00_31_31.13_08.pdf

PDF 21 KB Posted

Attached to
East Branch Cutoff Wall Construction Project Federal contract opportunity
Solicitation number
W911WN-13-R-0002
Issued by
Department of the Army Corps of Engineers Engineering District Pittsburgh

About this file

Revised Specification Section 00 31 31.13 08

View the file

Other files for this federal contract opportunity

Other files attached to East Branch Cutoff Wall Construction Project, newest first.
File Type Posted
W911WN-13-R-0002-0010.pdf PDF
01_45_00.00_10_-_Amendment_0009.pdf PDF
QUESTION_351_DIAGRAM.pdf PDF
DBWD_PA_130004__13_Sep_2013.pdf PDF
W911WN-13-R-0002-0009.pdf PDF
31_32_23.13_08_-_Amendment_0009.pdf PDF
Contractor_Questions__Responses_435-448.pdf PDF
BID_SCHEDULE.xlsx XLSX spreadsheet
Certified_Final_Tech_Specs_Volume__3D_-_Attachments_to_Specifications_-_AMEND_0008.pdf PDF
Attachment_8_-_Contractor_Proposed_Quantities.xlsx XLSX spreadsheet
W911WN-13-R-0002-0008_Plan_amended_26_Aug_2013.pdf PDF
W911WN-13-R-0002-0008_conformed.pdf PDF
Certified_Final_Tech_Specs_Volume__1_-_Technical_Specifications_-_AMEND_0008_-_Showing_Revisions.pdf PDF
Certified_Final_Tech_Specs_Volume__1_-_Technical_Specifications_-_AMEND_0008_-_Accepted_Revisions.pdf PDF
Attachment_6_Offerors_Expected_Funding.docx DOCX document
W911WN-13-R-0002-0007.pdf PDF
1_-_Rock_Core_Viewing_28_Jun_2013.pdf PDF
W911WN-13-R-0002-0006.pdf PDF
W911WN-13-R-0002_24_JUN_2013pdf.pdf PDF
3__-_Questions_ _Responses.pdf PDF
2_-_MSWord_format_Attachments_1_thru_7.doc DOC document
Core_Viewing_Sign_In_12_Jun_2013.pdf PDF
10_-_PERMIT_-_Phase_I_Site_Development_-_PADEP_NPDES_Notice_of_Termination.pdf PDF
1_-_PERMIT_-_Dam_Safety_-_Appendix_B_E S_Control_Report_(1).pdf PDF
7_-_PERMIT_-_Phase_I_Site_Development_-_E S_Drawings.pdf PDF
Core_viewing_sign_in_4_Jun_2013.pdf PDF
6_-_PERMIT_-_Phase_I_Site_Development_-_Appendix_B_E S_Report_Phase1.pdf PDF
2_-_PERMIT_-_Dam_Safety_-_Approval_Letter.pdf PDF
8_-_PERMIT_-_Phase_I_Site_Development_-_EBR_Site_Development_NPDES_Permit_Approval.pdf PDF
9_-_PERMIT_-_Phase_I_Site_Development_-_PADEP_NPDES_authorization_cover_letter.pdf PDF
5_-_PERMIT_-_Dam_Safety_-_Response_to_E S_TR_comments_2.pdf PDF
11_-_PERMIT_-__Phase_I_Site_Development_-_PADEP_NPDES_Permit_No._PAI_062411003.pdf PDF
00_31_31.13_08.pdf PDF
3_-_PERMIT_-_Dam_Safety_-_E S_Drawings.pdf PDF
Rock_Core_Viewing_Sign-up_3_June_2013.pdf PDF
Pre-Proposal_Conference_Sign-in_22_May_2013.pdf PDF
W911WN-13-R-0002-0002.pdf PDF
1._Certified_Final_Tech_Specs_Volume__1_-_Technical_Specifications_-_Amendment_0001.pdf PDF
Certified_Final_Tech_Specs_Volume_2A_-_GBR_Appendix_A.pdf PDF
Certified_Final_Tech_Specs_Volume_2E_-_GBR_Appendix_E.pdf PDF
W911WN-13-R-0002_LRP_EB_CUTOFF_WALL_10__May_2013.pdf PDF
Certified_Final_Tech_Specs_Volume_2F_-_GBR_Appendix_F.pdf PDF
Certified_Final_Tech_Specs_Volume_2H_-_GBR_Appendix_H.pdf PDF
Certified_Final_Tech_Specs_Volume_2I_-_GBR_Appendix_I.pdf PDF
W911WN-13-R-0002_PLANS.pdf PDF
Certified_Final_Tech_Specs_Volume_2G_-_GBR_Appendix_G.pdf PDF
Certified_Final_Tech_Specs_Volume_2_-_GBR.pdf PDF
Certified_Final_Tech_Specs_Volume_2B_-_GBR_Appendix_B.pdf PDF
Certified_Final_Tech_Specs_Volume_2D-2_-_GBR_Appendix_D-2.pdf PDF
Certified_Final_Tech_Specs_Volume_3_-_Attachments_to_Specifications.pdf PDF
Show all 50

East Branch Cutoff Wall Construction Project has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

East Branch Dam, Dam Safety Modification, Cutoff Wall

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 31 31.13 08

SUBSURFACE INVESTIGATION INFORMATION

PART 1 GENERAL

1.1 SUBSURFACE CONDITIONS

1.1.1 Inspection of Geologic Samples

1.2 REFERENCE INFORMATION ON SUBSURFACE CONDITIONS

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)

-- End of Section Table of Contents --

DOCUMENT 00 31 31.13 08 Page 1

W911WN-13-R-0002 REVISED BY AMENDMENT 0001

SECTION 00 31 31.13 08

SUBSURFACE INVESTIGATION INFORMATION

PART 1 GENERAL

1.1 SUBSURFACE CONDITIONS

Subsurface exploratory borings have been obtained by the Government to determine the general character of the subsurface materials within the project area. Locations of the borings and boring logs that fall within the area of this contract are included for the convenience of the Contractor in the 2012 Geotechnical Baseline Report for East Branch Dam provided as Volume 2 - 2012 Geotechnical Baseline Report of the contract documents. The Government assumes no responsibility for any interpretation or deductions made by the Contractor from the logs, data, or report. While the borings are generally representative of subsurface conditions at their respective locations and for their respective vertical reaches, localized variations of characteristics of the subsurface materials of this region should be anticipated. Groundwater elevations, shown on the boring logs, are those encountered at the time when the borings were taken and will fluctuate due to factors such as rainfall, lake and/or river stages.

Seven additional borings will be required to be obtained by the Contractor as part of this contract, refer to Specification Section 02 32 00 SUBSURFACE DRILLING, SAMPLING AND TESTING. It is the Contractor's responsibility to obtain additional information, if necessary in his judgment. See also Section 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS, paragraph 52.236-4011 SITE INVESTIGATION BY THE CONTRACTOR.

1.1.1 Inspection of Geologic Samples

Samples taken during geologic investigations by the Government are available to Contractor's and bidders for examination. These data represent the best subsurface information available; however, variations may exist in the subsurface between boring locations. Contractors and bidders may inspect these cores and samples as follows:

Pittsburgh Engineering Warehouse and Repair Shops 3510 Grand Avenue Pittsburgh, Pa 15225

Point of Contact: Mr. Kevin Gabig, CELRP-EC-DG Telephone (412) 395-7248

Cores from the following borings will be available for viewing on 3 June and 4 June 2013 from 8:00 a.m. to 4:00 p.m.: E-39, E-41, E-46, E-47, E-50, E-52, E-55, E-60.

Any request for viewings outside of thisthese dates will be by appointment only. Requests for all viewings are to be submitted by sending an email to LRP.CONTRACTING@USACE.ARMY.MIL with SUBJECT: "W911WN-13-R-0002: Core Viewing - your company name. Requests are to include the information required by FAR 52.236-27 SITE VISIT." Bidders must indicate any additional cores which they would like to inspect during viewings outside of these dates when requesting an appointment.

DOCUMENT 00 31 31.13 08 Page 2

1.2 REFERENCE INFORMATION ON SUBSURFACE CONDITIONS

Reference information on subsurface conditions at the project site is contained in the following reports:

USACE Pittsburgh District, 2012 Geotechnical Baseline Report for East Branch Dam (Volume 2 - 2012 Geotechnical Baseline Report)

RHEA Engineers & Consultants, Inc., Geotechnical Exploration and Phase II Environmental Site Investigation Summary Report – East Branch Dam, Elk County PA, prepared for USACE Pittsburgh District, September 2011

D'Appolonia Engineering Division of Ground Technology, Inc., Subsurface Exploration and 3D Model Development - East Branch Clarion River Lake Wilcox, Elk County, PA, prepared for USACE Pittsburgh District, 25 August, 2009

Gannett Flemming, Geotechnical Data Report - East Branch Dam, Elk County, PA, prepared for USACE Pittsburgh District, May 2012

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)

-- End of Section --

DOCUMENT 00 31 31.13 08 Page 3

00 31 31.13 08 - SUBSURFACE INVESTIGATION INFORMATION
00 31 31.13 08 - SUBSURFACE INVESTIGATION INFORMATION
PART 1 GENERAL
1.1 SUBSURFACE CONDITIONS
1.1.1 Inspection of Geologic Samples

1.2 REFERENCE INFORMATION ON SUBSURFACE CONDITIONS

PART 2 PRODUCTS NOT APPLICABLE
PART 3 EXECUTION NOT APPLICABLE