W911SR25RCSIRP REQUEST FOR PROJECT PROPOSAL_CSIRP CS4.01 _ 18JUN2025.pdf
PDF 221 KB Posted
- Solicitation number
- W911SR-25-R-CSIRP
About this file
This document is a Request for Project Proposal (RPP) for the CBRN Sensor Integration on Robotic Platforms (CSIRP) Capability Set 4.0 project issued by the Army Contracting Command's Edgewood Contracting Division. The solicitation seeks preproposals for developing advanced Chemical, Biological, Radiological, and Nuclear (CBRN) sensor integration on unmanned aircraft systems (UAS), unmanned ground systems (UGS), and unmanned surface vessels (USV) under Other Transaction Authority (OTA).
Key project objectives include expanding CBRN detection and autonomy capabilities, with specific focus areas such as replacing legacy chemical sensors with advanced platforms, integrating software into a common operating picture, improving autonomous unmanned system capabilities, and developing biological detection/identification payloads. The government plans to award prototype agreements, with potential for up to five initial prototypes and ten final operational prototypes to be delivered by September 30, 2028. Preproposals are due by July 2, 2025, with questions accepted until June 24, 2025. The solicitation involves multiple military branches, including Army, Marine Corps, Navy, Air Force, and Special Operations Command, with testing planned at various locations like Dugway Proving Ground, Oak Ridge National Labs, and Fort Leonard Wood.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911SR25RCSIRP REQUEST FOR PROJECT PROPOSAL_CSIRP CS4.01_28JUL2025.pdf | ||
| CRM Questions for RPP_28JUL2025.xlsx | XLSX spreadsheet | |
| CRM Questions for RPP_28JUL2025.xlsx | XLSX spreadsheet | |
| CRM Questions for RPP_14JUL2025.xlsx | XLSX spreadsheet | |
| W911SR25RCSIRP REQUEST FOR PROJECT PROPOSAL_CSIRP CS4.01_09JUL2025.pdf | ||
| CRM Questions for RPP_25JUN2025.xlsx | XLSX spreadsheet | |
| CRM Questions for RPP_24JUN2025.xlsx | XLSX spreadsheet | |
| W911SR25RCSIRP REQUEST FOR PROJECT PROPOSAL_CSIRP CS4.01 _ 18JUN2025x.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Edgewood Contracting Division, Fort Detrick Request for Project Proposal
W911SR-25-S-CSIRP
Agency: Department of the Army Office: Army Contracting Command, Edgewood Contracting Division Location: Fort Detrick, MD, USA Program Office: JPEO CBRND – Joint Program Manager CBRN Sensors (JPEO- CBRND – JPM CBRN Sensors) RPP Number: W911SR-25-R-CSIRP Date Issued: 18 Jun 2025 Proposals Due: 2 Jul 2025 NLT 1400 EST Questions: Due by 24 Jun 2025 NLT 1400 EST
1. In accordance with Section I of announcement CWMD BOTAA 24-01, the Government is hereby requesting formal submission of preproposals intended to execute a formal agreement under 10 USC 4022(b), Other Transaction Authority (OTA) for the prototype project described below. Upon receipt of a preproposal submitted in response to this RPP, the next steps are as follows:
• The Government will evaluate the preproposal.
• Discussions among the parties, whether in-person, virtually, verbally, or in writing, will occur as appropriate.
• The Government may request a full proposal from the offeror(s).
• Additional discussions may occur as necessary.
• Award(s) may be made after evaluation and selection of a successful preproposal/proposal. (Note: Awards are dependent upon the availability of funds.)
3. This competitive Request for Project Proposal (RPP) is issued to request project proposals in compliance with 10 USC 4022 and is being issued for planning purposes only. It is not to be construed as a commitment by the Government to award an agreement, nor will the Government pay for the information solicited. This RPP is for the requirement described in Attachment 1, Statement of Objectives (SOO).
4. JPM CBRN Sensors has identified a need to advance the integration of CBRN sensors and autonomy capabilities onto unmanned aircraft system (UAS), unmanned ground system (UGS), and unmanned surface vessel (USV) platforms. Any award resulting from this RPP may be issued as an agreement under the authority of 10 USC 4022, with the expectation of a prototype testing event followed by final prototype development of the successful prototype. Follow on the purchase of quantities necessary for fielding and sustainment are considered.
A. GENERAL INFORMATION:
5. The Government will review and evaluate the submitted preproposals which may result in a selection of one or more to consider for an award. The Agreements Officer may issue a request for full proposal (RFFP) from the selected preproposal(s) considered for funding. The Government may issue an agreement for an award based on the proposal submission or may require submission of additional details. The award of prototype agreements shall be for the development of prototypes in accordance with 10 U.S.C. 4022 for projects that are directly relevant to enhancing the mission effectiveness of personnel of the Department of Defense or improving platforms, systems, components, or materials proposed to be acquired or developed by the Department of Defense, or to improvement of platforms, systems, components, or materials in use by the armed forces. A prototype project can generally be described as a preliminary pilot, test, evaluation, demonstration, or agile development activity used to evaluate the technical or manufacturing feasibility or military utility of a particular technology, process, concept, end item, effect, or other discrete feature. Only a warranted Agreements Officer may obligate the U.S. Government to the expenditure of funds for awards under this Announcement.
6. Evaluation will be performed by JPEO-CBRND personnel, other Federal Agency Representatives or combinations thereof to enable the selection of the best preproposal submission, and/or subsequent full proposal submission. After evaluation and selection, an award will be made to the successful offeror(s). Subsequent awards depend upon the availability of funds and fulfillment of requirements and priorities determined to exist at the time of award.
In some cases, funding priorities may change as certain scientific tasks are addressed and new mission assignments arise. Award may also be dependent upon demonstration by the offeror that they have adequately addressed the requirements.
The U.S. Government may engage advisory and assistance services from contractors (“Support Contractors”) in the review of pre-proposals and proposals. All Support Contractors have executed Non-Disclosure Agreements with their employer per the terms of their contracts with the Government, protecting confidential or sensitive information, intellectual property, third party information, and company inventions. In addition, the receiving agency requires persons receiving any pre-proposal or proposal information to certify non-disclosure and personal financial interest prior to viewing any government or third-party information. Offerors submitting proprietary information in their pre-proposals and proposals may seek to further protect their information from unauthorized use or disclosure by executing a non-disclosure agreement with the Support Contractor company for as long as it remains proprietary and refrain from using the information for any purpose other than that for which it was furnished. Prior to submitting pre-proposals, Offerors may contact the Agreements Officer (POC) for information about Support Contractors that may be involved in the pre-proposal evaluation process and to facilitate execution of any additional agreement. Offerors must provide any such additional agreements to the Agreements Officer. JPEO-CBRND obtains written agreements from all evaluators that information in the pre-proposal or proposal will only be used for evaluation purposes and will not be further disclosed. Proposals for funded projects may be subject to public release under the Freedom of Information Act (FOIA) to the extent that they are incorporated into an award document; proposals that are not selected for funding will not be subject to public release.
7. The U.S. Government does not fund preparation of proposals or support work efforts or tasks that are inferred from discussions with technical project officers. The Offeror will not be reimbursed for any costs incurred prior to the effective date of any agreement. There are certain post-employment restrictions on former Federal officers and employees as defined in 18 USC 207 and FAR 3.104-4(c). If an offeror believes a post-employment restriction or conflict of interest exists, notification should be sent to the Agreements Officer prior to initiating efforts on a full proposal.
8. The Freedom of Information Act (FOIA) (5 USC 552) provides a statutory basis for public access to official U.S. Government records. “Records” are defined to include documentation received by the U.S. Government in connection with the transaction of public business. Certain types of information (e.g. a proposal, proposal abstract, and supporting documents; a business plan submitted on a confidential basis; and technical information submitted on a confidential basis) submitted to the Government in a process having the potential for award of an OT are exempt from disclosure requirements of FOIA for a period of five (5) years from the date the Government receives the information. The types of information listed above may continue to be exempted, in whole or in part, from disclosure after the expiration of the five (5) year period if it falls within an exemption to the FOIA such as trade secrets and commercial or financial information obtained from a person and privileged or confidential. Offerors should mark business plans and technical information that are to be protected for five years from FOIA disclosure with a legend identifying the documents as being submitted on a confidential basis.
9. The Government is prohibited from soliciting and awarding actions to awardees that have engaged or are suspected to have engaged in criminal, fraudulent, or seriously improper conduct.
10. Prospective awardees shall complete electronic annual representations and certifications at https://beta.sam.gov/. By submission of an offer, the Offeror acknowledges the requirement that prospective awardees MUST be registered in the System for Award Management (SAM) database prior to submitting an invoice and through final payment of any contract resulting from this RPP. Offerors that are not registered should consider applying for registration immediately upon receipt of this solicitation. To remain registered in the SAM database after the initial registration, the Offeror is required to review and update on an annual basis from the date of initial registration (or subsequent updates) its information in the SAM database to ensure it is current, accurate and complete.
11. Data submitted that is proprietary and/or otherwise cannot be disclosed to the public for any purpose shall be appropriately marked.
12. Questions regarding this announcement may be submitted by email to the parties listed in paragraph 19 below within 5 business days prior to the closing date.
13. In accordance with 10 U.S.C. § 4022(f), the Government may award a follow-on production contract or Other Transaction (OT) for any OT awarded under this announcement if: (1) that participant in the OT, or a recognized successor in interest to the OT, successfully completed the entire prototype project provided for in the OT, as modified; and (2) the OT provides for the award of a follow-on production contract or OT to the participant, or a recognized successor in interest to the OT.
14. Proposals, brochures or other descriptions of general organizational or individual capabilities will not be accepted as a preproposal. An email will acknowledge receipt of a proposal.
Generally, the Project Manager of the submitting organization should receive a decision letter or email upon completion of the evaluation and determination.
15. Administration: The Government will retain comments and information received in response to this RPP. Do not use Government security classification markings. All written responses must be received by the due date to be considered. Submission must be identified with a Subject Line of Responding Organization and RPP Title (XXX LLC. W911SR-25-R-CSIRP). Material that is advertisement only in nature is not desired. All submissions must include the company information, point(s) of contact, UEI, and CAGE.
16. Eligibility: The Awardee must be eligible for an Other Transaction Authority for Prototype Agreement in accordance with 10 USC § 4022(d), meeting one of the following conditions:
(A) There is at least one nontraditional defense contractor or nonprofit research institution participating to a significant extent in the prototype project.
(B) All significant participants in the transaction other than the Federal Government are small businesses (including small businesses participating in a program described under section 9 of the Small Business Act (15 U.S.C. 638)) or nontraditional defense contractors.
(C) At least one third of the total cost of the prototype project is to be paid out of funds provided by sources other than the Federal Government.
(D) The senior procurement executive for the agency determines in writing that exceptional circumstances justify the use of a transaction that provides for innovative business arrangements or structures that would not be feasible or appropriate under a contract, or would provide an opportunity to expand the defense supply base in a manner that would not be practical or feasible under a contract.
A non-traditional defense contractor is defined as “An entity that is not currently performing and has not performed, for at least the one-year period preceding the solicitation of sources by the Department of Defense for the procurement or transaction, any contract or subcontract for the Department of Defense that is subject to the full coverage under the cost accounting standards prescribed pursuant to Section 1502 of title 41 and the regulations implementing such section”.
Offerors must document within their submission their eligibility.
17. Requirements: See Attachment 1, Statement of Objectives (SOO).
18. Submissions: Preproposals must be limited to ten (10) pages (not including cover sheet or supporting attachments for key personnel, intellectual property (IP), and cost information) and include a description of the relevant technology including supporting data, the scope of the proposed effort including a high-level Work Breakdown Structure (WBS), and a description of the proposer’s research, development, manufacturing, past performance, or other special qualifications. Submissions must also document the performers ability to meet the objectives and deliverables listed in the SOO. The preproposal must include a listing of existing patents or background IP for consideration, in addition to specify data rights for the subject data developed under the proposed prototype. The preproposal must also include an anticipated rough order of magnitude (ROM) cost for the efforts described in the preproposal, including a table demonstrating high level breakdown of the elements of cost for consideration (labor, hours, materials, ODC’s, other costs, indirects and fee) based on fiscal year. Preproposals shall be submitted in accordance with CWMD BOTAA-24-01 Section III.B.1 “Other Transaction Agreements for Prototypes” to the below listed mailboxes only:
usarmy.detrick.dod-jpeo-cbrnd.mbx.baa@army.mil richard.w.totten2.civ@army.mil alexander.z.mayatte.civ@army.mil Late submissions will not be considered.
19. EVALUATION FACTORS: The following factors will be considered during evaluation (in no particular order):
A. Technical Merit: The proposed plans, methods, techniques, and procedures must be feasible, clear, valid, adequately referenced, and state-of-the-art. The proposed schedule must be reasonable. Literature searches are recommended for documenting the strengths of the proposed project.
https://sam.gov/opp/f2d01f5a6c444e32af543e9519a0805f/view
B. Military and Program Relevance: Projects must be directly relevant to enhancing the mission effectiveness of personnel of the Department of Defense or improving platforms, systems, components, or materials proposed to be acquired or developed by the Department of Defense, or to improvement of platforms, systems, components, or materials in use by the armed forces.
C. Technology Readiness Level/Material Readiness Level (TRL/MRL): The technology proposed shall indicate at which TRL/MRL level the technology is at currently. See attached for a full description of the TRL/MRL levels.
D. Project Objectives: The stated objectives must be clear, valid and logical. Projects that demonstrate an innovative approach are desired.
E. Support of other U.S. Government requirements. The proposal will be evaluated for alignment with, and ensure no unnecessary duplication of, JPEO-CBRND or other DoD requirements.
F. Key Personnel Qualifications: Document the qualifications, capabilities and experience of the proposed Project Manager and other key personnel in sufficient details to demonstrate that the proposed staff has the knowledge and skills to achieve the proposed objectives.
G. Facilities: Describe the proposed facilities and equipment, or unique combinations of these, in detail to demonstrate that the organization has, or may access, the necessary facilities required for the accomplishing the proposed objectives.
H. Budget/Cost: The budget must reflect the actual needs of the proposed work and be fully justified so that the U.S. Government can evaluate and determine the cost to be realistic as well as fair and reasonable and commensurate with the complexity and nature of the work proposed.
I. Best value: Award will be made to that Offeror whose proposal offers the best overall value to the Government based on an integrated assessment of the non-cost and cost related factors.
J. Past Performance: Documented satisfactory performance record. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance.
20. SELECTION FOR AWARD: Selection will be made to the successful offeror(s) based upon Government evaluation of the preproposal submission.
ATTACHMENT 1
STATEMENT OF OBJECTIVES
PROJECT TITLE: CBRN Sensor Integration on Robotic Platforms (CSIRP) Capability Set 4.0 – Expanded CBRN Detection and Autonomy
BACKGROUND: The Joint Program Executive Office for Chemical, Biological, Radiological, and Nuclear Defense (JPEO-CBRND), Joint Project Manager for Chemical, Biological, Radiological and Nuclear (CBRN) Sensors (JPM CBRN Sensors) and Chemical, Biological, Radiological, and Nuclear (CBRN) Sensor Integration on Robotics Platforms (CSIRP) seeks the engineering and integration of payloads with ability to detect and identify additional threats and perform sample collection for use on unmanned air, ground, and water-borne surface platforms. These payloads should transmit CBRN data through a common operating picture giving warfighters the ability to integrate CBRN expertise and knowledge into all echelons, providing situational awareness in mounted and dismounted configurations enabling decisions in austere environments.
The objective of this prototyping effort is to further explore the employment of current and future CBRN sensors on service-relevant unmanned aircraft system (UAS), unmanned ground system (UGS), and unmanned surface vessel (USV) platforms across several missions prioritized by the Department of Defense user community. These efforts are focused on demonstrating integrated CBRN robotics capabilities to inform requirements and concepts of operation (CONOPS) and understand the capabilities and limitations of the completed efforts.
PROJECT OBJECTIVES: This project intends to facilitate the integration of CBRN sensors on unmanned systems to enhance the ability to detect and identify additional threats through a common operating picture and to perform sample collection when needed in CBRN contested environments. The SOO covers the engineering and repackaging, integration (hardware and software), and testing to support future employment. Service input was provided from the following:
United States Army (USA); Maneuver Support Center of Excellence (MSCOE); National Guard Bureau (NGB); United States Marine Corps (USMC); United States Navy (USN); United States Special Operations Command (USSOCOM); and United States Air Force (USAF) Explosive Ordinance Disposal (EOD) and Emergency Management/CBRN.
In addition to the Baseline Objective, responses may address one or more Secondary Objective areas
Baseline Objective: Expanded Detection and Autonomy Capabilities: Next generation handheld chemical detection and identification will be possible with the Compact Vapor Chemical Agent Detector (CVCAD) and the Proximate Chemical Agent Detector Non-Trace (PCAD NT).
• Replace legacy chemical sensors with more advanced and reduced SWAP sensing options on UGS and UAS platforms. Interfaces should be platform agnostic to allow for use on newer platforms without extensive adaptation.
• Integrate software for more advanced sensing solutions into a common command and control operating picture.
• Improve the ability of autonomous unmanned systems to perform CBRN missions such as hazard detection, source localization, and sample collection.
Secondary Objective 1: Biological Point Detection/Identification Payloads: Most biological detection relies on particle sizing and sample collection followed by sample processing in a lab for confirmation. New advances in biological hazard detection and identification technology have rendered those technologies smaller, lighter, and more viable on an unmanned platform. CSIRP seeks to integrate mature sensors to detect and identify potential biological hazards as well as collect samples for confirmatory analysis.
• Produce a more accurate biological detection and identification sensor that can do sample collection and provide real time confirmation of hazard in the battlefield.
• Integrate novel reduced-size, weight, and power (SWAP) Biological detection, identification, and sample collection system(s) onto UASs, UGSs, and USVs.
Secondary Objective 2: Microsensor Payloads: Soldiers will deploy CBRN Microsensors (C-MS) throughout the operating environment from a remote and/or stand-off location to provide continuous detection and identification of CBRN threats.
• CSIRP is looking to integrate C-MS payloads and employment mechanisms onto various UAS and UGS.
• Achieve integrated layered defense through deployment of remote sensing solutions for CBRN detection and identification.
Secondary Objective 3: Command and Control Integration: The ability to make informed, fast decisions on the battlefield is critical for warfighters’ maneuverability, operations and survivability.
CSIRP seeks to have sensors data integrated into communication networks that create decision support tools that provide the warfighter with information at their fingertips. CSIRP seeks to seamlessly incorporate various sensor technologies into one operating picture. Systems and capabilities communicating with each other and working together to provide situational understanding will get actionable information to the joint force faster.
• Integrate current chemical and radiological sensors along with a biological identification sensor, CVCAD, and PCAD NT, into an automated CBRN hazard warning and reporting common user interface and unified software solution. Interfaces should be platform agnostic to allow for use on newer platforms without extensive adaptation. This may include Army and Joint networks with command and control systems such as Android Tactical Assault Kit (ATAK) and CBRN Support to Command and Control (CSC2).
• Provide integrated situational awareness and real time understanding on potential CBRN hazards to inform decision making with next generation warning reporting and advanced hazard prediction and decision support tools.
• Give access to CBRN data and information collected during a mission to be shared in one holistic picture through a set of networked sensors.
• Ensure CSIRP integrated sensors have the ability to be plugged into service specific computing environments providing continuous CBRN defense capability to the joint force through a unified software solution.
• Provide CBRN layered defense through integration of newer sensor technologies, real time classification of data through common interfaces and data sharing displays. Interfaces should be platform agnostic to allow for use on newer platforms without extensive adaptation.
DATA DELIVERABLES: The Government intends to manage development towards the above-listed objectives using the following deliverables. The Awardee(s) shall submit deliverables using a format in accordance with the OTA Agreement and/or as negotiated with the Agreement Officer's Representative
(AOR).
Technical data deliverables described herein shall be delivered to the Government with no less than Government Purpose Rights.
1 Integrated Master Schedule (IMS): The Government expects to manage the program using a shared integrated master schedule. The member should propose the creation, maintenance, update of an IMS as well as execution based upon that master delivery schedule. The IMS will be shared with the Government program team. It is expected that the IMS will detail the durations of tasks/sub-tasks. The Government expects that the IMS will be updated no less frequently than on a monthly basis. The statement of work (SOW) should address this requirement fully.
2. Monthly Financial Status Report The Awardee shall submit a Monthly Financial Status Report no later than ten (10) calendar days after the end of each month. The Government will have ten (10) calendar days to respond to the report with any comments. Reports will cover milestones accomplished monthly for the duration of the Period of Performance (PoP), in addition to a monthly milestone forecast with both the planned accrual and the cumulative total for the current period and include a base line budget forecast for the remaining performance period. The Financial Status Report shall include a set of monthly expenditure forecasts for tasks and a set of monthly expenditure forecasts including definitized optional tasks. Expenditure forecast submissions shall include analysis of the cost drivers for Estimate to complete changes, if any, from the previous projection milestones accomplished monthly for the duration of the PoP, in addition to a monthly milestone forecast. The Awardee shall provide all submissions in Excel format, including all formulas and no protection.
3 Preliminary Design Review (PDR): The Awardee(s) will prepare and deliver a briefing sufficient to address design trade-off and a risk assessment for the Course of Action (COA) to complete the outlined task(s).
4 Software Design Lifecycle Documentation (SDLD): The Awardee(s) will deliver SDLD using the Defense Industrial Base and Department of the Army Best Practices. The Awardee will prepare and submit Software Development Package (SDP) that includes all interface and data files.
5 Risk Management Framework (RMF) Documentation: The Awardee(s) will deliver RMF using the Defense Industrial Base and Department of the Army Best Practices. The Awardee will prepare and submit a System Security Plan that includes all baseline controls of a system categorized at the confidentiality level: Moderate, integrity level: Moderate, and availability level: Moderate in addition to any controls required by the appropriate Security Technical Implementation Guides (STIGs).
6 Critical Design Review (CDR): The Awardee(s) will prepare briefing materials and documents to conduct a CDR that details the systems design, evaluated/anticipated performance, cybersecurity findings, manufacture approach, sustainment, safety, and environmental factors.
7 Configuration Control: After CDR, the offeror will use standard business practice Configuration Control processes. In addition, after the Technical Data Package (TDP) is delivered, the offeror will use Design Change Logs to document changes to the TDP. The Design Change Logs, which could include TDP redlines or markups, will clearly document the change’s purpose and potential benefit/impact to system performance, test scope, cost, and schedule.
8 Technical Data Package (TDP): The Awardee(s) will deliver a TDP that includes drawings, schematics, and software/firmware source code. The Awardee(s) will develop and deliver the initial TDP at CDR and upon delivery of the manufactured prototypes. The final TDP will include all changes stemming from Developmental Testing (DT) and submitted with the Final Report
9 Safety Assessment and Environmental Report: The Awardee(s) will document any potential safety and health hazards, safety and health risks (i.e., severity and probability of occurrence for each identified hazard), hazardous materials (HAZMAT), and special procedures or precautions associated with the system’s manufacture, operation, repair, storage, and disposal
10 Test Reports: The Awardee(s) will summarize and document results from all test events in a final report. The Awardee(s) will provide quick-look reports within 15 days after the conclusion of each test event, with the final report combining and expanding on each quick-look report within 60 days from the conclusion of the test event.
11 Bi-Weekly Status Meetings: Every other week the Awardee(s) will meet internally with JPM CBRN Sensors / CSIRP to discuss costs, technical progress, and schedule. Awardee shall submit minutes from each meeting 5 days after the event.
12 Quarterly Report: The Awardee(s) will prepare a Quarterly Report which will include a Technical Status Report and a Business Status Report in accordance with the terms and conditions of the Base Agreement. The Awardee(s) will be prepared to brief the JPM CBRN Sensors, the Joint
Product Manager Reconnaissance and Platform Integration (JPdM RPI), and external stakeholders including the test community and users.
13 Final Report: A Final Technical and Business Report shall be prepared at the end of the effort. A final report shall be provided whether any or all of the project Stages are completed. This report takes the place of the last quarterly report due (a financial report is still required). The report shall narrate a complete summary of the project execution and associated results obtained. The narration will include outstanding problems and their potential solutions, and problems solved during the period of performance, along with the solution to the solved problems. The report shall demonstrate how the prototype was advanced.
The offeror shall submit a Draft Final Report by the 30th calendar day following the end of the project period of performance. The Government shall provide comments to the offeror by the 30th calendar day following receipt of the offeror’s Draft Final Report. The offeror shall submit the Final Report on the 30th calendar day after receipt of Government comments.
PROTOTYPE DELIVERABLES: To achieve a solution suitable for incorporation into a Program of Record and/or employment in the field, an incremental prototype build-test-fix approach is often beneficial. This iterative approach shall be used incorporating the following activities into the overall project schedule:
1 Initial Prototypes: The awardee(s) will develop up to five (5) initial prototypes to support demonstrations and operational characterization test and evaluation.
2 Final Prototypes: Awardee(s) shall deliver up to ten (10) fully operational prototypes, including associated hardware and software to support test, evaluation, and characterization by 30 Sep 2028 to Aberdeen Proving Ground Edgewood Area (APG-EA).
3 Performance Assessment: The Awardee(s) will propose and execute a performance assessment of the prototypes before delivery to the Government. The awardee(s) will propose performance metrics based on its assessment approach.
4 Test and Integration Support: Planned testing of the CSIRP program will leverage both contractor run testing, independent government testing, and user feedback events. The Awardee(s) will propose appropriate activities to demonstrate product performance, suitability for use in relevant conditions by Warfighters, and technical maturity / supportability as required for insertion into Program(s) of Record or to address Urgent Operational Needs. The following list provides possible considerations for future testing events:
• Sensor performance testing on the detection/measurement accuracy and identification of radiological and nuclear hazards.
• Sensor chemical and/or biological live agent testing (Government executed):
o Industry partner provides detector technology for Government executed laboratory testing
• Integration/Technical Events:
o In house integration/testing:
Industry partner provides Government documented procedures and results in a test report o Government executed technical events:
Industry partner trains Government representatives on use of technology, then hands over technology for Government technical testing/demonstration
• User Feedback Events (Government executed):
o Industry partner provides overview and hands on training / demonstration of technology to collect user feedback in a classroom/simulated operational environment o Industry partner supports Government executed Table Top Exercises (TTX) to discuss and document the development of CONOPS and Techniques, Tactics and Procedures (TTPs) o Industry partner supports Government organized Soldier Touch Point (STP) to gain Warfighter feedback regarding operation of technology in relevant scenarios
• Operational Demonstration (Government executed):
o Industry partner supports New Equipment Training (NET) and Doctrine, Tactics, and
Techniques (DTT) training to representative users o Government sets up realistic scenarios to collect feedback on how users would utilize the technology
For estimating purposes (for the proposed task length), assume the following timeframe(s) and location(s) for Performance Assessments and user feedback events located in Table 1.
Table 1: CSIRP Proposed Test Locations
Potential Event Potential Location Estimated Timeframe Prototype Testing Eldorado, TX 6-9 months post award Performance Testing (CB) Dugway Proving Ground, UT 9-12 months post award Performance Testing (RN) Oak Ridge National Labs, TN 9-12 months post award Agent Testing APG (Edgewood), MD 12-18 months post award Agent Testing Kansas City, MO 12-18 months post award User Testing Ft. Leonard Wood, MO 24 months post award User Testing Yuma Proving Ground, AZ 30 months post award
PERIOD AND PLACE OF PERFORMANCE: Awardee(s) shall begin performance at award and continue test support through 30 Sep 2028. Prototypes shall be delivered to the Government and training on use of said prototypes shall occur at APG-EA, Gunpowder, MD no later than 30 Sep 2028.
Offerors will choose the test locations and durations from the list in Table 1 in support of government developmental and user testing (June 2026-Sep 2028) as necessary for their intended scope of work.
Note: Additional testing locations and durations may be required due to failures or programmatic changes.
GOVERNMENT FURNISHED EQUIPMENT: In support of proposed efforts, the government may be able to provide equipment to performers from the list below.
• Man Transportable Robotic System Increment II (MTRS Inc II)
• SkyRaider R80D unmanned aircraft
• Boston Dynamics SPOT legged robot
• Ghost Robotics Vision 60 legged robot
• Array Configured of Remote Network Sensors (ACoRNS) payload modules
• Joint Chemical Agent Detector (JCAD)
• Enhanced Chemical Detector Module (eCDM)
• MUVE B330 Biological Detector and Collector
• E2MU (RDRoP) Radiation Detector
• Compact Vapor Chemical Agent Detector (CVCAD)
• Proximate Chemical Agent Detector (PCAD) Non-Trace
• MPU-5 Radio
• Silvus Streamcaster Radio
• Platform and sensor data (ICD, TDP, etc.) will be made available to awardees
FUNDING CONFIDENCE LEVEL: CL-1. The Government is highly confident that the funds will be available for this effort.
| W911SR-25-S-CSIRP |
| A. GENERAL INFORMATION: |
| ATTACHMENT 1 STATEMENT OF OBJECTIVES |
File details come from the government source that posted it. Updated .