT) PUBLICATION
408.
3. WHERE THE ACCESS ROAD REHABILITATION INTERSECTS ADJACENT ROADS,
REFER TO THE SPECIFICATIONS FOR TRANSITION REQUIREMENTS.
1. FOR EROSION & SEDIMENT CONTROL BEST MANAGEMENT PRACTICE (BMP)
INSTALLATION AND MAINTENANCE NOTES, SEE SHEET X-002.
2. FOR EROSION & SEDIMENT CONTROL BMP DETAILS, SEE SHEET X-501.
EROSION AND SEDIMENT CONTROL NOTES
LEGEND
LIMITS OF PAVEMENT REHABILITATION AWARDABLE OPTION 2
R o a d
J
R
U S
N A
K
START OF ROAD REHABILITATION
ACCESS ROAD "M" STA 00+10
END OF ROAD REHABILITATION
ACCESS ROAD "M" STA 10+34
ROAD REHABILITATION ACCESS ROAD
"M" (SEE THIS SHEET, TYPICAL SECTION
E10 FOR ADDITIONAL INFORMATION)
EXISTING ROAD WIDTH VARIES
12'-0" REPAVING WIDTH
1. RECONSTRUCT PAVEMENT 12' ALONG THE RIGHT (NORTH) SIDE OF ACCESS ROAD "R" STARTING AT STATION 10+00 AND ENDING AT STATION
10+40, AND ON ACCESS ROAD "R" STARTING AT STATION 10+84 AND ENDING AT STATION 13+40, AS SHOWN ON THE ENLARGED PLAN ON SHEET
C-401.
2. FOR ADDITIONAL INFORMATION, SEE "NEW PAVEMENT SPECIFICATION NOTES", ON THIS SHEET.
EXISTING GRADE
SEED AND MULCH
DISTURBED AREAS
WIDTH VARIES
EXISTING BITUMINOUS
PAVEMENT ±2.5" THICK
EXISTING CRUSHED
AGGREGATE/ SLAG
±10" THICK
REMOVE EXISTING PAVEMENT AND CRUSHED
AGGREGATE/ SLAG TO A FULL DEPTH OF 11.5" AND 12'
FROM EDGE OF EXISTING ROAD PAVEMENT - SEE NOTE 1
ROAD NOTES:
COMPACT PADOT #2A COARSE
AGGREGATE LAYER - 6" THICK,
CONFORMING TO PADOT
PUBLICATION 408
COMPACT SUPERPAVE HMA 25.0 MM
BASE COURSE - 4" THICK
COMPACT SUPERPAVE HMA 9.5 MM
WEARING COURSE, 1.5" THICK
PLACE PADOT PUBLICATION 408,
SECTION 460 - BITUMINOUS
TACK COAT
1'-0"
ASPHALT SEALANT
SAWCUT AND MILL
EXISTING PAVEMENT
TO A DEPTH OF 1.5"
MILL AND REMOVE
EXISTING PAVEMENT TO
A DEPTH OF 2.5"
MILL OR EXCAVATE EXISTING
CRUSHED AGGREGATE/ SLAG TO A
DEPTH OF 9"
SLOPE 1/4" per 1'
1. RECONSTRUCT PAVEMENT 12' ALONG THE RIGHT (NORTH) SIDE OF ACCESS ROAD "A" STARTING AT STATION 0+07.00 AND ENDING AT
STATION 0+72.00, AS SHOWN ON THE ENLARGED PLAN ON SHEET C-401.
2. FOR ADDITIONAL INFORMATION, SEE "NEW PAVEMENT SPECIFICATION NOTES", ON THIS SHEET.
EXISTING ROAD WIDTH VARIES
12'-0" REPAVING WIDTH
WIDTH VARIES
EXISTING GRADE
SEED AND MULCH
DISTURBED AREAS
EXISTING BITUMINOUS
PAVEMENT ±3.5" THICK
EXISTING CRUSHED
AGGREGATE/ SLAG
±10" THICK
REMOVE EXISTING PAVEMENT AND CRUSHED
AGGREGATE/ SLAG TO A FULL DEPTH OF 11.5" AND 12'
FROM EDGE OF EXISTING ROAD PAVEMENT - SEE NOTE 1
ROAD NOTES:
SLOPE 1/4" per 1'
COMPACT PADOT #2A COARSE
AGGREGATE LAYER - 6" THICK,
CONFORMING TO PADOT
PUBLICATION 408
COMPACT SUPERPAVE HMA 25.0 MM
BASE COURSE - 4" THICK
COMPACT SUPERPAVE HMA 9.5 MM
WEARING COURSE, 1.5" THICK
PLACE PADOT PUBLICATION 408,
SECTION 460 - BITUMINOUS
TACK COAT
1'-0"
ASPHALT SEALANT
SAWCUT AND MILL
EXISTING PAVEMENT
TO A DEPTH OF 1.5"
MILL AND REMOVE
EXISTING PAVEMENT TO
A DEPTH OF 3.5"
MILL OR EXCAVATE EXISTING
CRUSHED AGGREGATE/ SLAG TO A
DEPTH OF 8"
12'-0" REPAVING WIDTH
1. RECONSTRUCT PAVEMENT TO OF ACCESS ROAD "R" FROM THE NORTHERN EDGE OF PAVEMENT TO THE EXISTING TRAFFIC ISLAND, AND THE TOTAL AREA OF
THE EXISTING TRAFFIC ISLAND STARTING AT STATION 10+40 AND ENDING AT STATION 10+84, AS SHOWN ON THE ENLARGED PLAN ON SHEET C-401.
2. SAWCUT OR MILL FULL PAVEMENT DEPTH WHERE THE CONCRETE CURB WAS REMOVED (BY OTHERS) TO FORM A NEAT VERTICAL EDGE ALONG EXISITING
BITUMINOUS PAVEMENT.
3. FOR ADDITIONAL INFORMATION, SEE "NEW PAVEMENT SPECIFICATION NOTES", ON THIS SHEET.
EXISTING CONCRETE
CURBS TO BE REMOVED
(BY OTHERS)
EXISTING GRADE
SEED AND MULCH
DISTURBED AREAS
ROAD NOTES:
COMPACT PADOT #2A COARSE
AGGREGATE LAYER - 6" THICK,
CONFORMING TO PADOT
PUBLICATION 408
COMPACT SUPERPAVE HMA 25.0 MM
BASE COURSE - 4" THICK
COMPACT SUPERPAVE HMA 9.5 MM
WEARING COURSE, 1.5" THICK
PLACE PADOT PUBLICATION 408,
SECTION 460 - BITUMINOUS
TACK COAT
FORMER TRAFFIC ISLAND
(WIDTH AND LENGTH VARIES)
EXCAVATE MATERIAL IN TRAFFIC
ISLAND AREA TO A FULL DEPTH
OF 11.5".
1'-0"
ASPHALT SEALANT
SAWCUT AND MILL
EXISTING PAVEMENT
TO A DEPTH OF 1.5"
EXISTING BITUMINOUS
PAVEMENT ±2.5" THICK
EXISTING CRUSHED
AGGREGATE/ SLAG
±10" THICK
MILL AND REMOVE
EXISTING PAVEMENT TO
A DEPTH OF 2.5"
MILL OR EXCAVATE EXISTING
CRUSHED AGGREGATE/ SLAG TO A
DEPTH OF 9"
SLOPE 1/4" per 1'
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
S
S
T E
P H
E N
S O
N
C
M
A R
T I N
M
R
O T
H E
R
S H
E E
T
O
F
T Y
P I C
A L
D
E T
A I L S
M A
C
E S
S
R
O A
D
A
A
A
D
R
C-301
OPTION 1
C U
S E
R S
H
E
C N
S E
S D
E S
K T
O P
S
H E
N A
N G
O D
E S
I G
N S
S
H E
E T
S C
D
W G
P
M
A E
C B
W
S
T B
H E
C N
S E
S
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
P I T
T S
B U
R G
H
D
I S
T R
I C
T
L I B
E R
E
N U
E
P I T
T S
B U
R G
H
P
A
M
F I
M
E
A N
S I
D
W W
N B
B E
A V
V
S
I N
S H
E N
A N
V
K E
R E
C R
E A
T I O
N
A
R E
A
P
A V
I N
G
R
E H
A B
I L I T
A T
I O
N
C E
R T
I F
I E
D
F
I N
A L
D
O C
U M
E N
T S
A1
SCALE: NTS
STATIONS 10+84 TO 13+40
1. FOR GENERAL PROJECT ABBREVIATIONS AND PROJECT GENERAL NOTES,
SEE SHEET G-003 AND G-004.
GENERAL SHEET NOTES
H1
SCALE: NTS
TYPICAL SECTION - ACCESS ROAD "A" RECONSTRUCTION STATIONS 00+07 TO 00+72
A11
SCALE: NTS
TYPICAL SECTION - ACCESS ROAD "R" RECONSTRUCTION STATIONS 10+40 TO 10+84 AND TRAFFIC ISLAND
1. VERTICAL SAWCUT ALONG EXISTING BITUMINOUS PAVEMENTS TO CREATE
UNIFORM EDGE TO BOND EXISTING BITUMINOUS PAVEMENT TO NEWLY
PLACED BITUMINOUS PAVEMENT.
2. CLEAN ALL VERTICAL BITUMINOUS PAVEMENT EDGES AND PAINT WITH PG
64-22 BINDER.
3. BASE COURSE SHALL BE SWEPT CLEAN PRIOR TO APPLYING THE TACK COAT
AND WEARING COURSE.
4. ALL EXPOSED JOINTS WHERE NEW BITUMINOUS PAVEMENT IS IN CONTACT
WITH EXISTING BITUMINOUS PAVEMENT SHALL BE NEATLY SEALED WITH AN
ASPHALT SEALANT 6" WIDE AND CENTERED ON THE SEAM.
NEW PAVEMENT SPECIFICATION NOTES
TYPICAL SECTION - ACCESS ROAD "R" RECONSTRUCTION STATIONS 10+00 TO 10+40 AND
J
R
U S
N
1. REMOVE EXISTING BITUMINOUS PAVEMENT AND CRUSHED AGGREGATE/ SLAG TO A FULL DEPTH OF 11.5".
2. RECONSTRUCT THE TOTAL WIDTH OF ACCESS ROAD "A" STARTING AT STATION 6+00 AND ENDING AT STATION 34+10, AS SHOWN ON THE ENLARGED
PLANS ON SHEETS C-401. C-402. C-403, AND C-404.
3. FOR ADDITIONAL INFORMATION, SEE "NEW PAVEMENT SPECIFICATION NOTES", ON THIS SHEET.
EXISTING ROAD WIDTH ±20'
E X
I S
T I N
G
C
R U
S H
E D
A G
G R
E G
A T
E
S
L
T H
I C
K
E X
I S
T I N
G
B
I T
U M
I N
O U
S
P A
V E
M E
T
H I C
K
SLOPE 1/4" per 1' SLOPE 1/4" per 1'
ROAD NOTES:
EXISTING GRADE
SEED AND MULCH
DISTURBED AREAS
EXISTING GRADE
SEED AND MULCH
DISTURBED AREAS
COMPACT PADOT #2A COARSE
AGGREGATE LAYER - 6" THICK,
CONFORMING TO PADOT
PUBLICATION 408
COMPACT SUPERPAVE HMA 25.0 MM
BASE COURSE - 4" THICK
COMPACT SUPERPAVE HMA 9.5 MM
WEARING COURSE, 1.5" THICK
PLACE PADOT PUBLICATION 408,
SECTION 460 - BITUMINOUS
TACK COAT
MILL AND REMOVE EXISTING
BITUMINOUS PAVEMENT TO A
DEPTH OF 4 1/2"
MILL OR EXCAVATE EXISTING
CRUSHED AGGREGATE/ SLAG TO
A DEPTH OF 7"
1. REMOVE EXISTING BITUMINOUS PAVEMENT AND CRUSHED AGGREGATE/ SLAG TO A FULL DEPTH OF 11.5".
2. RECONSTRUCT PAVEMENT ON THE TOTAL WIDTH OF ACCESS ROAD "A" STARTING AT STATION 4+81 AND ENDING AT STATION 6+00 AND THE TOTAL WIDTH OF ACCESS ROAD "R"
STARTING AT STATION 13+95 AND ENDING AT STATION 15+20, AS SHOWN ON THE ENLARGED PLAN ON SHEET C-401.
3. FOR ADDITIONAL INFORMATION, SEE "NEW PAVEMENT SPECIFICATION NOTES", ON THIS SHEET.
10'-0" 2'-0" 6'-0" 6'-0"
EXISTING CONCRETE
CURBS TO REMAIN
ROAD NOTES:
SLOPE 1/4" per 1'
EXISTING GRADE
SEED AND MULCH
DISTURBED AREAS
EXISTING GRADE
SEED AND MULCH
DISTURBED AREAS
COMPACT PADOT #2A COARSE
AGGREGATE LAYER - 6" THICK,
CONFORMING TO PADOT
PUBLICATION 408
COMPACT SUPERPAVE HMA 25.0 MM
BASE COURSE - 4" THICK
COMPACT SUPERPAVE HMA 9.5 MM
WEARING COURSE, 1.5" THICK
PLACE PADOT PUBLICATION 408,
SECTION 460 - BITUMINOUS
TACK COAT
MILL AND REMOVE EXISTING
BITUMINOUS PAVEMENT TO A
DEPTH OF 2 1/2"
MILL OR EXCAVATE EXISTING
CRUSHED AGGREGATE/ SLAG TO
A DEPTH OF 9"
E X
I S
T I N
G
C
R U
S H
E D
A G
G R
E G
A T
E
S
L
T H
I C
K
E X
I S
T I N
G
B
I T
U M
I N
O U
S
P A
V E
M E
T
H I C
K
SLOPE 1/4" per 1'
COMPACT PADOT #2A COARSE
AGGREGATE LAYER - 6" THICK,
CONFORMING TO PADOT
PUBLICATION 408
COMPACT SUPERPAVE HMA 25.0 MM
BASE COURSE - 4" THICK
COMPACT SUPERPAVE HMA 9.5 MM
WEARING COURSE, 1.5" THICK
PLACE PADOT PUBLICATION 408,
SECTION 460 - BITUMINOUS
TACK COAT
E X
I S
T I N
G
C
R U
S H
E D
A G
G R
E G
A T
E
S
L
T H
I C
K
E X
I S
T I N
G
B
I T
U M
I N
O U
S
P A
V E
M E
T
H I C
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
S
S
T E
P H
E N
S O
N
C
M
A R
T I N
M
R
O T
H E
R
S H
E E
T
O
F
T Y
P I C
A L
D
E T
A I L S
M A
C
E S
S
R
O A
D
A
A
A
D
R
C-302
C U
S E
R S
H
E
C N
S E
S D
E S
K T
O P
S
H E
N A
N G
O D
E S
I G
N S
S
H E
E T
S C
D
W G
P
M
A E
C B
W
S
T B
H E
C N
S E
S
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
P I T
T S
B U
R G
H
D
I S
T R
I C
T
L I B
E R
E
N U
E
P I T
T S
B U
R G
H
P
A
M
F I
M
E
A N
S I
D
W W
N B
B E
A V
V
S
I N
S H
E N
A N
V
K E
R E
C R
E A
T I O
N
A
R E
A
P
A V
I N
G
R
E H
A B
I L I T
A T
I O
N
C E
R T
I F
I E
D
F
I N
A L
D
O C
U M
E N
T S
A1
SCALE: NTS
TYPICAL SECTION - ACCESS ROAD "A" REPAVING STATIONS 6+00 TO 34+10
1. FOR GENERAL PROJECT ABBREVIATIONS AND PROJECT GENERAL NOTES,
SEE SHEET G-003 AND G-004.
GENERAL SHEET NOTES
H1
SCALE: NTS
TYPICAL SECTION - AWARDABLE OPTION 1 - ACCESS ROAD "A" REPAVING STATIONS 4+81 TO 6+00
1. VERTICAL SAWCUT ALONG EXISTING BITUMINOUS PAVEMENTS TO CREATE
UNIFORM EDGE TO BOND EXISTING BITUMINOUS PAVEMENT TO NEWLY
PLACED BITUMINOUS PAVEMENT.
2. CLEAN ALL VERTICAL BITUMINOUS PAVEMENT EDGES AND PAINT WITH PG
64-22 BINDER.
3. BASE COURSE SHALL BE SWEPT CLEAN PRIOR TO APPLYING THE TACK COAT
AND WEARING COURSE.
4. ALL EXPOSED JOINTS WHERE NEW BITUMINOUS PAVEMENT IS IN CONTACT
WITH EXISTING BITUMINOUS PAVEMENT SHALL BE NEATLY SEALED WITH AN
ASPHALT SEALANT 6" WIDE AND CENTERED ON THE SEAM.
NEW PAVEMENT SPECIFICATION NOTES
J
R
U S
N A
AND ACCESS ROAD "R" STATIONS 13+95 TO 15+20
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
S
S
T E
P H
E N
S O
N
C
M
A R
T I N
M
R
O T
H E
R
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
O L
N
O T
E S
B M
P
I N
S T
A L L A
T I O
N
M
A I N
T E
N A
N C
E
A
N
E R
A L
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
O L
P
L A
N
X-002
C U
S E
R S
H
E
C N
S E
S D
E S
K T
O P
S
H E
N A
N G
O D
E S
I G
N S
S
H E
E T
S X
D
W G
P
M
A E
C B
W
S
T B
H E
C N
S E
S
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
P I T
T S
B U
R G
H
D
I S
T R
I C
T
L I B
E R
E
N U
E
P I T
T S
B U
R G
H
P
A
M
F I
M
E
A N
S I
D
W W
N B
B E
A V
V
S
I N
S H
E N
A N
V
K E
R E
C R
E A
T I O
N
A
R E
A
P
A V
I N
G
R
E H
A B
I L I T
A T
I O
N
C E
R T
I F
I E
D
F
I N
A L
D
O C
U M
E N
T S
GENERAL SHEET NOTES
1. FOR GENERAL PROJECT ABBREVIATIONS AND PROJECT GENERAL NOTES,
SEE SHEET G-003 AND G-004.
SPECIES: ANNUAL RYEGRASS
%PURE LIVE SEED: 10%
APPLICATION RATE: 40 LBS / ACRE
FERTILIZER TYPE: 10-10-10
FERTILIZER APPLICATION RATE: 500 LBS / ACRE
LIMING RATE: 1 TON / ACRE
MULCH TYPE: STRAW
MULCHING RATE: 2 TONS / ACRE
TEMPORARY CONTROL MEASURES - VEGETATION
PERMANENT CONTROL MEASURES - VEGETATION
A. AFTER ALL BMP'S HAVE BEEN REMOVED FROM THE WORK AREA, THE GROUND SURFACE WITHIN THE WORK
AREA SHALL BE RETURNED TO PRE-CONSTRUCTION CONDITIONS.
B. IF THE WORK AREA PRE-CONSTRUCTION CONDITION WAS VEGETATED, THE AREA SHALL BE RE-VEGETATED
AS FOLLOWS:
SPECIES: PADOT 408, SECTION 804.2, FORMULA B
APPLICATION RATE: 2 LBS / 1000 SQ FT
FERTILIZER TYPE: 10-20-20
FERTILIZER APPLICATION RATE: 2 TONS / ACRE
LIMING RATE: 1 TON / ACRE
MULCH TYPE: STRAW
MULCHING RATE: 2 TONS / ACRE
NOTE: SOIL AMENDMENTS AND SEED MIX IN ACCORDANCE WITH THE "EROSION CONTROL AND CONSERVATION
PLANTINGS ON NONCROPLAND MANUAL" BY THE COLLEGE OF AGRICULTURAL SCIENCES, PENN STATE
UNIVERSITY.
C. AREAS DISTURBED DURING CONSTRUCTION ACTIVITIES SHALL BE PERMANENTLY SEEDED, FERTILIZED, LIMED AND MULCHED.
A. THE CONTRACTOR IS RESPONSIBLE FOR ENVIRONMENTAL INVESTIGATIONS FOR ANY OFF-SITE FILL MATERIAL.
ALL OFF-SITE FILL MUST MEET PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION (PADEP)
CLEAN FILL STANDARDS.
B. ALL OFF-SITE BORROW AND/OR WASTE AREAS REQUIRE PRIOR APPROVAL FROM THE MERCER COUNTY
CONSERVATION DISTRICT/PADEP. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING THOSE APPROVALS.
A. EACH BMP SHALL BE INSPECTED AT THE BEGINNING OF EACH WORK DAY BETWEEN 0730 AND 0830, AND AFTER
EACH RUNOFF AND HIGH-WATER EVENT.
B. THE CONSTRUCTION CONTRACTOR QUALITY CONTROL REPRESENTATIVE SHALL CONDUCT THE INSPECTIONS
AND NOTE THE FINDINGS IN THE DAILY CONSTRUCTION LOG. ANY DEFICIENCIES OBSERVED OR MAINTENANCE
REQUIRED WILL BE NOTED AND THE CONSTRUCTION CONTRACTOR SUPERINTENDENT SHALL BE INFORMED.
C. THE CONSTRUCTION CONTRACTOR SUPERINTENDENT WILL BE RESPONSIBLE FOR THE REPAIR AND
MAINTENANCE OF THE BMP'S.
D. REPAIR AND MAINTENANCE OF THE BMP SHALL BE PERFORMED THE SAME DAY OR PRIOR TO START OF WORK
THE FOLLOWING DAY.
A. STOCKPILE RCE STONE NEAR FOR DAILY REPAIR REQUIREMENTS. MAINTAIN 8" (INCH) THICKNESS OF AASHTO
#1 THROUGHOUT CONSTRUCTION.
B. INSPECT RCE DAILY. REMOVE ACCUMULATED SEDIMENTS DAILY.
C. REPLACE ALL ROCK WHEN SURFACE BECOMES CLOGGED WITH SOIL AND THE ABILITY TO TRAP MATERIAL HAS
BEEN LOST.
A. CFS SHALL BE INSTALLED PARALLEL TO CONTOURS (SEE PLAN DRAWINGS) WITH ENDS TURNED UP AT 45°
ANGLES.
B. REMOVE STICKS, ROCKS, HEAVY VEGETATION AND OTHER MATERIAL FROM ANY AREA WHERE CFS IS TO BE
INSTALLED.
C. REMOVE ANY MANUFACTURER'S PROTECTIVE COATING FROM CFS AND DISPOSE OF PROPERLY.
D. ROLL OUT COMPLETE CFS ALONG GROUND, OR ROLL OUT AND FILL CFS IN-PLACE WITH COMPOST.
E. PLACE STAKES IN THE CENTER OF THE CFS AND SECURE TO THE GROUND. STAKE TYPE, SIZE, SPACING AND
DEPTH REQUIREMENTS SPECIFIED BY CFS MANUFACTURER SHALL BE MET.
F. SEDIMENT CAPTURED BY THE CFS SHALL BE REMOVED WHEN SEDIMENT HEIGHT REACHES 1/2 THE HEIGHT OF
THE CFS.
G. CONSTRUCTION EQUIPMENT SHALL NOT BE DRIVEN OVER ANY INSTALLED CFS.
H. BIODEGRADABLE CFS SHALL BE REPLACED EVERY 6 MONTHS; PHOTODEGRADABLE CFS SHALL BE REPLACED
EVERY 12 MONTHS.
I. UPON STABILIZATION OF DISTURBED AREA ABOVE INSTALLED CFS, THE STAKES SHALL BE REMOVED, THE CFS
CUT OPEN, AND THE MULCH (COMPOST) SPREAD OVER THE SURROUNDING GROUND SURFACE. CFS MESH
AND STAKES SHALL BE REMOVED FROM THE AREA AND DISPOSED OF PROPERLY.
1. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA
PREVIOUSLY UNMARKED, THE CONTRACTOR SHALL NOTIFY THE PENNSYLVANIA ONE CALL SYSTEM AT
1-800-272-1776 FOR THE LOCATION OF ALL EXISTING UNDERGROUND UTILITIES.
2. THE CONTRACTOR SHALL FOLLOW THE RECOMMENDED SEQUENCE OF CONSTRUCTION, OR PROPOSE AN
ALTERNATE AND EQUALLY EFFECTIVE SEQUENCE.
A. SEDIMENT REMOVED FROM THE ROCK CONSTRUCTION ENTRANCE, FROM ALONG THE CFS, AND ANY
SEDIMENT WITHIN THE PUMPED WATER FILTER BAGS (PUMPED WATER FILTER BAGS THEMSELVES SHALL
BE TREATED AS NON-BIODEGRADABLE CONSTRUCTION WASTE), TREE LIMBS, BRUSH AND OTHER ORGANIC
MATERIAL SHALL BE DISPOSED OF ON-SITE IN THE DESIGNATED LOCATION CALLED OUT ON SHEET G-105.
A. ROCK CONSTRUCTION ENTRANCE (RCE): AN ADEQUATE SUPPLY OF AASHTO #1 STONE SHALL BE STOCKPILED
ON-SITE. THE THICKNESS OF THE RCE (8 INCHES) SHALL BE MAINTAINED AT ALL TIMES. ANY SEDIMENT
MATERIAL TRACKED OUT ON TO PAVED ROADWAYS SHALL BE REMOVED AND RETURNED TO THE
CONSTRUCTION SITE. WASHING THE ROADWAY OR SWEEPING THE DEPOSITS INTO ROADWAY DITCHES, SEWERS, CULVERTS, OR OTHER DRAINAGE COURSES IS NOT ACCEPTABLE.
B. COMPOST FILTER SOCK (CFS): SEDIMENT WILL BE REMOVED AND PROPERLY DISPOSED OF WHEN THE
ACCUMULATED HEIGHT BEHIND THE CFS REACHES ONE-HALF THE HEIGHT OF THE CFS. UNDERCUT
SECTIONS OF THE CFS WILL BE FILLED WITH NSA R-3 STONE. DAMAGED SECTIONS OF THE CFS WILL REMAIN
IN PLACE AND A NEW SECTION OF CFS SHALL BE PLACED DIRECTLY UPSLOPE OF THE DAMAGED SECTION OF
CFS. THE REPAIR CFS SECTION SHALL EXTEND A MINIMUM OF 4 FEET BEYOND EACH END OF THE DAMAGED
SECTION OF CFS. ANY LOOSE OR BROKEN STAKES SHALL BE SECURED OR REPLACED.
C. AREAS TO RECEIVE VEGETATION SHALL BE MAINTAINED BY RE-SEEDING, MULCHING, FERTILIZING AND
WATERING AS NEEDED.
D. SEED AND MULCH STOCKPILE AREA CONSISTING OF SOIL, ROCK, AND INCIDENTAL DEBRIS ONCE THAT
STOCKPILE AREA IS NO LONGER IN USE.
A. STOCKPILE EXCAVATED MATERIAL FROM CONSTRUCTION AND DEMOLITION OF THE VARIOUS WORK AREAS IN
THE DESIGNATED LOCATIONS CALLED OUT ON SHEET G-101.
B. CONTRACTOR PERSONNEL FOOD, PAPER PRODUCTS AND BOTTLES WILL BE PLACED INTO SEPARATE
GARBAGE CANS (PLASTIC AND GLASS BOTTLES FOR RECYCLING) AND SHALL BE DISPOSED OF OFF- SITE AT A
COMMERCIALLY AVAILABLE AND PROPERLY PERMITTED DISPOSAL FACILITY.
C. NON-BIODEGRADABLE CONSTRUCTION WASTES, SUCH AS GEOTEXTILE, PVC PIPE, ETC., SHALL BE DISPOSED
OF OFF-SITE AS STATED ABOVE.
1. INSTALL COMPOST FILTER SOCK DOWNSLOPE OF THE DESIGNATED STOCKPILING LOCATIONS CALLED OUT
ON SHEET G-101.
2. INSTALL ROCK CONSTRUCTION ENTRANCE PER DETAIL D2 ON SHEET X-501 STARTING AS CALLED OUT ON
G-101.
1. REMOVE ROCK CONSTRUCTION ENTRANCE FROM CONTRACTOR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .