Attachment_1_-_PWS_with_Supporting_Documentation.pdf

PDF 1019 KB Posted

Attached to
Johnstown Levee/Floodwall Culvert Cleaning and Video Inspections
Solicitation number
W911WN-16-T-3016
Issued by

About this file

Attachment 1 - PWS with Supporting Documentation

View the file

Other files

File Type Posted
Amendment_04.doc DOC document
Attachment_3_-_Access_Roads.pdf PDF
Amendment_3.doc DOC document
Amendment_02.doc DOC document
Amendment_01.doc DOC document
Attachment_2_-_Drawings.pdf PDF
Solicitation.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

Johnstown Levee/ Floodwall Culvert Cleaning and Video Inspections Pittsburgh District

2 August 2016

1. Location:

The project is located along the Conemaugh, Little Conemaugh and Stonycreek Rivers at Johnstown, in Cambria County, Pennsylvania.

2. General Statement of Work:

The objective of this Scope of Work (PWS) includes cleaning, dewatering and video inspections of the existing culvert systems though portions of the three separate levee/floodwall system only located in Johnstown PA, in the Pittsburgh District, U.S.

Army Corps of Engineers (USACE). The cleaning, dewatering and video inspections shall use protocol established by the National Association of Sewer Service Companies’ (NASSCO) in the Pipeline Assessment Certification Program (PACP) and the attached USACE Guidance for CCTV and Sonar Inspection Pipes Penetrating Levees, Attachment 1. The project systems includes; 1) Left Bank Stonycreek River & Left Bank Conemaugh River, 2) Right Bank Conemaugh River & Right Bank Little Conemaugh River and 3) Right Bank Stonycreek River & Left Bank Little Conemaugh River.

Attachment 2 to this PWS provides detailed information specific to project location culvert inventories.

a. Project Description: The purpose of this investigation is to evaluate the condition of the existing culvert systems at the levee floodwall system in Johnstown PA. The culverts are part of the levee/floodwall system. These inspections will evaluate the condition of the pipe material and identify pipe defects, as well as identify sedimentation within the existing pipe systems.

b. Overview: The Contractor shall provide qualifications for performing this type of work. The individuals performing the work must be certified in NASSCO’s PACP coding version 7. It is recommended that personnel demonstrate experience on similar projects and a minimum of 1-year experience in pipe inspection and PACP coding in accordance with NASSCO’s pipeline assessment program.

The information included in the report shall follow PACP standards.

c. Site Access and Trafficability: Site access requirements shall be obtained and adhered to by the contractor. The Contractor shall coordinate with City of Johnstown to obtain Rights of Entry. Access to manhole locations for the pipes to be inspected varies.

3. Description of Services for Levee/Floodwall Video Inspections:

Culvert Locations: Attachment 2 is a summary of the river, bank, size, area, total length, and material of the culverts. The distances are approximate and are estimated based upon best information; however, the contractor shall verify the distances. Contract Line Item Number (CLIN) 0001 is for Cleaning and Inspection of Structure (Pipes) of Ranks 1 through 95 for 95 structures on Attachment 2.

Option 1, CLIN 0002 is for Cleaning and Inspection of Structure (Pipes) of Ranks 96 through 178 for 83 structures on Attachment 2. CLINs 0001 and 0002 total to 178 structures. The Ranked Structures on Attachment 2 are designated on the As- Built Drawings provided by Rank number 1-178 in red.

a. Cleaning Procedures: Cleaning shall be conducted in accordance with protocol established by the National Association of Sewer Service Companies’ (NASSCO) in the Pipeline Assessment Certification Program (PACP). Cleaning should be completed prior to inspection. Supplies or Services and Prices/Cost in shall include all cost required to remove and dispose of all dirt, sand, roots, grease and other solid or semi-solid material at a commercially available properly permitted disposal facility.

b. Inspection Procedures: If possible perform inspection during periods of low or no flow in the pipes and culverts. All pipes and culverts shall have a CCTV camera inspection; inspections shall be done in accordance with the NASSCO PACP procedures. Where possible, metallic pipes must be temporarily bypassed and dewatered prior to inspection so that 100% of the interior pipe surface is visible to the CCTV camera. Non-metallic pipes are also dewatered and CCTV inspected. The PACP provides procedural guidelines for CCTV pipe inspection.

An inspection system specifically designed and constructed for pipe inspection shall be used. The CCTV camera shall be capable of panning 360° and tilting 270°. The camera is positioned in the center of circular pipes and 2/3 the height in oval pipes. Lighting for the CCTV camera shall be suitable to allow a clear picture of the entire periphery of the pipe. The camera shall be capable of operating in 100% humidity conditions. The minimum acceptable camera resolution is 500 lines. The CCTV monitor and other components of the CCTV system shall be capable of producing a color picture/CCTV quality to the Corps of Engineers satisfaction.

The CCTV camera needs to move through the pipe at a constant rate, stopping when necessary to permit proper documentation of the pipe's condition for coding. The CCTV camera shall not move at a speed greater than 25 feet per minute. Obtain a still picture (color jpeg format) of all significant defects observed during inspection. T h e c o n t r a c t o r s h a l l record segment, location along pipe, clock position, time and defect code for each picture.

Obtain a still photograph coaxial with each lateral.

c. Pipe Condition Coding: Pipe condition coding for pipes subjected to CCTV inspection is done in accordance with the National Association of Sewer Service Companies’ (NASSCO) Pipeline Assessment Certification Program (PACP). The company performing the inspection is required to provide qualifications for performing this work. Resumes of the individuals performing the work documenting experience and NASSCO’s PACP coding certification are required.

Personnel must demonstrate experience on similar projects and a minimum of 1-year experience in pipe inspection and PACP coding in accordance with NASSCO’s pipeline assessment program.

The information called out includes, but is not limited to the following:

o Structural condition and deformation of the pipe walls o Segment length (from inside walls of adjacent manholes) o o Manhole depth (invert to top of casting to nearest

0.1 ft.)

o o Blockages or obstructions o Condition of joints and pipe walls o Standing water/sag conditions o Infiltration/exfiltration o Fluctuations in water level o Size, location and condition of sewer laterals with the clock position

Distance measurements are referenced to the nearest 0.1 foot, using a readily identifiable baseline such as a headwall, manhole, or flap gate. The five PACP defect grades and an example PACP report are provided in Attachment 1.

Further details of the PACP condition grading system are available at www.nassco.org.

d. Site Restoration: Cleanup of work and storage areas shall be performed upon completion of work. All trash or debris shall be disposed of in accordance with all federal and state requirements. Care shall be taken to leave the project sites in the same condition as prior to inspections. Additionally, any disturbed grass areas shall be restored to original condition. Paved areas are to be cleaned to remove tracked mud and debris as necessary. Site cleanup shall be performed to the satisfaction of the Contracting Officer Representative identified for each site as the Site POC.

4. Contractor Requirements:

Contractor Requirements: The Contractor shall possess, or be able to quickly acquire, all the required expertise, knowledge, equipment and tools necessary to perform the work required in this PWS in accordance with established industry standards. The Contractor is responsible for and shall furnish all labor, materials, equipment, and supplies necessary to fully execute the work described and within the contract performance period.

The Contractor shall comply with all applicable federal, state and local rules, laws, and regulations to fulfill the work described in this PWS.

http://www.nassco.org/ http://www.nassco.org/

b. Government Property: All documents, maps, photographs, graphics, computer files and the like developed by the Contractor while completing the requirements of this PWS are government property and will be delivered to the COR upon completion of the project.

c. Security: The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.

d. Data Security: The Contractor shall not release any data, reports, or materials collected and/or developed during this project without the expressed written consent of the USACE.

5. Safety:

a. The Contractor shall be responsible for preparing an Activity Hazard Analysis (AHA), see EM -385-1-1, Safety and Health Requirements Manual of 2014.

b. 2014 at http://www.usace.army.mil/Safety-and-Occupational-Health/Safety-and- Health-Requirements-Manual/ Figure 1-2. The Contractor shall be responsible for preparing a U.S. Army Corps of Engineers Safety Inspection Checklist Abbreviated Accident Prevention Plan (APP) see EM -385-1-1, Safety and Health Requirements Manual of 2014, Appendix A at http://www.usace.army.mil/Safety-and-Occupational-Health/Safety-and-Health- Requirements-Manual/ These shall be submitted for review to the COR within two weeks prior to commencement of field work. No work shall begin until the AHA and APP have been accepted by the COR. Equipment Safety Inspection sheet shall be submitted for the equipment to be used prior to initiating work. All work shall be performed in accordance with EM 385-1-1 Safety and Health Requirements Manual of 2014.

c. The work will be conducted at Government operated facilities under normal operating conditions. Therefore, the workers shall be aware of the surroundings at all times while working and driving. All posted speed limits and traffic signs shall be obeyed. Access to restricted areas shall be approved by the Site POC prior to entry.

6. Deliverables:

a. Submit two copies of the following items within 2 weeks following completion of inspection activities:

• Electronic inspection videos, still pictures, and sonar images recorded and organized on CD, DVD, or external hard drive.

http://www.uscis.gov/e-verify) http://www.usace.army.mil/Safety-and-Occupational-Health/Safety-and-Health-Requirements-Manual/ http://www.usace.army.mil/Safety-and-Occupational-Health/Safety-and-Health-Requirements-Manual/ http://www.usace.army.mil/Safety-and-Occupational-Health/Safety-and-Health-Requirements-Manual/ http://www.usace.army.mil/Safety-and-Occupational-Health/Safety-and-Health-Requirements-Manual/

• Printed inspection logs with as-built stationing, defect codes, and the PACP Ratings including; the Structural, Operation and Maintenance, Overall Quick Rating shall be provided.

• List of recorded PACP defect codes for each specific line segment with ratings.

• A copy of as-built drawing with an arrow added to show the pipe location and direction of CCTV camera travel.

b. The contractor shall provide bound Inspection Reports with 4 weeks following completion of inspection activities.

c. The inspection video shall be either configured for viewing using the latest version of Windows Media Player, or the appropriate viewing software must be submitted on each CD, DVD, or external hard drive. Files are configured to have the ability to use all features of the CCTV player including fast forward capability.

d. No payment is made for poor or unacceptable quality CCTVs or for portions of pipes that are not inspected for any reason. If, in the opinion of the USACE, the CCTV is of such poor quality that the condition of the pipe cannot be adequately assessed, the Contractor re-inspects the unacceptable segments and resubmits all deliverables for that segment at no additional cost to the Owner.

e. The contractor shall provide an Activity Hazard Analysis (see paragraph 5), a U.S.

Army Corps of Engineers Safety Inspection Checklist Abbreviated Accident Prevention Plan (see paragraph 5) and a Work Plan detailing all proposed work.

7. Government Furnished Information

a. As-built drawings for Left Bank Stonycreek River & Left Bank Conemaugh River

b. As-built drawings for Right Bank Conemaugh River & Right Bank Little

Conemaugh River

c. As-built drawings for Right Bank Stonycreek River & Left Bank Little Conemaugh River

d. Priority ranking spreadsheet with river, bank, length, ID, as-built drawing numbers and size of structures/pipes

8. Project Schedule

a. Government Furnished Information Provided by the Government 1 week after

NTP

b. Submit Activity Hazard Analysis, Site Specific Safety Plan, and Work Plan within 2 weeks after Notice to Proceed (NTP).

c. Commence field work: within 3 weeks after NTP.

d. Submit two copies of the following items within 2 weeks following completion of inspection activities:

• Electronic inspection videos, still pictures, and sonar images.

• Inspection logs with as-built stationing, defect codes, and the PACP Ratings.

• List of recorded PACP defect codes for each specific line segment with ratings.

• A copy of as-built drawing with an arrow added to show the pipe location and direction of CCTV camera travel.

e. Provide bound Inspection Reports within 4 weeks following completion of inspection activities.

f. The Technical and Site Points of Contact listed below shall be contacted at least

48 hours prior to mobilization to the site. Any revision to the field schedule shall be coordinated through the Technical Points of Contact.

9. Points of Contact:

Contracting O ffic er’s Re presentative (COR)

Christopher Dening, PE (412) 395-7253 christopher.t.dening@usace.army.mil

Technical Points of Contact

Levee Safety Program Manager Jennifer Savitz, PE, PG (412) 395-7250 jennifer.l.savitz@usace.army.mil

GUIDANCE FOR CCTV AND SONAR INSPECTION

PIPES PENETRATING LEVEES

FEBRUARY 2013

SECTION 1 - BACKGROUND

Inspection of the interior of gravity pipes that penetrate under or through flood protection systems, discharge pipes from pump stations, and other third-party high-pressure pipelines (e.g., water distribution lines, petroleum product transmission lines) is necessary during pipe condition evaluation.

This assists in developing an understanding of the need to replace or rehabilitate a pipe, and selecting appropriate and economical solutions for deteriorated pipes. Pipes are also inspected after replacement or rehabilitation to document the new baseline condition for the pipe.

The current inspection checklist allows for either visual or television camera video-taping (CCTV) with a report of the findings provided to USACE on a 5 year frequency. When CCTV or sonar is employed, pipes shall be inspected using the methods described in this guidance.

Entry/walking-through a pipe should only be done when size (diameter) permits, it is safe to do so, and only when appropriate confined space entry procedures are followed. Examples of unsafe conditions include the potential for fire and explosion, heat stress, asphyxiation, drowning, and engulfment or entrapment. It should also be noted that a heavily corroded or structurally damaged culvert could collapse at any time and is not safe to enter.

Third-party high-pressure pipelines are regulated by other agencies and USACE recognizes those inspection methods as appropriate on a case-by-case basis.

SECTION 2 – GRAVITY PIPES AND PUMP STATION DISCHARGE PIPES

INSPECTION PROCEDURES FOR CCTV / SONAR

Pipe inspections are most efficient when planned and executed so that fieldwork is performed during periods of low or no flow in the pipe. Removal of small roots and debris is required prior to inspection.

All debris shall be removed from the sewer system and properly disposed of with no debris passing downstream.

Pipes are inspected using either CCTV cameras, sonar devices, or both. The method(s) used are determined by the presence or absence of water in the pipe, the pipe material, and the wall configuration. CCTV inspection is the preferred method because it provides a complete view of the pipe interior. Sonar inspection, which may be used on non-metallic pipes that contain water, portrays offsets and distortions in the interior pipe profile as well as sediment build up in the pipe invert. Sonar inspection will not reveal the presence of fractures without offset, cracks, corrosion or corrosion-induced section loss. The process described below and illustrated in Figure 1 is used to determine proper inspection protocols.

Metallic pipes, including corrugated metal pipes (CMPs) and cast iron pipes, are subject to corrosion and must be CCTV inspected because sonar methods are not able to detect and quantify the nature and extent of corrosion. Therefore, metallic pipes must be temporarily bypassed and dewatered prior to inspection so that 100% of the interior pipe surface is visible to the CCTV camera.

Non-metallic pipes are also dewatered and CCTV inspected when reasonably possible. When non-metallic pipes cannot be dewatered, partially submerged pipes are assessed using CCTV inspection above water and sonar inspection below water. Fully submerged non-metallic pipes are inspected using only sonar inspection. When sonar inspection of a submerged pipe indicates that the pipe cross-sectional profile deviates from the as-built condition, the pipe must be dewatered and CCTV inspected.

1 ATTACHMENT 1

The PACP (Pipe Assessment Certification Program) provides procedural guidelines for CCTV pipe inspection. An inspection system specifically designed and constructed for pipe inspection is used. The CCTV camera is capable of panning 360° and tilting 270°. The camera is positioned in the center of circular pipes and 2/3 the height in oval pipes. Lighting for the CCTV camera is suitable to allow a clear picture of the entire periphery of the pipe. The camera is capable of operating in 100% humidity conditions. The minimum acceptable camera resolution is 500 lines. The CCTV monitor and other components of the CCTV system are capable of producing a color picture/CCTV quality to the Owner's satisfaction.

The CCTV camera moves through the sewer at a constant rate, stopping when necessary to permit proper documentation of the sewer's condition for coding. The CCTV camera does not move at a speed greater than 25 feet per minute. Obtain a still picture (color jpeg format) of all significant defects observed during inspection. Record segment, location along sewer, clock position, time and defect code for each picture. Obtain a still photograph coaxial with each lateral.

Sonar inspection equipment is positioned in the pipe in accordance with the equipment manufacturer’s recommendations, and makes a complete 360 degree inspection of the pipe circumference at one inch intervals along the length of the pipe.

During the inspection the following information is clearly and continuously displayed on the periphery of the screen, monitor and CCTV recording: starting location ID, ending location ID, and distance from starting manhole or headwall. A global positioning System device is used to document the inlet and outlet locations.

If inspection of an entire sewer segment cannot be completed due to a collapse, excessive deformation, debris, intruding connections, obstructions or large displaced joints, move equipment to the downstream manhole/headwall and attempt inspection in the upstream direction.

Advise the Owner’s Representative on a daily basis if the complete sewer segment cannot be inspected.

Track all locations where a complete inspection is not obtained and clearly document the length of sewer not inspected, location, segment, distance from adjacent manholes, etc.

LIMITS OF CCTV AND SONAR INSPECTION

Within Levee Embankment Sections. Pipes penetrating the levee embankment cross section are inspected from headwall to headwall.

Beneath Levee Embankment Sections. Pipes underlying levee embankments which do not daylight at the levee toes are inspected a minimum distance of 15 horizontal feet as measured perpendicular from either toe; however, the inspection continues to the riverside headwall if the pipe does not daylight within the 15 horizontal feet.

T-Wall Sections. Pipes underlying T-Walls are inspected a minimum distance of 8 horizontal feet as measured perpendicular from either side of the base; however, the inspection continues to the riverside headwall if the pipe does not daylight within the 8 horizontal feet.

I-Wall Sections. Pipes underlying I-Walls are inspected a minimum distance of 15 horizontal feet as measured perpendicular from either face of the wall; however, the inspection continues to the riverside headwall if the pipe does not daylight within the 15 horizontal feet.

Discharge Pipes from Pump Stations. Discharge pipes from the pump stations are inspected between the pump discharge and the end of the discharge line at the headwall/gate well. If the discharge pipe ends in a gate well, inspection from the gate well to the headwall at the river is required. In this case, pipe access may be possible through an air vent and a push camera with adequate lighting may be used.

PIPE CONDITION CODING

Pipe condition coding for pipes subjected to CCTV inspection is done in accordance with the National Association of Sewer Service Companies’

(NASSCO) Pipeline Assessment Certification Program (PACP). The company performing the inspection shall provide qualifications for performing this work including experience and knowledge of NASSCO’s PACP procedures. The inspection team leader must demonstrate experience on similar projects and a minimum of 1-year experience in pipe inspection and PACP coding in accordance with NASSCO’s pipeline assessment program.

The information called out includes, but is not limited to the following:

Structural condition and deformation of the pipe walls Segment length (from inside walls of adjacent manholes) Manhole depth (invert to top of casting to nearest 0.1 ft) Blockages or obstructions and associated locations Condition of joints and pipe walls Standing water/sag conditions Infiltration/exfiltration Fluctuations in water level Size, location and condition of sewer laterals with the clock position

Distance measurements are referenced to the nearest 0.1 foot, using a readily identifiable baseline such as a headwall, manhole, or sluice gate.

The five PACP defect grades are shown in Table 1, and an example PACP report is provided in Attachment 1. Further details of the PACP condition grading system are available at www.nassco.org.

The NASSCO PACP coding procedure does not apply to pipes or portions of pipes where sonar inspection is used. A narrative description of the results of sonar inspection is provided along with profile images of pipe sections that display deterioration, profile offset, sediment accumulation, or any other concern with pipe integrity.

Table 1. PACP Defect Grades

Grade Description Estimated Time to Failure

1 EXCELLENT: Minor Defects.

Unlikely in the foreseeable future

2 GOOD: Defects that have not begun to deteriorate. 20 years or more

FAIR: Moderate defects that will continue to deteriorate.

10 to 20 years

POOR: Severe defects that will become grade 5 defects within the foreseeable future.

5 to 10 years

IMMEDIATE

ATTENTION: Defects requiring immediate attention.

Has failed or will likely fail within the next 5 years

REPORTS AND SUBMITTALS

Submit two copies of the following items within two weeks following completion of all required CCTV or sonar inspection activities:

Electronic inspection videos recorded and organized on CD or DVD.

Electronic still-capture pictures and sonar images of significant defects on CD or DVD.

Printed inspection logs with As-Built stationing, defect codes, and the PACP Ratings including, the Structural, Operation and Maintenance, Overall Quick Rating shall be provided (see example in Attachment 1).

Also provide an overall map locating these with pipe stationing shown. Sonar inspection defects are also mapped in a similar manner.

List of standard PACP defect codes.

Grade of the pipe invert in percent (if possible) Coordinates of the pipe inlet and outlet determined by handheld GPS, with estimated accuracy reported.

Copy of location maps (or as-built drawing, if possible) with an arrow added to show the pipe location and direction of CCTV camera travel (can be hand drawn).

Inspection reports shall beprovided in a bound report.

The inspection video is either configured for viewing using the latest version of Windows Media Player, or the appropriate viewing software must be submitted on each CD or DVD. Files are configured to have the ability to use all features of the CCTV player including fast forward capability.

No payment is made for poor or unacceptable quality CCTV’s or for portions of pipes that are not inspected for any reason. If, in the opinion of the Owner, the CCTV is of such poor quality that the condition of the sewer cannot be adequately assessed, the Contractor re-inspects the unacceptable segments and resubmit all deliverables for that segment at no additional cost to the Owner.

SECTION 3 – THIRD-PARTY HIGH-PRESSURE PIPES

The primary types of third-party high-pressure pipes (TPHPPs) are water distribution lines, natural gas pipelines, and hazardous liquid transmission lines.

The inspection protocol for TPHPPs used to determine pipe suitability is illustrated in Figure 2.

Water distribution pipes are not regulated by a federal agency and there are no national inspection standards. Several inspection techniques are available to pipe owners to evaluate the condition of the pipes. These methods include video inspection pressure testing, electrical methods, ultrasonics, acoustic emission, magnetic flux leakage, and remote field eddy current.

Owners of high-pressure water distribution pipes may have a pipe inspection program in place. If so, the Local Sponsor shall request confirmation in written format from the company operating the pressurized lines that they are in compliance with the appropriate regulatory agency requirements.

The local sponsor should then provide feedback to USACE. USACE may require additional inspection effort for pipes that pass through levees when warranted. If the pipe owner has no inspection program in place, the Local Sponsor shall request the pipe owner to develop a plan for the portion of the pipe that passes through the levee.

Natural gas pipeline safety is regulated under 49 CFR 192, Part 192-Transportation of Natural and Other Gas by Pipeline: Minimum Federal Safety Standards. The Part 192 requirements include assessment of condition using methods that are set out in a baseline assessment plan. The plan may specify methods such as internal inspection tools capable of detecting corrosion and any other threats;

pressure tests; or direct assessment to address threats of external corrosion, internal corrosion, and stress corrosion cracking. Other technology that an operator demonstrates can provide an equivalent understanding of the condition of the line pipe may also be used with approval. The assessment must be repeated at specified intervals

Pipelines that transport hazardous liquids, such as petroleum products, are regulated under 49 CFR 195 Part 195 - Transportation of Hazardous Liquids by Pipeline. The Part 195 requirements include the preparation of a baseline assessment plan similar to Part 192 for natural gas pipelines.

Both Parts 192 and 195 apply to pipes in “high consequence areas” which are defined based on the nearby presence of occupied structures.

Because these pipes may penetrate a levee in areas without nearby structures, the Local Sponsor shall ensure that the pipes are included in the high consequence area inspection schedule. USACE requires no further inspection unless site specific conditions warrant.

Figure 1. Pipe Condition Assessment Procedure for Gravity Pipes and Pump Station Discharge Pipes.

Figure 2. Pipe Condition Assessment Procedure for Third-Party High-Pressure Pipes (TPHPPs).

TV Truck Line

Flood Wall Inspection Photos / Inspection: Gate 150 Upstream MH Downstream MH Direction of Survey OH15269 OH15266 Upstream

6722 // Page: 155

Photo: OH15269_OH15266123825_05112009_A.JPG, VCR No.: FLOOD WALL#2, 01:42:22 0FT, Downstream Manhole, Survey Begins

Photo: OH15269_OH15266124326_05112009_A.JPG, VCR No.: FLOOD WALL#2, 01:42:36 0FT, Deposits Settled Compacted, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES

Photo: OH15269_OH15266124455_05112009_A.JPG, VCR No.: FLOOD WALL#2, 01:43:58 28.8FT, Water Level, Sag in pipe, 15 %of cross sectional area

Photo: OH15269_OH15266124520_05112009_A.JPG, VCR No.: FLOOD WALL#2, 01:44:10 35.8FT, Deposits Attached Encrustation, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint:

YES

Flood Wall Inspection Photos / Inspection: 1

6722 // Page: 156

Photo: OH15269_OH15266124541_05112009_A.JPG, VCR No.: FLOOD WALL#2, 01:44:21 37.9FT, Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

Photo: OH15269_OH15266124720_05112009_A.JPG, VCR No.: FLOOD WALL#2, 01:45:49 77.8FT, Material Change, Reinforced concrete pipe

Photo: OH15269_OH15266124748_05112009_A.JPG, VCR No.: FLOOD WALL#2, 01:46:07 83.6FT, Material Change, Vitrified clay pipe

Photo: OH15269_OH15266124807_05112009_A.JPG, VCR No.: FLOOD WALL#2, 01:46:12 83.6FT, Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Flood Wall Inspection Photos / Inspection: 1

6722 // Page: 157

Photo: OH15269_OH15266124848_05112009_A.JPG, VCR No.: FLOOD WALL#2, 01:46:48 104.3FT, Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish

Photo: OH15269_OH15266124907_05112009_A.JPG, VCR No.: FLOOD WALL#2, 01:46:54 104.3FT, Material Change, Reinforced concrete pipe

Photo: OH15269_OH15266124956_05112009_A.JPG, VCR No.: FLOOD WALL#2, 01:47:25 115.3FT, Upstream Manhole, Survey Ends

#Y

#Y

#Y #Y

#Y

#Y

#Y

#Y

#Y

#Y

#Y

#Y

#Y

#Y

#Y

#Y

#Y

#Y

#Y

#Y

DIXIE

HWY

36 In

In

In

18 In

In

In

OH15265

OH15272

OH15278

OH15267

OH15269

OH15266

OH15268

OH15271

OH15270

OH15264

FG0150

835+00

Floodwall TV Inspection

E

Linear Defects - Gate 150

STA 835+00 – 840+00

1/10/2010

0 3015 Feet

Copyright © 2010 LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT (MSD),LOUISVILLE WATER COMPANY, LOUISVILLE METRO GOVERNMENT, and JEFFERSON COUNTY PROPERTY VALUATION ADMINISTRATOR (PVA). All Rights Reserved.

Legend !? Flood Gate %[ Wastewater Treatment Plant "/ Sewer Pump Station #Y Other Drainage Point

#Y Storm Manhole

") Storm Lift Station !. Manhole !( Other Sewer Point

= Inspected Pipe Floodwall

= Sewer Line Force Main Drainage Water

Line Defects Deformed Pipe (D) Fracture Longitudinal (FM) Fracture Circumferential (FL)

! ! Crack Longitudinal (CL) Crack Circumferential (CC) Multiple Crack (CM)

44 Infilration Weeper/Dripper (IW,ID) ! ! Surface Spalling (SSS)

Surface Damage Aggregate Missing (SAM) Surface Reinforcement Visible/Chemical (SRV,SRVC ) Surface Damage Corossive Metalic Pipes (SCP) Obstacle Rocks (OBR) Roots Medium at Joints N(RMJ)

! ! Roots Fine at Joints (RFJ) Deposits Attached Encrustation (DAE,DAEJ) Deposits Attached Grease (DAG,DAGS) Deposits Attached Ragging/Settled/Other (DAR,DAZ,DSZ) Deposits Settled Compacted (DSC) Deposits Settled Fine (DSF) Lining Failure Detached (LFD) Mortar Missing Medium/Large (MML,MMM) Surface Aggrigate Visible Chemical (SAV,SAVC) Surface Roughness Increased Intruding (SRI,SRIZ)

H2EDDNC3

Highlight

H2EDDNC3

Highlight

#Y

#Y

#Y #Y

#Y

#Y

#Y

#Y

#Y

#Y

#Y

#Y

#Y

#Y

#Y

#Y

#Y

#Y

#Y

#Y

!A k

!A !A

!A

DIXIE

HWY

36 In

In

In

18 In

In

In

OH15265

OH15272

OH15278

OH15267

OH15269

OH15266

OH15268

OH15271

OH15270

OH15264

FG0150

835+00

Floodwall TV Inspection

E

Point Defects - Gate 150

STA 835+00 – 840+00

1/10/2010

0 3015 Feet

Copyright © 2010 LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT (MSD),LOUISVILLE WATER COMPANY, LOUISVILLE METRO GOVERNMENT, and JEFFERSON COUNTY PROPERTY VALUATION ADMINISTRATOR (PVA). All Rights Reserved.

Legend !? Flood Gate %[ Wastewater Treatment Plant "/ Sewer Pump Station #Y Other Drainage Point

#Y Storm Manhole ") Storm Lift Station !. Manhole !( Other Sewer Point

Point Defects k Crack Multiple !A Material Change !A Hard/Compacted Material !< Water Level Sag

= = Inspected Pipe Floodwall

= =Sewer Line Drainage Water

H2EDDNC3

Highlight

Attachment 2

A B C D E F G H I J K L M N Priority Points: Length (ft) Category TCP = Terra Cotta Pipe Levee= 3 1055 x>18 in WIP = Wrought Iron Pipe VCP/TCP= 1 1700 12<=x<=18 in CIP = Cast Iron Pipe Size= 0.0417*Size-0.25 4025 1.5<=x<12 in VCP = Vitrified Clay Pipe --> 6-inch=0, 18-inch=0.5, 30-inch=1.0, 48-inch=1.5, 60-inch=2.0 35 x<1.5 in RCP = Reinforced Concrete Pipe 6815

110 non-circular CP = Concrete Pipe

6925 TOTAL

RANK SYSTEM RIVER THROUGH BANK STATION Length (ft) ID Drawing SIZE (inches) AREA (sq ft) MATERIAL SCORE 1 3 Stonycreek Levee Right 20573 60 RB-P156 038abc-P10-82_56 20 2.2 VCP 4.5726 2 3 Stonycreek Levee Right 20794 60 RB-P158 038abc-P10-82_56 20 2.2 VCP 4.5726 3 3 Stonycreek Levee Right 18585 30 RB-P134 038abc-P10-82_53 18 1.8 VCP 4.4892 4 3 Stonycreek Levee Right 19482 130 RB-P143 038abc-P10-82_54 15 1.2 VCP 4.3641 5 3 Stonycreek Levee Right 18810 30 RB-P141 038abc-P10-82_53 10 0.5 VCP 4.1556 6 3 Stonycreek Levee Right 19807 35 RB-P146 038abc-P10-82_55 10 0.5 VCP 4.1556 7 3 Stonycreek Levee Right 16548 30 RB-P106 038abc-P10-82_49.1 8 0.3 VCP 4.0722 8 3 Stonycreek Levee Right 18350 30 ? 038abc-P10-82_52 8 0.3 VCP 4.0722 9 3 Stonycreek Levee Right 20675 60 RB-P157 038abc-P10-82_56 8 0.3 VCP 4.0722

10 3 Stonycreek Levee Right 19140 120 RB-P142 038abc-P10-82_54 30 4.9 Conc Pipe 3.9896 11 3 Stonycreek Levee Right 16724 30 RB-P108a 038abc-P10-82_50.1 6 0.2 VCP 3.9888 12 3 Stonycreek Levee Right 19788 35 RB-P145 038abc-P10-82_55 4 0.1 VCP 3.9054 13 3 Stonycreek Levee Right 20067 35 RB-P149 038abc-P10-82_55 24 3.1 CIP 3.7394 14 3 Stonycreek Levee Right 16736 30 RB-P109 038abc-P10-82_50.1 20 2.2 CIP 3.5726 15 3 Stonycreek Levee Right 18398 30 RB-P132 038abc-P10-82_52 20 2.2 CIP 3.5726 16 3 Stonycreek Levee Right 18690 30 RB-P137 038abc-P10-82_53 20 2.2 CIP 3.5726 17 3 Stonycreek Levee Right 18394 30 RB-P131 038abc-P10-82_52 12 0.8 CIP 3.239 18 3 Stonycreek Levee Right 16850 30 RB-P109a 038abc-P10-82_50.1 8 0.3 CIP 3.0722 19 3 Stonycreek Levee Right 19700 35 RB-P143a 038abc-P10-82_55 8 0.3 CIP 3.0722 20 3 Stonycreek Levee Right 19851 35 RB-P147 038abc-P10-82_55 8 0.3 CIP 3.0722 21 3 Stonycreek Levee Right 20400 30 RB-P152a 038abc-P10-82_56 8 0.3 PVC 3.0722 22 3 Stonycreek Levee Right 20529 50 RB-P155 038abc-P10-82_56 6 0.2 CIP 2.9888 23 3 Stonycreek Levee Right 18783 55 RB-P138 038abc-P10-82_53 2 0.0 CIP 2.822 24 3 Stonycreek Levee Right 18787 55 RB-P139 038abc-P10-82_53 2 0.0 CIP 2.822 25 3 Stonycreek Levee Right 18792 55 RB-P140 038abc-P10-82_53 2 0.0 CIP 2.822 26 3 Stonycreek Levee Right 19854 35 RB-P148 038abc-P10-82_55 1 0.0 Steam pipe 2.7803 27 3 Stonycreek Floodwall Right 1557 60 RB-P21 038abc-P10-82_2.1 72 28.3 RCP 2.741 28 3 Little Conemaugh Floodwall Left 3720 30 P4 038abb-P1-82_4.2 42x54 15.8 Concrete arch culvert 2 29 2 Conemaugh Floodwall Right 7070 40 038ab-P1-82_23.1 33x40 9.1 Stone culvert 2 30 2 Conemaugh Floodwall Right 8850 40 038ab-P1-82_25.1 36x15 3.8 Wood box culvert 2 31 3 Little Conemaugh Floodwall Left 2405 30 P6 038abb-P1-82_3.2 30 4.9 VCP 1.9896 32 2 Conemaugh Floodwall Right 8079 50 038ab-P1-82_24.3 30 4.9 TCP 1.9896 33 3 Little Conemaugh Floodwall Left 3539 30 P3 038abb-P1-82_4.2 48 12.6 CIP 1.7402 34 3 Stonycreek Floodwall Right 1565 60 RB-P22a 038abc-P10-82_2.1 24 3.1 TCP 1.7394 35 1 Stonycreek Floodwall Left 6123 30 LB-P228 038abc-P10-82_9.1 24 3.1 VCP 1.7394 36 1 Stonycreek Floodwall Left 12008 60 LB-P56 038abc-P10-82_42.1 24 3.1 VCP 1.7394 37 3 Stonycreek Floodwall Right 16266 100 RB-P101 038abc-P10-82_49.1 24 3.1 VCP 1.7394

A B C D E F G H I J K L M N 38 3 Little Conemaugh Floodwall Left 2100 30 P31 038abb-P1-82_2.2 24 3.1 VCP 1.7394 39 2 Conemaugh Floodwall Right 7263 40 038ab-P1-82_23.1 24 3.1 TCP 1.7394 40 1 Conemaugh Floodwall Left 15764 40 038ab-P1-82_69.1 24 3.1 TCP 1.7394 41 1 Stonycreek Floodwall Left 5467 100 LB-P156 038abc-P10-82_8.1 20 2.2 VCP 1.5726 42 1 Stonycreek Floodwall Left 5600 400 LB-P180 038abc-P10-82_8.1 18 1.8 VCP 1.4892 43 3 Little Conemaugh Floodwall Left 1600 30 P22 038abb-P1-82_2.2 18 1.8 VCP 1.4892 44 2 Little Conemaugh Floodwall Right 7775 30 P6 038abb-P1-82_8.1 18 1.8 VCP 1.4892 45 3 Stonycreek Floodwall Right 13313 30 RB-P70a 038abc-P10-82_44.1 16 1.4 VCP 1.4058 46 1 Stonycreek Floodwall Left 12102 30 LB-P57 038abc-P10-82_42.1 15 1.2 VCP 1.3641 47 1 Stonycreek Floodwall Left 12871 30 LB-P63 038abc-P10-82_43.1 15 1.2 VCP 1.3641 48 2 Little Conemaugh Floodwall Right 1052 30 P2 038abb-P1-82_1.2 15 1.2 VCP 1.3641 49 2 Conemaugh Floodwall Right 6436 50 038ab-P1-82_22.1 15 1.2 TCP 1.3641 50 2 Conemaugh Floodwall Right 6925 50 038ab-P1-82_23.1? 15 1.2 TCP 1.3641 51 1 Stonycreek Floodwall Left 11825 30 LB-P54 038abc-P10-82_42.1 14 1.1 VCP 1.3224 52 3 Little Conemaugh Floodwall Left 6620 30 P21 038abb-P1-82_7.1 36 7.1 RCP 1.2398 53 3 Stonycreek Floodwall Right 2478 30 RB-P40 038abc-P10-82_3.1? 12 0.8 VCP 1.239 54 3 Stonycreek Floodwall Right 2570 50 RB-P41a 038abc-P10-82_3.1 12 0.8 VCP 1.239 55 1 Stonycreek Floodwall Left 5538 50 LB-P168 038abc-P10-82_8.1 12 0.8 VCP 1.239 56 1 Stonycreek Floodwall Left 11614 40 LB-P50 038abc-P10-82_41.1 12 0.8 VCP 1.239 57 1 Stonycreek Floodwall Left 11806 30 LB-P53 038abc-P10-82_42.1 12 0.8 VCP 1.239 58 1 Stonycreek Floodwall Left 12320 30 LB-P58 038abc-P10-82_42.1 12 0.8 VCP 1.239 59 1 Stonycreek Floodwall Left 12491 60 LB-P60 038abc-P10-82_43.1 12 0.8 VCP 1.239 60 1 Stonycreek Floodwall Left 12902 70 LB-P64 038abc-P10-82_43.1 12 0.8 VCP 1.239 61 3 Stonycreek Floodwall Right 13480 30 RB-P70f 038abc-P10-82_44.1 12 0.8 VCP 1.239 62 2 Little Conemaugh Floodwall Right 420 30 038abc-P1-82_73 12 0.8 TCP 1.239 63 2 Little Conemaugh Floodwall Right 755 30 038abc-P1-82_73 12 0.8 TCP 1.239 64 2 Little Conemaugh Floodwall Right 1020 30 P1 038abb-P1-82_1.2 12 0.8 VCP 1.239 65 2 Little Conemaugh Floodwall Right 1330 30 P3 038abb-P1-82_1.2 12 0.8 VCP 1.239 66 2 Little Conemaugh Floodwall Right 7725 40 P5 038abb-P1-82_8.1 12 0.8 VCP 1.239 67 1 Stonycreek Floodwall Left 11605 50 LB-P49 038abc-P10-82_41.1 10 0.5 VCP 1.1556 68 2 Little Conemaugh Floodwall Right 1850 30 P3 038abb-P1-82_2.2 10 0.5 VCP 1.1556 69 1 Stonycreek Floodwall Left 6123 30 LB 038abc-P10-82_9.1 33 5.9 RCP 1.1147 70 1 Stonycreek Floodwall Left 5369 20 LB-P144 038abc-P10-82_8.1 8 0.3 VCP 1.0722 71 3 Stonycreek Floodwall Right 9293 30 RB-P391 038abc-P10-82_14.1 8 0.3 VCP 1.0722 72 1 Stonycreek Floodwall Left 11440 40 LB-P36 038abc-P10-82_41.1 8 0.3 VCP 1.0722 73 1 Stonycreek Floodwall Left 12675 30 LB-P61 038abc-P10-82_43.1 8 0.3 VCP 1.0722 74 1 Stonycreek Floodwall Left 12904 30 LB-P66 038abc-P10-82_43.1 8 0.3 VCP 1.0722 75 3 Stonycreek Floodwall Right 13475 30 RB-P70e 038abc-P10-82_44.1 8 0.3 VCP 1.0722 76 3 Stonycreek Floodwall Right 16297 100 RB-P102 038abc-P10-82_49.1 8 0.3 VCP 1.0722 77 2 Little Conemaugh Floodwall Right 1968 30 P4 038abb-P1-82_2.2 8 0.3 VCP 1.0722 78 2 Little Conemaugh Floodwall Right 6950 30 P1 038abb-P1-82_8.1 8 0.3 VCP 1.0722 79 2 Conemaugh Floodwall Right 6812 40 038ab-P1-82_23.1 8 0.3 TCP 1.0722 80 2 Conemaugh Floodwall Right 8136 30 038ab-P1-82_24.3 8 0.3 TCP 1.0722 81 2 Conemaugh Floodwall Right 8338 50 038ab-P1-82_24.3 8 0.3 TCP 1.0722 82 3 Stonycreek Floodwall Right 5124 20 RB-P126 038abc-P10-82_8.1 6 0.2 VCP 0.9888 83 3 Stonycreek Floodwall Right 5155 20 RB-P128 038abc-P10-82_8.1 6 0.2 VCP 0.9888

A B C D E F G H I J K L M N 84 3 Stonycreek Floodwall Right 5195 30 RB-P131 038abc-P10-82_8.1 6 0.2 VCP 0.9888 85 1 Stonycreek Floodwall Left 5377 20 LB-P146 038abc-P10-82_8.1 6 0.2 VCP 0.9888 86 3 Stonycreek Floodwall Right 5378 30 RB-P143a 038abc-P10-82_8.1 6 0.2 VCP 0.9888 87 1 Stonycreek Floodwall Left 5445 30 LB 038abc-P10-82_8.1 6 0.2 VCP 0.9888 88 1 Stonycreek Floodwall Left 5450 30 LB 038abc-P10-82_8.1 6 0.2 VCP 0.9888 89 1 Stonycreek Floodwall Left 5475 20 LB-P160 038abc-P10-82_8.1 6 0.2 VCP 0.9888 90 1 Stonycreek Floodwall Left 5483 20 LB-P161 038abc-P10-82_8.1 6 0.2 VCP 0.9888 91 1 Stonycreek Floodwall Left 5580 120 LB-P175 038abc-P10-82_8.1 6 0.2 VCP 0.9888 92 1 Stonycreek Floodwall Left 5598 45 LB-P177 038abc-P10-82_8.1 6 0.2 VCP 0.9888 93 3 Stonycreek Floodwall Right 6038 30 RB-P223 038abc-P10-82_9.1 6 0.2 VCP 0.9888 94 1 Stonycreek Floodwall Left 6039 30 LB-P224 038abc-P10-82_9.1 6 0.2 VCP 0.9888 95 3 Stonycreek Floodwall Right 6041 30 RB-P225 038abc-P10-82_9.1 6 0.2 VCP 0.9888 96 1 Stonycreek Floodwall Left 6064 30 LB-P226 038abc-P10-82_9.1 6 0.2 VCP 0.9888 97 1 Stonycreek Floodwall Left 6103 30 LB-P227 038abc-P10-82_9.1 6 0.2 VCP 0.9888 98 3 Stonycreek Floodwall Right 6145 30 RB-P232 038abc-P10-82_9.1 6 0.2 VCP 0.9888 99 1 Stonycreek Floodwall Left 6310 40 LB-P238 038abc-P10-82_10.1 6 0.2 VCP 0.9888

100 1 Stonycreek Floodwall Left 11386 30 LB-P34 038abc-P10-82_41.1 6 0.2 VCP 0.9888 101 1 Stonycreek Floodwall Left 11390 30 LB-P35 038abc-P10-82_41.1 6 0.2 VCP 0.9888 102 1 Stonycreek Floodwall Left 11450 30 LB-P37 038abc-P10-82_41.1 6 0.2 VCP 0.9888 103 1 Stonycreek Floodwall Left 11659 30 LB-P51 038abc-P10-82_41.1 6 0.2 VCP 0.9888 104 1 Stonycreek Floodwall Left 11693 30 LB-P52 038abc-P10-82_41.1 6 0.2 VCP 0.9888 105 1 Stonycreek Floodwall Left 12802 30 LB-P62 038abc-P10-82_43.1 6 0.2 VCP 0.9888 106 1 Stonycreek Floodwall Left 12903 100 LB-P65 038abc-P10-82_43.1 6 0.2 VCP 0.9888 107 2 Little Conemaugh Floodwall Right 1540 30 P1 038abb-P1-82_2.2 6 0.2 VCP 0.9888 108 2 Little Conemaugh Floodwall Right 1960 30 P5 038abb-P1-82_2.2 6 0.2 VCP 0.9888 109 3 Little Conemaugh Floodwall Left 3009 45 P16 038abb-P1-82_3.2 6 0.2 VCP 0.9888 110 3 Little Conemaugh Floodwall Left 6665 30 P21a 038abb-P1-82_7.1 6 0.2 VCP 0.9888 111 2 Little Conemaugh Floodwall Right 6680 40 P8 038abb-P1-82_7.1 6 0.2 VCP 0.9888 112 2 Little Conemaugh Floodwall Right 6760 40 P9 038abb-P1-82_7.1 6 0.2 VCP 0.9888 113 2 Little Conemaugh Floodwall Right 6780 30 P10 038abb-P1-82_7.1 6 0.2 VCP 0.9888 114 2 Little Conemaugh Floodwall Right 7010 30 P2 038abb-P1-82_8.1 6 0.2 VCP 0.9888 115 2 Little Conemaugh Floodwall Right 7380 60 P4 038abb-P1-82_8.1 6 0.2 VCP 0.9888 116 2 Little Conemaugh Floodwall Right 7870 30 P1 038abb-P1-82_9.1 6 0.2 VCP 0.9888 117 2 Conemaugh Floodwall Right 6564 30 038ab-P1-82_23.1 6 0.2 TCP 0.9888 118 2 Conemaugh Floodwall Right 6682 40 038ab-P1-82_23.1 6 0.2 TCP 0.9888 119 2 Conemaugh Floodwall Right 7405 30 038ab-P1-82_23.1 6 0.2 TCP 0.9888 120 3 Stonycreek Floodwall Right 5102 20 RB-P124 038abc-P10-82_8.1 4 0.1 VCP 0.9054 121 3 Stonycreek Floodwall Right 5349 30 RB-P138 038abc-P10-82_8.1 4 0.1 VCP 0.9054 122 1 Stonycreek Floodwall Left 5575 30 LB 038abc-P10-82_8.1 4 0.1 VCP 0.9054 123 3 Stonycreek Floodwall Right 9281 20 RB-P390a 038abc-P10-82_14.1 4 0.1 TCP 0.9054 124 1 Stonycreek Floodwall Left 11600 40 LB-P48 038abc-P10-82_41.1 4 0.1 VCP 0.9054 125 2 Little Conemaugh Floodwall Right 2090 30 P7 038abb-P1-82_2.2 4 0.1 VCP 0.9054 126 2 Little Conemaugh Floodwall Right 2120 30 P8 038abb-P1-82_2.2 4 0.1 VCP 0.9054 127 2 Little Conemaugh Floodwall Right 6850 40 P11 038abb-P1-82_7.1 4 0.1 VCP 0.9054 128 2 Little Conemaugh Floodwall Right 2060 30 P6 038abb-P1-82_2.2 3 0.0 VCP 0.8637 129 3 Stonycreek Floodwall Right 1526 30 RB-P20 038abc-P10-82_2.1 18 1.8 RCP 0.4892

A B C D E F G H I J K L M N 130 2 Conemaugh Floodwall Right 7420 50 038ab-P1-82_23.1? 15 1.2 0.3641 131 2 Little Conemaugh Floodwall Right 75 30 038abc-P1-82_72.1 12 0.8 CIP 0.239 132 2 Little Conemaugh Floodwall Right 750 30 038abc-P1-82_73 12 0.8 CIP 0.239 133 3 Little Conemaugh Floodwall Left 2408 30 P7 038abb-P1-82_3.2 12 0.8 CIP 0.239 134 3 Little Conemaugh Floodwall Left 2471 30 P10 038abb-P1-82_3.2 12 0.8 CIP 0.239 135 2 Conemaugh Floodwall Right 8100 50 038ab-P1-82_24.3? 12 0.8 0.239 136 3 Stonycreek Floodwall Right 5208 30 RB-P133 038abc-P10-82_8.1 10 0.5 CIP 0.1556 137 3 Stonycreek Floodwall Right 5365 30 RB-P141 038abc-P10-82_8.1 10 0.5 CIP 0.1556 138 2 Little Conemaugh Floodwall Right 78 30 038abc-P1-82_72.1 10 0.5 CIP 0.1556 139 2 Little Conemaugh Floodwall Right 8010 30 P2 038abb-P1-82_9.1 10 0.5 CIP 0.1556 140 3 Stonycreek Floodwall Right 4637 30 RB-P74 038abc-P10-82_7.1 8 0.3 CIP 0.0722 141 3 Stonycreek Floodwall Right 4640 20 RB-P76 038abc-P10-82_7.1 8 0.3 CIP 0.0722 142 3 Stonycreek Floodwall Right 5055 20 RB-P122 038abc-P10-82_7.1 8 0.3 CIP 0.0722 143 3 Stonycreek Floodwall Right 5357 30 RB-P140 038abc-P10-82_8.1 8 0.3 CIP 0.0722 144 3 Stonycreek Floodwall Right 6141 30 RB-P230 038abc-P10-82_9.1 8 0.3 CIP 0.0722 145 2 Little Conemaugh Floodwall Right 1440 30 P4 038abb-P1-82_1.2 8 0.3 CIP 0.0722 146 2 Little Conemaugh Floodwall Right 1680 30 P2 038abb-P1-82_2.2 8 0.3 CIP 0.0722 147 2 Conemaugh Floodwall Right 7370 30 038ab-P1-82_23.1 8 0.3 WIP 0.0722 148 2 Conemaugh Floodwall Right 8068 30 038ab-P1-82_24.3 8 0.3 WIP 0.0722 149 3 Stonycreek Floodwall Right 2497 30 RB-P41 038abc-P10-82_3.1 6 0.2 CIP -0.0112 150 3 Stonycreek Floodwall Right 5168 30 RB-P129 038abc-P10-82_8.1 6 0.2 CIP -0.0112 151 3 Stonycreek Floodwall Right 5374 30 RB-P145 038abc-P10-82_8.1 6 0.2 CIP -0.0112 152 3 Stonycreek Floodwall Right 6134 30 RB-P229 038abc-P10-82_9.1 6 0.2 CIP -0.0112 153 3 Little Conemaugh Floodwall Left 1589 30 P21 038abb-P1-82_2.2 6 0.2 CIP -0.0112 154 4 Little Conemaugh Floodwall Left 2120 30 P32 038abb-P1-82_2.2 6 0.2 CIP -0.0112 155 3 Little Conemaugh Floodwall Left 2358 30 P43 038abb-P1-82_2.2 6 0.2 CIP -0.0112 156 3 Little Conemaugh Floodwall Left 2380 30 P45 038abb-P1-82_2.2 6 0.2 CIP -0.0112 157 3 Little Conemaugh Floodwall Left 2467 30 P9 038abb-P1-82_3.2 6 0.2 CIP -0.0112 158 3 Stonycreek Floodwall Right 6143 30 RB-P231 038abc-P10-82_9.1 4 0.1 CIP -0.0946 159 3 Little Conemaugh Floodwall Left 1630 30 P23 038abb-P1-82_2.2 4 0.1 CIP -0.0946 160 3 Little Conemaugh Floodwall Left 1640 30 P24 038abb-P1-82_2.2 4 0.1 CIP -0.0946 161 3 Little Conemaugh Floodwall Left 1650 30 P25 038abb-P1-82_2.2 4 0.1 CIP -0.0946 162 3 Little Conemaugh Floodwall Left 1670 30 P26 038abb-P1-82_2.2 4 0.1 CIP -0.0946 163 3 Little Conemaugh Floodwall Left 1690 30 P27 038abb-P1-82_2.2 4 0.1 CIP -0.0946 164 3 Little Conemaugh Floodwall Left 1730 30 P28 038abb-P1-82_2.2 4 0.1 CIP -0.0946 165 5 Little Conemaugh Floodwall Left 2220 30 P33 038abb-P1-82_2.2 4 0.1 CIP -0.0946 166 7 Little Conemaugh Floodwall Left 2250 30 P35 038abb-P1-82_2.2 4 0.1 CIP -0.0946 167 8 Little Conemaugh Floodwall Left 2270 30 P36 038abb-P1-82_2.2 4 0.1 CIP -0.0946 168 9 Little Conemaugh Floodwall Left 2290 30 P37 038abb-P1-82_2.2 4 0.1 CIP -0.0946 169 10 Little Conemaugh Floodwall Left 2310 30 P38 038abb-P1-82_2.2 4 0.1 CIP -0.0946 170 11 Little Conemaugh Floodwall Left 2320 30 P39 038abb-P1-82_2.2 4 0.1 CIP -0.0946 171 13 Little Conemaugh Floodwall Left 2340 30 P41 038abb-P1-82_2.2 4 0.1 CIP -0.0946 172 14 Little Conemaugh Floodwall Left 2350 30 P42 038abb-P1-82_2.2 4 0.1 CIP -0.0946 173 3 Little Conemaugh Floodwall Left 2396 30 P46 038abb-P1-82_2.2 4 0.1 CIP -0.0946 174 3 Stonycreek Floodwall Right 6249 30 RB-P233 038abc-P10-82_9.1 3 0.0 CIP -0.1363 175 12 Little Conemaugh Floodwall Left 2330 30 P40 038abb-P1-82_2.2 3 0.0 CIP -0.1363

A B C D E F G H I J K L M N 176 1 Stonycreek Floodwall Left 11510 30 LB-P39 038abc-P10-82_41.1 2.5 0.0 CIP -0.15715 177 6 Little Conemaugh Floodwall Left 2240 30 P34 038abb-P1-82_2.2 2 0.0 CIP -0.178 178 1 Stonycreek Floodwall Left 11583 30 LB-P47 038abc-P10-82_41.1 1.5 0.0 IP -0.19885

Scope of Work
Johnstown Levee/ Floodwall Culvert Cleaning and Video Inspections Pittsburgh District
2. General Statement of Work:
3. Description of Services for Levee/Floodwall Video Inspections:
4. Contractor Requirements:
5. Safety:
6. Deliverables:
7. Government Furnished Information
8. Project Schedule
9. Points of Contact:
Johnstown SOW Attacments 1_2
Scope of Work
Johnstown Levee/ Floodwall Culvert Video Inspections Pittsburgh District
2. General Statement of Work:
3. Description of Services for Levee/Floodwall Video Inspections:
4. Contractor Requirements:
5. Safety:
6. Deliverables :
7. Government Furnished Information
8. Project Schedule
9. Points of Contact:
1 Guidance for CCTV and Sonar Inspection Pipe Penetrating Levees_Reduced Size
Guidance for Inspection of Pipes Penetrating Levees.pdf
Pipe Example.pdf
gate_150_defect_line
gate_150_defect_point
JohnstownCulvertList_v3
Ranking