About this file

Spec 01 22 00.00 10

View the file

Other files

File Type Posted
BidResults for 09B0021.doc DOC document
01 30 00.10.pdf PDF
W911WN-09-B-0021 AMEND 01.pdf PDF
01 45 01.pdf PDF
Hannibal Reference Dwgs.zip ZIP file
Pike Island Reference Dwgs.zip ZIP file
New Cumberland Reference Dwgs.zip ZIP file
Montgomery Reference Dwgs.zip ZIP file
W911WN-09-B-0021 Solicitation.pdf PDF
SPECIFICATIONS OR ROOF.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Reroofing Ohio River Locks and Dams Mongomery, New Cumberland, Pike Island & Hannibal Locks and Dams

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 10

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 LUMP SUM PAYMENT ITEMS

1.1.1 Project Signs

1.1.1.1 Payment

1.1.1.2 Unit of Measure

1.1.1.3 Payment Item

1.1.2 Replace Membrane Roofs

1.1.2.1 Payment

1.1.2.2 Unit of Measure

1.1.2.3 Payment Items

1.1.3 Replace Built-Up Roofs

1.1.3.1 Payment

1.1.3.2 Unit of Measure

1.1.3.3 Payment Items

1.1.4 Replace Observation Deck Coating

1.1.4.1 Payment

1.1.4.2 Unit of Measure

1.1.4.3 Payment Item

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section Table of Contents --

SECTION 01 22 00.00 10 Page 1 Bold Underlined or Struck-Through Text Revised By Amendment W911WN-09-B-0021-0003

SECTION 01 22 00.00 10

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 LUMP SUM PAYMENT ITEMS

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required.

1.1.1 Project Signs

1.1.1.1 Payment

Payment will be made for costs associated with furnishing, installing, maintaining and removing project signs at each of the four facilities as specified in Section 01 50 10 PROJECT SIGNS. One sign shall be placed at Montgomery Locks and Dam, New Cumberland Locks and Dam, Pike Island Locks and Dam and Hannibal Locks and Dam.

1.1.1.2 Unit of Measure

Unit of measure: lump sum.

1.1.1.3 Payment Item

0002 ARRA - Project Signs

1.1.2 Replace Membrane Roofs

1.1.2.1 Payment

This work is specified in SECTION 07 22 00 ROOF INSULATION, SECTION 07 55 10 MODIFIED BITUMEN ROOFING, SECTION 07 60 00 SHEET METALWORK. Payment will be made for costs associated with operations necessary for construction of the features of work. The price shall include all costs of labor, materials, supplies, equipment, supervision, overhead, permits, quality control, submittals, preliminary site work, cleanup, and other costs of completing the construction as specified.

1.1.2.2 Unit of Measure

Unit of measure: Lump Sum

1.1.2.3 Payment Items

0003 ARRA - Montgomery - Replace Membrane Roof on Middle Wall

SECTION 01 22 00.00 10 Page 2

Operations Building (Shelter House) 0004 ARRA - Montgomery - Replace Membrane Roof on Land Wall Service

Building 0006 ARRA - Montgomery - Replace Membrane Roofs on Control Shelters

Nos.1, 2 & 4 0007 ARRA - Montgomery - Replace Membrane Roof on Locker Room Building 0008 ARRA - New Cumberland - Replace Membrane Roof on Middle Wall

Operation Building 0009 ARRA - New Cumberland - Replace Membrane Roof on Land Wall Storage

Garage 0010 ARRA - New Cumberland - Replace Membrane Roofs on Control Shelters

Nos. 2 & 4 0013 ARRA - Pike Island - Replace Membrane Roof on Land Wall Service

Building 0017 ARRA - Hannibal - Replace Membrane Roof on Land Wall Service

Building

1.1.3 Replace Built-Up Roofs

1.1.3.1 Payment

This work is specified in SECTION 07 22 00 ROOF INSULATION, SECTION 07 55 10 MODIFIED BITUMEN ROOFING, SECTION 07 60 00 SHEET METALWORK. Payment will be made for costs associated with operations necessary for construction of the features of work. The price shall include all costs of labor, materials, supplies, equipment, supervision, overhead, permits, quality control, submittals, preliminary site work, cleanup, and other costs of completing the construction as specified.

1.1.3.2 Unit of Measure

Unit of measure: Lump Sum

1.1.3.3 Payment Items

0011 ARRA - New Cumberland - Replace Built Roofs-Up on Service Bridge Piers - Land Wall Pier, Middle Wall Pier, & Pier No 12

0012 ARRA - Pike Island - Replace Built-up Roof on Middle Wall Operations Building

0014 ARRA - Pike Island - Replace Built-Up Roofs on Four (4) Middle Wall Control Shelters

0015 ARRA - Pike Island - Replace Built-Up Roofs on Land Wall and Middle Wall Service Bridge Piers

0016 ARRA - Hannibal - Replace Built-Up Roof on Middle Wall Operations Building

0018 ARRA - Hannibal - Replace Built-Up Roofs on Four (4) Middle Wall Control Shelters

1.1.4 Replace Observation Deck Coating

1.1.4.1 Payment

This work is specified in SECTION 07 57 00 TRAFFIC-BEARING ROOF COATING and

SECTION 01 22 00.00 10 Page 3

SECTION 07 19 00 WATER REPELLENTS. Payment will be made for costs associated with operations necessary for construction of the features of work. The price shall include all costs of labor, materials, supplies, equipment, supervision, overhead, permits, quality control, submittals, preliminary site work, cleanup, and other costs of completing the construction as specified.

1.1.4.2 Unit of Measure

Unit of measure: Lump Sum

1.1.4.3 Payment Item

0005 ARRA - Montgomery - Replace Deck Coating on Observation Deck and Stairs of Land Wall Service Building

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section --

SECTION 01 22 00.00 10 Page 4

01 22 00.00 10 - MEASUREMENT AND PAYMENT
01 22 00.00 10 - MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 LUMP SUM PAYMENT ITEMS
1.1.1 Project Signs
1.1.1.1 Payment
1.1.1.2 Unit of Measure
1.1.1.3 Payment Item
1.1.2 Replace Membrane Roofs
1.1.2.1 Payment
1.1.2.2 Unit of Measure
1.1.2.3 Payment Items
1.1.3 Replace Built-Up Roofs
1.1.3.1 Payment
1.1.3.2 Unit of Measure
1.1.3.3 Payment Items
1.1.4 Replace Observation Deck Coating
1.1.4.1 Payment
1.1.4.2 Unit of Measure
1.1.4.3 Payment Item
PART 2 PRODUCTS Not Applicable
PART 3 EXECUTION Not Applicable

File details come from the government source that posted it. Updated .