Conformed Price Schedule.pdf
PDF 38 KB Posted
- Attached to
- RECOVERY--Z--PROJECT NUMBER 11740, Upgrade Remote Operation of 6 Navigation Dams, Monongahela River, PA
- Solicitation number
- W911WN09B0033
About this file
Conformed Copy of Price Schedule. Bidders are requested to use this conformed copy in preparing and submitting their bids.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID RESULTS.doc | DOC document | |
| W911WN-09-B-0033-0005.pdf | ||
| W911WN-09-B-0033-0004.pdf | ||
| 01 78 23.pdf | ||
| 01 45 01.pdf | ||
| 01 50 10.pdf | ||
| W911WN-09-B-0033-0003.pdf | ||
| WV080001.pdf | ||
| PA080004.pdf | ||
| W911WN-09-B-0033-0002.pdf | ||
| Site Visit Attendees.PDF | ||
| W911WN-09-B-0033-0001.pdf | ||
| PA080004.doc | DOC document | |
| W911WN-09-B-0033.pdf | ||
| WV080001.doc | DOC document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lump Sum ARRA - Reimbursement for Actual
FFP
Performance and Payment Bond Premiums (See Section 00800 Paragraph 52.228- 4000) FOB: Destination
PURCHASE REQUEST NUMBER: W81ET491776310
NET AMT
0002 3 Each ARRA - Project Signs
FFP
0003 1 Lump Sum ARRA - Remote Control System Upgrade
FFP
Charleroi Locks and Dam
0004 1 Lump Sum ARRA - Remote Control System Upgrade
FFP
Maxwell Locks and Dam
0005 1 Lump Sum ARRA - Remote Control System Upgrade
FFP
Point Marion Lock and Dam
0006 1 Lump Sum ARRA - Remote Control System Upgrade
FFP
Morgantown Lock and Dam
0007 1 Lump Sum ARRA - Remote Control System Upgrade
FFP
Hildebrand Lock and Dam
0008 1 Lump Sum ARRA - Remote Control System Upgrade
FFP
Opekiska Lock and Dam
Total, Remote Gate Control Systems Upgrade, Monongahela River, PA & WV, Items 0001 – 0008, INCLUSIVE
Do not round off totals, in case of a variation between the unit price and the extension, the unit price will be considered to be the bid. If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a prorata basis to every unit price in the bid schedule
File details come from the government source that posted it. Updated .