W911WN19T8008_0002.pdf

PDF 595 KB Posted

Attached to
Paving Project at Bossard Nature Parking Lot, Woodcock Creek Lake, Saegertown, PA
Solicitation number
W911WN19T8008
Issued by

About this file

W911WN19T8008 0002

View the file

Other files

File Type Posted
W911WN19T8008_0003.pdf PDF
Attachment_1_-_Scope_of_Work.pdf PDF
Attachment_2_-_Photos.pdf PDF
Attachment_3_-_Accident_Prevention_Plan.docx DOCX document
Attachment_4_-_Quality_Control_Plan.docx DOCX document
Attachment_5_-_Wage_Determination.pdf PDF
W911WN19T8008.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CELRP-RC-P

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2203

PITTSBURGH PA 15222-4186

W81ET492113319

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

RE: Woodcock Paving Project

The purpose of this amendment is to 1) provide responses to vendor questions; 2) revise Attachment 1, Scope of Work (Changes in Red);

and 3) incorporate a revised Attachment 5, Wage Determination.

See Summary of Changes.

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Sep-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911WN19T8008

X 9B. DATED (SEE ITEM 11)

28-Aug-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Sep-2019

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CELRP-RC-P

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2203

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W911WN

FACILITY CODECODE

carole.householder@usace.army.milEMAIL:412-395-7274TEL:

CAROLE M HOUSEHOLDER / CONTRACTING OFFICER

X

W911WN19T8008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following have been added by full text:

VENDOR QUESTIONS

Q1) There are two items listed as “Bond Reimbursement” for this, do two physical bid bonds need to be submitted with our bid or is the Government just looking for an estimated cost for the bonds once work is awarded?

A1) Bid bonds are not required for this effort.

Q2) I see that the request states 2.5” of 19mm Binder, and 1.5” of 9.5mm Wearing. Is the intent to remove and replace the existing asphalt with the new asphalt in the depths above? The scope of work noted on the webpage indicates resurfacing, and there are no excavation/milling items on the bid form.

A2) No milling is required. Binder source is to be placed on existing pavement.

Q3) Will the contractor be responsible for maintaining ADA grades on ramps?

A3) Paving of the ramp to the building is not required.

Q4) If the contractor self-performs all work described in the scope of work, do the minority and female participation goals still apply?

A4) Please see Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 for further details regarding compliance.

https://www.dol.gov/ofccp/regs/statutes/eo11246.htm https://www.dol.gov/ofccp/taguides/fedreg100380.pdf

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

ADDENDUM TO SECTION 00 73 00

00 73 00-1 COPYING, DISSEMINATION, OR DISTRIBUTION OF INFORMATION

Those who disseminate information contained in the solicitations and/or drawings must ensure that the recipients have a legitimate need for the information and maintain a record of each recipient. Legitimate need means recognized business entities seeking to do business, or having business, with the Government as prime contractors, subcontractors or suppliers. You shall maintain a record of the following information on each recipient: Business name and address, Unique Entity Identifier Number and IRS Tax ID Number, and name and telephone number of person receiving the information.

00 73 00-2 SUBMISSION OF CONTRACT DOCUMENTATION

Provide contract documentation in an electronic format to the greatest extent practicable. Contract documentation to be submitted electronically includes, but is not limited to, the following:

Submittals, including ENG 4025 transmittal form Meeting Minutes Construction Photographs Correspondence Requests for Information Payroll Documents Statement and Acknowledgement Forms (SF 1413) Request for Additional Classification (SF 1444) Progress Payment Requests and Supporting Documentation Contract Modification Documentation, including SF 30, Contractor’s Offer, Cost/Pricing, Audit Report, and Certificate of Current Cost or Pricing Data Contractor Quality Control Reports (with Attachments) Attachment Reports Schedules and Schedule Updates Closeout Documentation, including Release of Claims

Electronic files must be of sufficient quality that all information is legible. Electronic format shall be in Adobe. PDF format, unless otherwise specified or directed by the Contracting Officer. Whenever possible, PDF files shall be generated from original documents so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Resolution (OCR) routines are required. Files exceeding 30 pages shall be indexed and bookmarked to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature. Email electronic documents fewer than 10MB to an email address as directed by the Contracting Officer. Electronic documents over 10MB shall be provided on a CD/DVD, or through an electronic file sharing system such as the AMRDEC SAFE Web Application located at the following website:

https://safe.amrdec.army.mil/safe/

The Contractor shall be prepared to provide up to five (5) additional paper hard copies of any contract document at the discretion of the Contracting Officer, at no additional cost to the Government. In addition to the electronic file format described above, the following list of documents shall be provided in their original format because law or other regulations require signed originals be kept in accordance with FAR 4.805 -- Storage, Handling, and Disposal of Contract Files:

Advance Payment Bond Bid Bond including Annual Bid Bond Performance Bond including Annual Performance Bond Payment Bond Patent Infringement Bond Any performance security instruments Certificate of Insurance Novation/Change of Name Agreement Assignment of Claims Any document containing a raised seal. Examples include Notarized documents Architecture drawings Paper Payroll Documents Physical signatures on contracts and modifications o SF 18 o SF 30

00 73 00-3 WORK UNDER OTHER CONTRACTS

Attention is directed to the fact that other Contractors may be employed by the Government or by local interests at or in the vicinity of the work covered by these specifications. All Contractors shall have equal rights to the use of all roads and grounds so far as practicable and this Contractor shall cooperate with other Contractors so that the work may be performed with the maximum efficiency. Should a disagreement occur between Contractors as to the use of facilities or in other matters, the decision of the Contracting Officer shall govern.

00 73 00-4 SAFETY AND HEALTH REQUIREMENTS MANUAL

A copy of the current US Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 and its changes are available at https://intranet.usace.army.mil/lrd/lrp/safety/Links/EM%20385-1- 1%20SAFETY%20AND%20HEALTH%20REQUIREMENTS.pdf#search=385%2D1%2D1.

The contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.

00 73 00-5 WAGE RATES

The schedule of wage rates, Department of Labor General Decision No. PA20190002 (09/06/2019) (Attachment 5) contains rates applicable to all work under the contract.

SECTION 01 00 00 - GENERAL REQUIREMENTS

The following have been modified:

ATTACHMENTS

Attachment 1: Scope of Work (Revised 9/10/2019) Attachment 2: Photos Attachment 3: Accident Prevention Plan Attachment 4: Quality Control Plan Attachment 5: Wage Determination (Updated 9/6/2019)

(End of Summary of Changes)

File details come from the government source that posted it.