W911WN-09-B-0018 Amend 02.pdf
PDF 21 KB Posted
- Solicitation number
- W911WN09B0018
About this file
Amendment 02
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidResults for 09B0018.doc | DOC document | |
| W911WN-09-B-0018 Amend 03.pdf | ||
| 01 30 00.10.pdf | ||
| 07 60 00.pdf | ||
| 01 45 01.pdf | ||
| W911WN-09-B-0018 Amendment 01.pdf | ||
| Cover.pdf | ||
| W911WN-09-B-0018 Solicitation.pdf | ||
| Allegheny Specs.pdf | ||
| 09-B-0018 Reference Drawings.zip | ZIP file | |
| Synopsis Const Info -AL 4 5 CONEMAUGH MAHONING.doc | DOC document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81ET491766285
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Re: Reroofing at Allegheny Lock 4 & 5, Mahoning Creek Lake, and Conemaught River Lake.
This amendment is issued to answ er questions received. See Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Aug-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-09-B-0018
X 9B. DATED (SEE ITEM 11)
05-Aug-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Aug-2009
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CECT-LRP
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2116
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911WN-09-B-0018
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS AND ANSWERS
Q1. Refer to Solicitation page 16 of 89, section 52.236-4007 Description of Work, paragraph three. Please confirm removal and replacement of all roofing materials on storage buildings located at Allegheny River Lock and Dam 4.
Are there plans and specifications for these storage buildings? The plans that were provided do not include these storage buildings. How Many storage buildings are there?
A1. Section 01 30 00.10 of the specs, “General Requirements”, Page 2, Paragraph 1.1”Description of work, subparagraph, “Allegheny River Lock and Dam 4”, subparagraph “Replace Membrane Roof on Storage Garage”, fully describes the work required to replace the roofs. There is a drawing of this roof in the set of reference drawings entitled “4AR, and 5AR Reference drawings”, page 3 of the pdf file, entitled Lock 4, Allegheny River, Storage Garage, Sketch 4AR-LWSG-1.” The storage garage only exists at Allegheny Lock and Dam 4, and consists of the primary building with a membrane roof and an attached shed, with “Ondura Corrugated Roofing” panels.
Q2. Are the powerhouse’s located at Allegheny River Lock and Dam 4 and Allegheny River Lock and Dam 5 identical?
A2. Yes, the powerhouses are identical. The title for the powerhouse reference drawings refer to both Allegheny Locks and Dams 4 and 5.
Q3. Are the two Resource Manager’s Office’s at Mahoning Creek Lake identical?
A3. Yes, they are identical, but mirror images of one another. This is indicated on the reference drawings entitled “Mahoning Reference Drawings.”
(End of Summary of Changes)