01 22 00.00 10.pdf
PDF 22 KB Posted
- Solicitation number
- W911WN09B0021
About this file
Spec 01 22 00.00 10
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidResults for 09B0021.doc | DOC document | |
| 01 30 00.10.pdf | ||
| W911WN-09-B-0021 AMEND 01.pdf | ||
| 01 45 01.pdf | ||
| Hannibal Reference Dwgs.zip | ZIP file | |
| Pike Island Reference Dwgs.zip | ZIP file | |
| New Cumberland Reference Dwgs.zip | ZIP file | |
| Montgomery Reference Dwgs.zip | ZIP file | |
| W911WN-09-B-0021 Solicitation.pdf | ||
| SPECIFICATIONS OR ROOF.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reroofing Ohio River Locks and Dams Mongomery, New Cumberland, Pike Island & Hannibal Locks and Dams
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 LUMP SUM PAYMENT ITEMS
1.1.1 Project Signs
1.1.1.1 Payment
1.1.1.2 Unit of Measure
1.1.1.3 Payment Item
1.1.2 Replace Membrane Roofs
1.1.2.1 Payment
1.1.2.2 Unit of Measure
1.1.2.3 Payment Items
1.1.3 Replace Built-Up Roofs
1.1.3.1 Payment
1.1.3.2 Unit of Measure
1.1.3.3 Payment Items
1.1.4 Replace Observation Deck Coating
1.1.4.1 Payment
1.1.4.2 Unit of Measure
1.1.4.3 Payment Item
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 22 00.00 10 Page 1 Bold Underlined or Struck-Through Text Revised By Amendment W911WN-09-B-0021-0003
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 LUMP SUM PAYMENT ITEMS
Payment items for the work of this contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required.
1.1.1 Project Signs
1.1.1.1 Payment
Payment will be made for costs associated with furnishing, installing, maintaining and removing project signs at each of the four facilities as specified in Section 01 50 10 PROJECT SIGNS. One sign shall be placed at Montgomery Locks and Dam, New Cumberland Locks and Dam, Pike Island Locks and Dam and Hannibal Locks and Dam.
1.1.1.2 Unit of Measure
Unit of measure: lump sum.
1.1.1.3 Payment Item
0002 ARRA - Project Signs
1.1.2 Replace Membrane Roofs
1.1.2.1 Payment
This work is specified in SECTION 07 22 00 ROOF INSULATION, SECTION 07 55 10 MODIFIED BITUMEN ROOFING, SECTION 07 60 00 SHEET METALWORK. Payment will be made for costs associated with operations necessary for construction of the features of work. The price shall include all costs of labor, materials, supplies, equipment, supervision, overhead, permits, quality control, submittals, preliminary site work, cleanup, and other costs of completing the construction as specified.
1.1.2.2 Unit of Measure
Unit of measure: Lump Sum
1.1.2.3 Payment Items
0003 ARRA - Montgomery - Replace Membrane Roof on Middle Wall
SECTION 01 22 00.00 10 Page 2
Operations Building (Shelter House) 0004 ARRA - Montgomery - Replace Membrane Roof on Land Wall Service
Building 0006 ARRA - Montgomery - Replace Membrane Roofs on Control Shelters
Nos.1, 2 & 4 0007 ARRA - Montgomery - Replace Membrane Roof on Locker Room Building 0008 ARRA - New Cumberland - Replace Membrane Roof on Middle Wall
Operation Building 0009 ARRA - New Cumberland - Replace Membrane Roof on Land Wall Storage
Garage 0010 ARRA - New Cumberland - Replace Membrane Roofs on Control Shelters
Nos. 2 & 4 0013 ARRA - Pike Island - Replace Membrane Roof on Land Wall Service
Building 0017 ARRA - Hannibal - Replace Membrane Roof on Land Wall Service
Building
1.1.3 Replace Built-Up Roofs
1.1.3.1 Payment
This work is specified in SECTION 07 22 00 ROOF INSULATION, SECTION 07 55 10 MODIFIED BITUMEN ROOFING, SECTION 07 60 00 SHEET METALWORK. Payment will be made for costs associated with operations necessary for construction of the features of work. The price shall include all costs of labor, materials, supplies, equipment, supervision, overhead, permits, quality control, submittals, preliminary site work, cleanup, and other costs of completing the construction as specified.
1.1.3.2 Unit of Measure
Unit of measure: Lump Sum
1.1.3.3 Payment Items
0011 ARRA - New Cumberland - Replace Built Roofs-Up on Service Bridge Piers - Land Wall Pier, Middle Wall Pier, & Pier No 12
0012 ARRA - Pike Island - Replace Built-up Roof on Middle Wall Operations Building
0014 ARRA - Pike Island - Replace Built-Up Roofs on Four (4) Middle Wall Control Shelters
0015 ARRA - Pike Island - Replace Built-Up Roofs on Land Wall and Middle Wall Service Bridge Piers
0016 ARRA - Hannibal - Replace Built-Up Roof on Middle Wall Operations Building
0018 ARRA - Hannibal - Replace Built-Up Roofs on Four (4) Middle Wall Control Shelters
1.1.4 Replace Observation Deck Coating
1.1.4.1 Payment
This work is specified in SECTION 07 57 00 TRAFFIC-BEARING ROOF COATING and
SECTION 01 22 00.00 10 Page 3
SECTION 07 19 00 WATER REPELLENTS. Payment will be made for costs associated with operations necessary for construction of the features of work. The price shall include all costs of labor, materials, supplies, equipment, supervision, overhead, permits, quality control, submittals, preliminary site work, cleanup, and other costs of completing the construction as specified.
1.1.4.2 Unit of Measure
Unit of measure: Lump Sum
1.1.4.3 Payment Item
0005 ARRA - Montgomery - Replace Deck Coating on Observation Deck and Stairs of Land Wall Service Building
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --
SECTION 01 22 00.00 10 Page 4
| 01 22 00.00 10 - MEASUREMENT AND PAYMENT |
| 01 22 00.00 10 - MEASUREMENT AND PAYMENT |
| PART 1 GENERAL |
| 1.1 LUMP SUM PAYMENT ITEMS |
| 1.1.1 Project Signs |
| 1.1.1.1 Payment |
| 1.1.1.2 Unit of Measure |
| 1.1.1.3 Payment Item |
| 1.1.2 Replace Membrane Roofs |
| 1.1.2.1 Payment |
| 1.1.2.2 Unit of Measure |
| 1.1.2.3 Payment Items |
| 1.1.3 Replace Built-Up Roofs |
| 1.1.3.1 Payment |
| 1.1.3.2 Unit of Measure |
| 1.1.3.3 Payment Items |
| 1.1.4 Replace Observation Deck Coating |
| 1.1.4.1 Payment |
| 1.1.4.2 Unit of Measure |
| 1.1.4.3 Payment Item |
| PART 2 PRODUCTS Not Applicable |
| PART 3 EXECUTION Not Applicable |
File details come from the government source that posted it. Updated .