A07_-_Cost_Template_-_19-R-CMA1.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
DRAFT Solicitation Federal contract opportunity
Solicitation number
W911SR-19-R-CMA1
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

Cost Template

View the file

Other files for this federal contract opportunity

Other files attached to DRAFT Solicitation, newest first.
File Type Posted
A07_DRAFT_Solicitation_W911SR-19-R-CMA1.pdf PDF
A01_QASP_-_CMA_CTP_-_FINAL.DOCX DOCX document
A01_CDRLs_CMA_CTP_-_DRAFT.pdf PDF
A07_Q&A_Template.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Breakout

Year 1Year 2Year 3Year 4Year 5
LaborHours/UnitsRateDollarsHours/UnitsRateDollarsHours/UnitsRateDollarsHours/UnitsRateDollarsHours/UnitsRateDollars
e.g. Industrial Engineer, Mid0$0.00$00$0.00$00$0.00$00$0.00$00$0.00$0
Labor Category 20$0.00$00$0.00$00$0.00$00$0.00$00$0.00$0
Labor Category 30$0.00$00$0.00$00$0.00$00$0.00$00$0.00$0
Labor Category 40$0.00$00$0.00$00$0.00$00$0.00$00$0.00$0
Labor Category 50$0.00$00$0.00$00$0.00$00$0.00$00$0.00$0
Labor Category 60$0.00$00$0.00$00$0.00$00$0.00$00$0.00$0
Labor Category 70$0.00$00$0.00$00$0.00$00$0.00$00$0.00$0
Labor Category 80$0.00$00$0.00$00$0.00$00$0.00$00$0.00$0
Labor Category 90$0.00$00$0.00$00$0.00$00$0.00$00$0.00$0
Labor Category 100$0.00$00$0.00$00$0.00$00$0.00$00$0.00$0
Labor Category…0$0.00$00$0.00$00$0.00$00$0.00$00$0.00$0
Subtotal, Direct Labor0$00$00$00$00$0
Fringe (DL)0.00%Base*Rate0.00%Base*Rate0.00%Base*Rate0.00%Base*Rate0.00%Base*Rate
Overhead (DL+Fringe)0.00%Base*Rate0.00%Base*Rate0.00%Base*Rate0.00%Base*Rate0.00%Base*Rate
Labor$0$0$0$0$0
Subcontracts
e.g. ABC Tech, T&M (See ABC tab)<Ref><Ref><Ref><Ref><Ref><Ref><Ref><Ref><Ref><Ref>
e.g. XYZ Inc., FFP (See XYZ tab)<Ref><Ref><Ref><Ref><Ref><Ref><Ref><Ref><Ref><Ref>
Subcontractor…<Ref><Ref><Ref><Ref><Ref><Ref><Ref><Ref><Ref><Ref>
Subtotal, Subcontracts0$00$00$00$00$0
Sub Handling0.00%$00.00%$00.00%$00.00%$00.00%$0
Subcontracts$0$0$0$0$0
Materials
Material 1$0$0$0$0$0
Material 2$0$0$0$0$0
Material 3$0$0$0$0$0
Material…$0$0$0$0$0
Subtotal, Materials (May Reference a BOM Tab)$0$0$0$0$0
Material Handling0.00%$00.00%$00.00%$00.00%$00.00%$0
Materials$0$0$0$0$0
ODCs
ODC 1$0$0$0$0$0
ODC 2$0$0$0$0$0
ODC 3$0$0$0$0$0
ODC…$0$0$0$0$0
Subtotal, ODCs$0$0$0$0$0
Travel (Reference Travel Tab)$0$0$0$0$0
BaseBaseBaseBaseBase
G&A<Sum>0.00%Base*Rate<Sum>0.00%Base*Rate<Sum>0.00%Base*Rate<Sum>0.00%Base*Rate<Sum>0.00%Base*Rate
FCCOMBaseBaseBaseBaseBase
FCCOM, Fringe<sum>ERROR:#VALUE!<sum>ERROR:#VALUE!<sum>ERROR:#VALUE!<sum>ERROR:#VALUE!<sum>ERROR:#VALUE!
FCCOM, Overhead<sum>ERROR:#VALUE!<sum>ERROR:#VALUE!<sum>ERROR:#VALUE!<sum>ERROR:#VALUE!<sum>ERROR:#VALUE!
FCCOM, M&S Handling<sum>ERROR:#VALUE!<sum>ERROR:#VALUE!<sum>ERROR:#VALUE!<sum>ERROR:#VALUE!<sum>ERROR:#VALUE!
FCCOM, G&A<sum>ERROR:#VALUE!<sum>ERROR:#VALUE!<sum>ERROR:#VALUE!<sum>ERROR:#VALUE!<sum>ERROR:#VALUE!
Subtotal, FCCOMERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
Subtotal, Estimated Cost<Sum><Sum><Sum><Sum><Sum>
Fixed FeeERROR:#VALUE!0.00%ERROR:#VALUE!ERROR:#VALUE!0.00%ERROR:#VALUE!ERROR:#VALUE!0.00%ERROR:#VALUE!ERROR:#VALUE!0.00%ERROR:#VALUE!ERROR:#VALUE!0.00%ERROR:#VALUE!
Cost Plus Fixed FeeERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
*Delete Rows, Add Rows/Columns, and Change Equations as Needed.
*Use formulas wherever practical. Equations, pool names, allocation bases, etc. will need to be adjusted by offerors.
*The proposed fixed fee percentage will be incorporated as a ceiling fee rate for all tasks awarded under the basic IDIQ contract.

Travel Breakout

↓DELETE THESE COLUMNS IN THE UNCOSTED VOLUME PROPOSAL ↓

Year 1Number ofDurationR/TPer DiemDaily Car RentalOther per TripTotalTotal Cost
PeopleTripsDaysAirfareLodgingM&IEAirfareLodgingM&IERentalOther
From <Origin> to <Destination> 1 (WBS#.#...)$0$0$0$0$0$0
From <Origin> to <Destination> 2 (WBS#.#...)$0$0$0$0$0$0
From <Origin> to <Destination> 3 (WBS#.#...)$0$0$0$0$0$0
From <Origin> to <Destination> 4 (WBS#.#...)$0$0$0$0$0$0
From <Origin> to <Destination> 5 (WBS#.#...)$0$0$0$0$0$0
From <Origin> to <Destination> 6 (WBS#.#...)$0$0$0$0$0$0
From <Origin> to <Destination> 7 (WBS#.#...)$0$0$0$0$0$0
From <Origin> to <Destination> 8 (WBS#.#...)$0$0$0$0$0$0
From <Origin> to <Destination> 9 (WBS#.#...)$0$0$0$0$0$0
From <Origin> to <Destination> ... (WBS#.#...)$0$0$0$0$0$0
Total$0$0$0$0$0$0

Labor Categories

Labor CategoryDescription / ResponsibilitiesTypical EducationTypical ExperienceEmployee Makeup
Prime Contractore.g. Industrial Engineer, MidExample: Devise efficient systems that integrate workers, machines, materials, information, and energy to make productse.g. 4 year degree in engineering fielde.g. 5+ yearse.g. ≈75% current workforce
Labor Category 2
Labor Category 3
Labor Category 4
Labor Category 5
Labor Category 6
Labor Category 7
Labor Category 8
Labor Category 9
Labor Category 10
Labor Category…
Subcontractor, e.g. ABC TechLabor Category 1
Labor Category 2
Labor Category 3
Labor Category 4
Labor Category 5
Labor Category …

PWS Breakout

Labor CategoryPWS:3.13.1.13.1.23.1…3.23.2.13.2.23.2…3.3
TotalSafety & Health StatementsSub-Tier Description 1Sub-Tier Description 2Sub-Tier Description…Environmental StatementsSub-Tier Description 1Sub-Tier Description 2Sub-Tier Description…First Tier Short Description…
Prime Contractore.g. Industrial Engineer, Mid0.000.000.000.00
Labor Category 20.000.000.000.00
Labor Category 30.000.000.000.00
Labor Category 40.000.000.000.00
Labor Category 50.000.000.000.00
Labor Category 60.000.000.000.00
Labor Category 70.000.000.000.00
Labor Category 80.000.000.000.00
Labor Category 90.000.000.000.00
Labor Category 100.000.000.000.00
Labor Category…0.000.000.000.00
Subcontractor, e.g. ABC TechLabor Category 10.000.000.000.00
Labor Category 20.000.000.000.00
Labor Category 30.000.000.000.00
Labor Category 40.000.000.000.00
Labor Category 50.000.000.000.00
Labor Category …0.000.000.000.00
*Ensure total hours above are all inclusive and equal hours in the cost breakout.

File details come from the government source that posted it.