W81ET491776307

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Re: Roof Replacement at Braddock L/D, Hildebrand L/D, and Point Marion L/D

This modification is issued to include:

1. Revised Wage Rates effective 9/11/09 PA080001 and WV080002

2. Questions and Answ ers

See Summary of Changes

1. CONTRACT ID CODE PAGE OF PAGES

J 1 41

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Sep-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-09-B-0022

X 9B. DATED (SEE ITEM 11)

28-Aug-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Sep-2009

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CECT-LRP

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2116

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911WN-09-B-0022

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS AND ANSWERS

QUESTIONS AND ANSWERS

REROOFING PROJECTS

BRADDOCK , HILDEBRAND, AND POINT MARION LOCK & DAMS

Q1. The Braddock and Dam operations building is located on a concrete island between the locks, accessible only by a 4’ wide catwalk across the top of the lock gate. It will be difficult to access for a hot tar application. Can the roofing system for this building be revised to EPDM?

A1. No, the contract is for a modified bitumen roof.

Q2. What is the specified material for the roof drain and piping replacement on the Braddock Operations Building?

A2. The existing roof drains are steel pipe, we would accept steel or PVC pipe.

REVISED WAGE RATES

General Decision Number: PA080001 09/11/2009 PA1

Superseded General Decision Number: PA20070001

State: Pennsylvania

Construction Type: Building

Counties: Allegheny, Beaver, Butler, Fayette, Greene, Washington and Westmoreland Counties in Pennsylvania.

BUILDING ERECTION AND FOUNDATION EXCAVATION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories) EXCLUDING

SEWAGE AND TREATMENT PLANT PROJECTS

Modification Number Publication Date 0 02/08/2008 1 02/22/2008 2 03/07/2008 3 04/11/2008 4 06/20/2008 5 06/27/2008 6 07/18/2008 7 09/19/2008 8 10/10/2008 9 10/24/2008

10 11/21/2008 11 12/05/2008 12 12/12/2008 13 12/19/2008 14 12/26/2008 15 01/02/2009 16 02/27/2009 17 03/06/2009 18 04/03/2009 19 04/24/2009 20 05/01/2009 21 06/05/2009 22 06/12/2009 23 06/26/2009 24 07/03/2009 25 07/17/2009 26 07/24/2009 27 08/28/2009 28 09/11/2009

* ASBE0002-001 08/01/2009

Rates Fringes

Asbestos Workers/Insulator Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems..........$ 31.32 19.11

BOIL0154-001 06/01/2009

Rates Fringes

BOILERMAKER......................$ 36.70 20.82

BRPA0009-023 12/01/2008

BEAVER COUNTY

Rates Fringes

BRICKLAYER.......................$ 25.95 13.60

BRPA0009-024 12/01/2008

WASHINGTON (Cross Creek, Hanover, Jefferson, Mt Pleasant, Nottingham, Peters, Robinson, Smith, Union Twps) COUNTY

Rates Fringes

BRICKLAYER.......................$ 27.98 13.22

BRPA0009-027 12/01/2008

FAYETTE (Jefferson & Washington Twps), GREENE (Except Cumberland, Dunkirk, Greene, Monongahelia Twps), WASHINGTON (Remainder), AND WESTMORELAND (Rostraver Twp) COUNTIES

BRICKLAYER.......................$ 26.90 13.64

BRPA0009-028 06/01/2009

Rates Fringes

MASON - STONE (ALLEGHENY AND

WASHINGTON (Cross Creek, Hanover, Jefferson, Mt Pleasant, Nottingham, Peters, Robinson, Smith, and Union Twps) COUNTIES)..................$ 28.30 13.32

TILE SETTER (ALLEGHENY,

BEAVER, GREENE, AND

WASHINGTON COUNTIES).............$ 26.85 12.88

BRPA0009-029 12/01/2008

Rates Fringes

BRICKLAYER.......................$ 25.95 13.48

CARP0142-001 06/01/2009

ALLEGHENY, BEAVER, BUTLER, FAYETTE,GREENE, WASHINGTON AND

WESTMORELAND COUNTIES

Carpenter/Lather.................$ 27.82 11.02

CARP1759-001 06/01/2009

ALLEGHENY, BEAVER, BUTLER, FAYETTE, GREENE, WASHINGTON, AND

FLOOR LAYER: CARPET (SOFT)

FLOOR............................$ 27.82 11.02

* CARP2235-001 06/01/2009

MILLWRIGHT.......................$ 33.55 14.64

CARP2235-007 01/01/2009

Rates Fringes

PILEDRIVERMAN....................$ 28.85 12.10

ELEC0005-005 12/26/2008

BUTLER COUNTY

Rates Fringes

ELECTRICIAN......................$ 33.11 3%+$15.65

ELEC0005-007 12/26/2008

ALLEGHENY, FAYETTE, GREENE, WASHINGTON, AND WESTMORELAND

COUNTIES

ELECTRICIAN......................$ 33.11 3%+$15.65

ELEC0126-006 06/01/2008

ALLEGHENY, BEAVER, FAYETTE, GREENE, WASHINGTON, AND

Line Construction:

Groundhand..................$ 21.22 26%+5.55 Line Truck Operator.........$ 23.09 26%+5.55 Lineman.....................$ 37.45 26%+5.55 Winch Truck Operator........$ 24.96 26%+5.55

ELEC0712-005 03/02/2009

BEAVER COUNTY

Rates Fringes

ELECTRICIAN......................$ 29.20 17.48

ELEC1319-005 08/31/2008

BUTLER COUNTY

Groundman...................$ 24.53 17.13 Heavy Equipment Operator....$ 39.17 17.13 Lineman.....................$ 39.57 17.13 Truck Operator..............$ 25.72 17.13

ELEV0006-001 01/01/2009

Rates Fringes

ELEVATOR MECHANIC................$ 38.65 18.285+A&B

FOOTNOTE: A. Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.

B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day;

Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day.

* ENGI0066-001 12/01/2008

Rates Fringes

Power equipment operators:

CLASS 1.....................$ 27.765 14.13

CLASS 2.....................$ 24.83 14.13

CLASS 3.....................$ 23.11 14.13

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

CLASS I

Asphalt Paver, Asphalt Roller, Asphalt Plant Operator, Athey Loader, Auger (Truck or Tractor Mounted), Auto Grader (C.M.I. and similar), Backhoe (180� and 360� swing), Back-Filling Machine, Batch Plant, Bulldozer, Cable Layer, Cableway, Caisson Drill, Central Mix Plant, Compactor with Blade, Concrete Pump (all types), Over-Head Crane, Crane (Crawler or Truck Mounted)*, Tower Crane (Stationary or Climbing Type), Rough Terrain Crane**, Wagon Crane, Crushing and/or Screening Plant, Derrick Traveler, Derrick (all types)(when assistance is needed it will be an oiler or apprentice), Derrick Boats, Dragline, Drill (Davey or similar), Dredge, Drill (Well and Core)(Truck or Skid Mounted), Elevator, Excavating Equipment (all other), Fork Lift (Lull or similar), Franki Pile Machine (or similar), Guard Post Driver, Gradall (all types), Grader, Elevating Grader, Equipment Greaser, Helicopter, Helicopter Hoist Operators, Front End Loader, Hoist, Hydraulic Boom Truck, Jumbo Operator, Kocal, Koehring Scooper, Locomotive, Metro Chip Harvester (or similar), Mix Mobile, Mixer - Paver, Mucking Machine, Multiple Bowl Machines, Pile Driver (Sonic or similar), Scrapers, Shovels (powered), Slip Form Paver (C.M.I. and similar), Spreader (Concrete, Asphalt, or Stone), Tire Repairman (when assigned to a jobsite), Tower Mobile, Tractors (all types), Trencher, Tug Boat, Vermeer Saw, Welder (repairman), Whirley

* Cranes with Boom or Mast length (including jib) 100 ft or over shall be paid an additional $.50 per hour for each 50-foot increment of additional boom and/or jib length)

** Rough Terrain Cranes with Boom or Mast length (including jib) 101 ft or over shall be paid an Additional $.50 per hour for each 50-foot increment of additional boom and/or jib length)

Note: An additional $1.25 per hour (not counting boom pay) shall be paid for any crane (excluding overhead cranes) rated 100 ton or over.

CLASS II

Ballast Regulator, Boat (material or personnel)(powered), Boiler, Boring Machine, Compressor (combined with Air Tugger, Air Pump, Gunite Machine, or Sand Blaster), Concrete Belt Placer, Concrete Saw, Conveyor, Carry Crane, Crushing/Screening Plants, Curb Builder (self-propelled), Forklifts (ridden or self-propelled), Form Line Machine, Generator (over 5KW), Grout Pump, Heaters, Hoist (monorail, roof, one drum-regardless of power used), Huck Machine (or similar), Hydraulic Jack (single or multiple)(power driven), Ladavator, Mortar Mixer, Mulching Machine, Pavement Breaker (self-propelled or ridden), Pin Puller (powered), Pipe Cleaning Machine, Pipe Dream, Power Broom (except push type), Pulverizer, Pumps (regardless of power used), Roller/Compactor (Dirt), Refrigeration Plant, Ross Carrier (or similar), Seeding Machine, Skid Steer Loader (or similar), Slab Lifting Machine (hydraulic), Soil Stabilizer (pump type), Spray Cure Machine (power driven), Side Delivery Shoulder Spreader (attachment), Steam Jenny (or similar), Stone Crusher, Stone Spreader (self-propelled), Siphon (steam or air), Tie Tamper (multiple heads), Tractor (when used for landscaping, snaking, or hauling), Truck (Winch)(when hoisting and placing), Tube Finisher (C.M.I. and similar), Tugger, Water Blaster, Welding Machine, Well Point System

CLASS III

Brakeman, Deck Hand, Helicopter Signalman, Oiler*, Elevator (Alterations & Remodeling Commercial Buildings),

* Oilers on Truck Cranes: less than 50 ton shall receive $.10 over the Class III base rate; 50 ton up to 100 ton rated capacity shall be paid an additional $.25 per hour over the Class III base rate; 100 ton and over shall be paid an additional $1.00 per hour over the Class III base rate.

General Note: Hazardous Material Sites Level C & D receive $1.00 per hour premium for all classifications and Levels A & B receive $2.50 premium for all classifications

IRON0003-002 06/01/2009

ALLEGHENY, BEAVER, BUTLER, FAYETTE, WASHINGTON, AND

IRONWORKER.......................$ 29.43 21.25

IRON0549-002 12/01/2008

GREENE COUNTY

Rates Fringes

IRONWORKER.......................$ 28.75 10%+15.69

LABO0613-002 12/01/2008

Rates Fringes

Laborers:

GROUP 1.....................$ 20.52 9.16

GROUP 2.....................$ 20.67 9.16

GROUP 3.....................$ 20.80 9.16

GROUP 4.....................$ 21.27 9.16

LABORERS CLASSIFICATIONS

GROUP 1: COMMON LABORER - Building laborer; Brick removal for alterations; Carryable pumps; West brick buggy or similar; Walk behind forklift or similar (non self-propelled); Stripper and mover of forms; Toolroom man;

all material conveyors (regardless of power used, including starting and stopping); Pouring of mortar or aggregate into blocks of voids

GROUP 2: SKILLED LABORER - West brick buggy or similar (self propelled); Power wheelbarrows and buggies; walk behind forklift or similar (self-propelled); Drill runner; All operators of compacting equipment; Pipe layer; Burner;

Jackhammer man - concrete buster; Vibrator operator; Clay spade and/or similar; Gunnite nozzleman; Blaster; Concrete saw operator; Hod carrier; Scaffold builder; Air track operator; Bell and Bottom Man on furnace and stacks; Grout machine feeder and pump operator; Gunnite machine operator or similar; Gunnite machine potman or similar; Mortar Mixer; Mortar mixer machine (regardless of power used, including starting and stopping); Wagon drill operator;

Laser cleaner; Lancer

GROUP 3: Asbestos removal or abatement laborer

GROUP 4: Toxic or Hazardous waste handling laborer

* LABO0952-004 07/01/2009

Rates Fringes

Landscaping

GROUP 1.....................$ 18.25 9.05

GROUP 2.....................$ 18.67 9.05

GROUP 3.....................$ 18.97 9.05

LANDSCAPING CLASSIFICATIONS

GROUP 1: Landscape laborer to include general landscaping work and the driving of trucks for the distribution of materials on the job site but not to include trucks used to transport supplies to the job

GROUP 2: Skilled Landscape Laborer to plant all types of trees and shrubs without direct supervision.

GROUP 3 - Landscape tractor operator to operate small industrial rubber tire tractor equipped with front end loader and backhoe attachment or a skid loader with landscape attachments used for the sole purpose of landscape work including soil spreading, unloading and loading of materials and such other landscaping work but not for heavy and highway construction work

PAIN0057-003 08/01/2009

ALLEGHENY, FAYETTE, GREENE AND WASHINGTON COUNTIES

Rates Fringes

PAINTER

Brush.......................$ 24.77 12.63

PAIN0057-004 08/01/2009

BEAVER, BUTLER, AND WESTMORELAND COUNTIES

Rates Fringes

Painters:

Brush.......................$ 24.77 12.63 Spray.......................$ 24.77 12.63

PAIN0057-005 08/01/2009

DRYWALL FINISHER/TAPER...........$ 24.45 13.32

PAIN0751-001 09/01/2008

Rates Fringes

GLAZIER..........................$ 27.05 16.14

PLAS0031-014 06/01/2009

ALLEGHENY, BEAVER, BUTLER, FAYETTE, GREENE, WASHINGTON, AND

PLASTERER........................$ 26.13 11.65

PLAS0526-007 06/01/2009

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 25.79 11.82

PLUM0027-002 06/01/2009

ALLEGHENY, GREENE (except extreme Eastern portion), WASHINGTON (Area West of a North-South line drawn from East of McMurray to West of Fredericktown) and WESTMORELAND (City of Arnold and City of New Kensington Only) COUNTIES

PLUMBER..........................$ 33.75 16.37

PLUM0047-001 05/01/2009

BEAVER AND BUTLER COUNTIES

Rates Fringes

Plumber and Steamfitter..........$ 32.20 16.44

PLUM0354-001 06/01/2009

FAYETTE, GREENE, WASHINGTON (Area East of a North-South line drawn from East of McMurray to West of Fredericktown) AND

PLUMBER/PIPEFITTER...............$ 28.54 18.48

PLUM0449-001 06/01/2009

ALLEGHENY AND WASHINGTON COUNTIES (Area West of a North-South line drawn from East of McMurray to West of Fredericktown)

PIPEFITTER.......................$ 33.43 16.89

ROOF0037-001 06/01/2009

Rates Fringes

ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 26.50 11.19

SFPA0542-001 07/01/2009

ALLEGHENY COUNTY

Rates Fringes

SPRINKLER FITTER.................$ 30.84 16.60

SFPA0669-002 04/01/2009

BEAVER, BUTLER, FAYETTE, GREENE, WASHINGTON, AND WESTMORELAND

SPRINKLER FITTER.................$ 33.85 16.55

SHEE0012-002 07/01/2008

Rates Fringes

Sheet metal worker...............$ 30.20 18.76

TEAM0040-002 01/01/2009

Rates Fringes

Truck drivers:

GROUP 1.....................$ 24.23 $11.44+A+B

GROUP 2.....................$ 24.38 $11.51+A+B

GROUP 3.....................$ 24.91 $11.75+A+B

FOOTNOTES:

A. Hazardous/toxic waste material/work level A & B receive additional $2.50 per hour above classification rate

B. Hazardous/toxic waste materials/Work level C & D receive $1.00 per hour above classification

TRUCK DRIVERS CLASSIFICATIONS

GROUP 1 - Single Axle (2 axles including steering axle);

Includes partsman and warehoueman

GROUP 2 - Tandem - Tri-Axle - Semi-Tractor Trailer (combination) (3 axles or more including steering axle)

GROUP 3 - Specialty Vehicles; Heavy equipment whose capacity exceeds that for which state licenses are issued specifically refers to units in excess of eight (8) feet width (such as Euclids, Atley Wagon, Payloder, Tournawagons, and similar equipment when not self loaded);

Tar and Asphalt Distributors Trucks, Heavy Duty Trailer, such as Low Boy, High Boy

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: WV080002 09/11/2009 WV2

Superseded General Decision Number: WV20070002

State: West Virginia

Construction Type: Building

Counties: Barbour, Braxton, Brooke, Cabell, Calhoun, Doddridge, Gilmer, Grant, Hampshire, Hancock, Hardy, Harrison, Jackson, Kanawha, Lewis, Marion, Marshall, Mason, Mineral, Monongalia, Morgan, Ohio, Pendleton, Pleasants, Preston, Putnam, Randolph, Ritchie, Roane, Taylor, Tucker, Tyler, Upshur, Wayne, Webster, Wetzel, Wirt and Wood Counties in West Virginia.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories). See Heavy and Highway Construction General Wage determination for all work in connection with the clearing and grading of site, also all paving incidental to the project, and all incidental water lines, sewers and other utilities to within 5 feet of the building line)

Modification Number Publication Date 0 02/08/2008 1 02/22/2008 2 03/21/2008 3 04/11/2008 4 05/02/2008 5 06/20/2008 6 06/27/2008 7 07/04/2008 8 07/18/2008 9 08/08/2008 10 09/19/2008 11 11/07/2008 12 12/05/2008 13 01/02/2009 14 02/06/2009 15 03/06/2009 16 03/20/2009 17 04/03/2009 18 05/01/2009 19 06/05/2009 20 07/03/2009 21 08/07/2009 22 09/04/2009 23 09/11/2009

* ASBE0002-003 08/01/2009

BROOKE, HANCOCK, HARRISON, MARION, MARSHALL,MINERAL, OHIO,

TYLER AND WETZEL COUNTIES

Asbestos Workers/Insulator.......$ 31.32 19.11

SCOPE OF WORK:

Includes application of all insulating materials, protective coverings and finishings to all types of mechanical systems.

ASBE0080-001 03/02/2009

BRAXTON, CABELL, CALHOUN, DODDRIDGE, GILMER, JACKSON, KANAWHA,

LEWIS, MASON, PLEASANTS, PUTNAM, RITCHIE, ROANE, UPSHUR, WAYNE,

WIRT AND WOOD COUNTIES.

Asbestos/Insulator Worker........$ 30.00 16.17

SCOPE OF WORK:

Includes application of all insulating materials, protective coverings and finishings to all types of mechanical systems.

BOIL0045-003 10/01/2008

GRANT COUNTY

Rates Fringes

BOILERMAKER......................$ 30.96 16.87

BOIL0154-003 06/01/2009

BROOKE AND HANCOCK COUNTIES

Rates Fringes

BOILERMAKER......................$ 36.70 20.82

BOIL0667-001 10/01/2008

BARBOUR, BRAXTON, CABELL, CALHOUN, DODDRIDGE, GILMER,

HAMPSHIRE, HARDY, HARRISON, JACKSON, KANAWHA, LEWIS, MARION,

MARSHALL, MASON, MINERAL, MORGAN, MONONGALIA, OHIO, PENDLETON,

PLEASANTS, PRESTON, PUTNAM, RANDOLPH, RITCHIE, ROANE, TAYLOR,

TUCKER, TYLER, UPSHUR, WAYNE, WEBSTER, WETZEL, WIRT AND WOOD

COUNTIES.

BOILERMAKER......................$ 34.69 15.32

BRMD0006-003 06/01/2008

MINERAL COUNTY

BRICKLAYER (Brick, Stone, Marble, Mosaic, Pointers, Caulkers, Artifical, Tilesetters and Terrazzo workers).........................$ 26.52 11.60

BRWV0001-001 07/01/2008

MARSHALL, OHIO, TYLER AND WETZEL COS.

Rates Fringes

BRICKLAYER.......................$ 25.10 12.19

TILE SETTER......................$ 25.10 12.19

BRWV0006-003 06/01/2009

CALHOUN, JACKSON, PLEASANTS, RITCHIE, ROANE, WIRT AND WOOD COS.

Rates Fringes

BRICKLAYER.......................$ 25.74 12.38

TILE SETTER......................$ 25.24 12.38

BRWV0009-002 12/01/2008

BRAXTON, KANAWHA AND PUTNAM COS.

Rates Fringes

Bricklayer, Stonemason...........$ 26.54 14.40 Marble, Tile Layer & Terrazzo Worker...........................$ 26.54 14.40

BRWV0011-001 07/01/2008

BROOKE AND HANCOCK COS.

Rates Fringes

BRICKLAYER

Industrial..................$ 27.51 12.30 All other work..............$ 25.64 12.30

TILE SETTER......................$ 23.74 12.30

BRWV0015-002 12/01/2008

DODDRIDGE, GILMER, HARRISON, LEWIS, MARION AND UPSHUR COUNTIES

Rates Fringes

BRICKLAYER

Commercial..................$ 26.83 11.85 Industrial..................$ 28.35 11.85

BRWV0015-005 12/01/2008

BARBOUR, DODDRIDGE, GILMER, HARDY, HARRISON, LEWIS,MARION,

MONONGALIA, PRESTON, TAYLOR,TUCKER AND UPSHUR COUNTIES

Cement Masons:

Commerial...................$ 26.83 11.85 Industrial..................$ 28.35 11.85

BRWV0015-006 12/01/2007

CALHOUN, JACKSON, PLEASANTS, RITCHIE, ROANE, WIRT, AND WOOD

Counties

Marble & Tile Finisher...........$ 21.40 7.07

CARP0003-003 12/01/2008

BROOKE, HANCOCK, MARSHALL (North of 39 degrees 46' latitude) and OHIO COUNTIES

Carpenters: (carpet, drywall, lather, and soft tile installers)......................$ 23.07 11.62

CARP0302-001 06/01/2008

BUILDING

CABELL and WAYNE COUNTIES

Rates Fringes

Carpenter & Soft Floor Layer.....$ 27.31 13.61

PILEDRIVERMAN....................$ 27.31 13.61

* CARP0476-001 12/01/2008

BRAXTON, DODDRIDGE, GILMER, HARRISON, LEWIS, MARION, UPSHUR,

and WEBSTER COUNTIES

CARPENTER (carpet, drywall and soft tile installers)........$ 25.41 11.79 Piledriver.......................$ 25.91 11.79

* CARP0604-003 12/01/2008

BARBOUR, MONOGALIA, PRESTON, RANDOLPH, TAYLOR, and TUCKER

Carpenter......................$ 25.41 11.79

CARP0899-001 06/01/2008

CALHOUN, PLEASANTS, RITCHIE, TYLER, WIRT, and WOOD COUNTIES

Rates Fringes

Carpenters: (Soft Tile & Carpet Installers, Drywall installers)......................$ 25.00 11.44

PILEDRIVERMAN....................$ 25.00 11.44

CARP1024-003 05/01/2008

GRANT, HAMPSHIRE, HARDY, AND PENDLETON COUNTIES

Rates Fringes

CARPENTER (dry wall hangers and soft layers).................$ 24.95 9.75

CARP1024-006 05/01/2008

MINERAL AND MORGAN COUNTIES

Rates Fringes

CARPENTER........................$ 24.95 9.75

CARP1159-001 12/01/2008

JACKSON and MASON COUNTIES

Rates Fringes

CARPENTER........................$ 26.16 13.45

CARP1207-006 12/01/2008

KANAWHA, PUTNAM, and ROANE COUNTIES

Rates Fringes

CARPENTER........................$ 26.16 13.45

Pile Driver......................$ 26.16 13.45

CARP1519-001 06/01/2009

CABELL AND WAYNE COUNTIES

Rates Fringes

MILLWRIGHT.......................$ 30.11 14.14

CARP1755-001 12/01/2008

BRAXTON, CALHOUN, DODDRIDGE, GILMER, HARRISON, JACKSON,

KANAWHA,LEWIS, MARION, MASON, PLEASANTS, PUTNAM, RITCHIE,

ROANE, TYLER, UPSHUR, WETZEL, WIRT AND WOOD COUNTIES

MILLWRIGHT.......................$ 29.25 14.20

CARP1871-019 05/01/2009

BROOKE, HANCOCK, MARSHALL AND OHIO COUNTIES

Rates Fringes

MILLWRIGHT.......................$ 26.96 12.14

CARP2235-009 01/01/2009

BROOKE, HANCOCK, MARSHALL, OHIO & WETZEL COUNTIES

Rates Fringes

PILEDRIVERMAN....................$ 28.85 12.10

ELEC0026-010 11/07/2005

HARDY COUNTY

Rates Fringes

ELECTRICIAN......................$ 21.71 7.80

ELEC0141-001 09/01/2008

BROOKE (Buffalo Twp. only) MARSHALL, OHIO AND WETZEL COUNTIES

Rates Fringes

CABLE SPLICER....................$ 26.51 18.60

ELECTRICIAN......................$ 26.26 18.60

ELEC0141-002 09/01/2008

BROOKE (Buffalo Twp. only), MARSHALL, OHIO, AND WETZEL COUNTIES

Line Construction:

Cable Splicer...............$ 26.51 18.30 Groundsman..................$ 21.00 18.09 Lineman, Equipment Operator.$ 26.26 18.29

ELEC0246-003 10/29/2007

BROOKE (Except Buffalo Township), HANCOCK COUNTIES

Rates Fringes

ELECTRICIAN......................$ 31.00 18.29

FOOTNOTE: a. 1 1/2 Paid Holidays: The last scheduled workday prior to Christmas & 4 hours on Good Friday

ELEC0246-005 11/01/2004

BROOKE (Except Buffalo Twp.)AND HANCOCK COUNTIES

Rates Fringes

Line Construction:

Groundman...................$ 18.70 51.5%+a Lineman, Line Equipment Operator, and Truck Driver..$ 28.00 51.5%+a

FOOTNOTE: a. 1-1/2 Paid Holidays: The last scheduled workday prior to Christmas Day and 4 Hours on Good Friday.

* ELEC0307-003 06/01/2009

GRANT, HAMPSHIRE, MINERAL and MORGAN COUNTIES

Rates Fringes

ELECTRICIAN......................$ 27.60 14.24

* ELEC0307-004 06/01/2009

MINERAL COUNTY

Rates Fringes

LINE CONSTRUCTION: Equipment Operator.........................$ 26.22 14.18 LINE CONSTRUCTION: Groundman....$ 17.94 13.81 LINE CONSTRUCTION: Lineman......$ 27.60 14.24 LINE CONSTRUCTION: Truck Driver...........................$ 17.94 13.81

ELEC0317-001 06/01/2009

CABELL, MASON AND WAYNE COUNTIES

Rates Fringes

CABLE SPLICER....................$ 32.68 18.13

ELECTRICIAN......................$ 31.12 18.08

ELEC0317-009 05/25/2009

BRAXTON, CABELL, CALHOUN, GILMER, KANAWHA, MASON, PUTNAM,

ROANE, AND WAYNE COUNTIES

Cable Splicer...............$ 30.49 16.64 Equipment Operator..........$ 21.70 15.17 Groundman...................$ 17.61 15.01 Lineman.....................$ 27.15 15.37

ELEC0466-001 06/01/2008

BRAXTON, CALHOUN, GILMER, KANAWHA, PUTNAM, ROANE AND WEBSTER

CABLE SPLICER....................$ 33.50 13.71

ELECTRICIAN......................$ 30.45 13.61

ELEC0596-001 06/01/2009

BARBOUR, DODDRIDGE, HARRISON, LEWIS, MARION, MONONGALIA,

PENDLETON, PRESTON, RANDOLPH, TAYLOR, TUCKER, AND UPSHUR COS.

CABLE SPLICER....................$ 32.99 18.04

ELECTRICIAN......................$ 29.99 17.95

ELEC0596-002 06/01/2009

DODDRIDGE, LEWIS, MARION, AND UPSHUR COUNTIES

Rates Fringes

Line Construction:

Cable Splicers..............$ 29.69 17.94 Groundman & Truck Drivers...$ 21.59 17.70 Lineman & Equipment Op......$ 26.99 17.86

ELEC0968-002 06/01/2008

JACKSON, PLEASANTS, RITCHIE, TYLER, WIRT AND WOOD COUNTIES

Rates Fringes

Line Construction:

Groundman...................$ 21.37 3%+16.16 Lineman, Equipment Operator, and Cable Splicer.$ 28.81 16.71

ELEC0968-003 06/01/2008

JACKSON, PLEASANTS, RITCHIE, TYLER, WIRT AND WOOD COUNTIES.

Rates Fringes

ELECTRICIAN......................$ 28.81 16.71

ELEV0006-002 01/01/2008

BROOKE, HANCOCK, MARION, MARSHALL, OHIO AND WETZEL COUNTIES:

Rates Fringes

Elevator Constructor.............$ 37.65 16.285+A&B

Paid Holidays:

New Year's Day; Memorial Day; Independence Day; Labor Day;

Verterans Dayl; Thanksgiving day; the Friday after Thanksgiving Day; and Christmas Day.

Footnotes:

a. Employee contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.

ELEV0048-001 01/01/2009

BRAXTON, CABELL, CALHOUN, DODDRIDGE, GILMER, HARRISON, JACKSON,

KANAWHA, LEWIS, MASON, MINERAL, PLEASANTS, PUTNAM, RITCHIE,

ROANE, TYLER, PSHUR, WAYNE, WIRT AND WOOD COUNTIES

Elevator Constructor.............$ 37.30 18.285

PAID HOLIDAYS: a. New Year's Day; Memorial Day;

Independence Day; Labor Day; Thanksgiving Day; Christmas Day. Employer contributes 8% of the basic hourly rate for 5 years or more of service or 6% of the basic hourly rate for

6 months to 5 years of service as vacation pay credit.

ENGI0132-001 12/01/2008

POWER EQUIPMENT OPERATORS:

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 28.76 16.53

GROUP 2.....................$ 28.41 16.53

GROUP 3.....................$ 27.41 16.53

GROUP 4.....................$ 21.41 16.53

GROUP 1: All friction cranes, derricks, tower cranes and all cranes with 180 ft. or more of boom including mast and jibs or lifting capacity of 100 tons or more and hoists with 30,000 pound line pull or more, cableways.

GROUP 2: Those operating cranes, derricks, tower cranes, boom trucks, shovels, draglines, clamshells, caisson drilling rigs and similar equipment with a lifting capacity of 15 tons and over. Mechanic with tools with 3/4 inch drive and below.

GROUP 3: All tow boats or work boats, backhoes, end loaders, all excavators, gradalls, all other mechanics, side boom cat, all other cranes and concrete mixing plants, core drills, two drum hoist, concrete pump, mechanically operated laser screed, self contained hydraulic air drills, directional drill operator, standard gauge locomotive, rubber tired scraper, power grader dozer, tractor and pan, push cat, asphalt and concrete paving equipment operator, compactor, compactor with blade, material hauler, articulating equipment, material hoist, wellpoint system, forklift, trencher, air tugger "A" frame truck, grease truck operator, all tractors.

GROUP 4: Fireman, deckhand, elevators, ross carrier, air compressor, high compression equipment, load handler, "bobcat" or skid steer loader, greaser tender, two bag and under concrete mixer, assistant engineer on standard gauge locomotives, locomotive cranes, truck and crawler cranes, brakeman on cranes used for moving rail cars (when equipment is moving cars only), rollers, Barber green loader, mechanic tender, welding machines, light plants, generators, conveyors, mechanical heaters and pump operators, masonry hoist and all farm type tractors.

IRON0301-001 06/01/2009

Rates Fringes

Ironworkers:

BRAXTON, RANDOLPH

(southern portion) &

WEBSTER COUNTIES............$ 27.46 16.54

KANAWHA & PUTNAM COUNTIES...$ 25.78 16.54

IRON0549-001 12/01/2008

BARBOUR (north west third of county to include the Twps. of Philippi); BROOKE; HANCOCK; HARRISON; MARION; MARSHALL;

MONONGALIA; OHIO; TAYLOR; TYLER AND WETZEL COUNTIES

IRONWORKER.......................$ 28.75 15.69

IRON0568-003 05/01/2009

BARBOUR (Remainder of County), GRANT, MORGAN, PENDLETON, PRESTON, RANDOLPH (Remainder of County) AND TUCKER COUNTIES

IRONWORKER.......................$ 26.08 12.88

IRON0568-007 05/01/2009

HAMPSHIRE, HARDY AND MINERAL COUNTIES

Rates Fringes

IRONWORKER.......................$ 24.57 12.88

IRON0769-005 06/01/2009

CABELL AND WAYNE COUNTIES

Rates Fringes

Ironworkers:

ZONE 1:

0-10 miles from Union Hall.$ 28.38 17.37

ZONE 2:

10-50 miles from Union Hall.......................$ 28.78 17.37

ZONE 3:

50 miles & over from Union Hall.................$ 30.38 17.37

IRON0787-004 06/01/2009

CALHOUN, DODDRIDGE, GILMER, JACKSON, LEWIS, MASON, PLEASANTS,

RITCHIE, ROANE, UPSHUR, WIRT AND WOOD COUNTIES

Ironworkers:.....................$ 28.11 16.65

LABO0379-003 12/01/2008

HAMPSHIRE, MARION, MINERAL, MONONGALIA, MORGAN, PRESTON AND

TAYLOR COUNTIES

Laborers:

GROUP 1.....................$ 19.53 9.40

GROUP 2.....................$ 19.89 9.40

GROUP 3.....................$ 20.32 9.40

LABORER CLASSIFICATIONS

GROUP 1: Laborer, Carpenter Tender, Water boy, Fire watch, Demolition worker, Landscape laborer, Flagman.

GROUP 2: Powderman tender, Semi-skilled laborer, Scaffold builders, Signal man, Brick mason tenders, Plasterer tenders, Cement finishers tenders, Stone mason tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrator operators, Tamper operators, Chipping and peening hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Motorized buggy operators, Pipe layers tenders, Drill operators tenders sheeters and shorers, Post hole digger operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Workmen working with asbestos, Batch house scale operators, Workmen working with acid mortar and acid brick, Workmen working in acid with cresote and mastic asphalt, Nozzlemen for gunnite or sandblasting, Tool room attendants, Ride or walk roller tampers, Toxic & hazardous waste removal laborer, Asbestos abatement laborer, Lead-based paint remover, Grade checker, Pavement buster operators.

GROUP 3: Powderman, Air track operator, Pipe layer (including laser beam set-up), Burner and Blacksmith.

LABO0543-001 06/01/2009

CABELL, MASON AND WAYNE COUNTIES

Rates Fringes

Laborers:

GROUP 1:....................$ 23.66 11.15

GROUP 2:....................$ 24.15 11.15

GROUP 3:....................$ 24.46 11.15

LABORER CLASSIFICATIONS

GROUP 1: Laborer, Carpenter tender, Flagmen, Water boy, Fire watch, Demolition worker, Landscape laborer.

GROUP 2: Powderman tender, Semi-skilled laborer, Scaffold builders, Signal man, Brick mason tenders, Plasterer tenders, Cement finishers tenders, Stone mason tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrator operators, Tamper Operators, Chipping and peening hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Motorized buggy operators, Pipe layers tenders, Drill operators tenders Sheeters and shorers, Post hole digger operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Workmen working with asbestos, Batch house scale operators, Workmen working with acid mortar and acid brick, Workmen working in acid with cresote and mastic asphalt, Nozzlemen for gunnite or sandblasting, Tool room attendants, Ride or walk roller tampers, Toxic & Hazardous waste removal laborer, Asbestos abatement laborer, Lead-based paint remover,Grade checker.

GROUP 3: Blacksmith, Powderman, Air track operator, Pipe layer (including laser beam set-up), Burner.

LABO0809-002 07/01/2009

BROOKE AND HANCOCK COUNTIES

Rates Fringes

LABORER..........................$ 21.82 8.45

Asbestos Work; Hazardous Waste Work; Instrument & Laser; and Lead Based Paint Removal - Additional $.50 per hour

Hot Pay - Additional $1.00 per hour when working with other crafts receiving hot pay

LABO0984-001 12/01/2008

BARBOUR BRAXTON, DODRIDGE, GILMER, GRANT, HARDY, HARRISON,

LEWIS, PENDLETON, RANDOLPH, TUCKER, UPSHUR, and WEBSTER COUNTIES

LABORER

GROUP 1.....................$ 19.53 9.40

GROUP 2.....................$ 19.89 9.40

GROUP 3.....................$ 20.32 9.40

LABORER CLASSIFICATIONS

GROUP 1: Laborer, Carpenter Tender, Water boy, Fire watch, Demolition worker, Landscape laborer, Flagman.

GROUP 2: Powderman tender, Semi-skilled laborer, Scaffold builders, Signal man, Brick mason tenders, Plasterer tenders, Cement finishers tenders, Stone mason tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrator operators, Tamper operators, Chipping and peening hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Motorized buggy operators, Pipe layers tenders, Drill operators tenders sheeters and shorers, Post hole digger operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Workmen working with asbestos, Batch house scale operators, Workmen working with acid mortar and acid brick, Workmen working in acid with cresote and mastic asphalt, Nozzlemen for gunnite or sandblasting, Tool room attendants, Ride or walk roller tampers, Toxic & hazardous waste removal laborer, Asbestos abatement laborer, Lead-based paint remover, Grade checker, Pavement buster operators.

GROUP 3: Powderman, Air track operator, Pipe layer (including laser beam set-up), Burner and Blacksmith.

LABO1085-001 12/01/2008

CALHOUN, JACKSON, PLEASANTS RITCHIE, TYLER, WIRT AND WOOD

Laborers:

GROUP 1:....................$ 20.74 11.00

GROUP 2:....................$ 21.04 11.00

GROUP 3:....................$ 21.39 11.00

LABORER CLASSIFICATIONS

GROUP 1: Laborer, Carpenter Tender, Flagmen, Water Boy, Fire watch, Demolition worker, Landscape laborer.

GROUP 2: Powderman tender, Semi-skilled laborer, Scoffold builders, Signal man, Brick mason tenders, Plasterer tenders, Cement finishers tenders, Stone mason tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrator operators, Tamper operators, Chipping and peening, Hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Moterized Buggy operators, Pipe layers tenders, Drill operators tenders sheeters and shorers, Post hole digger operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Workmen working with asbestos, Batch house scale operators, Workmen working with acid mortar and acid brick, Workmen working in acid with cresote and mastic asphalt, Nozzlemen for gunnite or sandblasting, Tool room attendants, Ride or walk roller tampers, Toxic & hazardous waste removal laborer, Asbestos abatement laborer, Lead-based paint remover.

GROUP 3: Blacksmith, Powderman, Air track operator, Pipe layer (including laser beam set-up), Burner.

LABO1149-001 12/01/2008

MARSHALL, OHIO AND WETZEL COUNTIES

Rates Fringes

Laborers:

GROUP 1:....................$ 20.27 10.40

GROUP 2:....................$ 20.27 10.40

GROUP 3:....................$ 20.77 10.40

GROUP 4:....................$ 21.27 10.40

LABORER CLASSIFICATION

GROUP 1: Laborers, Carpenter tender, Flagmen, Water boy, Demolition worker, Deep ditch, Tool room attendants, Fire watch and Landscape laborer.

GROUP 2: Powderman tender, Semi-skilled laborer, Scaffold builders grade checker, Signal man, Brick masons tenders, Plasterers tenders, Cement masons tenders, Stone masons tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrater operators, Pavement buster operators, Chipping and peening hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Motorized buggy operators, Pipe layers tenders, Drill operators tenders, Sheeters and shorers, Post hole diggers operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Batch house scale operators, Workmen working with acid mortar, Mastic asphalt and acid brick, Workmen working in acid and with cresote, Nozzlemen for gunnite or sandblasting, Demolition worker, Ride or walk roller tampers, Deep ditch vertical 6 ft. or more, Scaffolding work over 50 ft.

(inside or out), Asbestos abatement laborer, Deep ditch, Toxic & hazardous waste removal laborer, Lead-based paint removal laborer.

GROUP 3: Blacksmith, Powderman, Air track operator, Pipe layer (including laser beam set-up), Burner.

GROUP 4: Asbestos Worker; Hazardous Waste Worker; & Lead Based Paint Removal Laborer.

LABO1353-001 12/01/2008

KANAWHA, PUTNAM AND ROANE COUNTIES

Rates Fringes

Laborers:

GROUP 1.....................$ 21.58 10.40

GROUP 2.....................$ 22.20 10.40

GROUP 3.....................$ 23.04 10.40

GROUP 1: Laborer; Carpenter Tender; Water Boy; Demolition Worker; Fire Watch; Landscape Laborer; Flagmen.

GROUP 2: Powderman Tender; Semi-Skilled Laborer; Scaffold Builder; Grade Checker; Signal Man; Brick Masons Tenders;

Plasterer Tenders; Cement Finisher Tender; Stone Masons Tenders; Lathers Tenders; Tile Setters Tenders; Mortar Mixers; Jackhammer; Vibrator; Tamper; Pavement Buster;

Chipping & Peening Hammer; Air Siphon & Air Pump; Riprap Finisher; Concrete Saw; Concrete Technician; Power Saw;

Chain Saw; Motorized Buggy; Pipelayers Tender; Drill Op.

Tender; Sheeters & Shorers; Post Hole Digger; Asphalt Raker; Lance and/or Water Blaster; Blachsmith Tender; Batch House Scale; Workmen working with Acid Mortar; Acid Brick;

Acid or Mastic Asphalt; Workmen working with Creosote;

Nozzlemen for Gunnite or Sandblasting; Tool Room Attendants; Ride or Walk Roller Tampers; Lather Tender;

Tile Setters Tenders; Asbestos Removal Worker; Hazardous Waste Worker.

GROUP 3: Blacksmith; Powdermen; Air Track; Pipe Layer (including Laser Beam Set-Up); Burner.

MARB0005-001 06/01/2005

CABELL, MASON (THAT PORTION SOUTH OF THE KANAWHA RIVER), AND

WAYNE COUNTIES

Marble, terrazzo and tile finisher.........................$ 20.38 12.75

PAIN0091-001 12/01/2008

BROOKE (SOUTH OF BUFFALO CREEK), MARSHALL, OHIO AND WETZEL COS.

Painters:

Brush, Roller, Paper hanger, Sand/Spray, Waterblast and Perfataping (Including Automatic Perfataping Tools)..........$ 22.55 10.00

PAIN0091-010 12/01/2008

Brooke, Marshall, Ohio, and Wetzel Counties

Rates Fringes

GLAZIER..........................$ 25.10 9.60

PAIN0091-011 12/01/2008

Hancock County

Rates Fringes

GLAZIER..........................$ 24.60 9.00

PAIN0438-003 12/01/2008

BROOKE (NORTH OF BUFFALO CREEK), HANCOCK COUNTIES

Rates Fringes

Painters: (Painters, Drywall Finishers & Paper Hangers, and Perfataping (Automatic Taping Tools, Bazooka & Banjo))..........................$ 22.55 10.00

PAIN0804-001 12/01/2008

BARBOUR, DODDRIDGE, GILMER, GRANT, HAMPSHIRE, HARDY, HARRISON,

LEWIS, MARION, MINERAL, MORGAN, MONONGALIA, PENDLETON, PRESTON,

RANDOLPH, TAYLOR, TUCKER, UPSHUR AND WEBSTER COS.

PAINTER (Bridges, Locks, Dams, High Tension Towers, Energized Substations)...........$ 27.83 10.00 PAINTER (Commercial).............$ 22.68 10.00 PAINTER (Industrial and Power Generating Facilities)...........$ 24.83 10.00

PAIN0813-001 12/01/2008

CABELL, MASON AND WAYNE COUNTIES

Painters:

Brush and Roller, Drywall Finishing and Texuring, Machine Toolstand and Stilts, Spray and Sandblast, and Wall Covering and Vinyl..........$ 22.68 10.00

PAIN0970-001 12/01/2008

BRAXTON, CALHOUN, KANAWHA AND PUTNAM COUNTIES

Rates Fringes

Painters: (Brush Painting, A/Compressor Op., Roller Painting, DryWall Pointers & Tapers, Dipping & Mitten Work, Sprayer Machine Op., Taping Machines, Mud Mixer, Pole Sander, Tape and Spackling Teams, All Synthetic Interior & Exterior Work, Sandblaster, Water Blaster, Steam Jenny Nozzle Op., Swinging Scaffold and Boat Swing Chair, Window Jack Work, Vinyl & Paper Hangers:)

All new commercial projects; Commercial repaint or renovation projects where the total construction cost on the project (all trades combined) exceeds $500,000 in construction cost; all work on waste and water treatment facilities........$ 22.68 10.00 Work at manufacturing plants and power plants.....$ 24.83 10.00

PAIN1144-002 12/01/2008

JACKSON, PLEASANTS, RITCHIE, ROANE, TYLER, WIRT AND WOOD COS.

Rates Fringes

Painters:

Commercial: Brush, roller, Drywall Finisher (Operating mechanical taping machines (men working behind the machine will receive the same rate), Pointers & tapers, Paper & vinyl hangers, Sign painter................$ 22.72 10.00 Industrial: Brush/roller, open structural steel, stacks, vent pipes, flag poles, electrical, radio and tv towers, tanks, spray, sand & water blast, pot man, hydrojet, and glove work..................$ 24.87 10.00

PAIN1195-001 12/01/2008

BARBOUR,BRAXTON, CABELL, CALHOUN, DODDRIDGE, GILMER, GRANT,

HAMPSHIRE, HARDY, HARRISON,KANAWHA, LEWIS, MARION, MASON,

MINERAL, MONOGALIA, MORGAN, PENDELTON, PRESTON, PUTNAM,

RANDOLPH, ROANE, TAYLOR, TUCKER WAYNE, WEBSTER AND UPSHUR

COUNTIES.

GLAZIER..........................$ 27.50 5.70

PAIN1195-007 12/01/2008

JACKSON, PLEASANTS, RITICHIE, TYLER, WIRT, and WOOD Counties

Rates Fringes

GLAZIER..........................$ 25.99 7.20

PLAS0039-003 07/01/2008

BROOKE, CALHOUN, GRANT, HAMPSHIRE, HANCOCK, HARDY, JACKSON,

MARSHALL, MINERAL,MORGAN, OHIO, PENDLETON, PLEASANTS, RANDOLPH,

RITCHIE, TAYLOR, WETZEL, WIRT & WOOD COUNTIES

CEMENT MASON/CONCRETE FINISHER...$ 23.88 10.20

Mechanical Equipment (Floating, Grinding, Bushhammering or finishing)......$ 24.48 10.20

PLAS0039-004 07/01/2008

BROOKE, CALHOUN, GILMER, GRANT, HAMPSHIRE, HANCOCK, HARDY,

JACKSON, MARSHALL, MINERAL, MORGAN, OHIO, PENDLETON, PLEASANTS,

RANDOLPH, RITCHIE, TYLER, WETZEL, WIRT & WOOD COUNTIES

PLASTERER........................$ 23.88 10.20

PLAS0887-001 06/01/2008

Rates Fringes

Cement Masons:...................$ 27.06 12.91

PLAS0887-003 06/01/2008

Rates Fringes

PLASTERER........................$ 28.66 9.97

PLUM0083-002 07/01/2009

BROOKE COUNTY (North to Route #27 due east to the State Line, Excluding the City limits of Wellsburg), MARSHALL, OHIO AND

WETZEL COUNTIES

Plumber and Steamfitter..........$ 30.51 16.28

PLUM0152-001 11/01/2008

HARRISON, LEWIS, MARION, MONONGALIA, TAYLOR AND UPSHUR COUNTIES

Rates Fringes

Plumbers and Pipefitters Work at power plants, chemical plants, glass plants and manufacturing facilities..................$ 34.22 18.40 All other work..............$ 29.96 18.40

PLUM0152-002 11/01/2008

BARBOUR, DODDRIDGE AND PRESTON COUNTIES

Rates Fringes

Plumbers and Pipefitters Work at power plants, chemical plants, glass plants and manufacturing facilities..................$ 34.51 18.40 All other work..............$ 30.25 18.40

PLUM0152-003 11/01/2008

BRAXTON, GILMER, RANDOLPH AND TUCKER COUNTIES

Plumbers and Pipefitters Work at power plants, chemical plants, glass plants and manufacturing facilities..................$ 34.80 18.40 All other work..............$ 30.54 18.40

PLUM0152-004 11/01/2008

GRANT, HAMPSHIRE, HARDY, MINERAL AND PENDLETON COUNTIES

Rates Fringes

Plumbers and Pipefitters Work at power plants, chemical plants, glass plants and manufacturing facilities..................$ 35.09 18.40 All other work..............$ 30.83 18.40

PLUM0490-001 06/01/1998

BROOKE (North of Buffalo Creek),AND HANCOCK COUNTIES

Rates Fringes

Plumbers and Pipefitters.........$ 26.15 12.25

PLUM0521-002 06/01/2009

CABELL, MASON AND WAYNE COUNTIES

Rates Fringes

Plumbers and Pipefitters.........$ 29.75 14.97

PLUM0565-001 07/01/2008

CALHOUN, JACKSON, PLEASANTS, RITCHIE, TYLER, WIRT AND WOOD COS.

Rates Fringes

Plumbers and Pipefitters.........$ 29.88 16.18

PLUM0625-001 12/01/2008

KANAWHA, PUTNAM, ROANE AND WEBSTER COUNTIES

Rates Fringes

Plumber, Pipefitter, Steamfitter

Work at plants that are in the process of manufacturing a product....$ 30.34 14.98 All other work..............$ 28.94 14.98

ROOF0034-002 05/01/2000

GRANT, HAMPSHIRE, HARDY, MINERAL, AND MORGAN COUNTIES

Rates Fringes

Roofers:

Composition Mopmen..........$ 16.25 5.05 Composition Roofer..........$ 16.00 5.05 Pitch Tear Off or Put On....$ 16.50 5.05 Slaters.....................$ 16.15 5.05

ROOF0185-004 06/01/2008

CABELL, KANAWHA, MASON, PUTNAM AND WAYNE COS.

Rates Fringes

Roofers:.........................$ 26.00 9.76

ROOF0188-002 07/01/2009

BROOKE, HANCOCK, MARSHALL AND OHIO COUNTIES

Rates Fringes

Roofers:

Coal Tar Pitch & Waterproofing...............$ 25.42 10.35 Roofer......................$ 25.17 10.35

ROOF0242-002 06/01/2009

BARBOUR, BRAXTON, CALHOUN, DODDRIDGE, GILMER, HARRISON,

JACKSON, LEWIS, MARION, MONONGALIA, PENDLETON, PLEASANTS,

PRESTON, RANDOLPH, RITCHIE, ROANE, TAYLOR, TUCKER, TYLER,

UPSHUR, WETZEL, WIRT AND WOOD COUNTIES

ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 23.81 9.81

SFWV0669-001 04/01/2009

BRAXTON, BROOKE, CABELL, CALHOUN, DODDRIDGE, GILMER, HANCOCK,

HARRISON, JACKSON, KANAWHA, LEWIS, MARION, MARSHALL, MASON,

MINERAL, OHIO, PLEASANTS, PUTNAM, RITCHIE, ROANE, TYLER,

UPSHUR, WAYNE, WETZEL, WIRT AND WOOD COUNTIES

SPRINKLER FITTER.................$ 30.10 16.05

SHEE0024-010 06/01/2008

CABELL AND WAYNE COUNTIES

Rates Fringes

Sheet metal worker...............$ 25.05 17.57

* SHEE0033-015 06/01/2009

KANAWHA, MASON AND PUTNAM COUNTIES

Rates Fringes

Sheet Metal Worker...............$ 25.38 17.34

SHEE0033-017 07/01/2009

BROOKE, HANCOCK, MARSHALL AND OHIO COUNTIES

Rates Fringes

Sheet Metal Worker...............$ 26.61 16.22

SHEE0033-020 06/01/2009

BRAXTON, CALHOUN, DODDRIDGE, GILMER, HARRISON, JACKSON, LEWIS,

MONONGALIA, MARION, PLEASANTS, RITCHIE, ROANE, TYLER, UPSHUR,

WETZEL, WIRT AND WOOD COUNTIES

Sheet metal worker...............$ 27.05 17.37

SHEE0100-008 05/01/2009

MINERAL COUNTY

Rates Fringes

Sheet Metal Worker 0-40 miles from City Hall, Cumberland, Maryland........$ 23.73 14.11…