W911WN-09-B-0035-0004.pdf

PDF 21 KB Posted

Attached to
RECOVERY--99--Hydraulic Pump Systems, Locks 6 and 7, Allegheny River
Solicitation number
W911WN09B0035
Issued by

About this file

Amendment 0004 Answer more questions

View the file

Other files

File Type Posted
BID RESULTS.doc DOC document
W911WN09B0035.pdf PDF
W911WN-09-B-0035-0002.pdf PDF
W911WN-09-B-0035-0001.pdf PDF
Bill of Materials.pdf PDF
W911WN_09-B-0035_SPEC.pdf PDF
W911WN-09-B-0035.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81ET491665506

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Ref: Hydraulic Pump Systems

The purpose of this amendment is to answ er more questions. There are not changes to the solicitation, and the bid opening is not extended.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Sep-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-09-B-0035

X 9B. DATED (SEE ITEM 11)

18-Aug-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Sep-2009

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CECT-LRP

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2116

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911WN-09-B-0035

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0004

QUESTIONS AND ANSWERS:

Q1. The future contracts to install for two different Dam locations, will there be two separate contracts with maybe two separate contractors? Or one contract with one general contractor doing both dams at the same time?

A1: There are no final plans to install the HPUs at this time. We would expect that installation of both units would be done by the same contractor or by government forces. We would expect the HPU installations would be completed within a few weeks of each other.

Q2.Can both Dams be ready at the same time for the field service and training in the same week?

A1: We cannot say that everything will be done in the same week.

Q3. We have your hours for training course defined on page 11 at a total of eight hours. Is this one meeting for two dams in one location, or two separate meetings for eight hours each at each dam on different dates?

A3: The Contractor shall provide eight hours of training at each site.

Q4. We need the future contractor and our field service efforts on page 10 to be more defined and clear as two the amount of hours of time to be able fill in a Lump Sum Price, ( can the contractor call us for more than one trip?)

And is this for both dams locations or one? So we can all bid the same as with the field training.

A4: During installation we would expect some phone conversations between the installer and supplier for possible clarification of installation instructions. We would expect one (1) site visit per unit for final adjustment and commissioning of each unit.

(End of Summary of Changes)