Technical SpecificationsR.pdf

PDF 10 MB Posted

Attached to
RECOVERY--Y--Findlay Township Water Transmission Line Project, Findlay Township, PAennsylvania
Solicitation number
W911WN09B0032
Issued by

About this file

Technical Specs

View the file

Other files

File Type Posted
BidResults for 09B0032.doc DOC document
W911WN-09-B-0032 Amend 02.pdf PDF
Amend 01 B-0032 Revised Specs.zip ZIP file
w911wn09b0032 Amend 01.pdf PDF
08-04-09 Potato Garden P2A Water Trans Lines Drawings.pdf PDF
W911WN-09-B-0032 Findlay Twp.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911WN-09-B-0032

Potato Garden Phase IIA Water Transmission Line Section 219 Project Findlay Township, Pennsylvania

Technical Specifications August 2009

FINDLAY TOWNSHIP MUNICIPAL AUTHORITY

ALLEGHENY COUNTY, PENNSYLVANIA

SPECIFICATION FOR:

POTATO GARDEN RUN PHASE IIA WATER TRANSMISSION

LINES

CONTRACT NUMBER: 30-114-94

INDEX

TECHNICAL SPECIFICATIONS

POTATO GARDEN PHASE IIA – WATER TRANSMISSION LINES

Page Section Title From To

DIVISION 01 – GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK 01 11 00-1 01 10 00-6

01 22 00.00 10 MEASIREMENT AND PAYMENT 01 22 00.00 10-1 01 22 00.00 10-10

01 30 00.10 GENERAL REQUIREMENTS 01 30 00.10-1 01 30 00.10-6

01 31 19 PROJECT MEETINGS 01 31 19-1 01 31 19-3

01 32 17 CONSTRUCTION PROGRESS SCHEDULE 01 32 17-1 01 32 17-3

01 33 00 SUBMITTAL PROCEDURES 01 33 00-1 01 33 00-9

List Of Required Submittals

01 35 00 SPECIAL REQUIREMENTS 01 35 00-1 01 35 00-6

01 41 00 REFERENCE STANDARDS 01 41 00-1 01 41 00-3

01 45 01 USACE QUALITY CONTROL 01 45 01-1 01 45 01-14

01 45 01.10 USACE QUALITY CONTROL SYSTEM (QCS) 01 45 01.10-1 01 45 01.10-9

01 50 00 CONSTRUCTION FACILITIES AND TEMPORARY

CONTROLS 01 50 00-1 01 50 00-7

01 50 10 PROJECT AND SAFETY SIGNS 01 50 10-1 01 50 10-4

Project and Safety Sign Standards

01 55 26 MAINTENANCE AND PROTECTION OF TRAFFIC 01 55 26-1 01 55 26-4

Appendix A – Highway Occupation Permit

01 57 13 TEMPORARY EROSION AND SEDIMENT CONTROL 01 57 13-1 01 57 13-7

01 57 20.00 10 ENVIRONMENTAL PROTECTION 01 57 20.00 10-1 01 57 20.00 10-15

01 60 00 MATERIAL AND EQUIPMENT 01 60 00-1 01 60 00-3

01 77 00 CONTRACT CLOSEOUT 01 77 00-1 01 77 00-5

DIVISION 03 – CONCRETE

03 30 53 CAST-IN-PLACE CONCRETE FOR UTILITY

CONSTRUCTION 03 30 53-1 03 30 53-3

DIVISION 31 - EARTHWORK

31 11 00 CLEARING AND GRUBBING 31 11 00-1 31 11 00-3

31 23 33 TRENCHING, BACKFILLING AND COMPACTING 31 23 33-1 31 23 33-13

31 41 00 SHORING AND BRACING 31 41 00-1 31 41 00-2

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 12 00 PAVING 32 12 00-1 32 12 00-5

32 92 19 FINISH GRADING AND SEEDING 32 92 19-1 32 92 19-8

DIVISION 33 - UTILITIES

33 11 13 PUBLIC WATER UTILITY DISTRIBUTION PIPING 33 11 13-1 33 11 13-19

Section 33 11 13 – Table 1

Contract No. 30-114-94 NIRA Consulting Engineers, Inc.

01 11 00 - 1

SECTION 01 11 00 – SUMMARY OF WORK

PART 1 – GENERAL

1.01 RELATED DOCUMENTS

A. Provisions of the Contract Documents, including requirements of Division 01 sections of the Specifications, apply to the work of this Section.

1.02 PROJECT DOCUMENTS

A. This project is entitled “Potato Garden Phase 11A Water Transmission Lines”.

1.03 DESCRIPTION OF WORK

A. This section provides an overview of Contractor requirements as further described by the below listed subsections.

1. Work Covered by the Contract Documents.

2. Responsibility of the Contractor.

3. Material and Equipment Furnished by Contractor.

4. Delivery and Storage of Equipment.

5. Substitutions.

6. Testing and Acceptance.

7. Special Conditions.

1.04 WORK COVERED BY THE CONTRACT DOCUMENTS

A. Without intending to limit and/or restrict the volume of work required by this Contract, the work generally consists of furnishing labor, materials, services, transportation, equipment, and appliances necessary to complete the following:

1. Preliminary Investigation: Supplement existing preliminary investigation of the site as required to provide a sound basis for the planned improvements including the water line, all other appurtenances, and all other work described by the Contract Documents. These investigations may include, but not be limited to, utility research, review of existing record drawings, site investigations and others as the Contractor requires to complete the Contract work.

2. Procurement and Construction: The following project features are to be included in the project and are to be furnished, installed or constructed (as appropriate) in accordance with the Contract Documents.

NIRA Consulting Engineers, Inc. Contract No. 30-114-94

01 11 00-2

a. Site facilities and services:

1. Provide services and facilities, required for construction work of this Contract, including, but not limited, to the following:

a. Temporary power.

b. Sanitation and toilets.

c. Lighting.

d. Hauling equipment and material.

e. Safety equipment and material.

f. Fire protection when and where required.

g. First aid station and supplies.

h. Test equipment.

i. Site security as appropriate.

j. Temporary buildings.

k. Drinking water.

2. Excavation, backfill of excavated materials, backfill of select materials, and compaction.

3. Surveying for locations and grades.

4. Waterline installation as specified herein.

5. Restoration of construction area as specified herein.

6. Maintain redline record drawings of Contract work completed and provide these redline drawings to the Engineer at project completion.

Redline record drawings shall be available for Engineer’s review at all times.

b. Quality Control: The Contractor shall develop a “Quality Control Plan” outlining a detailed program of inspection which will be followed throughout the Contract duration. This plan shall include, but is not limited to, the following:

1. Inspection and testing of excavation and backfill materials.

2. Planning and supervision of materials sampling and testing, except that undertaken by the Owner, as described in Section 01 45 00 – Quality Control.

3. Inspection of construction and installation activities to ensure compliance with this Contract.

01 11 00 - 3

4. Reports:

a. Daily inspection reports.

b. Compacting testing reports when performed by Contractor.

5. Records:

a. All reports.

b. Project files on all materials tested.

c. Photographs of all phases of construction.

6. The Contractor shall keep an accurate account of quantities of materials used and measurements of items used for this project, including invoice slips and weight bills.

1.05 RESPONSIBILITY OF THE CONTRACTOR

A. The responsibility of the Contractor includes construction of the proposed water system and connection to the existing water system as shown. These items are described in the Contract Documents.

B. It is strongly recommended that the Contractor examine the Contract Documents and visit the site to ascertain the extent and nature of the work prior to submitting a bid.

C. The Contractor is responsible for providing a complete and operational project, in accordance with the intent of the Specifications. Provide, without extra compensation, incidental items required as part of the work even though not particularly specified or indicated.

D. Should the Contractor object to the methods or materials specified, he shall so notify the

Owner or Engineer in writing. Proceeding without notice shall be construed as acceptance of the Construction Drawings and Specifications and a waiver of claims to the contrary. No change shall be made, to either the Construction Drawings or Specifications, without written approval of the Owner or Engineer.

E. In order to complete the various items of work, as defined by the specifications or reasonably implied therein, the Contractor may require the services of other crafts. The Contractor is responsible for assigning the work of the various crafts in accordance with national and/or local jurisdictional agreements.

F. Work performed and materials furnished under this Contract shall be in accordance with the Contract Documents, the General Conditions, applicable specifications of American Society of Testing and Materials, the Pennsylvania Department of Transportation Publications 19, 27, 34, 37, 68, 72, 212 and 408, and applicable ANSI/AWWA Standards Specifications (current revision).

G. Public utility companies known to have facilities within the project site are shown on the

Construction Drawings. The Owner does not guarantee that this includes all public utility companies who have facilities or who may install or adjust facilities within the right-of-way which may interfere with the Contractor’s operations. The Contractor is required to use the “One Call System” in accordance with the Pennsylvania Act 121-2008. The Contractor shall cooperate with these companies and shall exercise proper caution so as not to damage

01 11 00-4 any utility facilities. In the event of damage, the Contractor shall notify the utility Owner and the damaged facilities shall be repair at the Contractor’s expense.

H. Notify the PA One Call System and all utility companies seventy-two (72) hours prior to the start of work so that proper precautions can be exercised.

I. The private companies known to have facilities within the project site are identified on the

Construction Drawings. The Owner does not guarantee that this includes all facilities currently used by the private companies that may interfere with the Contractor’s operations.

The Contractor is required to cooperate with the companies to minimize utility service interruptions and shall exercise proper caution so as not to damage any private utility facility. In the event of damage, the Contractor shall notify the Owner of the utility and shall be responsible for the cost of repairs.

J. Obtain necessary permits needed for the transportation of equipment and material over private property, city streets and other roads and highways.

1.06 MATERIALS AND EQUIPMENT FURNISHED BY CONTRACTOR

A. Where manufacturer’s name, brand, or trademark is referred to throughout these Specifications, it has been selected to establish a standard of quality for the material and/or apparatus required. Materials of different manufacturers equal to the materials specified will receive full consideration and shall be subject to the approval of the Owner before being incorporated in the work. The Contract Price shall in all instances be based only upon materials specified.

B. Except as otherwise specified, materials shall be new and workmanship and material shall be of the best quality. Upon request, the Contractor shall furnish satisfactory evidence as to the kind and quality of material or appliance used throughout the work.

C. Materials furnished by the Contractor shall conform, where applicable, to the latest revision of standard or tentative specifications of the American Society for Testing and Materials or other standard specifications as described in Section 01 41 00 – Reference Standards of these Specifications.

D. Where material or equipment different than specified is approved equal by the Engineer, the Contractor is not relieved from meeting the standards of the specified equipment.

E. Equipment shall be installed in accordance with manufacturer’s instructions for the type and capacity of each piece of equipment used. These instructions shall be obtained from the manufacturer.

F. For layout and information purposes, the Contract Drawings and Specifications utilize and refer to the products specified. The Contractor shall be responsible for engineering required when equipment other than described on the Contract Documents is supplied, and results in changes in dimensions or configuration. Said equipment, layout, and/or configuration shall be approved by the Engineer, but said approval does not relieve the Contractor of engineering responsibilities.

1.07 DELIVERY AND STORAGE OF EQUIPMENT

A. Provide for delivery of equipment, unloading, and storage in a manner not to interfere with work operations. Assume responsibility for additional expense incurred because of equipment or material delivery delays.

01 11 00 - 5

B. Minimize material storage on the site. Schedule deliveries to coincide with the work as closely as practical.

C. Make arrangements for additional storage area at no additional cost to the Owner.

Equipment storage areas shall be secured and protected from the weather and vandalism as necessary.

1.08 SUBSTITUTIONS

A. Whenever materials or equipment are specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular supplier the naming of the item is intended to establish the type, function, and quality required. Unless the name is followed by words indicating that no substitution is permitted, material or equipment of other Suppliers may be accepted by the Engineer if sufficient information is submitted by Contractor to allow the Engineer to determine that the material or equipment proposed is equivalent or equal to the named. The procedure for review by the Engineer will include the following supplemented in the General Requirements. Requests for review of substitute items of material and equipment will not be accepted by Engineer from anyone other than Contractor. If Contractor wishes to furnish or use a substitute item of material or equipment, Contractor shall make written application to the Engineer for acceptance thereof, certifying that the proposed substitute will perform adequately the functions and achieve the results called for by the general design, be similar and of equal substance to that specified and be suited to the same use as specified. The application will state that the evaluation and acceptance of the proposed substitute will not prejudice Contractor’s achievement of Substantial Completion on time, whether or not acceptance of the substitute for use in the work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with Owner for work on the project) to adapt the design to the proposed substitute and whether or not incorporation or use of the substitute in connection with the work is subject to payment of any license fee or royalty. All variations of the proposed substitute from that specified will be identified in the application and available maintenance, repair and replacement service will be indicated. The application will also contain an itemized estimate of all costs that will result directly or indirectly from acceptance of substitute, including costs of redesign and claims of other contractors affected by the resulting change, all of which shall be considered by the Owner in evaluating the proposed substitute. The Owner may require the Contractor to furnish at the Contractor’s expense additional data about the proposed substitute.

B. If a specific means, method, technique, sequence or procedure of construction is indicated in or required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, sequence, technique or procedure of construction to determine that the substitute proposed is equivalent to that indicated or required by the Contract Documents.

The procedure for review by the Engineer will be similar to that provided in Section 1.08A as applied by the Engineer and as may be supplemented in the General Requirements.

C. The Engineer will be allowed a reasonable time within in which to evaluate each proposed substitute. The Engineer will be the sole judge of acceptability, and no substitute will be ordered, installed, or utilized without the Engineer’s prior written acceptance which will be evidenced by either a Change Order or an approved Shop Drawing. The Engineer may require the Contractor to furnish at the Contractor’s expense a special performance guarantee or other surety with respect to any substitute. The Engineer will record time required in evaluating substitutions proposed by the Contractor and in making changes in the Contract Documents occasioned thereby. Whether or not the Engineer accepts a proposed substitute, the Contractor shall reimburse the Owner for the charges of the Engineer and the Engineer’s consultants for evaluating each proposed substitute.

01 11 00-6

D. If any substitute items are submitted after the Contract has been awarded, and there is any question of equality of such items, samples may be required to the complete satisfaction of the Engineer. In no case shall additional remuneration be allowed because of the rejection of a submittal.

1.09 TESTING AND ACCEPTANCE

A. The Contractor is advised that the acceptance date of components of equipment and construction covered by this Contract is that date upon which this entire Contract is accepted, and not the date of completion of individual components or the date which the Owner started to use the components included in the Contract.

B. Where materials are required to conform to standard specifications, test or other authorities incorporated by reference, samples of these materials shall be furnished by the Contractor for inspection, testing and approval upon request or as described herein.

1.10 SPECIAL CONSIDERATIONS

A. Equipment furnished and installed under this Contract shall be in strict accordance with the current federal occupational and health standards.

B. Regulations of the Occupational Safety and Health Act of 1970 (OSHA) are in effect during the life of this Contract. The Owner will not be liable for any citations received by the Contractor from OSHA. It is the sole responsibility of the Contractor to comply with current OSHA Standards.

C. Unless noted otherwise in the Contract Documents, demolished material removed under this Contract shall become the property of the Contractor and must be promptly removed from the site.

D. The Contractor shall notify the Owner forty-eight (48) hours in advance of construction at any location where monuments are to be set or reset.

PART 2 – PRODUCTS

Not used.

PART 3 – EXECUTION

END OF SECTION 01 11 00

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 10

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 LUMP SUM PAYMENT ITEMS

1.1.1 Clearing and Grubbing

1.1.1.1 Payment

1.1.1.2 Unit of Measure

1.1.1.3 Payment Item

1.1.2 Maintenance and Protection of Traffic

1.1.2.1 Payment

1.1.2.2 Unit of Measure

1.1.2.3 Payment Item

1.1.3 Erosion and Sedimentation Control

1.1.3.1 Payment

1.1.3.2 Unit of Measure

1.1.3.3 Payment Item

1.1.4 Boring Under Existing Roads

1.1.4.1 Payment

1.1.4.2 Unit of Measure

1.1.4.3 Payment Items

1.1.5 Grading and Seeding

1.1.5.1 Payment

1.1.5.2 Unit of Measure

1.1.5.3 Payment Item

1.2 UNIT PRICE PAYMENT ITEMS

1.2.1 Test Holes for Underground Utility Verification

1.2.1.1 Payment

1.2.1.2 Measurement

1.2.1.3 Unit of Measure

1.2.1.4 Payment Item

1.2.2 Valves, Hydrants and Auxiliary Features

1.2.2.1 Payment

1.2.2.2 Measurement

1.2.2.3 Unit of Measure

1.2.2.4 Payment Item

1.2.3 Pipe Encasement

1.2.3.1 Payment

1.2.3.2 Measurement

1.2.3.3 Unit of Measure

1.2.3.4 Payment Item

1.2.4 Backfill

1.2.4.1 Payment

1.2.4.2 Measurement

1.2.4.3 Unit of Measure

1.2.4.4 Payment Item

1.2.5 Bituminous Pavement and Restoration

1.2.5.1 Payment

1.2.5.2 Measurement

1.2.5.3 Unit of Measure

SECTION 01 22 00.00 10 Page 1

1.2.5.4 Payment Items

1.2.6 Concrete Pavement Restoration

1.2.6.1 Payment

1.2.6.2 Measurement

1.2.6.3 Unit of Measure

1.2.6.4 Payment Items

1.2.7 Temporary Paving

1.2.7.1 Payment

1.2.7.2 Measurement

1.2.7.3 Unit of Measure

1.2.7.4 Payment Items

1.2.8 Driveway and Sidewalk Restoration

1.2.8.1 Payment

1.2.8.2 Measurement

1.2.8.3 Unit of Measure

1.2.8.4 Payment Items

1.2.9 Pavement Line Painting

1.2.9.1 Payment

1.2.9.2 Measurement

1.2.9.3 Unit of Measure

1.2.9.4 Payment Item

1.2.10 Vinyl Fencing

1.2.10.1 Payment

1.2.10.2 Measurement

1.2.10.3 Unit of Measure:

1.2.10.4 Payment Items

1.2.11 Pipe and Pipe Encasement

1.2.11.1 Payment

1.2.11.2 Measurement

1.2.11.3 Unit of Measure

1.2.11.4 Payment Items

1.2.12 Pipe Fittings and Accessories

1.2.12.1 Payment

1.2.12.2 Measurement

1.2.12.3 Unit of Measure

1.2.12.4 Payment Items

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)

-- End of Section Table of Contents --

SECTION 01 22 00.00 10 Page 2

SECTION 01 22 00.00 10

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 LUMP SUM PAYMENT ITEMS

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE in Section 00010 SUPPLIES OR SERVICES AND PRICES/COSTS and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.1.1 Clearing and Grubbing

1.1.1.1 Payment

This work is specified in Section 31 11 00 CLEARING AND GRUBBING. Payment for clearing and grubbing will be made at the contract lump sum price.

Payment shall include all costs for labor, equipment, and materials required for clearing and grubbing as specified.

1.1.1.2 Unit of Measure

Unit of measure: Lump Sum.

1.1.1.3 Payment Item

0001AC ARRA - Clearing and Grubbing

1.1.2 Maintenance and Protection of Traffic

1.1.2.1 Payment

This work is specified in Section 01 55 26 MAINTENANCE AND PROTECTION OF TRAFFIC. Payment for maintenance of traffic and any other incidental work shall be made at the contract lump sum price. Payment shall include all costs for labor, equipment, and materials required to maintain traffic as specified.

1.1.2.2 Unit of Measure

Unit of measure: Lump Sum.

1.1.2.3 Payment Item

0001AD ARRA - Maintenance and Protection of Traffic

SECTION 01 22 00.00 10 Page 3

1.1.3 Erosion and Sedimentation Control

1.1.3.1 Payment

This work is specified in Section 01 57 13 TEMPORARY EROSION AND SEDIMENT CONTROL. Payment for this item shall be based on the total Lump Sum Bid Price. This item includes rock construction entrances, silt fencing, inlet protection, and vegetative restoration, all as shown on the drawings and required. However, payments will be made monthly as the work progresses based on an estimated construction period. Payment shall include installation and maintenance of the Erosion and Sedimentation Control Plan as shown on the Construction Drawings and Specified. While the work progresses periodic inspections by the Contracting Officer and/or the Soil Conservation Service will occur. If these inspections show inadequate implementation and maintenance, payment for this item will be withheld until the deficiencies are adequately addressed.

1.1.3.2 Unit of Measure

Unit of measure: Lump Sum.

1.1.3.3 Payment Item

0001AE ARRA -Erosion and Sedimentation Control Implementation and Maintenance

1.1.4 Boring Under Existing Roads

1.1.4.1 Payment

Payment shall shall constitute full compensation for all labor, equipment, material and supply costs for boring and installing casing as specified.

The payment shall includes all costs of boring pit, 16' and 24” steel casing pipe, casing spacers, and casing end seals. Carrier pipe will be paid separately.

1.1.4.2 Unit of Measure

Unit of measure: Lump Sum.

1.1.4.3 Payment Items

0001AM ARRA - Bore # 3: Sta. 13+30± Bore Underneath U.S. Route 30 for Water Line 0001AN ARRA - Bore # 4: Sta. 38+23± Bore Underneath U.S. Route 30 for Water Line 0001AP ARRA - Bore # 1: Sta. 96+63± Bore Underneath U.S. Route 30 for Water Line 0001AQ ARRA - Bore # 2: Sta. 96+63 ± Bore Underneath US Route 30 for Future Sewer Line

1.1.5 Grading and Seeding

1.1.5.1 Payment

This work is specified in Section 32 92 19 FINISH GRADING AND SEEDING. The price shall be compensation for grading, cultivating, spreading topsoil, applying and mixing soil amendments, fertilizing, liming, planting seed, mulching seeded areas, and watering, and for furnishing all labor, SECTION 01 22 00.00 10 Page 4 materials, equipment, tools, and incidentals necessary to complete the work as specified.

1.1.5.2 Unit of Measure

Unit of measure: Lump Sum

1.1.5.3 Payment Item

0001BD ARRA - Finish Grading, Topsoil, Seeding and Sodding

1.2 UNIT PRICE PAYMENT ITEMS

Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular unit price payment item, shall be included in the listed unit price item most closely associated with the work involved. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.

1.2.1 Test Holes for Underground Utility Verification

1.2.1.1 Payment

This work is specified in Section 31 23 33 TRENCHING, BACKFILLING AND COMPACTING. Payment shall shall constitute full compensation for all labor, equipment, material and supply costs for excavating test holes to accurately determine the size, location, and type of existing water lines and other underground utilities, including locations for connections to existing 16" line as directed, as specified.

1.2.1.2 Measurement

Measurement will be made of the number of test holes excavated as approved or directed by the Contracting Officer or his authorized representative.

1.2.1.3 Unit of Measure

Unit of measure: Each.

1.2.1.4 Payment Item

0001AF ARRA - Test Holes for Underground Utility Verification in Accordance with Act 121

1.2.2 Valves, Hydrants and Auxiliary Features

1.2.2.1 Payment

This work is specified in Section 33 11 13 PUBLIC WATER UTILITY DISTRIBUTION PIPING. Payment shall shall constitute full compensation for all labor, equipment, material and supply costs for furnishing and installing gate valves, hydrants, air/vacuum valve assemblies, concrete thrust blocks, tapping sleeves and valves, and blow-off hydrant assemblies as specified.

SECTION 01 22 00.00 10 Page 5

1.2.2.2 Measurement

Measurement will be made of the number of items installed as specified.

1.2.2.3 Unit of Measure

Unit of measure: Each.

1.2.2.4 Payment Item

0001AG ARRA - 16-Inch Gate Valve & Box Complete in Place 0001AH ARRA - Fire Hydrant Assembly with Valve and Anchoring Tee.

Complete in Place 0001AJ ARRA - 2-Inch Air/Vacuum Valve Assembly with Manhole. Complete in Place 0001AK ARRA - Concrete Thrust Blocks (16” Fittings) (As Directed) 0001AL ARRA - 16” x 16” Tapping Sleeve and Valve Complete in Place 0001BM ARRA - 2-Inch Blow-Off Hydrant Assembly Complete in Place

1.2.3 Pipe Encasement

1.2.3.1 Payment

This work is specified in Section 03 30 53 CAST-IN-PLACE CONCRETE FOR UTILITY CONSTRUCTION. The concrete encasement shall be constructed in full compliance with the Standard Details in those areas shown on the Contract Drawings or required. Concrete shall have a compressive strength of 3000 psi.

1.2.3.2 Measurement

Measurement for this item shall be based on the cubic yard of concrete encasement placed.

1.2.3.3 Unit of Measure

Unit of measure: Cubic Yard.

1.2.3.4 Payment Item

0001AR ARRA - Concrete Pipe Encasement

1.2.4 Backfill

1.2.4.1 Payment

This work is specified in Section 31 23 33 TRENCHING, BACKFILLING AND COMPACTING. Payment shall shall constitute full compensation for all labor, equipment, material and supply costs for furnishing and placing backfill as specified.

1.2.4.2 Measurement

Measurement for this item shall be based on the cubic yard of backfill material placed.

SECTION 01 22 00.00 10 Page 6

1.2.4.3 Unit of Measure

Unit of measure: Cubic Yard.

1.2.4.4 Payment Item

0001AS ARRA - No. 2A Crushed Limestone Backfill

1.2.5 Bituminous Pavement and Restoration

1.2.5.1 Payment

This work is specified in Section 32 12 00 PAVING. Payment shall shall constitute full compensation for all labor, equipment, material and supply costs for milling existing pavement and furnishing and placing asphalt pavement, including base course, and wearing course as specified.

1.2.5.2 Measurement

Milling and wearing course will be measured for payment by the square yard of surface milled or paved. Quantity measured for payment shall be the actual number of square yards milled or paved as approved by the Contracting Officer.

1.2.5.3 Unit of Measure

Unit of measure: Square Yard.

1.2.5.4 Payment Items

0001AT ARRA - S.R. 30 Trench Pavement Restoration: Superpave HMA Base Course, 25.0 mm, Up to 7-½” Depth; Superpave HMA Wearing Course, 9.5 mm, 1-½” Depth, SRL-E 0001AU ARRA - S.R. 30 Shoulder Pavement Restoration (PennDOT Type 6):

Superpave HMA Base Course, 25.0 mm, 4” Depth; Superpave HMA Wearing Course, 9.5mm, 1-½” Depth; SRL-G 0001AV ARRA - Temporary Paving (Cold Patch) 0001AW ARRA - Burgettstown Road Trench Pavement Restoration: Superpave HMA Base Course, 25.0 mm, 4” Depth; Superpave HMA Wearing Course, 9.5 mm, 1-½” Depth, SRL-G 0001AX ARRA - Milling 1½” Depth (State Roads) 0001AY ARRA - Full-Lane Paving with Superpave HMA Wearing Course, 9.5 mm, 1-½” Depth, SRL-E 0001AZ ARRA - Milling 6”± Depth (Hamilton Lane) 0001BA ARRA - Hamilton Lane Full-Width Paving: Superpave HMA Base Course, 25.0 mm, 5” Depth; Superpave HMA Wearing Course, 9.5 mm, 1-½” Depth, SRL-G 0001BB ARRA - Public Works Road Trench Pavement Restoration: Superpave HMA Base Course, 25.0 mm, 5” Depth; Superpave HMA Wearing Course, 9.5 mm, 1-½” Depth, SRL-G

1.2.6 Concrete Pavement Restoration

1.2.6.1 Payment

This work is specified in Section 32 12 00 PAVING. Payment shall shall constitute full compensation for all labor, equipment, material and supply costs for milling existing pavement and furnishing and placing concrete pavement, including base course, and wearing course as specified.

SECTION 01 22 00.00 10 Page 7

1.2.6.2 Measurement

Milling and wearing course will be measured for payment by the square yard of surface paved. Quantity measured for payment shall be the actual number of square yards paved as approved by the Contracting Officer.

1.2.6.3 Unit of Measure

Unit of measure: Square Yard.

1.2.6.4 Payment Items

0001BC ARRA - Cement Concrete Paving: 8-Inch Min. Depth or Match Existing, Class HES or AA Cement Concrete (As Detailed)

1.2.7 Temporary Paving

1.2.7.1 Payment

Payment shall shall constitute full compensation for all labor, equipment, material and supply costs for temporary paving as specified.

1.2.7.2 Measurement

Restoration of driveways and sidewalks will be measured for payment by the ton of material placed as approved by the Contracting Officer. Measurement will be based on weigh slips from the plant.

1.2.7.3 Unit of Measure

Unit of measure: Ton.

1.2.7.4 Payment Items

0001BE ARRA - Temporary Paving (Cold Patch)

1.2.8 Driveway and Sidewalk Restoration

1.2.8.1 Payment

Payment shall shall constitute full compensation for all labor, equipment, material and supply costs for restoring driveways and sidewalks as specified.

1.2.8.2 Measurement

Restoration of driveways and sidewalks will be measured for payment by the square yard of surface restored. Quantity measured for payment shall be the actual number of square yards restored as approved by the Contracting Officer.

1.2.8.3 Unit of Measure

Unit of measure: Square Yard.

1.2.8.4 Payment Items

0001BF ARRA - Concrete Driveway Restoration

SECTION 01 22 00.00 10 Page 8

0001BG ARRA - Gravel Driveway Restoration 0001BH ARRA - 2A Course Aggregate Subbase at Depth When Ordered 0001BK ARRA - Concrete Sidewalk 0001BL ARRA - Bituminous Driveway Per Detail Complete In Place

1.2.9 Pavement Line Painting

1.2.9.1 Payment

This price shall constitute full compensation for all costs in connection with painting lines as shown on the drawings.

1.2.9.2 Measurement

Pavement line painting shall be measured along the line and shall include the actual length in place.

1.2.9.3 Unit of Measure

Unit of Measure: Linear Feet.

1.2.9.4 Payment Item

0001BJ ARRA - Pavement Line Painting

1.2.10 Vinyl Fencing

1.2.10.1 Payment

Payment for new vinyl fencing shall constitute full compensation for furnishing all materials, equipment, plant, and tools; and for labor and other incidentals necessary to complete the work as shown and as specified.

1.2.10.2 Measurement

Measurement for new vinyl fencing will be by the linear foot of fence installed and accepted.

1.2.10.3 Unit of Measure:

Unit of Measure: Linear Feet.

1.2.10.4 Payment Items

0001BN ARRA - Vinyl Fencing (per Detail)

1.2.11 Pipe and Pipe Encasement

1.2.11.1 Payment

This work is specified in Section 33 11 13 PUBLIC WATER UTILITY DISTRIBUTION PIPING. Payment for water line pipe shall be at the unit price bid per lineal foot for the various sizes and type of pipe. Pipe shall be measured along the longitudinal axis between the ends as laid and shall include the actual pipe in place. Payment shall include making connection to existing lines, trench excavation, shoring, control of ground and surface waters, preparation of subgrade, placing of bedding material, placing and joining pipe, backfilling with angular or rounded material to one foot above the top of pipe; backfilling and compacting the trench, with

SECTION 01 22 00.00 10 Page 9 excavated materials testing disinfection, flushing and all other work necessary to install the pipe complete in place. Work considered incidental to the pipe installation shall include maintaining and repairing all interfering utilities, providing adequate safety measures. These items of the work will not be paid for separately but will be included in the Unit Price for of pipe.

1.2.11.2 Measurement

Pipe shall be measured along the longitudinal axis between the ends as laid and shall include the actual pipe in place.

1.2.11.3 Unit of Measure

Unit of measure: Linear Feet.

1.2.11.4 Payment Items

0002AA ARRA - 16-Inch Ductile Iron Pipe and Fittings Complete in Place 0002AD ARRA - 16-Inch High Density Polyethylene Pipe Encasement, Complete in Place 0003AA ARRA - 16-Inch C-905 PVC Pipe and Mechanical Joint Fittings Complete in Place 0003AD ARRA - 16-Inch High Density Polyethylene Pipe Encasement, Complete in Place (for Ductile Iron Fittings Only)

1.2.12 Pipe Fittings and Accessories

1.2.12.1 Payment

This work is specified in Section 33 11 13 PUBLIC WATER UTILITY DISTRIBUTION PI. Payment shall shall constitute full compensation for all labor, equipment, material and supply costs for furnishing and installing the items, as specified.

1.2.12.2 Measurement

Measurement will be made of the number of items installed as specified.

1.2.12.3 Unit of Measure

Unit of measure: Each.

1.2.12.4 Payment Items

0002AB ARRA - 16-Inch Field-Lok Gasket for Ductile Iron Pipe 0002AC ARRA - 16-Inch Mega Lug for Ductile Iron Pipe 0003AB ARRA - 16-Inch PVC Joint Restraint For PVC Pipe Bells 0003AC ARRA - 16-Inch PVC Joint Restraint for use with Mechanical Joints

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)

-- End of Section --

SECTION 01 22 00.00 10 Page 10

SECTION 01 30 00.10

GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 DEFINITIONS

1.2 CONTRACTOR RESPONSIBILITIES

1.2.1 General

1.2.2 Licenses and Permits

1.3 DRAWINGS

1.3.1 Contract Drawings

1.4 WORK AREAS AND RESTRICTIONS

1.4.1 Work Areas

1.4.2 Hauling Materials and Equipment

1.4.3 Other Contractors

1.4.4 Storage Areas

1.4.5 Utilities

1.5 DAMAGE TO WORK

1.6 INSPECTIONS AND ACCEPTANCE OF WORK

PART 2 PRODUCTS

2.1 PRODUCTS AND PARTS OF STANDARD MANUFACTURE

PART 3 EXECUTION

3.1 TESTING

3.2 PRECONSTRUCTION CONDITION SURVEY

3.3 PROTECTION OF MATERIAL AND WORK

3.4 PROTECTION OF UTILITIES

3.5 PROTECTION AND MAINTENANCE OF ROAD TRAFFIC

3.6 PROTECTION OF EXISTING FACILITIES

-- End of Section Table of Contents --

SECTION 01 30 00.10 Page 1

SECTION 01 30 00.10

GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 DEFINITIONS

The following terms, where occurring within the Technical Specifications or on the contract drawings shall be defined as stated below:

a. Engineer - Contracting Officer or Contracting Officer's Authorized Representative

b. Construction Drawings - Contract Drawings

c. General Requirements - Contract Documents, including but not limited to, Section 00700 CONTRACT CLAUSES and Section 00800 SPECIAL

CONTRACT REQUIREMENTS

d. Owner - Government

1.2 CONTRACTOR RESPONSIBILITIES

1.2.1 General

Responsibilities of the Contractor include, but shall not be limited to, the items specified in Section 01 11 00 SUMMARY OF WORK, paragraph

RESPONSIBILITY OF THE CONTRACTOR.

1.2.2 Licenses and Permits

The Contractor shall be responsible for complying with all state or local contractor licensing or registration laws. The Contractor shall be responsible for furnishing qualified personnel for work which requires specialized registration or training.

1.3 DRAWINGS

1.3.1 Contract Drawings

The contract drawings reflect the work to be performed under this contract. In accordance with Section 00800 SPECIAL CONTRACT REQUIREMENTS, paragraph CONTRACT DRAWINGS, MAPS, AND SPECIFICATIONS, the Contractor shall check all such drawings immediately upon receipt, and verify the figures, dimensions, and the representation of the work, and shall promptly notify the Contracting Officer of any discrepancies. Any omissions from the drawings or misdescription of details of the work which are manifestly necessary to carry out the intent of the drawings, or which are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of work.

1.4 WORK AREAS AND RESTRICTIONS

1.4.1 Work Areas

As required by Section 00700 CONTRACT CLAUSES, paragraph OPERATIONS AND STORAGE AREAS, all operations of the Contractor shall be confined to the Limits of Disturbance as shown on the contract drawings and as required to

SECTION 01 30 00.10 Page 2 accomplish the work under this contract and as authorized and approved by the Contracting Officer.

1.4.2 Hauling Materials and Equipment

If the Contractor proposes to haul materials or equipment by road to the work site, such hauling shall be in accordance with all permits, bonds and other requirements of the state highway department and local authorities as applicable. No heavy hauling on public roads will be permitted until all permits and bonds have been obtained as required. The Contractor shall be responsible for investigating the load limits for local roads. All damage to transportation facilities, public or private property, or utilities caused by the Contractor's operations shall be repaired to the satisfaction of the Contracting Officer at no additional cost to the Government. Dirt, mud, debris and other materials which are deposited on the highways and roads shall be removed, as necessary or as determined by the Contracting Officer, to prevent creation of a dust nuisance or safety hazard. Upon completion of all work requiring use of the local roads, the roadways shall be restored to their preconstruction condition by cleaning and or reconstruction of damaged drainage facilities, base courses, and pavements as necessary. Repairs shall be made in the same manner as the original construction. No separate payment will be made for maintaining and restoring the condition of the roads, and all costs in connection therewith shall be considered as incidental to performance of the work.

1.4.3 Other Contractors

The Contractor is alerted to the fact that other contractors may be employed by the Government or local interests at, or in the vicinity of the site. See also Section 00700 CONTRACT CLAUSES paragraph WORK UNDER OTHER

CONTRACTS.

1.4.4 Storage Areas

Storage areas at the site will be limited to areas shown on the drawings and as required for performance of the work under this contract. No other areas will be made available at the project for storage of equipment and materials. All such work and storage areas and adjacent facilities shall be protected from damage by the Contractor's operations. Any damage caused by the Contractor's operations shall be repaired to the satisfaction of the Contracting Officer at the Contractor's expense. The Contractor's use of such storage areas shall not interfere with operation of the facilities.

1.4.5 Utilities

The Government will not make any utilities or services available to the Contractor; and the Contractor shall be responsible for furnishing all utilities and services required for performance of the work under this contract.

1.5 DAMAGE TO WORK

The responsibility for damage to any part of the permanent work shall be as set forth in Section 00700 CONTRACT CLAUSES, paragraph PERMITS AND RESPONSIBILITIES. However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood or earthquake, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor shall

SECTION 01 30 00.10 Page 3 make the repairs as ordered by the Contracting Officer. An equitable adjustment in the contract price will be made pursuant to Section 00700 CONTRACT CLAUSES, paragraph CHANGES, and such adjustment shall constitute full compensation for the repairs of the permanent work. Except as herein provided, damage to all work (including temporary construction), utilities, materials, equipment and plant shall be repaired to the satisfaction of the Contracting Officer at the Contractor's expense, regardless of the cause of such damage.

1.6 INSPECTIONS AND ACCEPTANCE OF WORK

Not withstanding other provisions of this contract, all materials and work to be performed under this contract shall be inspected and accepted by the Contracting Officer or his authorized representative(s). Inspections and acceptance will be performed on phases of the work, before the next definable sequential phase of work commences, OR may be performed at the completion of all of the work, as determined appropriate by the Contracting Officer. The Contracting Officer or his authorized representative shall be the individual(s) solely authorized to reject materials, disapprove or approve any work in progress, or order or direct any revision or change to the plans and specifications as presently shown and stated.

PART 2 PRODUCTS

2.1 PRODUCTS AND PARTS OF STANDARD MANUFACTURE

All materials, supplies and articles furnished so as to be incorporated into the work under this contract shall, whenever so specified and otherwise practicable, be standard products of recognized reputable manufacturers. Standard products of manufacturers other than those specified in the contract will be accepted when it is proven to the satisfaction of the Contracting Officer, in accordance with the Section 00700 CONTRACT CLAUSES, paragraph MATERIAL AND WORKMANSHIP, that they are equal in performance, strength, durability, usefulness and convenience for the purpose intended. Any changes required in the details and dimensions shown on the drawings as a result of the substitution of standard products, other than those provided for, shall be properly made as approved by the Contracting Officer, and at the expense of the Contractor. All products specified by "similar or equal to" a particular brand name are for descriptive purposes only and are not to imply that the product is available from only that source. Each major piece of equipment furnished under the contract shall be provided with a substantial nameplate securely fastened or cast in place and clearly inscribed with the manufacturer's name, year of manufacture, principal rating data and other pertinent data.

PART 3 EXECUTION

3.1 TESTING

Where testing is specified herein to be performed by the Government, the Government will perform the testing or will have the testing performed at a commercial laboratory at the expense of the Government. Where items or additional samples from items which have been previously tested and approved at the expense of the Government are required to be retested, the Government will bear the costs of such retesting. Where retesting is required because of the failure of previously tested samples, the expenses of all such retesting shall be borne by the Contractor at no extra expense to the Government. The Contractor shall pay for all additional retesting required due to subsequent test failures. Where so required for original

SECTION 01 30 00.10 Page 4 testing, retesting will be performed either in the Government laboratories or at such commercial laboratories as may be approved by the Contracting Officer.

3.2 PRECONSTRUCTION CONDITION SURVEY

Notwithstanding other Contract Clauses or Special Contract Requirements, the Contractor shall not begin construction until he has thoroughly documented the conditions of the site prior to construction. Documentation shall be DVD format videotape, which clearly shows the condition of the site prior to construction. All videotapes shall be labeled to clearly identify the location and date that the video was made. No separate payment will be made for video, and all costs in connection therewith shall be considered a subsidiary obligation of the Contractor. Videotapes and other documentation shall be submitted to the Contracting Officer.

3.3 PROTECTION OF MATERIAL AND WORK

The Contractor shall at all times protect and preserve all materials, supplies and equipment of every description (including property which may be Government-furnished or owned) and all work performed. A11 reasonable requests of the Contracting Officer to enclose or specially protect such property shall be complied with. If, as determined by the Contracting Officer, material, equipment, supplies and work performed are not adequately protected by the Contractor such property may be protected by the Government and the cost thereof may be charged to the Contractor or deducted from any payments due him.

3.4 PROTECTION OF UTILITIES

Notwithstanding the Section 00800 SPECIAL CONTRACT REQUIREMENTS, paragraph PROTECTION OF UTILITIES, and Section 00700 CONTRACT CLAUSES, paragraph

PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS, the Contractor shall locate and clearly identify all underground and above ground utility lines, wires, cables, pipes, poles, support lines, and culverts, within the Contractor's work area. The Contractor shall contact the Pennsylvania One Call System at telephone

(800) 242-1776 at least three days prior to beginning any Construction activity and comply with all applicable provisions of the state underground utility line protection laws. The Contractor shall be responsible for any costs associated with the utility locating services. The Contractor shall conduct his operations such that the utilities are not damaged or disturbed. Any damage to utilities caused by the Contractor's actions shall be repaired by him at no additional expense to the Government. The Contractor shall store materials and equipment in a manner that does not interfere with utility company services or utility company access to the facilities. The Contractor shall relocate any equipment or stockpiles, at no additional cost to the Government, that interfere with utility company operations, emergency repairs, or standard maintenance services.

3.5 PROTECTION AND MAINTENANCE OF ROAD TRAFFIC

During construction the Contractor shall maintain and protect traffic on all affected roads during the construction period except as otherwise specifically directed by the Contracting Officer. Such measures shall be in accordance with the applicable requirements of State and local authorities having jurisdiction. The traveling public shall be protected from damage to person and property. The Contractor shall submit his proposed traffic control plan for approval.

SECTION 01 30 00.10 Page 5

3.6 PROTECTION OF EXISTING FACILITIES

Care shall be taken when working around any existing structure. Any damage from the Contractor's operations to any structure or facility shall be repaired to the satisfaction of the Contracting Officer at no additional cost to the Government.

-- End of Section --

SECTION 01 30 00.10 Page 6

01 31 19 - 1

SECTION 01 31 19 – PROJECT MEETINGS

1.01 SECTION INCLUDES

A. General requirements for project meetings.

1.02 RELATED DOCUMENTS AND SECTIONS

A. Provisions of the Contract Documents, including requirements of all Division 1 Sections of the Specifications apply to all work of this section.

B. Section 01 33 00 – Submittals.

PART 2 – PRODUCTS

PART 3 – EXECUTION

3.01 GENERAL REQUIREMENTS

A. All project meetings shall be administered by the Engineer or Engineer’s Representative, who shall preside at all meetings, record significant proceedings and decisions and distribute copies of all meeting minutes.

B. Attendance of all meetings shall be required of representatives of the Owner, the Engineer, the Contractor, various utilities and agencies as needed, and any Subcontractors as pertinent to the agenda. The Contractor’s representative shall be capable of making decisions binding upon the Contractor.

3.02 SUBMITTAL

A. Comply with Division 01, Section 01 33 00 – Submittals.

3.03 PRE-CONSTRUCTION MEETING

A. A pre-construction meeting shall be held prior to the start of the construction at a time and place designated by the Engineer. The Contractor and the Contractor’s project superintendent shall attend this meeting.

B. The agenda shall include, but shall not be limited to the following:

1. Designation of responsible personnel including mailing addresses and day and evening phone numbers.

2. Discussion of the project schedule.

3. Processing of field decisions, change orders and invoicing.

4. Submittal, including pay estimates.

01 31 19 - 2

5. Procedures for maintaining project record documents.

6. Security and housekeeping.

7. Quality assurance.

8. Contract completion date.

9. Safety.

C. The Engineer will record the date, attendees and purpose of the meeting, the proceedings and decisions and distribute copies of all meeting minutes to all attendees within seven (7) working days of the meeting.

3.04 CONSTRUCTION PROGRESS MEETINGS

A. The entire project will be inspected in the field by the Engineer’s Representative.

B. Monthly progress meetings, or as scheduled by the Engineer, will be conducted for the purpose of coordinating all phases of the work. All commitments and schedules developed in these meetings shall be binding upon the Contractor. All possible sources of delay must be reported at the progress meeting so that their impact on the overall schedule can be immediately determined.

C. The agenda shall include, but not be limited to:

1. Review of previous meeting minutes.

2. Reviewing job progress since the previous meeting.

3. Review and coordination of work planned for the next period.

4. Reviewing field observations, problems and decisions.

5. Reviewing off-site fabrication and delivery schedules.

6. Identifying any problems which may impede the progress of the work.

7. Developing…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .