This solicitation document outlines requirements for a road paving project at Shenango River Lake Recreation Area in Mercer County, Pennsylvania. The U.S. Army Corps of Engineers, Pittsburgh District is seeking bids to pave approximately 3,000 linear feet of park access roads and two optional additional areas totaling 1,400 linear feet. Work will be completed according to PennDOT specifications and include full depth base replacement, asphalt overlay, and other miscellaneous tasks. The estimated cost is between $500,000 and $1,000,000. This will be a 100% small business set-aside contract awarded as a firm-fixed-price for a one-year period. The IFB is expected to publish on May 1, 2020 via SAM.gov. Interested parties must register in SAM prior to bid submission. A training presentation is provided to familiarize new contractors with the Pittsburgh District bidding process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81ET400853710

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SHENANGO RECREATION AREA PAVING, SHENANGO RIVER LAKE, HERMITAGE, MERCER COUNTY, PENNSYLVANIA

The purpose of this Amendment is to:

1. Extend Bid Opening date to 25 June 2020 @ 11:00 a.m. via electronic Bid Opening procedures.

2. Answ er question arising from the Solicitation and/or Site Visit.

3. Update Wage Determination to PA2020002 06/05/2020.

1. CONTRACT ID CODE PAGE OF PAGES

1 21

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Jun-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911WN20B8004

X 9B. DATED (SEE ITEM 11)

19-May-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Jun-2020

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CELRP-CT

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2203

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911WN20B8004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 18-Jun-2020 11:00 AM to 25-Jun-2020 11:00 AM.

The following have been added by full text:

QUESTIONS AND ANSWERS

W911WN20B8004 Shenango Recreation Access Road Paving

Questions and Answers

Q1. Will the contractor be responsible to re-establish horizontal and vertical control to a planned finished grade?

A1. Yes, contractor will be responsible to re-establish horizontal and vertical control. Refer to Specification Section 32 11 23-AGGREGATE BASE COURSE, paragraph 3.4 Grade Control and Specification Section 32 12 16.00 08 BITUMINOUS PAVEMENT CONSTRUCTION, paragraph 3.5.6.1 Grade Control.

Q2. Contract has 365 days scheduled but does not state any dates of restrictions to do the work. Is it assumed the campgrounds will be open in the work areas? If so this may be impossible to keep safe conditions for ingress and degrees in these areas unless the project is phased with campground and roadway closures.

A2. The restrictions are defined in Specification Section 01 35 00.00 08 SPECIAL PROCEDURES. Specifically paragraph 1.7 Holidays addresses no work on federal holidays, paragraph 1.12.2 Contractor Work Hours addresses work hours and paragraph 1.6 Work Area Restrictions addresses the seasonal restrictions and location restrictions when the recreation area is used by the public.

Q3. Drawing G-101 shows work in 6 intersections off of road A. Does roadwork continue in these side roads? If so could you approximate the distance?

A3. Sheet ID G-101 shows the contractor work limits. Contractor is restricted to work within these limits. The side roads/loops areas outlined along Access Road “A” from station 6+00 to 34+10 are to provide contractor turnaround areas within the contractor work limits. No roadwork is to occur in these side roads/ loops.

Q4. What item is the island excavation paid under?

A4. Sheet ID C-401, states the existing concrete curb “To be removed (by others). The material within the island will be removed by others down to the depth for placement of new coarse aggregate. Refer to sheet ID-301, Typical Section A11 for placement requirements.

Q5. Is line painting included in contract?

A5. No, line painting is not required under this contract.

Q6. Are we responsible to remove the milling and the excavated sub-base for the stock areas after the contract is completed?

A6. Milling and the excavated sub-base to remain within Route 18 Access Area, as shown on Sheet ID G-101. In addition to the stock areas shown on Sheet ID G-101, note 2 under Sheet Keynotes, outlines how the material is to be placed along Route 18 Access Road Area.

Q7. Is compaction or material testing required from a 3rd party or can contractor provide NECEPT certified technicians?

A7. Materials testing, such as aggregate base courses, and bituminous materials, are to be supplied from approved sources listed in Pennsylvania Department of Transportation Construction Bulletin 14, Publication 34, and Construction Bulletin 41, Publication 15. Refer to Specification Section 32 11 23 AGGREGATE BASE

COURSES, paragraph 1.7.2.1 Production Testing for aggregate base course testing, and paragraph 3.6 Compaction for aggregate base course testing requirements. Refer to Specification Section 32 12 16.00 08 BITUMINOUS PAVEMENT CONSTRUCTION, paragraph 2.1.1 Bituminous Hot Mix for material testing, and paragraph 1.7 Applicable Provisions for placement and compaction requirements.

Q8. Is there any provisions to handle unstable subgrade?

A8. The Government does not anticipate any unstable subgrade material. However, if any unstable subgrade material were to be encountered this would be addressed in accordance with FAR 52.236-2 Differing Site Conditions.

Q9. Is the contractor responsible to restore the edge of payment with topsoil, seed and mulch or use granular waste material for the milling phase?

A9. Typical Sections on Sheet IDs C-405, C-301, and C-302 depict the contractor is responsible to restore the edge of pavement with seed and mulch of disturbed areas. Refer to Specification Section 32 92 19 SEEDING and Sheet ID X-002 for requirements of topsoil, seed and mulch.

Q10. Would it be possible to provide a detail tabulation of how the quantities were determined?

A10. No, detailed tabulation of how the quantities were determined will not be provided. Quantities were determined based off of field measurements and measurements taken off plans. Refer to Specification Section 01 22

00.00 08 Price and Payment Procedures for how CLINS will be paid.

Q11. In the bid documents it states the facility shall remain open during the entire project and that a traffic control plan is required. During the virtual meeting I believe it was stated the facility would be shut down in September and reopen in May which will be our window of opportunity to complete the project. Please confirm which it is?

A11. The restrictions are defined in Specification Section 01 35 00.00 08 SPECIAL PROCEDURES. Specifically paragraph 1.7 Holidays, addresses no work on federal holidays, paragraph 1.12.2 Contractor Work Hours, addresses work hours, paragraph 1.8 Protection and Maintenance of Road Traffic, addresses traffic control requirements, and paragraph 1.6 Work Area Restrictions, addresses the seasonal restrictions and location restrictions when the recreation area is used by the public.

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been added by full text:

WAGE DETERMINATION

"General Decision Number: PA20200002 06/05/2020

Superseded General Decision Number: PA20190002

State: Pennsylvania

Construction Types: Heavy and Highway

Counties: Allegheny, Armstrong, Beaver, Bedford, Blair, Butler, Cambria, Cameron, Centre, Clarion, Clearfield, Clinton, Crawford, Elk, Erie, Fayette, Forest, Franklin, Fulton, Greene, Huntingdon, Indiana, Jefferson, Lawrence, McKean, Mercer, Mifflin, Potter, Somerset, Venango, Warren, Washington and Westmoreland Counties in Pennsylvania.

HEAVY AND HIGHWAY CONSTRUCTION PROJECTS (excluding sewer grouting projects and excluding sewage and water treatment plant projects)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 01/24/2020 2 01/31/2020 3 02/07/2020 4 02/14/2020 5 02/28/2020 6 03/13/2020 7 04/10/2020 8 06/05/2020

BOIL0013-005 03/01/2018

CENTRE, FRANKLIN, POTTER, CLINTON, FULTON, HUNTINDON AND

MIFFLIN COUNTIES

Rates Fringes

BOILERMAKER......................$ 45.89 33.39

BOIL0154-004 01/01/2017

ALLEGHENY, ARMSTRONG, BEAVER, BEDFORD, BLAIR, BUTLER, CAMBRIA,

CAMERON, CLARION, CLEARFIELD, CRAWFORD, ELK, FAYETTE, FOREST,

GREENE, INDIANA, JEFFERSON, LAWRENCE, MCKEAN, MERCER, SOMERSET,

VENANGO, WARREN, WASHINGTON AND WESTMORELAND COUNTIES

BOILERMAKER......................$ 40.90 27.27

BOIL0744-003 07/01/2008

ERIE COUNTY

Rates Fringes

BOILERMAKER......................$ 35.34 18.48

BRPA0005-033 05/01/2018

MIFFLIN COUNTY

Bricklayer, Stonemason...........$ 31.36 17.73

BRPA0005-046 05/01/2016

FRANKLIN COUNTY

Rates Fringes

Bricklayer, Stonemason...........$ 32.21 14.18

BRPA0005-071 05/01/2018

CLINTON COUNTY

Rates Fringes

BRICKLAYER.......................$ 33.16 16.31

BRPA0009-004 12/01/2018

BEDFORD, BLAIR,CAMBRIA, CENTRE COUNTY (Halfmoon, Houston, Patton, Rush,Taylor and Worth Townships),FULTON, HUNTINGDON, and SOMERSET COUNTIES

Bricklayer, Stonemason & Marble Setter....................$ 29.46 19.58

BRPA0009-006 12/01/2018

CLEARFIELD, FOREST, JEFFERSON, VENANGO, AND CLARION (Except Brady, Madison, Perry, Porter, Redbank, and Toby Townships)

COUNTIES

Bricklayer, Stonemason...........$ 29.90 19.91 Marble mason.....................$ 29.90 19.91

BRPA0009-023 06/01/2018

BEAVER COUNTY

Rates Fringes

BRICKLAYER.......................$ 30.16 21.41

BRPA0009-025 06/01/2019

BUTLER, LAWRENCE, AND MERCER COUNTIES

Rates Fringes

BRICKLAYER.......................$ 30.51 21.94

BRPA0009-032 06/01/2017

FAYETTE (Jefferson & Washington Twps), GREENE (Except Cumberland, Dunkirk, Greene, Monongahelia Twps), INDIANA, AND WESTMORELAND (Rostraver Twp) COUNTIES

BRICKLAYER.......................$ 31.00 20.66

BRPA0009-033 06/01/2019

ARMSTRONG, CLARION (Brady, Madison, Perry, Tobe, Porter, Redbank Twps), FAYETTE (Except Jefferson & Washington Twps), GREENE (Cumberland, Dunkirk, Greene, Monongahelia Twps), INDIANA, AND WESTMORELAND (Except Rostrave Twp) COUNTIES

BRICKLAYER.......................$ 32.35 22.26

BRPA0009-034 11/01/2019

ERIE COUNTY

Rates Fringes

BRICKLAYER.......................$ 28.64 21.86

BRPA0009-058 12/01/2017

ALLEGHENY, WASHINGTON (Cross Creek, Hanover, Jefferson, Mt Pleasant, Nottingham, Peters, Robinson, Smith, Union Twps)

BRICKLAYER.......................$ 31.69 21.27

BRPA0009-059 06/01/2019

CAMERON, ELK, McKEAN, POTTER AND WARREN COUNTIES

Rates Fringes

BRICKLAYER.......................$ 27.86 20.17

* CARP0443-004 06/01/2020

Rates Fringes

MILLWRIGHT.......................$ 41.68 19.97

CARP2235-005 01/01/2019

Rates Fringes

PILEDRIVERMAN

Piledriverman (welder)......$ 35.25 19.30 Piledriverman...............$ 34.30 19.30

CARP2235-006 01/01/2019

Rates Fringes

Diver............................$ 51.45 19.30 Tender...........................$ 34.30 19.30

CARP2274-001 01/01/2020

Rates Fringes

CARPENTER (ALLEGHENY,

ARMSTRONG, BEAVER, BUTLER,

ERIE, FAYETTE, GREENE,

LAWRENCE, MERCER, WASHINGTON,

AND WESTMORELAND COUNTIES)

Carpenters (Welders)........$ 35.97 18.92 Carpenters..................$ 35.02 18.92

CARPENTER (BEDFORD, BLAIR,

CAMBRIA, CAMERON, CENTRE,

CLARION, CLINTON, CLEARFIELD,

CRAWFORD, ELK, FOREST,

FRANKLIN, FULTON, HUNTINGDON,

INDIANA, JEFFERSON, MCKEAN,

MIFFLIN, POTTER, SOMERSET,

VENANGO, AND WARREN COUNTIES)

Carpenters (Welders)........$ 35.72 18.92 Carpenters..................$ 34.77 18.92

ELEC0005-006 12/22/2019

ALLEGHENY, ARMSTRONG, BEDFORD, BLAIR, BUTLER CAMBRIA, CAMERON,

CENTRE (Remainder), CLARION, CLEARFIELD, ELK, FAYETTE, FULTON, GREENE, HUNTINGDON, INDIANA, JEFFERSON, MCKEAN, SOMERSET, VENANGO, WASHINGTON, AND WESTMORELAND COUNTIES

ELECTRICIAN......................$ 42.61 27.19

* ELEC0056-004 06/01/2020

ERIE, FOREST AND WARREN COUNTIES

Rates Fringes

ELECTRICIAN......................$ 35.29 23.30

ELEC0126-005 05/24/2019

ALLEGHENY, ARMSTRONG, BEAVER, BEDFORD, BLAIR, CAMBRIA, CENTRE,

CLARION, CLEARFIELD, FAYETTE, FULTON, GREENE, HUNTINGDON,

INDIANA, JEFFERSON, SOMERSET, WASHINGTON AND WESTMORELAND

Line Construction:

Cable Splicer...............$ 47.38 30.25%+11.50 Groundman...................$ 28.43 30.25%+11.50 Lineman.....................$ 47.38 30.25%+11.50 Truck Driver................$ 30.80 30.25%+11.50 Winch Truck Operator........$ 33.17 30.25%+11.50

ELEC0126-007 05/28/2018

FRANKLIN AND MIFFLIN COUNTIES

Rates Fringes

Line Construction:

Cable Splicer...............$ 45.25 29.25%+11.25 Groundman...................$ 27.15 29.25%+11.25 Lineman.....................$ 45.25 29.25%+11.25 Truck Driver................$ 29.41 29.25%+11.25 Winch Truck Operator........$ 31.68 29.25%+11.25

* ELEC0143-007 06/01/2020

FRANKLIN and MIFFLIN COUNTIES

ELECTRICIAN......................$ 32.50 24.90

ELEC0712-003 12/30/2019

CRAWFORD, BEAVER, LAWRENCE AND MERCER COUNTIES

Rates Fringes

ELECTRICIAN......................$ 40.55 24.96

ELEC0812-008 06/01/2019

CLINTON COUNTY

Rates Fringes

ELECTRICIAN......................$ 34.73 20.24

ELEC0812-009 06/01/2019

POTTER COUNTY

Rates Fringes

ELECTRICIAN......................$ 35.74 20.27

ELEC0812-011 06/01/2019

CENTRE COUNTY (Burnside, Curtin, Liberty, Howard, Marion, Walker, Miles, Haines Townships)

ELECTRICIAN......................$ 34.73 20.24

ELEC1319-004 01/01/2020

BUTLER, CAMERON, CLINTON, CRAWFORD, ELK, ERIE, FOREST,

LAWRENCE, MCKEAN, MERCER, VENANGO, WARREN AND POTTER COUNTIES

Line Construction:

Equipment Operator..........$ 57.49 20.91 Groundmen...................$ 35.64 12.34 Linemen.....................$ 57.49 24.41 Truck Driver................$ 37.37 12.46

ENGI0066-016 01/01/2020

Rates Fringes

Power equipment operators:

(ALLEGHENY, ARMSTRONG,

BEAVER, BLAIR, BUTLER,

CAMBRIA, CENTRE, CLARION,

CLEARFIELD, CRAWFORD, ERIE,

ELK, FAYETTE, GREENE,

INDIANA, JEFFERSON, LAWRENCE,

MCKEAN, MERCER, SOMERSET,

VENANGO, WARREN, WASHINGTON,

AND WESTMORELAND COUNTIES)

GROUP 1.....................$ 32.89 22.23

GROUP 1-A...................$ 35.89 22.23

GROUP 1-B...................$ 34.89 22.23

GROUP 2.....................$ 32.63 22.23

GROUP 3.....................$ 28.98 22.23

GROUP 4.....................$ 28.52 22.23

GROUP 5.....................$ 28.27 22.23

Power equipment operators:

(BEDFORD, CAMERON, CLINTON,

FOREST, FRANKLIN, FULTON,

HUNTINGDON, MIFFLIN, AND

POTTER COUNTIES)

GROUP 1.....................$ 32.60 22.23

GROUP 1-A...................$ 35.60 22.23

GROUP 1-B...................$ 34.60 22.23

GROUP 2.....................$ 32.32 22.23

GROUP 3.....................$ 28.68 22.23

GROUP 4.....................$ 28.19 22.23

GROUP 5.....................$ 27.98 22.23

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1 - Asphalt Paving Machine (Spreader), Autograde (C.M.I. and similar); Backfiller, Compactor with Blade, Backhoe - 360 and 180 degree Swing; Cableway; Caisson Drill (similar to Hugh Williams), Central Mix Plant; Cooling Plant; Concrete Paving Mixer, Concrete Pump (self-propelled); Cranes; Cranes (boom or mast over 101ft.$.50 per each additional 50 feet inclusive of jib), Cranes (Tower Stationary- Climbing Tower Crane); Derrick; Derrick Boat; Dozer(greater than 25,000 lbs.); Dragline; Dredge;

Dredge Hydraulic; Elevating Grader; Franki Pile Machine;

Gradall (remote control or otherwise),Grader (power-fine grade); Hllift (4 cy. and over); Hoist 2 Drums or more (in one unit); Hydraulic Boom Truck with pivotal cab (single motor-Pitman or similar), (Boom and Mast over 101 feet will be paid an additional 50 feet inclusive of jib if used;)

Kocal; Mechanic, Locomotive (std. Gauge); Metro-chip Harvester or similar; Milling Machine (Roto Mill or similar); Mix Mobile; Mix Mobile (with Self Loading Attachment), Mucking Machine (tunnel); Pile Driver Machine;

Pipe Extrusion Machine; Prespliter Drill (self contained);

Refrigeration Plant (soil Stablization) Rough Terrain Crane (25 ton over) (Boom and Mast over 101 feet will be paid an additional 50 feet inclusive of jib if used); Rough Terrain Crane (under 25 ton), Scrapers; Shovel-Power; Slip form Paver (C.M.I. and similar); Trenching Machine (30,000 lbs.

and over), Trenching Machine (under 30,000 lb.), Tunnell Machine (Mark XXI Jarva or similar), Vermeer Saw, Whirley, Mechanic, Compactor with blade

GROUP 1-A Backhoes-360 degree swing (above 120,000 lbs. gross weight); Cranes (over 100 tons), Cranes-Rough Terrain (over 100 ton)

GROUP 1-B Backhoes-360 degree swing (above 70,000 lbs. to 120,000 lbs. gross weight); Cranes (up to 100 ton), Cranes-Rough Terrain (65 ton-100 ton), Tower Crane

GROUP 2: Asphalt plant operator; auger (tractor mtd.); auger (truck mtd.); belt loader (euclid or similar); boring machine; cable placer or layer; Directional drill over 3,000 lbs thrust; concrete batch plant (electronically synchronized); concrete belt placer (C.M.I. and similar);

concrete finishing machine and spreader, concrete mixer (over 1 cy.) concrete pump (stationary); core drill (truck or skid mtd. - similar to penn drill), dozer (25,000 lbs or less); Ditch Witch Saw, force feedloader; fork lift (lull or similar); grader - power; grease unit opertor (head);

guard rail post driver (truck mounted) guard rail post driver (skid type); hilift (under 4 cy.); skid steer loader; hydraulic boom truck (non-pivotal cab); job work boat (powered), jumbo operator; locomotive (narrow guage);

minor equipment operator (accumulative four units); mucking machine; multi-head saw (groover); overhead crane; roller -power- asphalt; ross carrier; side boom or tractor mounted boom; shuttle buggy (asphalt), stone crusher (screening-washing plants); stone spreader (self propelled) truck mounted drill (davey or similar); welder and repairman; well point pump operator; bidwell concrete finishing machine (or similar).

GROUP 3: Broom Finisher (C.M.I. or similar);

Compactors/Rollers (static or vibratory (Self-propelled) on dirt or stone; Curb Builder; Minor Equipment Opertor (two or three units); Multi-head Tie Tamper; Pavement Breaker (self-propelled or ridden); Soil Stablizer Machine; Tire Repairman; Tractor (snaking and hauling); Well Driller and Horizontal: Winch or ""A"" Frame Truck (when hoisting and lowering).

GROUP 4: Ballast Regulator; Compressor; Concrete Mixer (1

cy. & under with skip); Concrete Saw (Ridden or selp-propelled); Conveyor; Elevator (Material hauling only); Fork-lift (Ridden or self-propelled); Form Line Machine; Generator; Groute Pump; Heater (Machinical); Hoist (single Drum); Ladavator, Light Plant; Mulching Machine;

Personnel Boat (Powered), Pulverizer, Pumps, Seeding Machine, spray Cure Machine (powered Driven); Subgrader;

Tie Puller; Tugger; Welding Machine (Gas or Diesel).

GROUP 5: Deck Hand; Farm Tractor; Fireman on Boiler; Oiler;

Power Broom; Side Delivery Shoulder Spreader (attachment);

* IRON0003-001 06/01/2020

ALLEGHENY, FAYETTE, WESTMORELAND, CAMBRIA, INDIANA, ARMSTRONG,

BUTLER, BEAVER, CLARION, AND WASHINGTON COUNTIES

IRONWORKER.......................$ 37.29 32.40

* IRON0003-007 06/01/2020

BLAIR, CAMERON, CENTRE, CLEARFIELD, CLINTON, ELK, JEFFERSON,

MCKEAN, AND POTTER COUNTIES

IRONWORKER.......................$ 31.11 30.48

* IRON0003-011 06/01/2020

CRAWFORD, ERIE, FOREST, AND WARREN COUNTIES

Rates Fringes

IRONWORKER.......................$ 32.31 30.26

* IRON0207-002 06/01/2020

LAWRENCE, MERCER, AND VENANGO COUNTIES

Rates Fringes

IRONWORKER.......................$ 30.25 25.75

IRON0404-008 07/01/2019

FRANKLIN (Remainder), HUNTINGDON (Remainder), AND MIFFLIN

IRONWORKER, STRUCTURAL...........$ 32.76 29.88

IRON0549-002 12/01/2012

GREENE COUNTY

Rates Fringes

IRONWORKER.......................$ 30.45 16.04

IRON0568-004 05/01/2019

BEDFORD, FRANKLIN (Southwest 1/3), FULTON, HUNTINGDON (Western

2/3), AND SOMERSET COUNTIES

IRONWORKER

Structural, Ornamental, Reinforcing, Machinery Mover, Rigger & Machinery Erector, Welder, Fence Erector.....................$ 28.66 21.51

LABO1058-001 01/01/2020

Rates Fringes

LABORER (BEDFORD, CAMERON,

CENTRE, CLINTON, CRAWFORD,

FOREST, FRANKLIN, FULTON,

HUNTINGDON, JEFFERSON,

MIFFLIN, AND POTTER COUNTIES)

GROUP 1.....................$ 26.00 24.10

GROUP 2.....................$ 26.16 24.10

GROUP 3.....................$ 26.65 24.10

GROUP 4.....................$ 27.10 24.10

GROUP 5.....................$ 27.51 24.10

GROUP 6.....................$ 24.35 24.10

GROUP 7.....................$ 27.00 24.10

GROUP 8.....................$ 28.50 24.10

Laborers: (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CLARION, CLEARFIELD, ELK, ERIE, FAYETTE, GREENE, INDIANA, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON, AND WESTMORELAND

COUNTIES)

GROUP 1.....................$ 26.10 24.10

GROUP 2.....................$ 26.26 24.10

GROUP 3.....................$ 26.65 24.10

GROUP 4.....................$ 27.10 24.10

GROUP 5.....................$ 27.51 24.10

GROUP 6.....................$ 24.35 24.10

GROUP 7.....................$ 27.10 24.10

GROUP 8.....................$ 28.60 24.10

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt curb sealer; Asphalt tamper; Batcherman (weigh) Blaster,Boatman, Brakeman, Change house attendant, Coffer dam, Concrete curing pitman, Puddler, Drill Runner's helper (Includes Drill Mounted on Truck, Track, or similar and Davey Drill Spots, Clean up, helps to maintain), Electric Brush and or Grinder, Fence Construction (Including Fence Machine Operator) Form stripper and Mover, Gabion (Erectors and Placers) Hydro jet blaster nozzleman;

Landscape laborer, Manually moved emulusion sprayer, Radio actuated traffic control operator Rip rap work, scaffolds and Runways, Sheeters and Shorers (includes lagging) structural concrete Top Surfacer, Walk Behind Street Sweeper, and Wood Chipper; water boy

GROUP 2: Air tool operator (all types); Asphalt, batch & concrete plant operator (manually operated) Burner, Caisson; men (open air); Carryable pumps; Chain saw operator including attachments, Cribbing, (concrete or steel); Curb machine operator (asphalt or concrete walk behind); Diamond head Core Drller, Drill runner's helper (tunnel) Fork Lift, (walk behind), Form Setter (Road Forms Line man) Highway Slab reinforcement placers (including joint and Basket Setters) Hydraulic pipe pusher; Liner plates (Tile or Vitrified Clay) Mechanical compacting equipment operators, Mechanical joint sealer, Dope pot and Tar Kettle, Mortar mixer (hand or machine) Muckers, Brakemen & all other Labor, (Includes installation of utility lines) Pipe Layers /Fusion /Heating Iron (Regardless of materials) Portable Single Unit Conveyor, Post Hole Auger, (2 or 4 cycle hand operated) Power wheelbarrows and buggies, Rail porter or similar; Sand blaster;Signal Man,Vibrator operator, All RAILROAD TRACK WORK TO INCLUDE THE FOLLOWING: adzing machine, ballast Router, Bolting Machine, Power Jacks, Rail Drills, Railroad Brakeman,Rail Saws, Spike Drivers (Manually or hand held tool) Spike Pullers Tamping Machine, Thermitweld

GROUP 3: Asphalt Luteman/Raker,Blacksmith, Blaster, Brick, stone and block pavers and block cutters (wood, belgian and asphalt); Cement mortar lining car pusher; Cement mortar mixer (pipe relining); Cement mortar pipe reliners;

concrete saw operator (walk behind); Curb cutters and setters; Elevated roadway drainage construction; erector of overhead signs, Form setter (road forms-lead man); Grout machine operator; Gunite or dry pack gun (nozzle and machine man); Manhole or catch basin builder (Brick block concrete or any prefabrication) Miners and drillers (including lining, supporting and form workmen, setting of shields, miscellaneous equipment and jumbos); Multi-plate pipe (aligning and securing); Placing wire mesh on gunite projects; Wagon drill operators (air track or similar);

Walk behind ditching machine (trencher or similar);crown screed adjuster and welder

GROUP 4: Reinforcing Steel Placer (Bending, aligning, and securing, Cadweld)

GROUP 5:High Burner, (Any burning not done from deck), Welder (Pipeline)

GROUP 6: Uniformed Flagperson, Watchman

GROUP 7: Toxic/Hazardous Waste Removal Laborer Levels C & D

GROUP 8: Toxic/Hazardous Waste Removal Laborer Levels A & B

PAIN0021-019 05/01/2018

CLINTON COUNTY

Rates Fringes

Painters:

Bridge......................$ 36.67 18.80

Brush & Roller..............$ 27.67 18.80 Spray.......................$ 28.67 18.80

PAIN0021-024 05/01/2018

FRANKLIN COUNTY

Rates Fringes

PAINTER

Brush.......................$ 23.92 14.23

PAIN0057-014 06/01/2019

ALLEGHENY, FAYETTE, GREENE, WASHINGTON COUNTIES

Rates Fringes

Painters:

Bridge......................$ 35.25 19.82 Brush & Roller..............$ 28.50 19.82 Spray.......................$ 28.50 19.82

PAIN0057-015 06/01/2019

ARMSTRONG, BEAVER, BEDFORD, BLAIR, BUTLER,CAMBRIA, CENTRE,

CLARION, CLEARFIELD, ELK, FULTON, HUNTINGTON, INDIANA,

JEFFERSON, LAWRENCE, MERCER, MIFFLIN, SOMERSET, VENANGO AND

WESTMORELAND COUNTIES

Painters:

Bridge......................$ 35.25 19.82 Brush and Roller............$ 28.50 19.82 Spray.......................$ 28.50 19.82

PAIN0057-022 05/01/2019

Rates Fringes

Painters: (ERIE, McKEAN, AND WARREN (Including Columbus and Freehold twps) COUNTIES) Bridges,Stacks,Towers.......$ 25.37 18.71 Brush and Roller............$ 22.87 18.71 Spray and Sandblasting......$ 23.62 18.71

PAIN0057-027 06/01/2019

CAMERON, CRAWFORD, POTTER, WARREN, (Excluding Columbus and Freehold twps)

PAINTER

Brush and Roller............$ 25.11 19.14

PLAS0526-002 01/01/2020

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 32.84 21.10

PLUM0027-001 06/01/2019

ALLEGHENY, ARMSTRONG, GREENE (Except extreme Eastern portion), WASHINGTON (Except extreme Eastern portion) and WESTMORELAND

(City of Arnold and City of New Kensington Only) COUNTIES

Plumbers and Pipefitters (Bridge Drain Pipe)..............$ 42.30 22.47

PLUM0047-005 05/01/2013

BEAVER, BUTLER, MCKEAN, MERCER, VENANGO, CLARION, LAWRENCE,

FOREST, WARREN, CRAWFORD, AND ERIE COUNTIES

(Bridge Drain Pipe)..............$ 38.52 20.11

PLUM0354-005 06/01/2012

BEDFORD, BLAIR, CAMBRIA, CAMERON, CLEARFIELD, ELK, FAYETTE,

GREENE (Extreme Eastern portion), HUNTINGDON, INDIANA, JEFFERSON, SOMERSE, WASHINGTON (Extreme Eastern portion), AND

WESTMORELAND COUNTIES

(Bridge Drain Pipe)..............$ 35.54 19.97

TEAM0040-001 01/01/2019

Rates Fringes

TRUCK DRIVER (ALLEGHENY,

ARMSTRONG, BEAVER, BLAIR,

BUTLER, CAMBRIA, CENTRE,

CLARFIELD, CRAWFORD, ERIE,

FAYETTE, GREENE, INDIANA,

JEFFERSON, LAWRENCE, MCKEAN,

MERCER, SOMERSET, VENANGO,

WARREN, WASHINGTON, AND

WESTMORELAND)

GROUP 1.....................$ 28.99 19.43

GROUP 2.....................$ 29.13 19.51

GROUP 3.....................$ 29.59 19.82

Truck drivers: (BEDFORD, CAMERON, CLAIRON, CLINTON, ELK, FOREST, FRANKLIN, FULTON, HUNTINGDON, MIFFLIN, AND POTTER COUNTIES)

GROUP 1.....................$ 28.83 19.32

GROUP 2.....................$ 28.99 19.43

GROUP 3.....................$ 29.45 19.73

FOOTNOTES: A. Hazardous/toxic waste material/work level A & B receive additional $2.50 per hour above classification rate

B. Hazardous/toxic waste materials/Work level C & D receive $1.00 per hour above classification

TRUCK DRIVERS CLASSIFICATIONS

GROUP 1 - Single Axle (2 axles including steering axle);

Includes partsman and warehoueman

GROUP 2 - Tandem - Tri-Axle - Semi-Tractor Trailer

(combination) (3 axles or more including steering axle)

GROUP 3 - Specialty Vehicles; Heavy equipment whose capacity exceeds that for which state licenses are issued specifically refers to units in excess of eight (8) feet width (such as Euclids, Atley Wagon, Payloder, Tournawagons, and similar equipment when not self loaded);

Tar and Asphalt Distributors Trucks, Heavy Duty Trailer, such as Low Boy, High Boy

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

The following have been modified:

ADDENDUM TO SECTION 00 73 00

00 73 00 – 1 PAYMENT FOR PERFORMANCE AND PAYMENT BONDS

a. In order to ensure that sufficient funds have been set-aside for payment of performance and payment bond premiums, bidders shall insert in Price Schedule Item No. 0001, 1001 and 2001, an appropriate not-to-exceed dollar amount. Failure of bidders to insert a not-to-exceed dollar amount in Price Schedule Item No. 0001, 1001, and 2001 will cause the bid to be rejected as non-responsive.

b. The Contractor shall be reimbursed the actual bond costs only, as established by evidence of full payment to the surety, up to the dollar amount set forth in Price Schedule Item No. 0001, 1001, and 2001. In no case will the Contractor be reimbursed an amount which exceeds the dollar amount set forth in Price Schedule Item No.

0001, 1001, and 2001.

c. The Government will reimburse only the Prime Contractor for actual paid bond premiums. The Government will not reimburse any subcontractor's paid bond premiums.

00 73 00 – 2 REQUIRED INSURANCE

a. The Contractor shall procure and maintain during the entire performance period of this contract, the following minimum insurance. (See also Section CONTRACT CLAUSES, FAR 52.228-5 INSURANCE--WORK ON A

GOVERNMENT INSTALLATION (JAN 1997)

Type Bodily Injury Amount Property

Damage

Comprehensive General $500,000 Per Occurrence $100,000 Liability

Automobile Liability $200,000 Each Person -- $500,000 Per Occurrence $ 20,000

Workmen’s Compensation $100,000 and Employer’s Liability

b. The Contracting Officer will notify the Contractor of any noncompliance with the foregoing provisions. The Contractor shall, after receipt of such notice, immediately comply. Such notice, when delivered to the Contractor or his representative at the site or mailed to the Contractor's address, will be deemed sufficient for the purpose. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until the Contractor complies. No part of the time lost due to any such stop orders shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor. Compliance with the provisions of this article by subcontractors will be the responsibility of the Contractor

00 73 00 – 3 AWARDABLE OPTIONS

The Awardable Options will be as follows: Awardable Option Items (1001 thru 1008, 2001 thru 2004) will be awarded based on funding no later than 30 October 2020. If sufficient funding is available, Option 1 and/or Option 2 may be exercised at the time of award. The contract completion time will not be extended after the receipt of Notice to Proceed for Option 1 and 2. It will remain at 365 days. Awardable Option Items within each of these groupings will be awarded as a group. The Not-to-Exceed amount for Price Schedule Items (1001, 2001), should reflect bond costs for all awardable option items within each respective group. The Government may exercise these Awardable Option Items no later than the following dates:

Awardable Option 1, Items 1001 thru 1008 expires 30 October 2020 Awardable Option 2, Items 2001 thru 2004 expires 30 October 2020

The contract completion time will not be extended for of award of any of these optional items, and the optional item work shall be performed concurrently with the 365 day base contract work.

00 73 00 - 4 SAFETY AND HEALTH REQUIREMENTS MANUAL

A copy of the current US Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 and its changes are available at https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.

00 73 00 – 5 WORK PERFORMED BY CONTRACTOR

Within ten (10) days after award of the contract, the successful bidder will be required to furnish a description of the work which he intends to perform with his own organization, the percentage of the total work this represents, and the estimated cost thereof.

00 73 00 – 6 WORK UNDER OTHER CONTRACTS

Attention is directed to the fact that other Contractors may be employed by the Government or by local interests at or in the vicinity of the work covered by these specifications. All Contractors shall have equal rights to the use of all roads and grounds so far as practicable and this Contractor shall cooperate with other Contractors so that the work may be performed with the maximum efficiency. Should a disagreement occur between Contractors as to the use of facilities or in other matters, the decision of the Contracting Officer shall govern. (See also FAR 52.236-8 OTHER

CONTRACTS).

00 73 00 – 7 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

a. This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the clause entitled "Default (Fixed-Price Construction)". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied.

(1) The weather experienced at the project site during the contract period must be found to be unusually severe; that is, more severe than the adverse weather anticipated for the project location during any given month.

(2) The unusually severe weather must actually cause a delay to the completion of the project. This delay must be beyond the control and without the fault or negligence of the Contractor.

b. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY

WORK DAYS BASED ON (5) DAY WORK WEEK

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

11 8 6 5 6 5 5 4 4 4 5 8

c. Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more on the Contractor's scheduled work day. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph b. above, the Contracting Officer will convert any qualifying delays to work days, giving full consideration for equivalent fair weatherwork days, and issue a modification in accordance with the clause entitled, "Default (Fixed-Price Construction)".

d. The anticipated adverse weather work days listed above are based on days with precipitation greater than 0.1 inch and/or maximum temperature below 32 degrees F. The numbers shown represent the number of work days (not calendar days) normally expected to have these particular weather conditions based on historical data. The actual number of days will vary. This information is furnished for computation of possible time extensions due to weather delays and is not intended to imply that no work can be done on these days. The Contractor shall make his own determination of the effect of these conditions on his operations under this contract, and schedule his work accordingly.

00 73 00 – 8 CONTRACTOR QUALITY CONTROL

Section 01 45 00.00 08, QUALITY CONTROL, of this specification requires that the Contractor's Quality Control System Manager or person responsible for Contractor Quality Control complete the Corps of Engineers' "Construction Quality Management for Contractors" course not later than 90 days after receipt of the Notice to Proceed. The course consists of approximately 12 hours of classroom instruction and is offered periodically by the Pittsburgh District. For additional information on scheduling and location of the training, contact U.S. Army Engineer District, Pittsburgh, Theresa BonAnno, U.S. Army Engineer District, Pittsburgh, Upper Ohio Area Office, 3510 Grand Ave., Pittsburgh, Pennsylvania 15225, telephone (412) 395-7677. Certification of course completion is valid for 5 years. Completion of training offered by other Corps of Engineers Districts will be acceptable provided a valid certification is presented.

00 73 00 – 9 COPYING, DISSEMINATION OR DISTRIBUTION OF INFORMATION.

Those who disseminate information contained on this CD or in the solicitations and/or drawings must ensure that the recipients have a legitimate need for the information and maintain a record of each recipient. Legitimate need means recognized business entities seeking to do business, or having business, with the Government as prime contractors, subcontractors or suppliers. You shall maintain a record of the following information on each recipient:

Business name and address, Entity Identifier Number and IRS Tax ID Number, and name and telephone number of person receiving the information.

00 73 00 – 10 SUBMISSION OF CONTRACT DOCUMENTATION

Provide contract documentation in an electronic format to the greatest extent practicable. Contract documentation to be submitted electronically includes, but is not limited to, the following:

Submittals, including ENG 4025 transmittal form Meeting Minutes Construction Photographs Correspondence Requests for Information Payroll Documents Statement and Acknowledgement Forms (SF 1413) Request for Additional Classification (SF 1444) Progress Payment Requests and Supporting Documentation Contract Modification Documentation, including SF 30, Contractor’s Offer, Cost/Pricing Audit Report Contractor Quality Control Reports (with attachments) Accident Reports Schedules and Schedule Updates Closeout Documentation, including Release of Claims

Electronic files must be of sufficient quality that all information is legible. Electronic format shall be in Adobe.PDF format, unless otherwise specified or directed by the Contracting Officer. Whenever possible, PDF files shall be generated from original documents so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Resolution (OCR) routines are required. Files exceeding 30 pages shall be indexed and bookmarked to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature.

Email electronic documents fewer than 8GB to an email address as directed by the Contracting Officer. Provide electronic documents over 8GB on an optical disc or through an electronic file sharing system such as the DoD SAFE Web Application located at the following website:

https://safe.apps.mil/

Note that this site is not directly accessible outside the Corps of Engineers. The Contracting Officer will invite the Contractor to establish an account, which will enable the Contractor to send and receive files.

The Contractor shall be prepared to provide up to five (5) additional paper hard copies of any contract document at the discretion of the Contracting Officer, at no additional cost to the Government. In addition to the electronic file format described above, the following list of documents shall be provided in their original format either signed via ink signature or with an electronic signature, affixed in the proper location, and with or without a visible seal per FAR 52.228-11 (Deviation 2020-O0016) and FAR 52.228-15 (Deviation 2020-O0016). Law or other regulations require signed originals be kept in accordance with FAR 4.805 -- Storage, Handling, and Disposal of Contract Files:

Advance Payment Bond Bid Bond including Annual Bid Bond Performance Bond including Annual Performance Bond Payment Bond Patent Infringement Bond Any performance security instruments Certificate of Insurance Novation/Change of Name Agreement Assignment of Claims Any document containing a raised seal. Examples include o Notarized documents o Architecture Drawings

Paper Payroll Documents Physical signatures on contracts and modifications o SF 1442 o SF 30

00 73 00 – 11 WAGE RATES

The following schedule of wage rates contains rates applicable to all work under the contract.

General Decision Number: PA20200002 06/05/2020 Superseded General Decision Number: PA20190002 State: Pennsylvania Construction Types: Heavy and Highway

Counties: Allegheny, Armstrong, Beaver, Bedford, Blair, Butler, Cambria, Cameron, Centre, Clarion, Clearfield, Clinton, Crawford, Elk, Erie, Fayette, Forest, Franklin, Fulton, Greene, Huntingdon, Indiana, Jefferson, Lawrence, McKean, Mercer, Mifflin, Potter, Somerset, Venango, Warren, Washington and Westmoreland Counties in Pennsylvania.

https://beta.sam.gov/wage-determination/PA20200002/8?index=wd&is_active=true&date_filter_index=0&date_rad_selection=date&wdType=…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .