Sheet1

Ridgway, PA
PL 84-99, Elk Creek Flood Protection Project
May 2014 Flood Project Repairs
Elk Creek, Elk County, Pennsylvania
ITEM NO.DESCRIPTIONQUANTITYUNITUNIT
PRICEAMOUNT
0001Reimbursement for Actual Performance and Payment Bonds Premiums1JOB$_____.__$_____.__
0002Digital Progress Images6SETS$_____.__$_____.__
0003Mobilization and Demobilization1JOB$_____.__$_____.__
0004Protection and Maintenance of Traffic During Construction1JOB$_____.__$_____.__
0005Erosion and Sediment Controls1JOB$_____.__$_____.__
0006Field Survey and Bench Marks1JOB$_____.__$_____.__
0007Sediment Sampling and Testing1JOB$_____.__$_____.__
0008Temporary Cofferdam / Stream Diversion1JOB$_____.__$_____.__
0009Removal and Disposal of Clean Material and Sediment, Sta. 17+75 to Sta. 18+751,480CUBIC YARD$_____.__$_____.__
0010Removal and Disposal of Regulated Material and Sediment, Sta. 17+75 to Sta. 18+75400CUBIC YARD$_____.__$_____.__
0011Clearing of Vegetation, Slope Repair1JOB$_____.__$_____.__
0012Bank Grading and Placement of Fill, Slope Repair670CUBIC YARD$_____.__$_____.__
0013Geotextile, Slope Repair1,330SQUARE YARD$_____.__$_____.__
AASHTO #3 Gravel, Slope Repair
0014PDT R-6 Stone, Slope Repair890CUBIC YARD$_____.__$_____.__
0015Seeding and Mulching, Slope Repair1JOB$_____.__$_____.__
0016Demolition, Removal and Disposal of Floor and Chute Blocks, Ramp Repair2CUBIC YARD$_____.__$_____.__
0017Steel Reinforcing and Dowels, Ramp Repair360POUNDS$_____.__$_____.__
Excavation, Ramp Repair230CUBIC YARD$_____.__$_____.__
Geotextile, Ramp Repair240SQUARE YARD$_____.__$_____.__
AASHTO #3 Gravel Fill, Ramp Repair50CUBIC YARD$_____.__$_____.__
0019PDT R-4 Stone, Ramp Repair180CUBIC YARD$_____.__$_____.__
0018Concrete, Ramp Repair30CUBIC YARD$_____.__$_____.__
0020Excavation, Scour Repair10CUBIC YARD$_____.__$_____.__
0021PDT R-6, Scour Repair30CUBIC YARD$_____.__$_____.__
0022Clearing of Vegetation, Scour Repair1JOB$_____.__$_____.__
0023Demolition, Removal, and Disposal Portion of Existing Stone Wall210CUBIC YARD$_____.__$_____.__
0024Design and Certification of Precast Concrete Block Retaining Wall1JOB$_____.__$_____.__
0025Precast Concrete Block Wall Retaining Wall, Including Foundation, Drainage, Select and Structural Backfill (Complete)1JOB$_____.__$_____.__
0026PDT R-6 Stone, Precast Concrete Block Retaining Wall100SQUARE YARD$_____.__$_____.__
0027Concrete Grouting, Precast Concrete Block Retaining Wall9CUBIC YARD$_____.__$_____.__
0028Railing Replacement, Precast Concrete Block Retaining Wall100LINEAR FEET$_____.__$_____.__
0030Gravel Surface Restoration, Precast Concrete Block Retaining Wall8CUBIC YARD$_____.__$_____.__
TOTAL, ITEMS 0001 THROUGH 0030$_____.__
0001Reimbursement for Actual Performance and Payment Bonds Premiums1JOB$_____.__$_____.__
0002Digital Progress Images9SETS$_____.__$_____.__
0003Mobilization and Demobilization1JOB$_____.__$_____.__
0004Protection and Maintenance of Traffic During Construction1JOB$_____.__$_____.__
0005Erosion and Sediment Controls1JOB$_____.__$_____.__
0006Field Survey and Bench Marks1JOB$_____.__$_____.__
0007Debris Sampling & Testing1JOB$_____.__$_____.__
0008Removal and Disposal of Debris in Channel480CUBIC YARDS$_____.__$_____.__
0009Clearing of Vegetation, Scour Repair Channel with Vegetated Side Slope1JOB$_____.__$_____.__
0010Sloughed Toe Removal, Scour Repair Channel with Vegetated Side Slope180CUBIC YARDS$_____.__$_____.__
0011Geotextile, Scour Repair Channel with Vegetated Side Slope4,520SQUARE YARDS$_____.__$_____.__
0012Select Fill, Scour Repair Channel with Vegetated Side Slope2,840CUBIC YARDS$_____.__$_____.__
0013Sloughed Toe Removal, Scour Repair Channel with Rock-Protected Side Slope10CUBIC YARDS$_____.__$_____.__
0014Select Fill, Scour Repair Channel with Rock-Protected Side Slope20CUBIC YARDS$_____.__$_____.__
0015Geotextile, Scour Repair Channel with Rock-Protected Side Slope280SQUARE YARDS$_____.__$_____.__
0016AASHTO No. 3 Coarse Aggregate Fill, Scour Repair Channel with Rock-Protected Side Slope45CUBIC YARDS$_____.__$_____.__
0017PDT R-5 Riprap, Scour Repair Channel with Rock-Protected Side Slope260.0CUBIC YARDS$_____.__$_____.__
0018Excavation, Ramp Repair215CUBIC YARDS$_____.__$_____.__
0019Geotextile, Ramp Repair230SQUARE YARDS$_____.__$_____.__
0020AASHTO No. 3 Drainage Backfill, Ramp Repair50CUBIC YARDS$_____.__$_____.__
0021PDT R-4 Stone, Grouted, Ramp Repair180CUBIC YARDS$_____.__$_____.__
0022Remove and Dispose Existing Rock and Fill, Bridge Abutment Repair225.0CUBIC YARDS$_____.__$_____.__
0023Flowable Fill, Bridge Abutment Repair60.0CUBIC YARDS$_____.__$_____.__
0024Structural Backfill, Bridge Abutment Repair75.0CUBIC YARDS$_____.__$_____.__
0025Select Fill, Bridge Abutment Repair120.0CUBIC YARDS$_____.__$_____.__
0026AASHTO No. 1 Coarse Aggregate, Bridge Abutment Repair55.0CUBIC YARDS$_____.__$_____.__
0027Geotextile, Bridge Abutment Repair245.0SQUARE YARDS$_____.__$_____.__
0028PDT R-7 Riprap, Bridge Abutment Repair160.0CUBIC YARDS$_____.__$_____.__
0029Demolition, Removal, and Disposal Portion of Existing Stone Wall and Building Foundation Material1JOB$_____.__$_____.__
0030Design and Certification of Precast Concrete Block Retaining Wall1JOB$_____.__$_____.__
0031Precast Concrete Block Wall Retaining Wall, Including Foundation, Drainage, Select and Structural Backfill (Complete)1JOB$_____.__$_____.__
0032Railing Replacement, Precast Concrete Block Retaining Wall100LINEAR FEET$_____.__$_____.__
0033Bituminous Pavement Behind Retaining Wall700SQUARE YARDS$_____.__$_____.__

TOTAL, ITEMS 0001 THROUGH 0033 $_____.__