W911WN09B0014-0003.pdf
PDF 22 KB Posted
- Solicitation number
- W911WN09B0014
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidResults for W911WN09B0014.pdf | ||
| HPIM5225.JPG | JPG image | |
| HPIM5228.JPG | JPG image | |
| 100_0229.jpg | JPG image | |
| HPIM5217.JPG | JPG image | |
| BidSched-Am0004.pdf | ||
| W911WN-09-B-0014-0004.zip | ZIP file | |
| 32 30 00.pdf | ||
| 01 22 00.00 10.pdf | ||
| W911WN09B0014-0004.pdf | ||
| CC Bid Sheet 09B00014.doc | DOC document | |
| W911WN09B0014-0002.pdf | ||
| W911WN09B0014-0001.pdf | ||
| W911WN-09-B-0014.zip | ZIP file | |
| Specs MAH Guard Rails.pdf | ||
| W911WN09B0014.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81ET491615248
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Re: Mahoning Creek Lake, New Bethlehem, Pennsylvania, replace guard rails and handrails and install a new hand rail.
This amendment is issued to (1) provide responses to questions received and (2) correct the quantity required to 112.5 Linear Feet in Line Item 0008 in Section 00010 - Solicitation Contract Form.
See Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Aug-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-09-B-0014
X 9B. DATED (SEE ITEM 11)
22-Jul-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Aug-2009
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CECT-LRP
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2116
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911WN-09-B-0014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS AND ANSWERS
Q1. What should the post spacing be for the handrail at the steps?
A1. Handrail post spacing should be a maximum of 6'-0" along horizontal runs and 5'-0" maximum along stairs.
Q2. How far off of the steps should the handrail be located?
A2. The handrail should be located as close to the steps as allowed per the contract documents.
Q3. Plan page C-101 says install 112.5 LF steel handrail @ stairs, but bid sheet 6/75 in the solicitation shows 77 LF. Which is correct?
A3. Plan Sheet C-101 is correct. Line Item 0008 of the Solicitation is amended with this amendment to show 112.5 LF of new pipe handrail. This quantity includes handrail along both sides of the top and bottom sections of the stairs, in addition to handrail along the outside edge only for the middle section of the stairs.
Q4. Is the contractor intended to replace guardrail and handrail posts only if they are damaged in removal or are posts that are already cracking or bent intended to be replaced? If any are already intended to be replaced, can an amount be specified?
A4. There are a few posts that are currently damaged that will need to be replaced as part of this contract (in addition to replacing any posts that are damaged during construction). Please refer to Spec Section 32 30 00, Paragraph 3.2.
Q5. For the guardrail posts, the specs state post spacing is approximately 10 ft. How is the contractor intended to install guardrail if post spacing is not 10 ft and exceeds the width of standard guardrail? If posts are beyond the standard manufacturers slots for adjustment, what is the intent for installation?
A5. Please refer to Spec Section 32 30 00, Paragraph 3.2. Post spacing related to the work in this contract is shorter in length than typical spacing per PennDOT RC Standards.
SECTION 00010 - SOLICITATION CONTRACT FORM
CLIN 0008
The pricing detail quantity has increased by 35.50 from 77.00 to 112.50.
(End of Summary of Changes)