EXHIBIT_A.pdf

PDF 4 MB Posted

Attached to
Mosquito Creek Lake Building & Grounds Maintenance
Solicitation number
W911WN18T3002
Issued by

About this file

Exhibit A

View the file

Other files

File Type Posted
Option_Year_4_Pricing.pdf PDF
Attach_8_-_Performance_Work_Statement.pdf PDF
Amendment_0001.pdf PDF
Attach_1_-_Sample_QCP.pdf PDF
W911WN18T3002.pdf PDF
Attach_4_-_Accident_Investigation_Report.pdf PDF
Attach_2_-_Accident_Prev_Plan.pdf PDF
EXHIBIT_C.pdf PDF
Attach_7_-_Pesticide_Application_Record.pdf PDF
EXHIBIT_F.pdf PDF
Attach_5_-_Contract_Discrepancy_Report.pdf PDF
EXHIBIT_E.pdf PDF
Attach_6_-_Quality_Assurance_Surveillance_Plan.pdf PDF
EXHIBIT_D.pdf PDF
Attach_3_-_Activity_Hazards_Analysis.xls XLS spreadsheet
Price_Schedule.xls XLS spreadsheet
EXHIBIT_B.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A

Section C-2

GRASS MOWING REQUIREMENTS Mosquito Creek Lake

Estimated Frequency of Mowing

Total Estimated Mowing 20

Normal Work Hours: Monday through Friday, 7:30-4:00.

Area A: (Line Item 000 l) Area B: (Line Item 0002)

2.1.1 The total mowed area consists of approximately 52.5 acres. All areas shall be a Type I Cut. The areas are listed as Area A and Area B. Area A is comprised of the Resource Manager 's Office, Maintenance Area, Dam Site Picnic Area, most of Tailwater Recreation Area and most of Lakeview Recreation Area for approximately 43 acres. The Lakeview Area will be mowed to the edge of road along Rt. 305 and will include the entire upstream and downstream embankment to toe and include all drainage ditches. Area B is comprised of part of Tailwater Recreation Area, part of Lakeview Recreation Area and the Rt. 305 Boat Launch. All areas will be mowed each cycle.

(All trash, debris, garbage, drift and fallen trees and branches (up to six inches in diameter) within three feet of all boarders of mowing areas and visible from pathways shall be removed.)

Note: The contractor shall receive estimated start dates for each mowing on a work order.

However , the COR reserves the right to adjust the estimated start dates according to existing conditions. In such a situation, the contractor shall begin mowing operations within a 24 hour notice from COR. The mowing cycle shall be complete within three consecutive days. All guide rails, fences, and roadway berms adjacent to mowed areas shall also be mowed/ trimmed during each mowing cycle. All required safety equipment and apparel shall be strictly enforced.

A-1

April 2 May 3 June 3 July 3 August 3 September 3 October November

Total 20

Ex hi bi t A

-2

M ow in g

M ai nt en an ce

A re a bi

-3 in g

Al te rn at e In ta ke a nd

D am

A as bi

-4 in g

Da m a nd

L ak ev ie w A bi

-5 in g

La ke vi ew

A a bi

-6 in g

Bo at

L au nc h

Ar ea bi

-7 in g

Ta ilw at er a nd

M an ag er

’s O ffi ce

A bi

-8 in g

M os qu ito

P ic ni c

Ar ea

File details come from the government source that posted it.