Emergency_Power_ACI_Pre-Proposal_Breifing.pdf
PDF 564 KB Posted
- Solicitation number
- W911WN-14-R-0001
About this file
Pre-Proposal Conference Slide Show
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911WN-14-R-0001-0002.pdf | ||
| Amendment_0002_-_Contractor's_Questions_and_Responses.docx | DOCX document | |
| 18-Potential_ISB_Locations.pdf | ||
| Contractor's_Questions_and_Responses.docx | DOCX document | |
| W911WN-14-R-0001-0001.pdf | ||
| Sing-In_Sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers
BUILDING STRONG®
Emergency Power Advanced Contracting Initiative (ACI)
W911WN-14-R-0001
Pre-proposal Conference 1:00 10 June 2014
Pittsburgh District
Emergency Power ACI
DISCLAIMER
Nothing discussed during this pre-proposal conference shall be construed as changing any terms and conditions of the solicitation.
Any change(s) to the solicitation will be made only by an amendment to the solicitation
Solicitation, Performance Work Statement, Instructions
On the Web www.fbo.gov Solicitation No. W911WN-14-R-0001 Request for Proposal with Attachments
• Section A – Solicitation/Contract Form
• Section B – Supplies or Services Price
• Section C – Performance Work Statement
• Section E – Inspection and Acceptance
• Section F – Deliveries or Performance
• Section G – Contract Administration Data
• Section I – Contract Clauses
• Section J – List of Attachments
• Section K – Representations, Certs & other Statements of Offerors
• Section L – Instructions, Conditions and Notices to Offerors
• Section M – Evaluation Factors for Awards http://www.fbo.gov/
Contract Structure
Regions Specific Coverage Contract Value FEMA Regions IX & X, PR, VI, Alaska, Hawaii, Guam, and AS
Arizona, California, Nevada, Idaho, Oregon, Washington, Puerto Rico (PR), US Virgin Islands (VI), Alaska, Hawaii, Guam, and America Samoa (AS) (AS not shown on the map)
$95,000,000
Total Contract Value $95,000,000
Offerors proposal must address all regions.
Contract Period
Base Contract:
►Date of Award – One year Period
Four One-Year Option Periods ►Decision to exercise any Option Period is solely at the discretion of the Government
How can you be awarded the ACI Emergency Power Contract??
Submit the Information Required in the RFP Follow the directions provided in Section L Evaluation Factors are shown in Section M The award will be made using a best value, trade-off methodology. The proposal that is determined to be the most beneficial to the Government, with appropriate consideration given to the evaluation factors identified in the solicitation, will be awarded the contract. The evaluation factors, other than cost or price, when combined, are approximately equal to cost or price.
The Technical Approach factor, is significantly more important than the Past Performance factor, which is slightly more important than the Small Business Participation Plan factor. The relative importance of the non-Cost sub-factors is listed in Section C. To receive consideration for award, a rating of no less than “Acceptable” must be achieved for each of the non- Cost factors/sub-factors. Offerors will be cautioned that the award may not necessarily be made to the lowest price offered.
What you need to submit.
Section L – Instructions, Conditions and
Notices to Offerors 3 Volumes
• Volume 1 – Technical Proposal & Past Performance (1 Original and 4 Copies)
• Volume 2 – Small Business Participation (1 Original and 1 Copy)
• Volume 3 – Price Proposal (1 Original and 2 copies)
Two CDs of the entire proposal also required
Volume I
Tab I: Factor I -Technical Approach Deployment Package Operations and Execution Plan Readiness, Activation, and Mobilization Plan Command, Control, and Communication Plan Quality Control, Environmental Protection, and Safety Plans
Volume I
Tab II: Factor II – Past Performance Experience and Sustainability of Key
Personnel Hauling and Installation of Diesel Generators and Related Equipment Operating, Servicing, and Maintaining
Generators and Related Equipment Assessing Power Needs
Volume II
Tab I: Factor III – Small Business Participation Plan Small Business Participation Plan Past Utilization of Small Business Concerns
Volume III Tab I - Price Proposal Rate Schedule Type III (CONUS & OCONUS) Deployment
Package Daily Expense Report for four days Type II (CONUS) Deployment Package Daily
Expense Report for four days Tab II - Certifications and Representations Section A – SF 33 Solicitation, Offer and
Award Section K - Representations, Certs & other
Statements of Offerors
Proposal Due Date/Time
Offerors must submit complete proposal, Volumes I, II, and III by date/time required:
08 July 2014 by 11:00 am (EST) U.S. Army Corps of Engineers
Pittsburgh District 1000 Liberty Avenue
22nd Floor, Room 2203 Pittsburgh, PA 15222
Offers submitted by Facsimile or Electronic methods will NOT be accepted
How will the proposal be evaluated?
Evaluation criteria is detailed in Section M of the RFP Carefully review Section L and M of the
RFP when preparing proposal Failure to furnish a complete proposal may result in elimination from consideration
Relative Importance of Factors Factor Relative Importance to
Other Factors Sub-Factor Relative Importance
I. Technical Approach
This Factor is significantly more important than Factor II. Past Performance and Factor III. Small Business Participation.
Sub-Factor A. Deployment Packages is significantly more important than Sub- Factor B. Operations and Execution Plan. Sub-Factor B. is more important than Sub-Factor C. Readiness, Activation, and Mobilization Plan; D.
Command, Control, and Communication Plan; and E. Quality Control, Environmental Protection, and Safety Plans. Subfactors C, D, and E are equally important.
II. Past
Performance
This Factor is slightly more important than Factor III.
Small Business Participation Plan.
Sub-Factors A, B, C, and D are in descending order of importance.
III. Small Business
Participation Plan
This Factor is less important than Factor I. Technical Approach and Factor II. Past Performance.
Sub-Factor A. Small Business Participation Plan is equally important as Sub-Factor B. Past Utilization of Small Business Concerns.
IV. Price
The evaluation factors, other than cost or price, when combined, are approximately equal to cost or price.
What if I have a question?
Questions must be submitted in writing via email to:
EmergencyPowerACI@usace.army.mil
Submit questions NLT COB 13 June 2014.
Addressing questions received after 13
June 2014 is at the discretion of the Contracting Officer.
mailto:EmergencyPowerACI@usace.army.mil
| Emergency Power Advanced Contracting Initiative (ACI) |
| Emergency Power ACI |
| Solicitation, Performance Work Statement, Instructions |
| Contract Structure |
| Contract Period |
| How can you be awarded the ACI Emergency Power Contract?? |
| What you need to submit. |
| Volume I |
| Volume I |
| Volume II |
| Volume III |
| Proposal Due Date/Time |
| How will the proposal be evaluated? |
| Relative Importance of Factors |
| What if I have a question? |
File details come from the government source that posted it. Updated .