Text version
Sheet1
| Ridgway, PA |
| PL 84-99, Elk Creek Flood Protection Project |
| May 2014 Flood Project Repairs |
| Elk Creek, Elk County, Pennsylvania |
| ITEM NO. | DESCRIPTION | QUANTITY | UNIT | UNIT | |
| PRICE | AMOUNT |
| 0001 | Reimbursement for Actual Performance and Payment Bonds Premiums | 1 | JOB | $_____.__ | $_____.__ |
| 0002 | Digital Progress Images | 6 | SETS | $_____.__ | $_____.__ |
| 0003 | Mobilization and Demobilization | 1 | JOB | $_____.__ | $_____.__ |
| 0004 | Protection and Maintenance of Traffic During Construction | 1 | JOB | $_____.__ | $_____.__ |
| 0005 | Erosion and Sediment Controls | 1 | JOB | $_____.__ | $_____.__ |
| 0006 | Field Survey and Bench Marks | 1 | JOB | $_____.__ | $_____.__ |
| 0007 | Sediment Sampling and Testing | 1 | JOB | $_____.__ | $_____.__ |
| 0008 | Temporary Cofferdam / Stream Diversion | 1 | JOB | $_____.__ | $_____.__ |
| 0009 | Removal and Disposal of Clean Material and Sediment, Sta. 17+75 to Sta. 18+75 | 1,480 | CUBIC YARD | $_____.__ | $_____.__ |
| 0010 | Removal and Disposal of Regulated Material and Sediment, Sta. 17+75 to Sta. 18+75 | 400 | CUBIC YARD | $_____.__ | $_____.__ |
| 0011 | Clearing of Vegetation, Slope Repair | 1 | JOB | $_____.__ | $_____.__ |
| 0012 | Bank Grading and Placement of Fill, Slope Repair | 670 | CUBIC YARD | $_____.__ | $_____.__ |
| 0013 | Geotextile, Slope Repair | 1,330 | SQUARE YARD | $_____.__ | $_____.__ |
| AASHTO #3 Gravel, Slope Repair | |||||
| 0014 | PDT R-6 Stone, Slope Repair | 890 | CUBIC YARD | $_____.__ | $_____.__ |
| 0015 | Seeding and Mulching, Slope Repair | 1 | JOB | $_____.__ | $_____.__ |
| 0016 | Demolition, Removal and Disposal of Floor and Chute Blocks, Ramp Repair | 2 | CUBIC YARD | $_____.__ | $_____.__ |
| 0017 | Steel Reinforcing and Dowels, Ramp Repair | 360 | POUNDS | $_____.__ | $_____.__ |
| Excavation, Ramp Repair | 230 | CUBIC YARD | $_____.__ | $_____.__ | |
| Geotextile, Ramp Repair | 240 | SQUARE YARD | $_____.__ | $_____.__ | |
| AASHTO #3 Gravel Fill, Ramp Repair | 50 | CUBIC YARD | $_____.__ | $_____.__ | |
| 0019 | PDT R-4 Stone, Ramp Repair | 180 | CUBIC YARD | $_____.__ | $_____.__ |
| 0018 | Concrete, Ramp Repair | 30 | CUBIC YARD | $_____.__ | $_____.__ |
| 0020 | Excavation, Scour Repair | 10 | CUBIC YARD | $_____.__ | $_____.__ |
| 0021 | PDT R-6, Scour Repair | 30 | CUBIC YARD | $_____.__ | $_____.__ |
| 0022 | Clearing of Vegetation, Scour Repair | 1 | JOB | $_____.__ | $_____.__ |
| 0023 | Demolition, Removal, and Disposal Portion of Existing Stone Wall | 210 | CUBIC YARD | $_____.__ | $_____.__ |
| 0024 | Design and Certification of Precast Concrete Block Retaining Wall | 1 | JOB | $_____.__ | $_____.__ |
| 0025 | Precast Concrete Block Wall Retaining Wall, Including Foundation, Drainage, Select and Structural Backfill (Complete) | 1 | JOB | $_____.__ | $_____.__ |
| 0026 | PDT R-6 Stone, Precast Concrete Block Retaining Wall | 100 | SQUARE YARD | $_____.__ | $_____.__ |
| 0027 | Concrete Grouting, Precast Concrete Block Retaining Wall | 9 | CUBIC YARD | $_____.__ | $_____.__ |
| 0028 | Railing Replacement, Precast Concrete Block Retaining Wall | 100 | LINEAR FEET | $_____.__ | $_____.__ |
| 0030 | Gravel Surface Restoration, Precast Concrete Block Retaining Wall | 8 | CUBIC YARD | $_____.__ | $_____.__ |
| TOTAL, ITEMS 0001 THROUGH 0030 | $_____.__ |
| 0001 | Reimbursement for Actual Performance and Payment Bonds Premiums | 1 | JOB | $_____.__ | $_____.__ |
| 0002 | Digital Progress Images | 9 | SETS | $_____.__ | $_____.__ |
| 0003 | Mobilization and Demobilization | 1 | JOB | $_____.__ | $_____.__ |
| 0004 | Protection and Maintenance of Traffic During Construction | 1 | JOB | $_____.__ | $_____.__ |
| 0005 | Erosion and Sediment Controls | 1 | JOB | $_____.__ | $_____.__ |
| 0006 | Field Survey and Bench Marks | 1 | JOB | $_____.__ | $_____.__ |
| 0007 | Debris Sampling & Testing | 1 | JOB | $_____.__ | $_____.__ |
| 0008 | Removal and Disposal of Debris in Channel | 480 | CUBIC YARDS | $_____.__ | $_____.__ |
| 0009 | Clearing of Vegetation, Scour Repair Channel with Vegetated Side Slope | 1 | JOB | $_____.__ | $_____.__ |
| 0010 | Sloughed Toe Removal, Scour Repair Channel with Vegetated Side Slope | 180 | CUBIC YARDS | $_____.__ | $_____.__ |
| 0011 | Geotextile, Scour Repair Channel with Vegetated Side Slope | 4,520 | SQUARE YARDS | $_____.__ | $_____.__ |
| 0012 | Select Fill, Scour Repair Channel with Vegetated Side Slope | 2,840 | CUBIC YARDS | $_____.__ | $_____.__ |
| 0013 | Sloughed Toe Removal, Scour Repair Channel with Rock-Protected Side Slope | 10 | CUBIC YARDS | $_____.__ | $_____.__ |
| 0014 | Select Fill, Scour Repair Channel with Rock-Protected Side Slope | 20 | CUBIC YARDS | $_____.__ | $_____.__ |
| 0015 | Geotextile, Scour Repair Channel with Rock-Protected Side Slope | 280 | SQUARE YARDS | $_____.__ | $_____.__ |
| 0016 | AASHTO No. 3 Coarse Aggregate Fill, Scour Repair Channel with Rock-Protected Side Slope | 45 | CUBIC YARDS | $_____.__ | $_____.__ |
| 0017 | PDT R-5 Riprap, Scour Repair Channel with Rock-Protected Side Slope | 260.0 | CUBIC YARDS | $_____.__ | $_____.__ |
| 0018 | Excavation, Ramp Repair | 215 | CUBIC YARDS | $_____.__ | $_____.__ |
| 0019 | Geotextile, Ramp Repair | 230 | SQUARE YARDS | $_____.__ | $_____.__ |
| 0020 | AASHTO No. 3 Drainage Backfill, Ramp Repair | 50 | CUBIC YARDS | $_____.__ | $_____.__ |
| 0021 | PDT R-4 Stone, Grouted, Ramp Repair | 180 | CUBIC YARDS | $_____.__ | $_____.__ |
| 0022 | Remove and Dispose Existing Rock and Fill, Bridge Abutment Repair | 225.0 | CUBIC YARDS | $_____.__ | $_____.__ |
| 0023 | Flowable Fill, Bridge Abutment Repair | 60.0 | CUBIC YARDS | $_____.__ | $_____.__ |
| 0024 | Structural Backfill, Bridge Abutment Repair | 75.0 | CUBIC YARDS | $_____.__ | $_____.__ |
| 0025 | Select Fill, Bridge Abutment Repair | 120.0 | CUBIC YARDS | $_____.__ | $_____.__ |
| 0026 | AASHTO No. 1 Coarse Aggregate, Bridge Abutment Repair | 55.0 | CUBIC YARDS | $_____.__ | $_____.__ |
| 0027 | Geotextile, Bridge Abutment Repair | 245.0 | SQUARE YARDS | $_____.__ | $_____.__ |
| 0028 | PDT R-7 Riprap, Bridge Abutment Repair | 160.0 | CUBIC YARDS | $_____.__ | $_____.__ |
| 0029 | Demolition, Removal, and Disposal Portion of Existing Stone Wall and Building Foundation Material | 1 | JOB | $_____.__ | $_____.__ |
| 0030 | Design and Certification of Precast Concrete Block Retaining Wall | 1 | JOB | $_____.__ | $_____.__ |
| 0031 | Precast Concrete Block Wall Retaining Wall, Including Foundation, Drainage, Select and Structural Backfill (Complete) | 1 | JOB | $_____.__ | $_____.__ |
| 0032 | Railing Replacement, Precast Concrete Block Retaining Wall | 100 | LINEAR FEET | $_____.__ | $_____.__ |
| 0033 | Bituminous Pavement Behind Retaining Wall | 700 | SQUARE YARDS | $_____.__ | $_____.__ |
TOTAL, ITEMS 0001 THROUGH 0033 $_____.__